The document lists 23 notifications related to planned maintenance and repair work at JSR-AGR-H330. The notifications include jobs like insulation, painting, seal pressurization, scaffold erection, plug welding and filter cleaning. For each notification, it provides the work location, assigned planner group and agency, required permit type, readiness status and assigned risk assessment level. Electrical isolation points and temporary connections required are also noted.
Original Description:
Original Title
Copy of Daily job planning OGBL-1 06.08.2022 08.08.2022 (00000003)
The document lists 23 notifications related to planned maintenance and repair work at JSR-AGR-H330. The notifications include jobs like insulation, painting, seal pressurization, scaffold erection, plug welding and filter cleaning. For each notification, it provides the work location, assigned planner group and agency, required permit type, readiness status and assigned risk assessment level. Electrical isolation points and temporary connections required are also noted.
The document lists 23 notifications related to planned maintenance and repair work at JSR-AGR-H330. The notifications include jobs like insulation, painting, seal pressurization, scaffold erection, plug welding and filter cleaning. For each notification, it provides the work location, assigned planner group and agency, required permit type, readiness status and assigned risk assessment level. Electrical isolation points and temporary connections required are also noted.
Attendee: Jeevarathinam M, Srimannarayanan R, Ankit K, Mohit S, Shodhan M, Vivek T, Samir P
Sl. No Notification / Order Description
1 100006517185 INSULATION JOB AS PER ANNEX 13
2 100006517185 PAINTING TO BE DONE 3 100006517185 SEAL PRESSURIZE AND LUBE OIL FILLING AS PER REQ 4 100006517185 SBC FABRICATION JOB IN PCG WORKSHOP YARD 5 100006467248 S009B SPOOL ROTATION FOR CHEMICAL CLEANING 6 100006467248 S009B CHEMICAL CLEANING RELATED HOSE CONNECTION JOB 7 100006651869 P005A OVERHAULING JOB FOR SEAL REPLACEMENT 8 100006651869 P005A DEBLINDING TO BE DONE 9 100006651869 P005A DEBLINDING RELATED TORQUE DETORQUE JOB 10 100006671580 Shuttering and reinforcement fixing 11 100006517181 S015A/B PLUG WELDING RELATED HOT WORK 12 100006594185 AGR lighting maintenance 13 100006517185 V009 DRAIN BLIND REVERSAL JOB 14 100006662001 FV702001/FV702003 SCAFFOLD ERECTION FOR DROPPING HEIGHT <6M 15 100005680568 MOC V008 BYPASS- material lifting/shifting in K Area 16 100005680568 MOC V08 BYPASS- SCAFFOLDING DISMANTLING ABOVE 12 MTR HEIGHT KA 17 100005680568 MOC V008 bypass line control valve XV500100 dropping 18 100006517185 CA Area 200 MT crane positioning and counter weight loading 19 100006612279 FILTER CLEANING OF PIB-161 HVAC 20 100006537614 PM OF SPLIT AC MA-HOH300-U161002A 21 100006537489 PM OF SPLIT AC MA-HOH300-U161002B 22 100006537702 FILTER CLEANING OF PIB-161 HVAC 23 100006594198 PM OF CHEM FILTER MA-HOH300-U161004 HITRA FUNC LOC Planner Agency Permit READINES RA level group Type S
JSR-AGR-H330 MEC IES CW YES L1
JSR-AGR-H330 MEC CHAITANYA CW YES L1 JSR-AGR-H330 MEC SIPL CW YES L1 JSR-AGR-H330 MEC EXCELLENT HW YES L2-MEDIUM JSR-AGR-H330-ME-HOH330-S009B MEC EXCELLENT CW YES L1 JSR-AGR-H330-ME-HOH330-S009B OPR CHEM CLEAN CW YES L1 JSR-AGR-H330-MP-HOH330-P005A MEC SIPL CW YES L1 JSR-AGR-H330-MP-HOH330-P005A MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330-MP-HOH330-P005A MEC ABS LB YES L2-MEDIUM JSR-AGR-H330 CES Civil Sonu infra CW YES L1 JSR-AGR-H330-ME-HOH330-S015A MEC CR ASIA HW YES L2-MEDIUM JSR-AGR-H330 ELE EXCEL NCW Yes L1 JSR-AGR-H330 MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330 MEC EXCELLENT CW YES L2-MEDIUM JSR-AGR-H330-MV-HOH330-V008 MPC RS CW DONE L1 JSR-AGR-H330-MV-HOH330-V008 MPC RS CW DONE L2-MEDIUM JSR-AGR-H330-MV-HOH330-V008 MPC RS CW DONE L1 JSR-AGR-H330 MEC ELECTROMAINT CW YES L1 JSR-AGR-H300-PIB-161 MEC AIRON CW YES L1 JSR-AGR-H300-PIB-161-MA-HOH300-U161002AMEC AIRON CW YES L1 JSR-AGR-H300-PIB-161-MA-HOH300-U161002BMEC AIRON CW YES L1 JSR-AGR-H300-PIB-161 MEC AIRON CW YES L1 JSR-AGR-H300-PIB-161-MA-HOH300-U161004 MEC AIRON CW YES L1 Electrical New / Ext LOTO / Temp REMARKS connection required EXT NO EXT NO EXT NO EXT YES Temp Connection required NEW NO NEW NO EXT YES NEW NO NEW NO EXT NO EXT YES Temp Connection required New NO NEW NO NEW NO ext No New No ext No NEW NO NEW NO NEW NO NEW NO NEW NO NEW NO Attendee: Jeevarathinam M, Srimannarayanan R, Ankit K, Mohit S, Shodhan M, Vivek T, Samir P
Sl. No Notification / Order Description
5 100006517185 INSULATION JOB AS PER ANNEX 13
6 100006517185 PAINTING TO BE DONE 7 100006517185 SEAL PRESSURIZE AND LUBE OIL FILLING AS PER REQ 8 100006517185 SBC FABRICATION JOB IN PCG WORKSHOP YARD 10 100006564045 SCAFFOLD ERECTION FOR DROPPING OF H330PSV700191A/B/C/D 11 100006614457 H330-P030BA DECONTAMINATION RELATED HOSE CONNECTION & F 12 100006555130 S231A/B BELZONA APPLICATION IN CHANNEL HEAD & COVER & CLE 13 100006517181 S015A/B PLUG WELDING RELATED HOT WORK 14 100006564055 ERECTION OF H330PSV900001B 15 100006564004 ERECTION OF H330PSV400052F 16 100006662001 PRC-B FV702002 DROPPING FOR INSPECTION 17 100006662001 PRC-B FV702002 FLANGES TORQUE DETORQUE JOB HITRA FUNC LOC Planner Agency Permit READINES RA level group Type S
JSR-AGR-H330 MEC IES CW YES L1
JSR-AGR-H330 MEC CHAITANYA CW YES L1 JSR-AGR-H330 MEC SIPL CW YES L1 JSR-AGR-H330 MEC EXCELLENT HW YES L2-MEDIUM JSR-AGR-H330-H330PSV700191A MEC EXCELLENT CW YES L2-MEDIUM JSR-AGR-H330-MP-HOH330-P030BA MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330-MC-HOH330-S231B MEC NICCO CW YES L1 JSR-AGR-H330-ME-HOH330-S015A MEC CR ASIA HW YES L2-MEDIUM JSR-AGR-H330-H330PSV900001B MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330-H330PSV400052F MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330-MC-HOH330-C002B MEC EXCELLENT LB YES L2-MEDIUM JSR-AGR-H330-MC-HOH330-C002B MEC ABS LB YES L2-MEDIUM Electrical New / Ext LOTO / Temp REMARKS connection required NEW NO NEW NO NEW NO NEW YES Temp Connection required NEW NO NEW NO NEW NO NEW YES Temp Connection required NEW NO NEW NO NEW NO NEW NO