E1 E2 E3 E4 E5 E6 E7 E8 E9

Compact and Stabilise earthwork with


selected fill material and protect slope
with Fibertex Greencells. Compact and Stabilise earthwork with
selected fill material and protect slope
with Fibertex Greencells.
outlet C B
1
1

N1 1

25

13
3
17

64
0

6 inch outlet.
Stabilise earthwork with
grass and keep slope
(Minimum slope - 1:60).

N2
Existing road side drain to be dredg
repaired where necessary

Compact and Stabilise earthwork with


A selected fill material and protect slope
B
with Fibertex Greencells.
B
A

30.0 m

30.0 m
N3 3
ed
and stonework

A OUT

e
1032
IN

Lan
1200
Shelter Road

N4
0
1217

Kira
A
Main gate-Sliding

A
p
p

um
um

1
IN A
H
H

0
68
15

xit
yE
0 A
37
13

enc
erg
B
12575

Em
4600

7760

N5 94
45 Emergency
Gate

3895
30.0 m
4600

12000
5000

B B
Compact and Stabilise earthwork with
4600

selected fill material and protect slope

9665
N6
5000
990
0
with Fibertex Greencells.
2100

outlet CB
OUT
8450 5450

C B
5600

N7
PROPOSED EXTERNAL DRAINAGE LAYOUT (1:150)

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb EXTERNAL DRAINAGE PLAN
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-01 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
Y
100 1500 100

1500
100 900 100 900 Conc. cover.
900

100
1 1
WELL COMPACTED SELECTED GRAVEL WELL COMPACTED SELECTED GRAVEL
WELL COMPACTED SELECTED GRAVEL

600

600
INLET 4 4

600
OUTLET SELECTED STONE PITCHED DRAIN SELECTED STONE PITCHED DRAIN

600

75

75
600 IN CEMENT/SAND MORTAR (1:3 MIX) 600 IN CEMENT/SAND MORTAR (1:3 MIX)

900
600

900

1050
X X
SELECTED STONE PITCHED DRAIN MASS CONCRETE INVERT DRAIN CHANNEL MASS CONCRETE INVERT DRAIN CHANNEL
SELECTED STONE PITCHED DRAIN IN CEMENT/SAND MORTAR (1:3 MIX) WITH 1 LAYER OF A-142 MESH WITH 1 LAYER OF A-142 MESH

300
250

225
IN CEMENT/SAND MORTAR (1:3 MIX)
150mm THK. CONCRETE BASE IN BASIN 150mm THK. CONCRETE BASE IN BASIN 25mm THICK CEMENT/SAND 25mm THICK CEMENT/SAND

150

150
100

150

150
(1:3MIX) BEDDING BASE (1:3MIX) BEDDING BASE

SECTION `Y-Y' THRU. CATCH BASIN (1:25)


PLAN OF CATCH BASIN (1:25) SECTION `X-X' THRU. CATCH BASIN (1:25) SECTION THRU DEEP OPEN DRAIN-3 (1:25) SECTION THRU DEEP COVERED DRAIN-2 (1:25)

Raised kerb

150

100

200
75 300 75 50 350 50 Saucer drain

300

100
0

100
30

75

75

75
450 450 450 450
T10.200
ELEVATION OF SAUCER DRAIN-4 (1:10) SECTION THROUGH SAUCER WITH KERB (1:10)
150

PLAN OF SAUCER DRAIN-4 (1:10) ISOMETRIC VIEW OF SAUCER DRAIN-4 (1:10) (E.F)

Wing wall

Varies from 300-1400mm


RC Beam
Wall
6.T8.04.200-Links
2.T10.04

1650 1650 T10.200


825

T10.200 (E.F)
(E.F)
4.T10.03 4.T10.03
(2-E.F) (2-E.F)

1100
2.T10.04
2300
1650

Wing wall

6.T8.05.200-Links

6.T8.05.200-Links
Wing wall
to detail
Wing wall
to detail
4.T10.02 4.T10.02

1400
T10.200 U-bars U-bars
(E.F)

1100
00
Ø9
825

1400
0 0 00
Ø9 Ø9
4.T10.01 4.T10.01

150
300
T10.200-B1
(2-E.F) (2-E.F)
300

150
300

150
1500 10.T10.200-B2

300
10.T10.200-B2
2600 2600
150

2.T10.04

150
150

PLAN AT CHANNEL OUTLET (1:25) FRONT VIEW OF CHANNEL OUTLET (1:25) SECTION THROUGH
BACK VIEW OF CHANNEL OUTLET (1:25) SECTION THRU. CHANNEL OUTLET (1:20) DETAILS OF OF CHANNEL OUTLET WALL (1:20)
WING WALL (1:10)

80mm heavy duty concrete pavers


2.T12
125mm gravel capping layer
25mm diameter compacted to 95% MDD
Grating. drain holes
350 950
Wall
200

150mm thick lime stabilised gravel


T.8.200 50x50mm sub-base layer compacted to 95%MDD
concrete groove
LINKS
200

RC Beam
Imported compacted well selected murram 25mm diameter 8mm cross bars
2.T12
200

filling to make up level drain holes 75


Existing
200 T12.200
Bearing bars boundary wall

150
U-bars.
22

950
CULVERT SECTION DETAIL THROUGH PAVED AREA (1:10) 300
00

8T12-150

8T12-150
600

600

SECTION A-A THRU. OUTLET COVER (1:10)


EXTENT OF BASE TO BE
INSTRUCTED ON SITE LAID TO FALL

Tree stem
150

150mm THK. CONCRETE BASE 25mm diameter


150
450

CUT OFF WALL IN OUTLET CHAMBER drain holes


BEDDING TO CULVERT
1000 100dp x 10 thk x 900 long 8mm cross bars
3T10-200 B2 75
TOP 150mm IN TRENCH INVERT Mulching. bearing bar
100 75MM Compacted and Stabilised earthwork
75

100

150
Kerb.

Site dimension
Pavers SECTION THROUGH WALL OUTLET (1:20) 105 with selected fill material at 600 slope
Pavement. 950
protected with Fibertex Greencells.
SECTION B-B THRU. OUTLET COVER (1:10)

Base course.
100dp x 10mm thk bearing bars
spaced at 75mm c/c.
00

10
00

10

00
80

75 25mm diameter
B drain holes

60
75
Pavers
Structural spoil.

°
50mm sand bed Saucer drain
A A
Driveway level.
120

950
900
T.8mm cross bars
spaced at 75mm c/c.

2200
18
0

Approved selected backfill


18

Sub grade.
0

rammed to form shape.

900
B

LAYOUT OF HUMP (1:50) PLAN OF WALL OUTLET COVER (1:20)


SECTION THRU. HUMP (1:20) PLAN OF TREE ISLAND (1:25) SECTION THRU. TREE ISLAND (1:20) SECTION THRU. SOIL SLOPE (1:20)

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb EXTERNAL DRAINAGE DETAILS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-02 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
+1,192,000 N1 N2 N3 N4 N5 N6 N7

BLOCK A
+1,190,000
+1,189,070

+1,188,000

+1,186,000

+1,185,167
+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000

EXISTING FORMATION

+1,185,586 +1,185,825

+1,186,053 +1,185,825

+1,186,053 +1,185,825

+1,184,800 +1,185,825

+1,185,825

+1,185,300 +1,185,825

+1,185,825
TERRAIN LEVEL

+1,185,400
E2 Earthworks Section 1:150

+1,192,000 N1 N2 N3 N4 N5 N6 N7

BLOCK A
+1,190,000
+1,189,070

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000
EXISTING FORMATION

+1,186,808 +1,186,646

+1,186,128 +1,186,646

+1,185,800 +1,186,646

+1,185,328 +1,186,646

+1,185,660 +1,186,646
+1,186,930 +1,186,968
TERRAIN LEVEL

+1,185,990
E3 Earthworks Section 1:150

+1,192,000 N1 N2 N3 N4 N5 N6 N7

BLOCK A
+1,190,000
+1,189,070

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000
EXISTING FORMATION

+1,186,308 +1,186,959

+1,186,426 +1,186,959

+1,186,388 +1,186,959
+1,186,274 +1,187,000

+1,187,100 +1,187,000

+1,186,895 +1,187,000

+1,186,274 +1,187,000
TERRAIN LEVEL

E4 Earthworks Section 1:150

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb CROSS SECTIONS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-03 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
+1,192,000 N1 N2 N3 N4 N5 BLOCK C N6 N7
+1,190,722

+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000

EXISTING FORMATION

+1,187,549 +1,187,000

+1,187,549 +1,187,000

+1,187,105 +1,187,260

+1,186,885 +1,187,363

+1,186,599 +1,187,363
+1,187,549 +1,187,728
TERRAIN LEVEL

+1,186,923
E5 Earthworks Section 1:150

+1,192,000 N1 N2 N3 N4 N5 BLOCK C N6 N7
+1,190,722

+1,190,000

BLOCK B
+1,188,000 +1,187,423

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000
EXISTING FORMATION

+1,187,363 +1,187,694
+1,188,814 +1,187,000

+1,187,453 +1,187,535

+1,187,100 +1,187,639

+1,187,032 +1,187,743
TERRAIN LEVEL

E6 Earthworks Section 1:150

+1,192,000 N1 N2 N3 N4 N5 N6 N7
BLOCK B
+1,190,090
+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000
EXISTING FORMATION

+1,189,790 +1,189,445
+1,189,617 +1,189,590

+1,188,772 +1,189,700

+1,187,846 +1,187,809

+1,187,951 +1,188,357
+1,188,041 +1,187,913
TERRAIN LEVEL

E7 Earthworks Section 1:150

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb CROSS SECTIONS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-04 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
+1,192,000 N1 N2 N3 N4 N5 N6 N7
BLOCK B

+1,190,090
+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000
60,000

EXISTING FORMATION

+1,189,756 +1,189,927

+1,189,979 +1,189,987
TERRAIN LEVEL

+1,189,802
E8 Earthworks Section 1:150

+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9

+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
80,000
+1,185,587 +1,185,825

+1,186,930 +1,186,968

+1,189,617 +1,189,590
+1,186,274 +1,187,000

+1,188,814 +1,187,000

+1,189,756 +1,189,927
+1,187,550 +1,187,728

+1,190,938 +1,191,000
+1,184,637

N1 Earthworks Section 1:150

+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9

+1,190,090
+1,190,000
+1,189,070

+1,188,000 +1,187,423

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
80,000
EXISTING FORMATION

+1,183,200 +1,184,695

+1,186,800 +1,186,646
+1,185,899 +1,185,825

+1,187,100 +1,187,000

+1,187,550 +1,187,000

+1,189,700

+1,191,300 +1,191,200
TERRAIN LEVEL

N2 Earthworks Section 1:150

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb CROSS SECTIONS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-05 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9

+1,190,090
+1,190,000
+1,189,070

+1,188,000 +1,187,423

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
80,000
EXISTING FORMATION

+1,186,128 +1,186,646
+1,185,596 +1,185,825

+1,186,895 +1,187,000

+1,187,351 +1,187,000

+1,188,772 +1,189,700
TERRAIN LEVEL
+1,183,800

+1,190,880
N3 Earthworks Section 1:150

+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9
+1,190,722

+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
80,000
EXISTING FORMATION

+1,185,800 +1,186,646
+1,184,794 +1,185,825

+1,186,308 +1,186,959

+1,187,105 +1,187,260

+1,187,453 +1,187,535

+1,187,846 +1,187,809

+1,189,987 +1,189,987
TERRAIN LEVEL
+1,183,840

+1,184,523
N4 Earthworks Section 1:150

+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9
+1,190,722

+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
80,000
EXISTING FORMATION

+1,185,400 +1,185,824

+1,185,328 +1,186,646

+1,186,426 +1,186,959

+1,186,887 +1,187,363

+1,187,112 +1,187,639

+1,188,041 +1,187,913
TERRAIN LEVEL
+1,183,800

+1,189,500
N5 Earthworks Section 1:150

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb CROSS SECTIONS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-06 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb
CONSTRUCTION AS SHOWN A1
+1,192,000 E1 E2 E3 E4 E5 E6 E7 E8 E9
+1,190,722

+1,190,000

+1,188,000

+1,186,000

+1,184,000

+1,182,000

+1,180,000
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
EXISTING FORMATION 80,000

+1,185,664 +1,186,646
+1,185,300 +1,185,823

+1,186,388 +1,186,959

+1,186,599 +1,187,363

+1,187,032 +1,187,743

+1,187,951 +1,188,357
TERRAIN LEVEL
+1,183,828

N6 Earthworks Section 1:150

copyright Client, Architect, Structural & Civil Engineer revision date notes design by drawn by revision date notes design by drawn by key plan project drawing title
9 5.08. 2020 Covered drain replaced with 600mm diameter culvert,
This drawing is the copyright of NHCCL and NATIONAL HOUSING & CONSTRUCTION COMPANY LTD
some open drains replaced with saucer & kerb nrm msb CROSS SECTIONS
8 10.06. 2020 Drain cover changed to heavy duty steel at drain 5, PROPOSED JASMINE APARTMENTS
must not be reproduced without permission. PLOT 5, 7TH STREET, INDUSTRIAL AREA Retaining wall removed behind block B nrm msb
The moral right of the author is hereby P O. Box 659, KAMPALA NOTE: ALL DRAINS SHOULD HAVE A MINIMUM SLOPE OF 1:40
7 15.05. 2020 RC retaining walls removed nrm msb address project no discipline drawing no revision
6 13.05. 2020 Masonry retaining walls added nrm msb
asserted. TEL: 0414330002 5 7.05.2020 Concrete covers introduced at some deep drains nrm msb CIVIL CIV-07 11
4 April 2020 Saucer drain at main sliding gate moved inside nrm msb
FAX: 0414258708 3 March 2020 Saucer drains added, tree islands added nrm msb PLOT No. 931 BLOCK 221 NAALYA, issue type scale paper size
Copyright ©2016. www.nhcc.co.ug
2 25.01.2019 Covered drain specifications changed nrm msb
11 29.09.2020 Humps introduced along the drive to divert storm water nrm msb KIRA MUNICIPALITY, WAKISO DISTRICT.
1
0
16.08.2018
11.05.2016
Issued for construction
Issued for planning
nrm
no
msb
no 10 10.09.2020 600mm culverts removed, retaining walls removed. nrm msb