Professional Documents
Culture Documents
TRAINING FOR
ENABLON PRODUCTION VOLUME DATA QUESTIONNAIRE
TRAINING GUIDE FOR DEPLOYMENT
MAY 2019
TA B L E O F C O N T E N T S
SECTION 1
Data Entry Guidelines
SECTION 2
How to Enter Production Volume Monthly Data into the Nike
System
SECTION 3
Finalize and Submit your Questionnaire
SECTION 4
Appendix
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 2
ENABLON DATA ENTRY GLOSSARY
As you work in the Enablon system, you will become familiar with the following terms:
Entity
A unit of the business for which data is being collected, in our case a Factory.
Campaign
A collection of questionnaires. Each campaign will have a set closure date, at which time all questionnaires
within the campaign will be locked and no further data entry will be permitted.
Questionnaire
A collection of indicators, grouped together by SM&S Program. Questionnaires are grouped together into
campaigns
Reporting Period
The unit of time for which we are collecting data in a campaign – month, quarter, or year.
Indicator
An individual data point, such as electricity consumption or waste generated. Indicators are grouped
together into questionnaires. Indicators listed in green are for data entry; indicators listed in red are
calculated by Enablon.
Factory A
Factory A
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 3
GENERAL TIPS ON DATA ENTRY
v Make sure you Tab to get to the next line. Do not hit Enter on your keyboard. Enter will take you to the
questionnaire screen.
v For monthly questionnaires in a quarterly campaign, when you navigate to the Questionnaire screen, the default
questionnaire view is the last month of the campaign. For example, for a June-August questionnaire, the August
questionnaire will display. Make sure you choose the correct month on the top of the page:
Factory A
v On the My Questionnaires Screen the status will be shown for the last month of the campaign. For example, in a
June to August campaign, the status as shown below is for the month of September. To find status for July or
August, click on the drop down selection shown in #1 below:
v Pay attention to the data integrity (data quality) rules to avoid Enablon data errors.
v Save your work often when entering data to avoid losing data.
v Keep in mind, if you’d rather download the questionnaire as a spreadsheet, enter data, and then upload back to the
system, this is an option on all the questionnaires.
v Common login issues: wrong link, user set up incorrectly or password issues. Contact Lst-
SM&S.SMSOnline.Support@nike.com for any login issues.
v If you can't see the questionnaire anymore, it may mean the questionnaire is closed. When the campaign is closed,
it will drop from the “My Questionnaires” screen.
v Data integrity errors messages ( ) may show up when accessing a questionnaire for the first time, this could be a
system error and not an error in the data (for example if there is no data in the questionnaire, in some
questionnaires a data integrity error symbol will display).
v For “Contributor Information” questionnaire, if you don’t have enough space to enter information, click on the
Pencil icon to expand the data entry box.
v You finished the data entry but campaign progress still says less than 100%, one potential reason for this may be the
" Contributor Information“ questionnaire has not been submitted for each month. For example, for some quarterly
campaigns with 3 questionnaires for each month of data will also have 3 questionnaires for “Contributor
Information” (one for each month).
v If the campaign uses the “Contributor Information" questionnaire, you need to Submit this questionnaire for each
month in the campaign
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 4
1 DATA ENTRY GUIDELINES
CONTENTS GUIDELINES DATA ENTRY FINALIZE
WHO ENTERS
Factory Staff
WHEN TO ENTER
Enter data monthly. Enter previous month’s data by the 15th of the current month.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 6
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Please contact a Nike Sustainability lead for questions related to facility data
boundaries.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 7
CONTENTS GUIDELINES DATA ENTRY FINALIZE
*Finished Material defined as dyed finished textile, finished tanned leather, dyed yarn, and
finished synthetic leather.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 8
CONTENTS GUIDELINES DATA ENTRY FINALIZE
CAMPAIGN CADENCE
In Enablon, Campaigns are launched at a set cadence throughout the year. As shown below, the
Production Volume Questionnaire is launched Quarterly (there are four campaigns per year).
CAMPAIGN QUESTIONNAIRES
QUESTION ANSWER
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 9
CONTENTS GUIDELINES DATA ENTRY FINALIZE
DATA QUALITY
Enablon offers the ability to conduct system level data quality checks. The Production Volume
Questionnaire has been set up to check data quality for the Indicator fields. In (#1) below, you will notice
there are four Indicators where the factory will enter data (Indicators are shown in Green font below). If
Enablon does not accept the data, it is because of the data quality rules. These rules are defined by
Sustainability Leads. The rules have been coded into the system so that if the data rules are not met, the
data will be rejected until the rules are met.
Factory A
Factory A
2 If the data quality rules are not met, the system will
produce a red circle with an exclamation mark(see #2).
Prior to submitting data into the Enablon system, it is important to check for data accuracy. Some of the
general data errors Sustainability Leads see are listed below. Double check your data entries for the
following:
ü Typos
ü Wrong units of measurement
In addition, it’s important to include Enablon Training in new hire onboarding training. Common errors
can be avoided with thorough new hire training. Please contact your Sustainability Lead for support and
updated Enablon training documentation.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 10
CONTENTS GUIDELINES DATA ENTRY FINALIZE
DATA QUALITY
The table below explains the data quality rules for the Production Volume Questionnaire:
SM&S Production Volume Data Entry Must enter a value (must not be left blank)
Info
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 11
CONTENTS GUIDELINES DATA ENTRY FINALIZE
A Questionnaire Workflow allows Nike to review and validate data for accuracy. Nike SM&S team
is currently working on defining business requirements for workflows.
The data will then be available for SM&S staff to review at any time after the factory rep has entered
the data into the system.
QUESTIONNAIRES:
ENERGY USAGE
PRODUCTION VOLUME DATA ENTRY DATA AVAILABLE
FACTORY FOR REPORTING
WATER PROGRAM
WASTE (FTWR)
WASTE (APRL)
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 12
2 HOW TO ENTER PRODUCTION VOLUME DATA
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
1 2
1. Scroll down the list until you see the SM&S Production Volume Entry Questionnaires for your factory. Ensure
you select the report under the correct month for which you want to enter data. Also ensure you select the correct
Production Volume Questionnaire for your factory type, if more than one is available.
Note: If you are searching for another month, find “Select a Questionnaire” and choose the month your are
searching for from the drop down list.
2. Launch the Production Volume Questionnaire that best matches your factory by selecting the Pencil icon.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 14
CONTENTS GUIDELINES DATA ENTRY FINALIZE
1 2 3
Factory A
Above is a screen shot of Production Volume Data Entry T1 FTWR Questionnaire for August 2018.
1. The name of the Questionnaire is auto populated into the first drop down.
2. In the second drop down, select the time period to enter data. For the Production Volume Questionnaire, the
data will be entered monthly and the campaign will remain open for three months. Data is due on the 15th of the
following month.
If you need to enter data for a time period not shown in the drop down selections, click the browser "back" button
to return to the My Questionnaires page, and ensure you have selected the correct 3-month campaign. If the
month you are looking for is not present in any available campaign, contact your Nike sustainability lead.
3. This is the factory identification code. If you are a Contributor for only one factory, this code will default to your
correct factory. If you are a Contributor for more than one factory, select the correct factory CR Code for the time
period selected in #2 above.
Review the following four pages and select the instructions for your specific factory type: T1 Footwear,
T1 Apparel, T1 Equipment or T2 to complete your data entry.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 15
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
Above is a screen shot of Production Volume Data Entry T1 FTWR Questionnaire for August 2018
1. Fill in the total number of pairs of footwear produced for the month, for each brand shown; if no units
produced, enter zero (0)
2. When complete, click Submit to finalize your information. You may also click Save to save the data
entered without submitting your data or click Cancel to return to the previous screen.
Note: If the value of production for a brand is 0, enter 0 and do not leave fields blank.
Continue to Section 3, Finalize and Submit, to complete the final step for submitting Production
Volume.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 16
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
Above is a screen shot of Production Volume Data Entry T1 APRL Questionnaire for August 2018
1. Fill in the total pieces (each) of clothing produced for the month, for each brand shown; if no units
produced, enter zero (0)
2. When complete, click Submit to finalize your information. You may also click Save to save the data
entered without submitting your data or click Cancel to return to the previous screen.
Note: If the value of production for a brand is 0, enter 0 and do not leave fields blank.
Continue to Section 3, Finalize and Submit, to complete the final step for submitting Production
Volume.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 17
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
Factory A
Above is a screen shot of Production Volume Data Entry T1 EQUIP Questionnaire for August 2018
1. Fill in the total pieces (each) of equipment produced for the month, for each brand shown; if no units
produced, enter zero (0)
2. When complete, click Submit to finalize your information. You may also click Save to save the data
entered without submitting your data or click Cancel to return to the previous screen.
Note: If the value of production for a brand is 0, enter 0 and do not leave fields blank.
Continue to Section 3, Finalize and Submit, to complete the final step for submitting Production
Volume.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 18
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
1
2 3 3
Above is a screen shot of Production Volume Data Entry T2 Questionnaire for August 2018
1. Fill in Production Volume by weight (kilograms). Production Volume by size (square feet or linear
yards) is optional.
2. Fill in the total production amount, in kilograms, for the month, for each brand shown; if no production,
enter (0)
3. You may also enter total square foot and/or total linear yards (these are optional while Kg is
mandatory).
Note: If the value of production for a brand is 0, enter 0 and do not leave fields blank.
Continue to Section 3, Finalize and Submit, to complete the final step for submitting Production
Volume.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 19
3 FINALIZE AND SUBMIT
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
This is the final step in the Production Volume Questionnaire Process. Complete this Questionnaire
after completing the Production Volume Questionnaire(s)
1. Select the SM&S Production Volume Data Entry Info Questionnaire by clicking the Pencil icon
Note: You must fill out this questionnaire for each month of the campaign.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 21
CONTENTS GUIDELINES DATA ENTRY FINALIZE
Factory A
This is the final step in the Production Volume Questionnaire Process. Complete this Questionnaire
after completing the Production Volume Questionnaire(s). When completing this Questionnaire, please
use the name, title and contact information for the person who completed the Production Volume
Questionnaire(s)
1. Enter the name, title and contact (either phone or email) for the person who completed the Production
Questionnaire(s).
2. Click Submit to submit the information. Click Save to save your information and comeback later to
submit. Click Cancel to return to the previous screen.
Note: You must fill out this questionnaire for each month of the campaign.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 22
CONTENTS GUIDELINES DATA ENTRY FINALIZE
1. Confirm data is correct and click “Submit” on the popup window to confirm final submission.
Note, you cannot make changes after clicking the Submit button in the overlay.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 23
CONTENTS GUIDELINES DATA ENTRY FINALIZE
COMPLETE
You have now completed all steps for submitting the Production Volume Questionnaire.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 24
4 APPENDIX
LOGGING INTO ENABLON
Nike/Converse/Hurley user Auditors and partner companies outside of Nike
with NIKE ID ecosystem (including ext. factory partners)
https://rctus8.enablon.com/8. https://rctus8.enablon.com/8.8/Nike.rctCH2/api/Auth/Logi
Log in URL RCT
8/Nike.rctch2/ n/?forcedisplay=true
BROWSERS
It is best to use Chrome browser to access Enablon. PASSWORD REQUIREMENTS
Other supported browsers include:
• Mozilla Firefox (most recent stable version) • Minimum Password Size à 8 characters
• Internet Explorer 11 • Must be mixed case
• Safari for iPad: iOS 9 • Must contain a number
• Apple Safari v9
MY QUESTIONNAIRES SCREEN
The “My Questionnaires” screen contains all the questionnaires available for data entry, shown in separate sections.
Every questionnaire is set up based on the questionnaire cadence.
See Questionnaire Cadence for details.
SELECT QUESTIONNAIRE
1. The title of the questionnaire indicates the cadence of the data reporting
2. The progress bar indicates completion of the campaign, providing a quick view of remaining data entry needed and data
entry completed
3. To enter data, click on the pencil to open the questionnaire in Edit mode; Enter data on the next screen
4. If you want to open the questionnaire in View mode only, simply click on the name of the questionnaire
5. If you would like to open a questionnaire from another reporting period, select the drop down arrow to navigate to the
other reporting period questionnaire. Note: To enter data for a time period not shown in the drop down, contact your
Sustainability Lead
6. Click the Swoosh to go back to the Dashboard (home screen) at any time.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 26
QUESTIONNAIRE DETAILS VIEW
The Questionnaire screen is where you will spend most of your time and where the data will be entered, Saved and
Submitted for review and reporting.
Enablon calls each of the questions Indicators. As a contributor of data, your role is to enter values for each of the
indicators listed in the questionnaire.
DATA ENTRY
1. Each indicator will be listed in Green font. Enter the value for the indicator. More information on each Indicator
is reviewed in the Questionnaires Trainings.
2. For each Indicator, you will see 4 icons on the right side of the screen:
• The first icon is the Comments field. This field is visible to anyone who opens the questionnaire. If there is a
comment, a Pencil will appear on the comment icon.
• The second icon is the Attach Files icon, select Choose File, Click Upload to start the transfer. Once
completed, select Attach.
• The third icon is Show Indicator Trend field which will show history of data. Once data history builds up in
the system, this field can be a useful data analysis tool.
• The fourth icon, the Additional Information field is not used at this time.
1. The items shown in Red are auto-calculated by the system based on the answers provided in the Green font.
2. View Indicator Definition and Properties: Information icon provides a definition for each indicator.
3. Form Options allows you to see previous values and pre fill current month’s data with
previous values.
SAVE / SUBMIT
You can Save the session if you need to go back and enter more information. If you don’t want to save your work, you
can Cancel. Once you have entered in all data and checked it for accuracy, you can select the Submit button to send
for verification (if applicable for that questionnaire) and review by Sustainability team.
ENABLON TRAINING
Sustainability Performance Management (SPM) PRODUCTION VOLUME 27