Technical Comparison:

Genset specifications:

Prime Power: 11 kW / 13 kVA - 240 / 415 Volts 18 Amps per Phase

Standby Power: (Pg) 12 kW / 14 kVA

Power Factor: 0.8

Phase Voltage: Three Phase 240 / 415 Volt

Starter System: Electric Start

Fuel Tank Capacity: 40 Lt

Running Time: 13 Hours Continuous (Prime Load)

Fuel Consumption: 3 Lt/Hour (Prime Load)

Overload Protection: No

Weight (Dry): 165 kg

Workshop loads:

6 KVA air compressor 1 unit

3 KVA car lift 1unit

3.5 KVA for 1-ton ac

4 KVA light and power LS

---------------

Total minimum asking load (Pw): 16.5 KVA

The total capacity of load borne by Perkins genset (13KVA) = 14 KVA

The minimum required capacity to adhere in single setup = 16+KVA

Thus, the units are under capacity compared to the consumption.

Rejection parameters:

1. Pg (14KVA) <Pw (16.5KVA)


2. Plus, the said unit doesn’t have overload protection as well

Therefore, the said units are not suitable for our workshop backups.