A DIVISI 1. UMUM
1 1.2 Mobilisasi 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.8 Manajemen dan Keselamatan Lalu Lintas 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
2 1.8.(1) Manajemen dan Keselamatan Lalu Lintas Jalan LS 265.500.000,00 273.000.000,00 273.000.000,00 277.500.000,00 279.000.000,00 256.500.000,00 279.000.000,00 270.000.000,00 279.000.000,00 319.500.000,00 276.000.000,00 301.500.000,00 325.500.000,00 262.500.000,00 270.000.000,00
3 1.8.(2) Jembatan Sementara LS 569.833.169,67 617.661.636,27 608.522.734,62 678.100.941,97 635.695.276,24 599.838.881,11 699.966.415,16 619.573.594,77 666.927.456,93 858.129.695,04 624.505.287,52 688.428.981,54 719.145.423,94 576.887.927,93 596.525.666,54
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.17 Pengamanan Lingkungan Hidup 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
4 1.17.(1a) Pengujian pH Buah 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00
5 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00 2.160.000,00
6 1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00
7 1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00 2.070.000,00
8 1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00 2.205.000,00
9 1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00 2.745.000,00
10 1.17.(1g) Pengujian Coliform Buah 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00 3.600.000,00
11 1.17.(1h) Pengujian E. Coli Buah 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00 2.952.000,00
12 1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00 4.230.000,00
13 1.17.(1j) Pengujian Temperatur (Suhu) Buah 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00 1.935.000,00
14 1.17.(1k) Pengujian Parameter Kualitas Air Lainnya Buah 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00 1.890.000,00
15 1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00 6.525.000,00
16 1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00 8.100.000,00
17 1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00 1.170.000,00
18 1.17.(3a) Pengujian NoX Buah 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00 3.723.000,00
19 1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00 4.440.000,00
20 1.17.(3c) Pengujian Karbondioksida (CO2) Buah 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00 4.800.000,00
21 1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00 4.620.000,00
22 1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00 4.467.000,00
23 1.17.(3g) Pengujian Timah Hitam (Pb) Buah 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00 4.278.000,00
24 1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. Buah 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00 1.800.000,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.19 Keselamatan dan Kesehatan Kerja 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
25 1.19 Keselamatan dan Kesehatan Kerja ( K3 ) LS 589.300.000,00 595.857.500,00 594.546.000,00 608.972.500,00 605.038.000,00 585.365.500,00 598.078.300,00 600.608.200,00 604.426.200,00 738.006.600,00 601.889.000,00 716.880.200,00 745.628.000,00 600.608.200,00 603.153.100,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.20 Pengujian Tanah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
26 1.20.(1) Pengeboran, termasuk SPT dan Laporan M1 603.383,55 604.971,68 604.517,93 605.652,30 603.899,18 593.071,05 614.727,30 625.555,43 604.332,30 610.396,05 603.899,18 608.446,99 609.313,24 603.899,18 604.353,96
27 1.20.(2) Sondir termasuk Laporan M1 467.178,07 468.448,57 468.085,57 468.993,07 467.590,57 458.928,07 476.253,07 484.915,57 467.937,07 472.788,07 467.590,57 471.228,82 471.921,82 467.590,57 467.954,39
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.21 Manajemen Mutu 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
28 1.21 Manajemen Mut u LS 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00 952.704.000,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B DIVISI 2. DRAINASE 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
29 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 44.364,24 45.311,35 45.064,01 47.040,07 47.163,62 43.747,37 46.922,75 47.422,16 47.780,17 63.700,82 46.717,06 62.471,46 65.471,94 46.180,14 46.671,41
30 2.2.(1) Pasangan Batu dengan Mortar M3 1.460.794,18 1.530.268,12 1.497.561,19 1.661.067,19 1.622.889,32 1.413.375,79 1.525.250,98 1.568.715,98 1.593.259,81 2.868.681,00 1.564.914,85 2.699.219,85 2.963.137,23 1.553.509,63 1.571.232,68
31 2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 137.038,53 153.142,82 141.076,78 186.166,83 136.523,22 122.230,59 157.685,98 135.859,80 162.344,81 225.156,57 146.466,57 212.587,11 229.754,73 132.490,77 141.164,82
32 2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 195.320,41 225.635,94 201.497,57 286.987,39 187.295,57 167.265,64 231.891,66 185.433,60 238.705,97 303.589,81 208.274,75 286.649,80 308.116,79 180.407,48 197.130,75
33 2.3.(3) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 222.884,79 248.143,18 229.825,08 299.868,55 224.744,78 200.040,43 255.200,31 222.858,40 263.272,39 379.880,35 239.111,69 357.387,27 387.986,97 217.952,98 231.393,44
34 2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm M1 606.983,88 648.720,25 625.009,29 734.346,23 641.223,80 571.865,09 666.771,73 636.523,55 688.474,07 1.098.282,44 652.012,77 1.031.777,39 1.125.106,13 625.231,55 645.411,11
35 2.3.(5) Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm M1 942.956,50 1.002.039,53 972.258,01 1.122.919,40 1.008.764,25 895.331,10 1.028.690,17 998.424,90 1.064.265,14 1.763.425,87 1.016.208,66 1.651.621,62 1.807.506,74 983.195,65 1.010.650,25
36 2.3.(6) Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm M1 1.473.745,06 1.554.442,81 1.518.514,20 1.719.447,72 1.585.507,16 1.410.713,42 1.594.939,01 1.569.893,00 1.649.247,78 2.752.947,45 1.586.410,07 2.580.522,82 2.822.572,37 1.546.913,33 1.583.029,85
37 2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm M1 1.998.157,05 2.101.331,00 2.060.367,36 2.311.811,25 2.164.042,32 1.920.391,56 2.154.264,75 2.138.837,80 2.230.227,14 3.800.330,60 2.154.693,60 3.555.773,35 3.897.045,71 2.110.854,99 2.155.538,91
38 2.3.(8) Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm M1 2.600.214,65 2.736.714,47 2.684.719,26 3.014.716,29 2.829.623,78 2.499.057,47 2.805.056,03 2.791.454,52 2.908.676,99 5.055.355,56 2.812.239,03 4.719.507,98 5.185.360,61 2.757.542,43 2.816.007,99

BIDANG BINA MARGA BM - 1 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

39 2.3.(9) Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm M1 3.831.283,05 4.034.427,06 3.958.282,77 4.447.415,04 4.178.057,17 3.682.619,73 4.131.059,46 4.113.791,58 4.287.567,93 7.521.869,52 4.148.536,67 7.011.518,80 7.713.845,62 4.069.804,82 4.156.436,55
40 2.3.(10) Gorong-gorong Pipa Baja Bergelombang Ton 42.609.355,80 44.674.510,86 44.268.996,34 48.924.982,76 47.536.816,23 41.253.533,66 45.298.782,35 46.028.719,18 47.311.269,34 89.257.557,88 46.528.217,79 82.797.832,39 91.861.079,16 45.999.295,54 46.856.994,42
41 2.3.(11) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm M1 618.304,08 643.683,89 638.094,83 694.341,40 679.430,00 602.503,44 655.199,00 665.384,78 679.860,55 1.200.043,49 666.897,17 1.118.235,82 1.228.892,92 662.191,17 671.969,14
42 2.3.(12) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm M1 830.201,16 865.728,90 857.853,77 936.853,96 915.563,03 807.995,80 881.413,56 895.624,05 916.020,07 1.647.546,97 898.289,49 1.531.753,31 1.687.818,86 891.903,58 905.532,23
43 2.3.(13) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm M1 1.057.080,53 1.102.901,11 1.092.735,97 1.194.823,10 1.167.211,41 1.028.188,91 1.124.028,13 1.142.591,70 1.168.568,17 2.113.387,98 1.145.209,83 1.964.471,67 2.165.970,99 1.136.853,76 1.154.410,04
44 2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1 1.659.042,76 1.730.066,12 1.714.352,20 1.873.476,69 1.830.395,55 1.612.677,26 1.769.796,17 1.800.284,06 1.838.039,73 3.305.716,39 1.797.699,05 3.080.176,26 3.391.878,01 1.783.541,79 1.810.722,17
45 2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 2.866.321,95 2.986.480,49 2.959.983,38 3.230.771,59 3.157.479,66 2.784.954,52 3.066.841,03 3.121.630,05 3.180.793,68 5.668.812,84 3.104.706,73 5.297.443,82 5.823.281,38 3.078.457,18 3.124.395,91
46 2.3.(16) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm M1 4.367.292,04 4.541.791,87 4.503.551,68 4.899.874,34 4.792.910,15 4.243.115,83 4.686.122,14 4.772.390,76 4.848.413,36 8.469.359,57 4.721.352,80 7.952.253,72 8.711.886,80 4.678.284,22 4.744.955,31
47 2.3.(17) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm M1 7.182.363,74 7.462.412,00 7.401.239,12 8.040.318,27 7.868.007,27 6.977.296,49 7.720.333,95 7.865.179,91 7.977.767,89 13.797.492,02 7.758.120,34 12.988.384,98 14.204.055,25 7.684.353,04 7.791.284,12
48 2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 8.624.934,34 8.952.931,18 8.881.522,42 9.632.879,67 9.430.641,29 8.379.087,58 9.281.213,51 9.457.204,80 9.579.686,03 16.402.556,61 9.306.699,23 15.476.150,67 16.895.965,51 9.215.585,86 9.340.795,16
49 2.3.(19) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm M1 10.965.330,50 11.380.170,24 11.289.913,79 12.241.373,05 11.985.284,10 10.652.237,36 11.805.041,98 12.029.991,53 12.181.438,00 20.814.505,03 11.830.400,30 19.650.297,76 21.444.940,61 11.713.479,95 11.871.804,64
50 2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm M1 15.859.169,77 16.439.354,43 16.313.701,10 17.651.483,20 17.292.244,83 15.407.246,64 17.098.404,99 17.428.719,67 17.617.312,33 29.708.181,36 17.087.424,56 28.132.409,75 30.632.532,31 16.912.250,35 17.133.598,39
51 2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 22.351.406,86 23.145.001,47 22.973.853,05 24.812.465,20 24.319.815,80 21.715.865,12 24.126.900,82 24.598.189,94 24.827.355,26 41.386.011,88 24.054.235,79 39.295.846,35 42.703.237,90 23.800.151,96 24.102.827,79
52 2.3.(22) Saluran berbentuk U Tipe DS 1 M1 493.173,00 516.099,00 508.314,00 560.386,00 547.975,00 478.466,00 504.262,00 510.324,00 544.632,00 956.660,00 532.746,00 927.229,00 1.020.685,00 528.691,00 536.456,00
53 2.3.(23) Saluran berbentuk U Tipe DS 1a (dengan tutup) M1 625.430,00 654.955,00 643.003,00 712.457,00 694.663,00 605.323,00 640.589,00 651.382,00 687.481,00 1.229.315,00 674.405,00 1.182.215,00 1.304.003,00 669.750,00 678.695,00
54 2.3.(24) Saluran berbentuk U Tipe DS 2 M1 512.067,00 535.935,00 527.555,00 582.110,00 568.930,00 496.588,00 523.738,00 530.475,00 565.039,00 995.611,00 552.983,00 963.656,00 1.061.159,00 548.843,00 556.776,00
55 2.3.(25) Saluran berbentuk U Tipe DS 2a (dengan tutup) M1 663.218,00 694.628,00 681.485,00 755.906,00 736.573,00 641.568,00 679.540,00 691.684,00 728.295,00 1.307.216,00 714.879,00 1.255.068,00 1.384.951,00 710.052,00 719.335,00
56 2.3.(26) Saluran berbentuk U Tipe DS 3 M1 530.961,00 555.772,00 546.797,00 603.835,00 589.886,00 514.711,00 543.213,00 550.626,00 585.446,00 1.034.562,00 573.220,00 1.000.082,00 1.101.633,00 568.994,00 577.096,00
57 2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 701.006,00 734.302,00 719.968,00 799.355,00 778.484,00 677.813,00 718.491,00 731.987,00 769.109,00 1.385.117,00 755.353,00 1.327.921,00 1.465.899,00 750.354,00 759.975,00
58 2.3.(28) Saluran berbentuk U Tipe DS 4 M1 568.749,00 595.445,00 585.279,00 647.284,00 631.796,00 550.956,00 582.164,00 590.929,00 626.260,00 1.112.463,00 613.694,00 1.072.936,00 1.182.581,00 609.296,00 617.735,00
59 2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 776.581,00 813.648,00 796.932,00 886.253,00 862.306,00 750.303,00 796.392,00 812.591,00 850.738,00 1.540.919,00 836.301,00 1.473.628,00 1.627.795,00 830.959,00 841.254,00
60 2.3.(30) Saluran berbentuk U Tipe DS 5 M1 606.536,00 635.119,00 623.762,00 690.733,00 673.707,00 587.201,00 621.114,00 631.231,00 667.074,00 1.190.364,00 654.168,00 1.145.789,00 1.263.529,00 649.598,00 658.375,00
61 2.3.(31) Saluran berbentuk U Tipe DS 5a (dengan tutup) M1 852.157,00 892.995,00 873.897,00 973.151,00 946.127,00 822.792,00 874.293,00 893.196,00 932.366,00 1.696.722,00 917.249,00 1.619.334,00 1.789.690,00 911.564,00 922.534,00
62 2.3.(32) Saluran berbentuk U Tipe DS 6 M1 606.536,00 635.119,00 623.762,00 690.733,00 673.707,00 587.201,00 621.114,00 631.231,00 667.074,00 1.190.364,00 654.168,00 1.145.789,00 1.263.529,00 649.598,00 658.375,00
63 2.3.(33) Saluran berbentuk U Tipe DS 6a (dengan tutup) M1 852.157,00 892.995,00 873.897,00 973.151,00 946.127,00 822.792,00 874.293,00 893.196,00 932.366,00 1.696.722,00 917.249,00 1.619.334,00 1.789.690,00 911.564,00 922.534,00
64 2.3.(34) Pasangan Batu tanpa Adukan (Aanstamping) M3 755.811,43 759.897,74 759.080,48 768.070,36 765.618,58 753.359,65 761.274,18 762.865,69 765.231,45 848.463,14 763.639,94 835.283,72 853.194,66 762.865,69 764.457,20
65 2.4.(1) Bahan Drainase Porous atau Penyaring (Filter) M3 270.350,56 278.473,10 276.882,08 294.801,91 289.945,13 265.410,05 281.236,43 284.334,72 289.107,76 455.410,43 285.925,73 429.016,37 464.789,03 284.334,72 287.516,75
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah
66 2.4.(2) M1 133.349,92 138.675,02 137.655,32 149.438,52 146.266,12 130.064,22 140.487,82 142.527,22 145.699,62 255.260,72 143.546,92 237.812,52 261.378,92 142.527,22 144.566,62
Permukaan, diameter 4 inch
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah
67 2.4.(3) M1 101.476,05 105.781,45 104.875,05 114.505,55 111.899,65 98.756,85 107.141,05 108.840,55 111.333,15 200.047,05 109.633,65 185.952,53 205.032,25 108.840,55 110.540,05
Permukaan, diameter 5 inch
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah
68 2.4.(4) M1 138.865,05 145.096,55 143.850,25 157.559,55 153.820,65 135.126,15 147.135,95 149.628,55 153.254,15 280.036,85 150.761,55 259.982,75 287.288,05 149.628,55 152.007,85
Permukaan, diameter 6 inch
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah
69 2.4.(5) M1 175.121,05 183.165,35 181.465,85 199.253,95 194.382,05 170.249,15 185.771,25 188.943,65 193.588,95 357.307,45 190.529,85 331.565,69 366.824,65 188.943,65 192.002,75
Permukaan, diameter 8 inch
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
C DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
70 3.1.(1) Galian Biasa M3 11.481,43 11.801,14 11.703,12 12.437,19 12.388,02 11.253,51 12.268,03 12.423,45 12.631,77 18.618,10 12.288,78 17.997,17 19.215,04 12.134,43 12.286,38
71 3.1.(2) Galian Batu Lunak M3 30.545,89 31.282,46 31.052,29 32.695,92 32.710,35 29.963,85 32.934,54 33.724,72 33.206,55 46.553,16 32.498,87 45.013,45 47.754,98 32.177,91 32.520,48
72 3.1.(3) Galian Batu M3 72.734,06 74.553,36 73.983,99 78.109,46 78.022,83 71.328,56 78.205,02 79.848,36 79.304,08 112.804,18 77.496,05 108.984,70 115.852,98 76.670,75 77.529,56
73 3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter M3 16.235,87 16.781,20 16.612,54 17.860,61 17.680,21 15.861,09 17.289,16 17.518,28 17.877,71 28.176,65 17.459,96 26.891,23 29.048,05 17.229,43 17.495,21
74 3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 676.671,54 710.234,97 703.466,31 777.332,48 757.370,18 656.496,76 721.962,94 734.996,06 754.539,48 1.437.197,10 741.317,73 1.329.598,87 1.476.436,49 734.689,11 747.776,99
75 3.1.(6) Galian Struktur dengan kedalaman 4 - 6 meter M3 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21
76 3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 134.931,60 138.207,73 137.224,03 144.212,05 142.562,82 130.401,76 143.057,76 146.775,89 143.714,20 200.161,28 141.121,82 193.148,23 204.714,43 139.906,31 141.421,66
77 3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 528.228,22 544.776,57 541.484,13 573.144,01 576.943,70 521.097,70 573.635,06 579.397,29 585.772,11 839.615,26 565.041,02 832.828,30 875.063,26 553.287,46 562.941,74
78 3.1.(9) Galian Perkerasan berbutir M3 21.400,37 22.107,19 21.896,02 23.473,38 23.293,54 20.926,21 22.816,13 23.140,39 23.507,33 36.499,81 22.977,24 34.919,55 37.606,40 22.669,44 23.021,20
79 3.1.(10). Galian Perkerasan Beton M3 418.602,60 428.546,13 425.363,96 451.515,57 447.641,40 411.712,26 454.014,01 459.663,22 465.721,34 675.284,51 446.821,58 661.540,87 702.352,40 439.906,68 444.699,07
80 3.2.(1a) Timbunan Biasa dari sumber galian M3 183.819,97 191.448,62 189.691,66 206.571,66 202.396,38 178.325,96 195.743,24 199.282,95 202.499,07 353.405,94 198.714,34 331.060,54 363.108,80 196.659,92 199.878,00
81 3.2.(1b) Timbunan Biasa dari hasil galian M3 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64 39.755,64
82 3.2.(2a) Timbunan Pilihan dari sumber galian M3 276.416,37 288.644,25 285.842,08 313.248,47 306.168,03 268.216,84 294.364,02 299.569,85 306.284,42 553.320,21 300.491,49 515.913,59 568.841,74 297.552,52 302.493,16
83 3.2.(2b) Timbunan Pilihan dari galian M3 78.039,47 80.456,52 79.690,77 85.282,44 84.049,65 75.804,42 82.938,76 84.348,31 85.158,67 131.133,58 83.195,75 125.343,31 135.001,48 82.180,70 83.338,38
84 3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3 246.255,63 257.580,78 255.072,59 280.259,95 273.809,24 239.155,26 262.407,10 266.791,28 273.723,09 502.111,95 268.522,93 467.136,09 516.098,66 265.922,61 270.508,31

BIDANG BINA MARGA BM - 2 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

85 3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M3 293.818,10 307.085,72 304.066,49 333.691,49 326.237,13 285.452,75 312.994,09 318.070,67 326.470,76 593.557,37 320.125,04 553.023,59 610.246,84 316.927,71 322.363,93
86 3.2.(4) Penimbunan Kembali Berbutir (Granular Backfill) M3 194.039,93 202.485,70 200.602,56 218.697,05 215.255,01 188.916,08 206.809,46 209.795,80 214.791,44 375.620,66 210.582,58 353.264,49 386.852,08 208.008,95 211.750,27
87 3.3.(1) Penyiapan Badan Jalan M2 13.369,17 13.587,40 13.521,20 13.956,45 13.786,63 12.845,51 14.210,81 14.698,39 13.980,49 17.406,63 13.745,31 17.054,06 17.728,72 13.653,68 13.747,93
88 3.4.(1) Pembersihan dan Pengupasan Lahan M2 16.746,28 17.254,65 17.106,96 18.210,98 18.026,00 16.286,13 17.780,07 18.089,21 18.166,22 27.206,95 17.786,23 26.126,16 27.968,47 17.558,24 17.815,78
89 3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah 1.886.524,15 1.900.001,00 1.896.165,91 1.906.226,39 1.891.696,92 1.801.011,44 1.980.994,05 2.070.683,43 1.895.286,17 1.950.965,15 1.891.457,87 1.934.308,34 1.942.518,07 1.891.273,60 1.895.228,82
90 3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm buah 42.469,19 43.828,46 43.485,47 46.225,98 46.018,59 41.454,72 45.135,77 45.792,12 46.124,25 68.461,65 45.145,67 66.155,62 70.459,68 44.447,92 45.196,79
91 3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm buah 124.015,35 128.087,15 126.978,38 135.600,50 134.634,15 121.034,59 131.757,48 133.538,74 135.341,74 205.935,92 132.346,57 198.037,81 212.089,21 130.372,72 132.535,42
92 3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah 323.409,71 335.013,60 331.730,07 357.061,98 354.118,99 316.257,80 343.216,59 346.581,78 356.012,33 564.583,51 347.860,59 539.833,48 582.219,25 342.467,94 348.552,19
93 3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2 121.319,43 150.522,54 123.893,87 210.822,08 99.499,74 92.708,37 153.640,53 97.727,31 155.875,62 131.369,59 126.544,29 126.464,34 130.985,20 95.681,55 113.127,42
94 3.5.(2a) Geotekstil Separator Kelas 1 M2 113.808,68 134.401,40 114.800,32 178.405,84 95.863,46 92.481,70 136.723,99 95.909,49 138.959,08 121.534,72 117.134,17 116.463,46 120.984,31 95.000,26 107.271,67
95 3.5.(2b) Geotekstil Separator Kelas 2 M2 151.936,71 181.139,82 154.511,15 241.439,37 130.117,03 123.325,66 184.257,81 128.344,60 186.492,91 161.986,88 157.161,57 157.081,63 161.602,48 126.298,83 143.744,70
96 3.5.(2c) Geotekstil Separator Kelas 3 M2 161.000,71 190.203,82 163.575,15 250.503,37 139.181,03 132.389,66 193.321,81 137.408,60 195.556,91 171.050,88 166.225,57 166.145,63 170.666,48 135.362,83 152.808,70
97 3.5.(3) Geotekstil Stabilisator (Kelas 1) M2 179.436,35 208.639,46 182.010,79 268.939,01 157.616,67 150.825,30 211.757,45 155.844,24 213.992,54 189.486,52 184.661,21 184.581,27 189.102,12 153.798,47 171.244,34
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
D DIVISI 4. PEKERJAAN PREVENTIF 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

4.1 Pengabutan Aspal Emulsi (Fog Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lambat (CSS-1h
98 4.1.(1) Liter 22.495,27 23.525,81 23.296,06 25.815,39 25.132,24 21.807,21 23.891,35 24.351,04 25.034,63 47.566,80 24.562,43 44.086,58 48.953,26 24.328,71 24.787,28
atau SS-1h)
Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lebih Cepat (CQS-
99 4.1.(2) Liter 22.495,27 23.525,81 23.296,06 25.815,39 25.132,24 21.807,21 23.891,35 24.351,04 25.034,63 47.566,80 24.562,43 44.086,58 48.953,26 24.328,71 24.787,28
1h atau QS-1h)
Pengabutan (Fog Seal) dengan Aspal Emulsi Modifikasi Polymer yang
100 4.1.(3) Liter 22.495,27 23.525,81 23.296,06 25.815,39 25.132,24 21.807,21 23.891,35 24.351,04 25.034,63 47.566,80 24.562,43 44.086,58 48.953,26 24.328,71 24.787,28
Mengikat Lebih Cepat (PMCQS-1h atau PMQS-1h)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.2 Laburan Aspal (Buras) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
101 4.2.(1) Aspal di Labur M2 24.861,38 26.041,00 25.782,69 28.504,79 27.737,49 24.211,97 26.587,70 27.104,52 27.763,84 52.907,91 26.044,73 46.698,24 51.850,89 27.066,43 27.496,03
102 4.3 Pemeliharaan Dengan Laburan Aspal Satu Lapis (Single Chip Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
103 4.4 Lapis Penutup Bubur Aspal Emulsi (Emulsified Asphalt Slurry Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
104 4.4.(1) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CSS-1h SS-1h M2 37.804,86 39.585,44 39.138,96 43.516,31 42.181,94 36.592,50 40.147,41 40.848,39 42.062,20 79.804,30 41.253,41 73.951,61 82.124,81 40.823,66 41.608,15
105 4.4.(2) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h QS-1h M2 30.067,53 31.388,14 31.041,14 34.235,53 33.203,10 29.170,46 32.069,95 32.673,19 33.326,23 60.539,70 31.629,10 54.446,28 60.111,69 32.337,06 32.928,68
106 4.4.(3) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CSS-1h SS-1h M2 33.228,09 35.203,31 34.829,65 38.410,46 37.102,87 33.223,40 37.225,65 36.548,86 37.588,17 65.549,09 36.505,47 58.570,90 64.238,51 35.708,35 36.155,72
107 4.4.(4) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CQS-1h QS-1h M2 33.228,09 35.203,31 34.829,65 38.410,46 37.102,87 33.223,40 37.225,65 36.548,86 37.588,17 65.549,09 36.505,47 58.570,90 64.238,51 35.708,35 36.155,72
108 4.4.(5) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CSS-1h SS-1h M2 34.451,38 38.106,29 36.041,76 45.014,71 36.420,95 32.695,43 40.228,50 35.915,96 40.709,20 63.864,32 37.788,60 56.879,97 62.257,81 35.055,74 36.546,65
109 4.4.(6) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CQS-1h QS-1h M2 34.881,36 38.548,00 36.477,99 45.498,91 36.892,12 33.089,92 40.649,94 36.371,20 41.169,28 64.808,46 38.246,08 57.792,58 63.280,78 35.521,16 37.020,29
110 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
111 4.5 Lapis Permukaan Mikro Aspal Emulsi Modifikasi Polimer (Micro Surfacing) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h
112 4.5.(1) M2 11.541,77 12.378,05 12.232,52 13.410,58 12.800,33 11.945,84 13.730,21 12.906,45 13.299,47 19.858,01 12.749,34 16.954,28 18.112,73 12.196,53 12.324,54
atau PMCQS-1h untuk Tipe 1
Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer
113 4.5.(2) Ton 65.752,10 80.837,79 66.903,30 113.687,62 54.242,88 49.781,74 83.599,68 56.147,37 85.056,67 78.603,73 69.267,74 73.732,76 78.122,60 53.414,57 62.355,27
PMCQS-1h atau PMCQS-1h untuk Tipe 1
Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h
114 4.5.(3) M2 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83 4.111,83
atau PMCQS-1h untuk Tipe 2
Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer
115 4.5.(4) Ton 37.634,57 52.274,95 38.478,89 84.357,52 25.268,18 22.755,35 53.692,25 25.205,08 55.644,01 42.087,32 40.357,46 37.962,69 40.948,70 24.693,69 33.443,24
PMCQS-1h atau PMCQS-1h untuk Tipe 2
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.6 Lapis Tipis Aspal Pasir 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
116 4.6.(1) Latasir Kelas A (SS-A) Ton 2.486.111,11 2.620.929,37 2.574.973,20 2.904.957,50 2.748.044,85 2.388.413,36 2.660.157,34 2.672.410,48 2.776.178,34 5.191.585,63 2.705.411,61 4.794.385,61 5.320.719,02 2.668.639,52 2.720.418,89
117 4.6.(2) Latasir Kelas B (SS-B) Ton 2.964.420,57 3.120.718,41 3.069.173,09 3.449.724,70 3.278.501,03 2.851.327,48 3.167.807,48 3.191.522,23 3.303.751,45 6.174.202,92 3.223.655,54 5.704.067,85 6.328.011,02 3.184.556,25 3.243.159,73
118 4.6.(3) Latasir Kelas A Modifikasi (SS-A Mod) Ton 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
119 4.6.(4) Latasir Kelas B Modifikasi (SS-B Mod) Ton 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.7 Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphalt Tipis (SMA TIPIS) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
120 4.7.(1) Lapis Tipis Beton Aspal - A (LTBA-A) Ton 2.376.041,97 2.504.820,03 2.460.495,32 2.773.814,55 2.622.616,81 2.296.725,02 2.560.643,44 2.571.411,32 2.668.685,28 4.946.317,91 2.466.717,56 4.331.929,28 4.801.962,55 2.561.006,32 2.614.173,14

BIDANG BINA MARGA BM - 3 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

121 4.7.(2) Lapis Tipis Beton Aspal - B Halus (LTBA-B Halus) Ton 2.159.907,25 2.279.080,66 2.236.915,29 2.527.900,98 2.382.915,34 2.087.566,30 2.330.908,84 2.336.778,53 2.430.059,10 4.503.388,04 2.230.431,86 3.918.354,49 4.344.213,66 2.327.879,69 2.377.872,27
122 4.7.(3) Lapis Tipis Beton Aspal - B Halus (LTBA-B Kasar) Ton 1.927.888,39 2.036.095,33 1.996.367,81 2.261.713,76 2.124.064,75 1.863.149,64 2.084.547,71 2.085.530,15 2.172.731,50 4.010.665,78 1.975.490,30 3.459.459,67 3.834.330,53 2.076.590,46 2.122.994,07
123 4.7.(4) Lapis Tipis Beton Aspal - B Halus Modifikasi Kasar (LTBA-B Mod Kasar) Ton 1.993.998,87 2.105.035,34 2.064.664,50 2.336.577,07 2.197.017,31 1.927.059,54 2.154.786,21 2.157.311,33 2.245.483,03 4.143.308,18 2.047.278,66 3.583.207,44 3.970.963,71 2.147.631,19 2.194.980,66
124 4.7.(5) Stone Matrix Asphalt Tipis (SMA Tipis) Ton 3.090.274,32 3.249.557,45 3.165.342,59 3.577.311,35 3.413.345,44 2.975.549,31 3.249.226,29 3.317.922,09 3.394.677,90 6.372.155,31 3.217.137,66 5.711.501,38 6.337.283,20 3.309.330,97 3.353.904,48
125 4.7.(6) Stone Matrix Asphalt Modifikasi Tipis (SMA Mod Tipis) Ton 3.131.679,66 3.292.917,57 3.208.327,15 3.624.812,00 3.459.565,43 3.015.645,66 3.293.309,17 3.362.833,08 3.440.715,55 6.460.321,07 3.262.538,34 5.793.222,61 6.428.084,56 3.354.246,32 3.399.489,58
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.8 Penambalan Dangkal Perkerasan Beton Semen Bersambung Tanpa Tulangan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan
126 4.8.(1) M3 463.471,04 479.673,37 474.545,10 513.127,59 504.941,69 453.415,78 503.929,13 510.034,75 518.470,26 818.925,98 499.040,50 792.460,16 851.259,46 489.593,81 497.657,11
Lalu Lintas Umur Beton < 24 jam
Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan
127 4.8.(2) M3 348.308,82 358.557,11 355.434,26 380.053,32 376.638,11 342.255,40 381.679,93 386.151,06 390.523,09 576.254,80 373.389,88 567.229,44 601.126,05 365.803,26 371.158,34
Lalu Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari
Tambahan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan
128 4.8.(3) M3 348.716,14 358.964,43 355.841,58 380.473,24 377.058,03 342.662,73 382.150,24 386.621,37 391.006,00 576.813,28 373.822,39 567.838,31 601.734,92 366.223,18 371.578,26
Lalu Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.9 Penambalan Penuh Perkerasan Beton Semen Bersambung Tanpa Tulangan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan
129 4.9.(1) M3 15.423.428,46 16.255.626,69 15.950.904,82 17.933.034,60 17.101.314,02 14.836.180,97 16.432.464,41 16.575.581,93 17.152.289,52 32.212.749,24 16.775.228,18 29.842.511,49 33.111.346,77 16.541.416,02 16.880.583,83
Lalu Lintas Umur Beton < 24 jam
Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan
130 4.9.(2) M3 15.039.253,22 15.858.311,96 15.556.967,46 17.506.739,82 16.682.202,92 14.460.576,09 16.014.977,55 16.150.767,67 16.721.408,28 31.503.926,02 16.359.714,14 29.165.706,13 32.377.482,95 16.131.841,36 16.465.173,35
Lalu Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari
Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan
131 4.9.(3) M3 15.034.765,42 15.853.543,68 15.552.199,18 17.501.971,54 16.676.873,67 14.456.088,30 16.009.648,30 16.145.438,41 16.716.079,03 31.497.755,31 16.354.665,37 29.158.132,98 32.369.909,80 16.126.792,59 16.460.124,58
Lalu Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari
132 4.9.(4) Pemasangan Ruji (Dowel) Buah 106.404,71 111.076,11 110.522,88 119.837,70 118.981,34 103.886,50 108.243,07 110.127,92 116.775,38 190.737,07 114.493,42 189.564,21 205.651,72 112.733,22 115.137,41
133 4.9.(5) Pemasangan Sealant M1 961,26 992,62 990,56 1.035,17 1.059,41 954,49 1.067,82 1.072,23 1.088,94 1.476,97 1.033,34 1.533,74 1.582,06 1.010,80 1.025,16
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.10 Penambahan Penyalurab Beban Pada Perkerasan Beton Semen (Dowel Retrofit) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Penambahan dan/atau Penggantian Ruji (Dowel) pada Perkerasan Beton
134 4.10.(1) Buah 342.221,06 352.185,74 349.977,96 373.415,18 371.649,52 336.227,49 370.099,86 376.027,35 384.054,19 569.008,21 367.659,35 567.065,61 603.474,95 361.416,50 366.199,34
Semen dengan Epoksi
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.11 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
135 4.11.(1) Penjahitan Melintang Tipe 1 (tabel pelat beton = 150 - 175 mm) Buah 26.485,06 27.663,25 27.499,88 29.531,59 29.558,44 26.021,16 27.826,26 28.055,28 28.852,26 46.606,80 28.435,65 45.003,24 48.374,03 27.965,68 28.593,67
136 4.11.(2) Penjahitan Melintang Tipe 2 (tabel pelat beton = > 175 mm - 200 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
137 4.11.(3) Penjahitan Melintang Tipe 3 (tabel pelat beton = > 200 mm - 225 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
138 4.11.(4) Penjahitan Melintang Tipe 4 (tabel pelat beton = > 225 mm - 250 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
139 4.11.(5) Penjahitan Melintang Tipe 5 (tabel pelat beton = > 250 mm - 275 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
140 4.11.(6) Penjahitan Melintang Tipe 6 (tabel pelat beton = > 275 mm -300 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
141 4.11.(7) Penjahitan Melintang Tipe 7 (tabel pelat beton = > 300 mm - 325 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
142 4.11.(8) Penjahitan Melintang Tipe 8 (tabel pelat beton = > 325 mm - 350 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
143 4.12.(1) Penutupan Sambungan Melintang (Termoplastik) M1 100.246,99 104.867,19 103.917,91 114.044,78 111.672,73 97.351,64 106.746,67 108.242,92 111.036,29 202.924,80 108.824,98 189.056,70 208.286,21 107.591,81 109.545,88
144 4.12.(2) Penutupan Sambungan Melintang (Termoseting) M1 175.612,30 184.250,00 182.491,66 201.558,95 196.532,78 170.340,35 187.196,08 190.598,32 195.571,95 371.317,01 192.168,65 344.309,20 382.018,30 190.323,17 193.764,52
145 4.12.(3) Penutupan Sambungan Melintang (Preformed) M1 785.006,52 824.114,22 816.261,92 902.363,09 879.054,94 761.452,75 837.506,91 852.661,88 875.482,07 1.671.944,77 860.108,78 1.546.605,59 1.717.904,03 852.387,02 867.581,06
146 4.12.(4) Penutupan Sambungan Memanjang (Termoplastik) M1 100.246,99 104.867,19 103.917,91 114.044,78 111.672,73 97.351,64 106.746,67 108.242,92 111.036,29 202.924,80 108.824,98 189.056,70 208.286,21 107.591,81 109.545,88
147 4.12.(5) Penutupan Sambungan Memanjang (Termoseting) M1 175.612,30 184.250,00 182.491,66 201.558,95 196.532,78 170.340,35 187.196,08 190.598,32 195.571,95 371.317,01 192.168,65 344.309,20 382.018,30 190.323,17 193.764,52
148 4.12.(6) Penutupan Sambungan Memanjang (Preformed) M1 785.006,52 824.114,22 816.261,92 902.363,09 879.054,94 761.452,75 837.506,91 852.661,88 875.482,07 1.671.944,77 860.108,78 1.546.605,59 1.717.904,03 852.387,02 867.581,06
149 4.12.(7) Penutupan Retak (Termoplastik) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
150 4.12.(8) Penutupan Retak (Termoseting) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.13 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
151 4.13.(1) Pengeboran Lubang Buah 5.385,27 5.401,71 5.399,48 5.423,24 5.433,40 5.380,46 5.423,68 5.428,84 5.429,32 5.624,34 5.416,23 5.627,22 5.655,69 5.405,92 5.415,58
152 4.13.(2) Material Injeksi Berbahan Dasar Semen Kg 451.185,20 473.739,83 469.230,73 518.839,96 505.324,40 437.657,90 481.359,14 490.119,68 503.263,09 962.487,48 494.489,51 889.953,08 988.792,56 490.100,12 498.867,18
153 4.13.(3) Material Injeksi Berbahan Dasar Cellular Kg 538.283,36 565.188,43 559.809,31 618.991,69 602.866,95 522.145,99 574.367,93 584.722,74 600.462,41 1.148.413,99 589.947,02 1.061.741,28 1.179.651,62 584.690,33 595.185,92
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

BIDANG BINA MARGA BM - 4 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

E DIVISI 5. PERKERASAN BERBUTIR 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
154 5.1.(1) Lapis Pondasi Agregat Kelas A M3 752.877,41 818.753,42 781.651,61 956.763,01 806.214,72 699.881,01 833.099,65 783.091,79 870.048,68 1.523.484,53 823.180,59 1.406.335,98 1.559.961,45 782.047,85 814.411,81
155 5.1.(2) Lapis Pondasi Agregat Kelas B M3 910.159,23 1.060.957,88 1.030.934,90 1.218.519,77 1.058.531,29 1.053.366,48 1.326.007,03 1.053.558,93 1.201.337,57 1.579.605,70 1.091.349,06 1.069.801,99 1.103.707,36 958.925,82 977.982,27
156 5.1.(3) Lapis Pondasi Agregat Kelas S M3 967.774,53 1.089.130,09 1.058.692,24 1.257.876,28 1.073.161,71 1.067.921,56 1.344.324,54 1.068.118,23 1.217.939,77 1.601.466,26 1.106.432,99 1.084.623,07 1.119.006,34 972.183,16 991.502,78
157 5.1.(4) Lapis Drainase M3 984.878,52 1.062.079,54 1.022.974,32 1.222.576,33 1.066.620,78 952.641,62 1.110.426,98 1.066.382,54 1.160.009,42 2.081.804,09 850.608,48 1.457.896,00 1.617.571,06 1.061.284,47 1.102.653,62
158 5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3 973.025,57 1.094.537,12 1.064.074,12 1.263.501,47 1.078.815,92 1.073.044,60 1.349.928,05 1.073.826,98 1.223.548,19 1.609.013,98 1.111.932,63 1.092.094,94 1.126.774,75 977.583,09 997.000,56
159 5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3 967.592,00 1.088.939,41 1.058.501,56 1.257.679,08 1.072.954,73 1.067.739,03 1.344.130,60 1.067.924,29 1.217.745,83 1.601.221,80 1.106.240,68 1.084.370,46 1.118.753,73 971.997,36 991.310,47
160 5.3.(1.a) Perkerasan Beton Semen (PPC) M3 2.063.181,57 2.220.589,94 2.110.284,31 2.543.945,66 2.213.120,77 1.923.672,18 2.213.498,84 2.145.131,06 2.305.042,72 4.072.552,10 2.215.030,62 3.794.862,42 4.204.303,45 2.135.776,32 2.195.848,21
161 5.3.(1.a) Perkerasan Beton Semen (OPC Tipe I + Fly ash) M3 2.099.719,40 2.258.562,53 2.147.986,98 2.585.373,53 2.253.880,99 1.959.702,61 2.254.163,01 2.186.108,57 2.347.912,55 4.148.580,91 2.255.468,67 3.867.973,51 4.283.982,87 2.175.464,89 2.236.137,34
162 5.3.(1.b) Perkerasan Beton Semen Fast Track 8 Jam M3 4.060.086,45 4.255.330,72 4.180.729,22 4.651.063,25 4.516.045,85 3.918.112,48 4.267.479,62 4.376.645,33 4.458.796,54 8.406.819,25 4.392.422,09 7.821.942,12 8.675.015,71 4.364.045,71 4.422.437,19
163 5.3.(1.c) Perkerasan Beton Semen Fast Track 24 Jam M3 3.629.611,23 3.864.887,89 3.732.473,05 4.344.733,11 3.963.984,07 3.440.260,85 3.874.842,69 3.841.677,69 4.043.235,77 7.389.940,28 3.924.129,69 6.871.563,34 7.621.304,90 3.831.034,01 3.918.130,45
164 5.3.(2.a) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3 2.502.220,84 2.681.842,27 2.566.092,00 3.049.837,51 2.705.231,81 2.349.266,25 2.682.563,32 2.621.748,68 2.795.923,02 5.017.521,01 2.696.297,43 4.669.793,02 5.176.253,28 2.612.450,59 2.680.912,58
165 5.3.(2.b) Perkerasan Beton Semen Fast Track 8 Jam dengan Anyaman Tulangan Tunggal M3 5.005.505,07 5.449.851,37 5.145.072,11 6.347.779,68 5.266.588,19 4.593.577,69 5.499.324,55 5.141.417,05 5.680.022,92 9.599.456,68 5.379.263,85 8.920.119,61 9.862.733,98 5.100.723,82 5.302.028,92
166 5.3.(2.c) Perkerasan Beton Semen Fast Track 24 Jam dengan Anyaman Tulangan Tunggal M3 5.077.852,11 5.527.159,20 5.221.298,09 6.431.016,14 5.348.109,40 4.665.590,29 5.580.027,39 5.222.753,30 5.764.305,75 9.760.862,37 5.462.913,27 9.070.688,57 10.030.032,82 5.182.060,07 5.385.379,38
167 5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) M3 1.412.332,86 1.538.013,92 1.443.628,53 1.798.262,29 1.490.893,39 1.297.076,19 1.535.457,68 1.447.377,65 1.596.439,60 2.727.411,86 1.514.812,51 2.545.597,22 2.816.833,36 1.438.316,22 1.490.538,21
168 5.4.(1) Stabilisasi Tanah Dasar dengan Semen Ton 815.266,72 878.521,43 841.258,40 1.010.105,79 879.228,44 763.769,33 885.787,04 852.373,31 925.394,77 1.643.340,70 885.534,06 1.524.003,62 1.689.736,99 850.980,83 878.802,22
169 5.4.(2) Lapis Fondasi Tanah Semen M3 892.359,49 963.717,24 914.894,64 1.112.528,22 956.698,09 830.470,09 961.898,63 925.552,84 1.005.124,02 1.774.673,97 962.213,84 1.651.309,01 1.831.009,85 923.563,81 952.362,80
170 5.5.(1) Lapis Fondasi Agregat Semen Kelas A (Cement Treated Base = CTB) M3 1.048.724,81 1.165.670,75 1.123.109,53 1.340.527,83 1.153.657,22 1.112.090,69 1.362.032,74 1.137.474,17 1.272.026,99 1.809.386,49 1.174.916,57 1.359.870,19 1.440.121,71 1.059.163,67 1.078.465,79
171 5.5.(2) Lapis Fondasi Agregat Semen Kelas B (Cement Treated Sub-Base = CTSB) M3 960.514,27 1.100.178,88 1.060.553,47 1.261.691,59 1.097.461,00 1.063.532,59 1.310.026,73 1.083.805,40 1.217.438,76 1.707.299,04 1.120.787,76 1.263.454,50 1.333.026,04 1.005.505,82 1.024.544,76
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
F DIVISI 6. PERKERASAN ASPAL 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
172 6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 37.099,08 38.807,35 38.427,62 42.599,53 41.466,93 35.960,59 39.388,10 40.147,31 41.282,92 78.625,45 40.517,13 72.839,89 80.910,38 40.134,91 40.894,49
173 6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 37.227,98 38.939,23 38.558,63 42.738,49 41.604,98 36.087,24 39.531,23 40.292,53 41.429,19 78.834,10 40.655,30 73.048,23 81.129,80 40.270,37 41.031,38
174 6.1 (2b) Lapis Perekat - Aspal Emulsi Modifikasi Polimer Liter 39.166,01 40.966,70 40.566,22 44.964,74 43.771,60 37.965,63 41.588,52 42.389,57 43.585,86 82.948,68 42.772,22 76.858,69 85.363,64 42.367,41 43.168,18
175 6.2 (1) Agregat Penutup BURTU M2 11.957,15 12.703,54 12.419,98 14.215,90 13.160,18 11.758,50 13.282,67 13.154,76 13.849,48 25.303,87 10.349,21 17.892,26 19.796,87 13.064,37 13.455,07
176 6.2 (2) Agregat Penutup BURDA M2 16.164,57 17.189,55 16.783,08 19.261,32 17.742,85 15.857,63 17.961,56 17.731,50 18.706,43 33.776,97 14.105,34 24.111,99 26.628,27 17.587,83 18.129,34
177 6.2 (3a) Bahan Aspal Keras untuk Pekerjaan Pelaburan Liter 21.631,33 22.653,80 22.426,32 24.812,86 24.131,29 20.948,58 22.997,71 23.452,05 24.020,97 45.944,07 23.563,43 42.380,60 47.082,27 23.448,77 23.789,98
178 6.2 (3b) Bahan Aspal Emulsi Modifikasi untuk Pekerjaan Pelaburan Liter 34.094,33 35.665,87 35.316,37 39.158,38 38.110,77 33.045,53 36.192,80 36.891,17 37.939,44 72.334,26 37.237,86 66.994,59 74.431,15 36.887,89 37.586,44
179 6.2 (4a) Aspal Cair untuk Precoated Liter 19.781,78 20.725,95 20.499,11 22.699,58 22.073,89 19.153,29 21.018,59 21.420,26 21.961,13 41.980,32 21.556,63 38.770,14 43.067,74 21.415,15 21.756,68
180 6.2 (4b) Aspal Emulsi untuk Precoated Liter 21.605,91 22.628,26 22.401,42 24.784,30 24.106,50 20.925,31 22.973,02 23.426,80 23.993,73 45.889,17 23.537,12 42.335,01 47.028,71 23.421,70 23.763,22
181 6.2 (4c) Aspal Emulsi Modifikasi Polimer untuk Precoated Liter 22.172,41 23.194,76 22.967,92 25.464,10 24.786,30 21.491,81 23.539,52 23.993,30 24.673,53 47.022,17 24.216,92 43.558,65 48.388,31 23.988,20 24.443,02
182 6.3 (1a) Stone Matrix Asphalt Halus (SMA Halus) Ton 2.154.383,62 2.261.804,74 2.233.147,54 2.484.404,52 2.393.928,98 2.096.131,74 2.313.428,28 2.345.307,20 2.413.577,66 4.541.053,12 2.223.122,56 3.945.392,69 4.376.576,71 2.338.626,35 2.381.706,23
183 6.3 (1b) Stone Matrix Asphalt Modifikasi Halus (SMA Mod Halus) Ton 2.221.083,11 2.329.856,51 2.300.905,37 2.562.679,98 2.471.372,96 2.162.871,51 2.380.967,73 2.412.386,99 2.490.811,21 4.678.542,00 2.299.927,23 4.083.892,88 4.530.508,44 2.407.949,16 2.458.567,36
184 6.3 (2a) Stone Matrix Asphalt Kasar (SMA Kasar) Ton 2.129.622,03 2.235.998,13 2.207.578,57 2.456.404,50 2.366.588,93 2.072.114,03 2.287.132,54 2.318.469,49 2.386.322,65 4.491.612,62 2.196.218,80 3.899.258,63 4.325.665,94 2.311.995,73 2.354.725,44
185 6.3 (2b) Stone Matrix Asphalt Modifikasi Kasar (SMA Mod Kasar) Ton 2.186.105,45 2.291.454,83 2.264.852,14 2.516.670,80 2.435.079,62 2.130.918,34 2.341.952,83 2.376.931,76 2.450.220,66 4.613.520,45 2.261.942,14 4.023.341,67 4.463.777,45 2.372.720,26 2.421.483,00
186 6.3(3) Lataston Lapis Aus (HRS-WC) Ton 2.340.113,94 2.456.045,10 2.423.444,62 2.697.552,05 2.599.288,12 2.269.317,26 2.502.405,69 2.539.336,19 2.610.477,18 4.915.802,91 2.467.258,44 4.382.958,11 4.862.536,56 2.532.846,93 2.576.697,18
187 6.3.(4) Lataston Lapis Fondasi (HRS-Base) Ton 2.015.569,73 2.116.198,02 2.087.121,50 2.325.268,63 2.237.808,71 1.956.086,29 2.158.262,42 2.188.670,12 2.251.311,17 4.232.237,10 2.106.310,58 3.736.507,63 4.144.709,82 2.182.336,87 2.221.244,04
188 6.3(5a) Laston Lapis Aus (AC-WC) Ton 2.088.549,32 2.193.016,45 2.164.063,55 2.409.604,68 2.320.346,16 2.032.780,64 2.243.698,38 2.274.890,88 2.340.746,67 4.405.583,11 2.142.272,56 3.803.021,09 4.218.886,23 2.267.905,05 2.309.739,68
189 6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton 2.145.302,16 2.248.741,88 2.221.605,98 2.470.194,99 2.389.161,20 2.091.853,02 2.298.785,13 2.333.619,38 2.404.967,10 4.528.023,87 2.208.334,70 3.927.713,96 4.357.675,32 2.328.896,06 2.376.819,77
190 6.3(6a) Laston Lapis Antara (AC-BC) Ton 1.976.638,87 2.076.038,45 2.048.224,94 2.281.948,22 2.196.015,78 1.924.426,04 2.124.822,30 2.153.595,16 2.216.986,10 4.173.603,87 2.020.020,82 3.587.125,72 3.979.638,46 2.147.030,43 2.187.186,06
191 6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton 2.037.788,56 2.138.499,41 2.110.404,99 2.353.922,12 2.267.185,99 1.985.650,71 2.186.712,08 2.215.001,08 2.287.909,96 4.301.462,95 2.090.577,57 3.715.617,09 4.122.645,80 2.210.733,22 2.257.783,90
192 6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1.806.439,08 1.897.874,78 1.871.831,02 2.086.960,11 2.006.323,43 1.759.714,58 1.944.019,25 1.969.184,25 2.028.292,87 3.814.206,87 1.833.628,05 3.253.206,73 3.608.859,84 1.962.770,54 2.000.298,87
193 6.3(7b) Laston Lapis Fondasi Modifikasi (AC-Base Mod) Ton 1.855.974,48 1.946.386,45 1.922.159,11 2.138.844,44 2.066.422,57 1.811.468,24 1.991.993,97 2.020.911,81 2.083.804,13 3.921.851,90 1.890.980,93 3.361.945,09 3.729.879,06 2.016.529,46 2.058.672,29
194 6.3.(8) Bahan anti pengelupasan Kg 45.320,00 47.586,00 47.132,80 52.118,00 50.758,40 43.960,40 48.265,80 49.172,20 50.531,80 96.531,60 49.625,40 89.325,72 99.250,80 49.172,20 50.078,60
195 6.4.(1a) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Zeolit Ton 2.164.546,17 2.272.813,14 2.242.547,37 2.497.001,06 2.405.186,18 2.106.012,97 2.321.992,44 2.353.340,71 2.423.996,27 4.564.482,62 2.226.248,21 3.954.177,26 4.386.837,53 2.348.630,31 2.393.058,67
196 6.4.(1b) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Wax Ton 2.125.615,84 2.231.883,34 2.202.612,73 2.452.178,23 2.361.860,66 2.068.682,21 2.281.939,10 2.312.785,21 2.381.943,46 4.484.375,94 2.182.833,93 3.876.031,54 4.300.008,96 2.308.042,79 2.350.618,76
197 6.4.(2a) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Zeolit Ton 1.267.466,50 1.314.115,05 1.297.542,87 1.408.234,60 1.357.442,42 1.250.184,06 1.342.517,63 1.346.315,19 1.383.086,10 2.202.576,18 1.212.005,43 1.805.714,21 1.954.877,92 1.342.026,15 1.365.932,32
198 6.4.(2b) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Wax Ton 2.010.585,17 2.111.633,49 2.083.529,09 2.320.937,88 2.234.035,63 1.957.303,67 2.159.744,55 2.188.108,63 2.254.712,79 4.245.759,77 2.057.181,88 3.654.015,62 4.053.960,58 2.183.787,56 2.224.621,87
199 6.4.(3a) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Zeolit Ton 1.883.537,62 1.978.833,23 1.951.455,79 2.175.637,90 2.092.404,42 1.834.004,76 2.023.466,57 2.048.806,97 2.112.755,31 3.975.512,97 1.918.831,13 3.406.647,38 3.779.361,37 2.044.671,15 2.084.834,63
200 6.4.(3b) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Wax Ton 1.845.097,34 1.938.415,50 1.912.039,86 2.131.376,14 2.049.632,29 1.797.154,81 1.983.955,78 2.008.808,37 2.071.267,08 3.896.491,40 1.875.939,76 3.329.442,91 3.693.578,63 2.004.639,99 2.042.943,28
201 6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 2.056.509,38 2.158.664,76 2.131.686,29 2.370.494,11 2.285.069,80 2.002.431,60 2.207.857,16 2.237.960,27 2.303.847,61 4.337.699,05 2.109.096,05 3.744.597,18 4.154.178,80 2.233.272,27 2.273.700,27

BIDANG BINA MARGA BM - 5 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

202 6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1.944.598,93 2.041.686,77 2.015.847,68 2.242.837,64 2.160.739,42 1.894.077,00 2.088.981,08 2.116.664,55 2.180.087,03 4.105.719,80 1.986.844,31 3.528.701,81 3.914.931,04 2.112.397,65 2.151.146,65
203 6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 1.774.085,25 1.863.198,50 1.839.140,63 2.047.503,03 1.970.711,67 1.729.064,46 1.907.864,80 1.931.929,46 1.991.069,38 3.745.796,41 1.800.112,51 3.194.247,68 3.543.569,73 1.927.815,25 1.963.937,25
204 6.6.(1) CPHMA Kemasa Kantong Ton 1.089.697,84 1.151.279,32 1.132.094,37 1.276.064,39 1.208.403,27 1.048.961,67 1.170.616,72 1.173.093,32 1.222.918,52 2.280.725,73 1.192.490,53 2.110.563,12 2.341.542,79 1.172.202,22 1.198.250,26
205 6.7.(1) Lapis Penetrasi Macadam M3 3.109.036,84 3.297.454,35 3.225.478,69 3.690.731,11 3.422.823,63 3.009.244,53 3.391.724,88 3.367.764,42 3.540.798,79 6.556.674,79 3.083.576,71 5.425.405,82 6.019.699,54 3.358.370,50 3.443.066,69
206 6.7.(2) Lapis Penetrasi Macadam Asbuton M3 2.637.264,18 2.791.801,54 2.736.318,11 3.150.356,60 2.891.099,62 2.543.083,62 2.857.616,34 2.841.505,08 2.972.753,38 5.491.183,80 2.578.034,52 4.517.285,85 5.011.062,33 2.832.719,10 2.891.681,53
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
G DIVISI 7. STRUKTUR 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
207 7.1 (1) Beton struktur, fc’50 MPa M3 3.197.518,56 3.402.908,03 3.268.864,32 3.815.551,79 3.461.552,28 3.023.754,79 3.404.296,54 3.371.946,73 3.545.123,80 6.155.419,50 3.421.243,15 5.781.853,52 6.359.152,13 3.332.334,52 3.403.004,55
208 7.1 (2) Beton struktur, fc’45 MPa M3 3.116.876,28 3.318.232,35 3.188.412,57 3.722.811,88 3.372.941,04 2.947.238,59 3.323.980,89 3.287.449,26 3.460.762,10 5.994.788,21 3.336.790,40 5.629.838,57 6.190.246,63 3.247.837,06 3.318.596,51
209 7.1 (3) Beton struktur, fc’40 MPa M3 3.017.068,81 3.213.357,29 3.088.300,59 3.608.561,93 3.262.659,78 2.852.154,16 3.223.170,71 3.181.889,72 3.355.252,98 5.799.226,36 3.231.626,20 5.442.587,76 5.983.326,15 3.142.656,17 3.213.449,00
210 7.1 (4) Beton struktur, fc’35 MPa M3 2.921.263,98 3.112.760,73 2.992.563,81 3.498.384,88 3.157.308,49 2.761.172,10 3.127.489,15 3.081.360,59 3.254.769,74 5.607.863,25 3.131.112,26 5.261.662,66 5.782.298,26 3.042.127,04 3.112.950,24
211 7.1 (5a) Beton struktur, fc’30 MPa M3 2.430.308,40 2.605.907,23 2.491.893,29 2.965.166,38 2.624.770,32 2.280.634,41 2.604.797,91 2.544.301,38 2.715.726,09 4.834.540,66 2.615.983,72 4.506.656,10 4.989.484,64 2.532.303,18 2.599.115,27
212 7.1 (5b) Beton strukutr bervolome besar, fc'30 MPa M3 2.553.170,13 2.727.822,32 2.613.808,38 3.102.713,71 2.761.292,12 2.403.496,14 2.729.145,24 2.671.238,73 2.838.653,45 4.980.147,09 2.744.419,92 4.642.678,07 5.135.406,61 2.654.297,15 2.727.551,47
213 7.1 (5c) Beton strukutr memadat sendiri, fc'30 MPa M3 2.360.765,83 2.533.221,00 2.420.488,14 2.887.203,27 2.547.458,97 2.212.784,23 2.531.813,25 2.469.145,80 2.639.212,66 4.707.583,10 2.542.045,94 4.385.984,91 4.859.358,66 2.458.804,22 2.524.982,56
214 7.1 (6a) Beton struktur, fc’25 Mpa M3 2.316.359,22 2.486.594,48 2.376.890,31 2.836.154,78 2.499.096,54 2.171.045,82 2.488.863,81 2.423.318,09 2.593.951,32 4.621.684,22 2.496.472,62 4.303.952,93 4.768.212,01 2.412.976,52 2.479.577,50
215 7.1 (6b) Beton struktur bervolume besar, fc’25 Mpa M3 2.464.859,22 2.635.094,48 2.525.390,31 3.001.154,78 2.664.096,54 2.319.545,82 2.640.663,81 2.578.418,09 2.745.751,32 4.803.184,22 2.651.572,62 4.475.552,93 4.949.712,01 2.561.476,52 2.634.677,50
216 7.1 (6c) Beton struktur memadat sendiri, fc’25 Mpa M3 2.314.683,69 2.484.833,92 2.374.286,46 2.834.207,97 2.496.712,81 2.168.949,55 2.485.543,95 2.420.657,20 2.590.634,84 4.615.044,51 2.493.533,05 4.298.661,70 4.762.332,87 2.410.315,62 2.476.437,44
217 7.1 (7a) Beton strukur, fc’20 MPa M3 2.476.126,44 2.585.698,22 2.540.915,75 2.802.435,74 2.740.917,03 2.402.283,60 2.618.917,69 2.686.044,56 2.726.794,59 4.850.522,83 2.665.874,90 4.568.007,58 5.010.733,88 2.644.652,34 2.675.908,30
218 7.1 (7b) Beton strukut bervolume besar, fc’20 MPa M3 2.624.626,44 2.734.198,22 2.689.415,75 2.967.435,74 2.905.917,03 2.550.783,60 2.770.717,69 2.841.144,56 2.878.594,59 5.032.022,83 2.820.974,90 4.739.607,58 5.192.233,88 2.793.152,34 2.831.008,30
219 7.1 (7c) Beton strukut memadat sendiri, fc’20 MPa M3 2.515.686,91 2.627.361,83 2.580.247,66 2.847.026,95 2.784.814,40 2.439.904,53 2.658.846,33 2.728.135,05 2.768.280,59 4.920.282,58 2.707.077,04 4.638.763,51 5.087.458,29 2.686.111,74 2.716.924,09
220 7.1 (7d) Beton strukut, fc’20 MPa yang dilaksanakan di air M3 3.257.543,57 3.409.166,91 3.363.352,94 3.644.177,37 3.646.408,95 3.181.072,59 3.498.355,47 3.565.272,17 3.605.969,49 5.958.107,17 3.520.469,67 5.805.614,10 6.263.394,33 3.485.125,13 3.530.816,70
221 7.1 (8) Beton , fc’15 Mpa M3 2.470.120,08 2.579.391,50 2.534.759,78 2.795.528,39 2.734.235,23 2.396.502,71 2.612.661,70 2.679.601,81 2.720.242,54 4.838.010,84 2.659.396,23 4.556.345,97 4.997.776,53 2.638.209,60 2.669.393,69
222 7.1 (9) Beton Siklop, fc’15 Mpa M3 1.106.479,40 1.154.316,67 1.128.574,83 1.246.369,12 1.215.589,80 1.070.957,39 1.146.557,46 1.177.951,57 1.192.263,81 2.091.217,79 1.177.221,04 1.974.285,49 2.164.085,93 1.169.816,98 1.181.017,31
223 7.1 (10) Beton, fc’10 Mpa M3 2.447.588,63 2.555.735,38 2.514.333,83 2.769.632,15 2.710.516,42 2.376.139,45 2.593.634,54 2.657.854,97 2.700.017,82 4.799.956,52 2.638.143,05 4.518.090,25 4.955.270,18 2.616.462,75 2.648.660,24
224 7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 84.030.744,26 88.098.178,64 87.245.900,35 96.234.226,96 93.782.405,97 81.725.808,88 88.713.379,43 90.091.625,96 93.772.592,45 175.026.262,79 92.054.772,95 163.973.857,68 181.915.212,22 88.937.070,43 91.836.603,21
225 7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 144.084.504,10 151.114.664,65 149.625.801,77 165.197.909,31 160.940.477,90 140.255.669,64 151.819.426,80 154.017.058,78 161.078.246,51 301.238.357,54 158.085.132,58 282.828.505,00 313.975.931,47 151.815.654,87 157.339.074,38
226 7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
227 7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 7.766.953,53 7.869.499,86 7.842.039,54 7.986.082,72 7.927.828,57 7.440.927,87 8.202.816,22 8.530.279,19 7.956.174,74 9.083.264,36 7.895.737,42 8.957.754,69 9.175.472,35 7.875.256,29 7.911.593,13
228 7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 9.789.268,53 9.918.515,28 9.883.905,00 10.065.453,32 9.992.031,29 9.378.354,17 10.338.618,65 10.751.344,56 10.027.758,08 11.448.312,85 9.951.584,43 11.290.123,69 11.564.529,43 9.925.770,54 9.971.568,56
229 7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
230 7.2 (3a) Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 342.545.103,66 359.334.473,01 355.636.600,04 392.940.256,56 382.698.715,70 334.450.736,64 358.316.536,99 362.327.535,46 384.402.573,56 714.232.577,92 377.007.924,58 676.889.530,60 751.821.515,47 354.183.234,98 371.950.999,65
231 7.2 (3b) Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
232 7.2 (4a) Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 9.789.268,53 9.918.515,28 9.883.905,00 10.065.453,32 9.992.031,29 9.378.354,17 10.338.618,65 10.751.344,56 10.027.758,08 11.448.312,85 9.951.584,43 11.290.123,69 11.564.529,43 9.925.770,54 9.971.568,56
233 7.2 (4b) Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
234 7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
235 7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
236 7.2.(7) Baja Prategang Kg 391.114,82 417.412,41 400.848,13 468.355,45 405.032,40 365.507,47 430.260,28 408.083,75 435.171,29 587.820,26 412.347,52 564.919,85 599.072,15 391.030,80 406.001,71
237 7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
238 7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Beton Pratekan untuk Diafragma fc' 45 MPa termasuk Pekerjaan pasca-tarik
239 7.2.(10) M3 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
(post-tension)
240 7.2.(11a) Penyediaan Balok T Beton Pratekan bentang 40m Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
241 7.2.(11b) Pemasangan Balok T Beton Pratekan bentang 60 m Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
242 7.2.(12a) Penyediaan Panel Full Depth slab Buah 1.592.432,53 1.639.567,42 1.628.515,05 1.728.213,71 1.697.332,49 1.549.242,29 1.666.315,32 1.702.896,58 1.707.583,46 2.576.746,44 1.686.221,55 2.475.043,65 2.670.487,20 1.603.769,54 1.664.028,61
243 7.2.(12b) Penmasangan Panel Full Depth slab Buah 713.663,66 723.229,70 720.727,21 734.074,89 728.987,02 683.952,62 753.715,59 783.668,06 731.459,79 835.829,22 725.620,75 824.280,96 844.121,79 723.643,84 727.065,70
244 7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50
245 7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50
246 7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50
247 7.3 (4) Baja Tulangan Sirip BjTS 420B Kg 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38 15.746,38
248 7.3 (5) Baja Tulangan Sirip BjTS 520 Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50
249 7.3 (6) Baja Tulangan Sirip BjTS 550 Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50
250 7.3 (7) Baja Tulangan Sirip BjTS 700 Kg 22.924,00 24.024,00 23.790,80 26.004,00 25.639,90 22.339,90 23.263,90 23.302,40 25.498,00 43.585,30 24.896,30 43.058,84 47.262,60 24.696,10 25.129,50

BIDANG BINA MARGA BM - 6 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

251 7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 25.701,50 26.911,50 26.678,30 29.001,50 28.747,40 25.117,40 26.178,90 26.244,90 28.468,00 47.352,80 27.783,80 46.798,84 51.002,60 27.501,10 28.017,00
252 7.4 (1a) Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) Kg 27.957,40 29.281,37 29.060,48 32.035,95 31.264,53 27.066,79 29.731,94 30.292,64 31.043,99 59.025,76 30.492,07 54.554,85 60.567,94 30.270,65 30.712,58
253 7.4 (1b) Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 19.167,44 19.170,38 19.169,48 19.174,09 19.171,49 19.156,82 19.180,56 19.191,17 19.172,45 19.207,59 19.170,92 19.201,97 19.209,06 19.170,29 19.171,43
254 7.4 (1c) Penyediaan Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Kg 20.267,44 20.270,38 20.269,48 20.274,09 20.271,49 20.256,82 20.280,56 20.291,17 20.272,45 20.307,59 20.270,92 20.301,97 20.309,06 20.270,29 20.271,43
255 7.4 (1d) Penyediaan Baja Struktur Grade 690 (Kuat Leleh 690 Mpa Untuk Tebal Pelat < 2,5) Kg 24.667,44 24.670,38 24.669,48 24.674,09 24.671,49 24.656,82 24.680,56 24.691,17 24.672,45 24.707,59 24.670,92 24.701,97 24.709,06 24.670,29 24.671,43
Penyediaan Baja Struktur Grade 690 (Kuat Leleh 620 Mpa Untuk Tebal Pelat <
256 7.4 (1e) Kg 21.367,44 21.370,38 21.369,48 21.374,09 21.371,49 21.356,82 21.380,56 21.391,17 21.372,45 21.407,59 21.370,92 21.401,97 21.409,06 21.370,29 21.371,43
2,5-4,0 inch)
257 7.4 (2) Pemasangan Baja Struktur Kg 3.290,84 3.320,27 3.311,33 3.357,43 3.331,37 3.184,73 3.422,05 3.528,23 3.340,99 3.692,44 3.325,66 3.636,20 3.707,06 3.319,38 3.330,82
258 7.4 (3) Penyediaan Struktur Jembatan Rangka Baja Standar …… m Kg 27.967,44 29.290,38 29.069,48 32.044,09 31.271,49 27.076,82 29.740,56 30.301,17 31.052,45 59.027,59 30.500,92 54.555,97 60.569,06 30.280,29 30.721,43
259 7.4 (4) Pemasangan Jembatan Rangka Baja Standar Panjang ….. M Kg 3.290,84 3.320,27 3.311,33 3.357,43 3.331,37 3.184,73 3.422,05 3.528,23 3.340,99 3.692,44 3.325,66 3.636,20 3.707,06 3.319,38 3.330,82
260 7.4 (5a) Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa Kg 3.290,84 3.320,27 3.311,33 3.357,43 3.331,37 3.184,73 3.422,05 3.528,23 3.340,99 3.692,44 3.325,66 3.636,20 3.707,06 3.319,38 3.330,82
261 7.4 (5b) Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa Kg 27.967,44 29.290,38 29.069,48 32.044,09 31.271,49 27.076,82 29.740,56 30.301,17 31.052,45 59.027,59 30.500,92 54.555,97 60.569,06 30.280,29 30.721,43
262 7.5.(1) Tiang bor sekan primer diameter 80 cm (fc' > 15 MPa) M1 2.077.851,86 2.140.082,80 2.114.664,68 2.263.174,47 2.228.267,53 2.035.926,18 2.159.030,44 2.197.153,36 2.220.298,58 3.426.384,39 2.185.646,12 3.265.974,02 3.517.372,22 2.173.580,17 2.191.339,76
263 7.5.(2) Tiang bor sekan sekunder diameter 80 cm (fc' > 30 MPa) M1 3.040.456,40 3.140.461,32 3.075.529,48 3.345.062,25 3.151.204,00 2.955.215,87 3.139.829,55 3.105.376,30 3.203.004,03 4.409.685,70 3.146.199,96 4.222.952,85 4.497.927,52 3.098.543,23 3.136.593,25
264 7.5.(3) Tiang bor sekan primer diameter 100 cm (fc' > 15MPa) M1 2.869.150,39 2.966.386,23 2.926.670,42 3.158.716,96 3.104.174,87 2.803.641,52 2.995.991,92 3.055.558,99 3.091.723,39 4.976.232,47 3.037.578,93 4.725.591,26 5.118.400,95 3.018.725,87 3.046.475,23
265 7.5.(4) Tiang bor sekan sekunder diameter 100 cm (fc' > 30 MPa) M1 3.693.584,97 3.849.842,66 3.748.386,66 4.169.531,61 3.866.628,09 3.560.396,65 3.848.855,52 3.795.022,32 3.947.565,64 5.833.005,76 3.858.809,28 5.541.235,67 5.970.883,60 3.784.345,64 3.843.798,80
266 7.5.(5) Tiang bor sekan primer diameter 120 cm (fc' > 15 MPa) M1 3.836.293,03 3.976.312,65 3.919.121,87 4.253.268,90 4.174.728,29 3.741.960,27 4.018.944,84 4.104.721,42 4.156.798,16 6.870.491,24 4.078.830,13 6.509.567,89 7.075.213,84 4.051.681,74 4.091.640,81
267 7.5.(6) Tiang bor sekan sekunder diameter 120 cm (fc' > 30 MPa) M1 4.735.786,24 4.960.797,33 4.814.700,68 5.421.149,41 4.984.968,34 4.543.995,07 4.959.375,85 4.881.856,02 5.101.518,41 7.816.552,18 4.973.709,26 7.396.403,25 8.015.096,28 4.866.481,62 4.952.094,16
268 7.5.(7) Tiang bor sekan primer diameter 150 cm (fc' > 15 MPa) M1 5.616.714,72 5.835.495,37 5.746.134,79 6.268.239,51 6.145.519,81 5.469.319,77 5.902.108,16 6.036.134,07 6.117.503,98 10.357.649,42 5.995.678,93 9.793.706,69 10.677.528,49 5.953.259,57 6.015.695,62
269 7.5.(8) Tiang bor sekan sekunder diameter 150 cm (fc' > 15 MPa) M1 6.853.965,61 7.205.545,43 6.977.269,41 7.924.845,56 7.243.312,64 6.554.291,90 7.203.324,36 7.082.199,64 7.425.422,13 11.667.662,39 7.225.720,32 11.011.179,69 11.977.887,54 7.058.177,13 7.191.946,72
270 7.5.(9) Tiang bor sekan primer diameter …… cm (fc' > 15 MPa) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
271 7.5.(10) Tiang bor sekan sekunder diameter ….. cm (fc' > 15 MPa) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
272 7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 54.626,79 56.937,57 56.937,57 59.433,00 61.559,14 54.280,29 58.231,64 58.740,00 59.363,86 80.713,29 57.676,93 80.875,61 82.746,71 56.382,86 57.792,43
273 7.6 (2) Dinding Turap Kayu Tanpa Pengawetan, Penyediaan dan Pemancangan M2 156.974,71 163.664,52 163.505,13 170.365,56 176.565,97 156.496,54 166.685,48 168.173,13 169.815,32 225.335,25 165.184,82 225.518,38 229.012,49 161.101,71 165.339,35
274 7.6.(3) Dinding Turap Kayu Dengan Pengawetan, Penyediaan dan Pemancangan M2 205.173,57 213.880,46 213.710,51 222.651,39 230.784,40 204.663,72 216.919,38 218.427,65 220.100,44 290.445,90 215.449,31 290.458,75 294.184,33 209.391,94 215.614,50
275 7.6.(4) Dinding Turap Baja, Penyediaan dan Pemancangan M2 4.630.174,03 4.850.512,79 4.811.877,04 5.308.201,67 5.171.708,16 4.476.434,85 4.923.460,52 5.007.225,73 5.146.953,15 9.734.117,20 5.054.744,25 9.023.798,83 10.014.882,61 4.998.155,66 5.087.285,53
276 7.6.(5) Dinding Turap Beton, Penyediaan dan Pemancangan M2 736.385,73 748.091,23 741.546,51 774.655,39 751.458,62 724.068,53 778.926,78 774.359,04 785.193,98 906.680,80 757.017,98 912.346,09 932.387,99 744.177,22 750.468,98
277 7.6.(6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran…… mm M1 146.934,50 154.281,23 153.011,88 167.474,68 165.166,64 143.126,47 157.439,11 159.901,64 163.593,62 297.878,22 160.631,09 279.935,97 307.762,18 158.901,64 161.864,17
278 7.6.(7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan Ukuran…… mm M1 150.128,18 157.634,59 156.327,89 171.075,98 168.764,66 146.245,44 160.858,77 163.358,66 167.125,35 303.908,02 164.101,65 285.744,88 314.060,45 162.311,04 165.353,41
279 7.6 (8a) Penyediaan Tiang Pancang Baja Diameter 500 mm tebal 10 mm M1 4.679.909,68 4.904.904,84 4.865.575,35 5.372.163,50 5.232.097,05 4.524.218,18 4.977.745,21 5.059.390,51 5.205.525,68 9.888.591,80 5.112.456,46 9.158.511,45 10.170.084,56 5.054.901,02 5.145.734,44
280 7.6 (8b) Penyediaan Tiang Pancang Baja Diameter …. mm tebal …... mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
281 7.6.(8c) Penyediaan Tiang Pancang Baja Diameter …... mm tebal …… mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
282 7.6.(9a) Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm
M1 2.260.078,75 2.382.521,28 2.345.685,58 2.626.054,53 2.511.053,64 2.179.325,83 2.418.954,60 2.437.787,38 2.518.860,01 4.713.669,25 2.462.452,03 4.355.954,59 4.828.782,97 2.431.589,19 2.481.502,99
Penyediaan Tiang Pancang Baja H Beam Ukuran …..mm x …….. mm x
283 7.6.(9b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
…….mm x ……... mm
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350
284 7.6.(10a) M1 783.333,31 842.337,28 813.126,85 964.507,41 844.347,88 703.615,02 789.370,46 756.442,64 854.938,63 1.407.961,01 813.278,67 1.366.453,67 1.508.075,82 801.009,52 858.902,47
mm
285 7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ……..mm x ……... mmM1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
286 7.6.(11a) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 1.165.418,13 1.222.686,77 1.212.022,32 1.316.859,50 1.300.554,39 1.095.262,35 1.194.437,45 1.212.082,58 1.266.042,73 2.038.098,58 1.215.048,00 1.995.366,68 2.153.952,27 1.230.645,12 1.287.044,21
287 7.6.(11b) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ……. mm x ………. mm
M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
288 7.6.(12a) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 817.613,94 860.915,38 848.746,72 950.626,99 904.570,74 745.538,94 809.070,61 815.694,11 864.994,92 1.549.764,23 843.698,01 1.475.066,96 1.633.913,28 857.774,19 915.479,15
289 7.6.(12b) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……...mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
290 7.6.(13) Pemancangan Tiang Pancang Kayu Ukuran ….. Mm M1 270.629,61 281.643,05 281.306,56 289.074,79 303.160,84 268.438,92 296.839,99 298.845,90 296.709,72 367.683,40 288.551,17 392.568,72 396.237,25 282.607,28 288.053,60
291 7.6.(14a) Pemancangan Tiang Pancang Baja Diameter 500 mm M1 433.784,14 443.999,49 442.814,13 454.185,65 459.370,52 421.725,49 462.505,92 474.362,51 454.857,07 545.464,03 448.441,34 550.343,31 560.859,72 442.714,54 448.515,78
292 7.6.(14b) Pemancangan Tiang Pancang Baja Diameter …….. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Pemancangan Tiang Pancang Baja H beam Ukuran 300 mm x 300 mm x 10
293 7.6.(15a) M1 233.733,80 240.903,83 240.654,08 246.938,28 255.930,19 232.096,50 252.776,98 255.641,16 251.368,90 301.919,54 245.904,55 313.800,98 315.867,29 240.759,58 245.318,87
mm x 15 mm
Pemancangan Tiang Pancang Baja H beam Ukuran…….. mm x …….. mm x
294 7.6.(15b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
…….. mm x ……... mm
295 7.6.(16a) Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 233.733,80 240.903,83 240.654,08 246.938,28 255.930,19 232.096,50 252.776,98 255.641,16 251.368,90 301.919,54 245.904,55 313.800,98 315.867,29 240.759,58 245.318,87
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran………. mm x
296 7.6.(16b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
………... mm
297 7.6.(17a) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 233.733,80 240.903,83 240.654,08 246.938,28 255.930,19 232.096,50 252.776,98 255.641,16 251.368,90 301.919,54 245.904,55 313.800,98 315.867,29 240.759,58 245.318,87
298 7.6.(17b) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ………. mm x ….. mm
M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
299 7.6.(18a) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 458.114,65 473.751,89 473.502,14 488.253,54 505.712,65 456.477,36 489.858,64 496.956,42 496.917,76 610.972,42 478.752,61 618.620,26 620.686,57 469.374,04 478.166,93

BIDANG BINA MARGA BM - 7 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

300 7.6.(18b) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter ….. mm 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
301 7.6.(19a) Tiang Bor Beton, diameter 800 mm M1 2.285.371,48 2.388.217,53 2.365.217,70 2.592.260,33 2.532.020,69 2.223.092,20 2.350.322,49 2.368.930,75 2.526.490,65 4.485.296,61 2.479.325,89 4.295.327,37 4.745.896,16 2.462.472,88 2.502.040,96
302 7.6.(19b) Tiang Bor Beton, diameter ….. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13)s/d 7.6.(18) bila Tiang
303 7.6.(20) M1 84.965,03 85.069,79 85.069,79 85.153,60 85.279,32 84.965,03 85.132,65 85.153,60 85.174,56 85.845,03 85.090,75 85.928,84 85.928,84 85.027,89 85.090,75
Pancang dikerjakan di tempat Yang Berair
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) Bila Tiang Bor Beton
304 7.6.(21) M1 135.248,60 135.507,11 135.507,11 135.713,91 136.024,11 135.248,60 135.662,21 135.713,91 135.765,61 137.420,04 135.558,81 137.626,84 137.626,84 135.403,70 135.558,81
dikerjakan ditempat Yang Berair
305 7.6.(22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
306 7.6.(23) Pengujian Pembebanan Pada Tiang Dengan Diameter di atas 600 mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
307 7.6.(24) Tiang Uji jenis …. Ukuran …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban
308 7.6.(25a) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
hidrolik Cara Beban Siklik
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban
309 7.6 (25b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
hidrolik Cara Beban Bertahap
Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban
310 7.6 (26a) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
statis Cara beban Siklik
Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban
311 7.6 (26b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
statis Cara beban Bertahap
312 7.6 (27a) Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada
313 7.6 (27b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Tiangukuran / diameter ....
314 7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
315 7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1 8.333.323,63 8.723.377,29 8.661.804,99 9.556.418,91 9.319.592,34 8.062.631,97 8.430.252,90 8.638.689,65 9.250.405,80 16.697.905,47 9.072.020,26 16.217.420,49 17.999.592,51 9.010.368,44 9.159.303,30
316 7.9.(1) Pasangan Batu M3 1.133.919,45 1.188.695,66 1.163.247,28 1.294.547,95 1.260.721,07 1.095.231,93 1.185.756,19 1.218.084,01 1.237.310,22 2.278.412,91 1.219.872,83 2.138.554,99 2.358.657,44 1.210.424,23 1.225.437,22
317 7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 707.298,31 739.545,33 727.918,12 796.974,03 786.507,06 688.529,01 744.178,67 761.274,29 773.431,92 1.326.376,13 756.969,25 1.257.519,86 1.365.788,99 748.396,89 759.525,89
318 7.10.(2) Pasangan Batu Kosong M3 834.338,49 874.151,61 867.758,69 945.382,06 934.769,55 814.932,42 889.215,62 903.866,94 924.911,19 1.633.139,57 904.617,80 1.531.695,37 1.672.652,26 893.783,61 910.868,66
319 7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1.077.862,50 1.129.392,00 1.120.647,00 1.225.284,50 1.207.866,00 1.049.735,50 1.148.471,50 1.167.782,00 1.195.716,50 2.157.380,50 1.170.906,00 2.017.705,80 2.213.937,00 1.158.157,00 1.179.530,00
320 7.10.(3b) Bronjong dengan kawat yang dilapisi PVC M3 1.070.746,49 1.081.746,49 1.081.746,49 1.091.829,82 1.103.746,49 1.070.746,49 1.087.246,49 1.090.913,16 1.094.579,82 1.171.579,82 1.082.663,16 1.172.496,49 1.172.496,49 1.076.246,49 1.082.663,16
321 7.10.(4) Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC
M2 254.793,00 265.092,67 264.866,07 275.721,97 285.125,50 253.999,90 270.932,57 275.052,43 279.398,90 367.698,47 267.029,03 364.785,59 369.974,73 262.219,10 267.255,63
322 7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed M1 2.332.466,02 2.444.258,67 2.422.493,51 2.671.220,89 2.608.233,09 2.260.338,59 2.482.804,02 2.528.089,10 2.593.159,11 4.890.393,24 2.544.568,03 4.535.236,38 5.026.180,30 2.521.117,27 2.565.576,81
323 7.11.(1b) Sabungan siar Muai Tipe Asphaltic Plug, Movable M1 4.678.298,52 4.907.807,67 4.861.738,01 5.367.868,14 5.236.691,34 4.535.498,84 4.987.905,52 5.079.459,35 5.207.292,61 9.889.046,24 5.110.906,53 9.156.460,68 10.158.857,30 5.071.662,52 5.161.318,31
324 7.11.(2) Sambungan Siar Muai Tipe Silicone Seal M1 738.792,97 767.543,26 763.264,53 815.814,07 812.434,24 726.183,37 779.432,57 788.970,50 803.568,66 1.281.480,74 787.520,43 1.218.064,71 1.309.726,17 779.030,74 791.642,36
325 7.11.(3) Sambungan Siar Muai Tipe Strip seal M1 1.379.279,42 1.448.197,70 1.434.488,40 1.585.504,70 1.544.929,01 1.338.151,52 1.471.886,61 1.498.455,04 1.538.528,82 2.932.877,42 1.511.508,89 2.712.935,65 3.012.988,04 1.497.981,72 1.524.764,99
326 7.11.(4) Sambungan Siar Muai Tipe Compression Seal M1 1.387.145,27 1.456.332,93 1.442.668,95 1.593.682,71 1.553.716,31 1.346.153,33 1.480.111,64 1.506.747,20 1.546.842,80 2.944.209,22 1.519.440,19 2.724.673,92 3.024.207,39 1.505.642,78 1.532.650,97
327 7.11.(5) Sambungan Siar Muai Expansion Joint Tipe Modular, lebar …….. M1 1.193.278,86 1.193.490,92 1.193.449,57 1.193.845,19 1.193.857,06 1.193.177,18 1.193.746,65 1.193.830,92 1.193.932,24 1.197.148,07 1.193.675,14 1.196.944,86 1.197.488,62 1.193.556,62 1.193.664,89
328 7.11.(6) Sambungan Siar Muai Expansion Joint Tipe Finger Plate, lebar …….. M1 4.129.108,46 4.335.481,20 4.294.207,71 4.748.156,83 4.624.472,29 4.005.310,37 4.405.831,56 4.485.902,92 4.605.933,64 8.808.701,90 4.525.684,02 8.144.468,05 9.048.890,38 4.485.628,62 4.565.729,40
329 7.11.(7) Sambungan Siar Muai Expansion Tipe Karet dengan Lebar Celah …….. Cm M3 2.306.198,59 2.413.682,68 2.393.393,18 2.621.272,80 2.567.782,35 2.245.330,09 2.450.170,27 2.492.090,73 2.550.242,79 4.653.945,60 2.508.355,84 4.336.302,62 4.781.048,46 2.484.712,68 2.524.587,44
330 7.11.(8) Joint Filler untuk Sambungan Konstruksi M3 2.576.022,10 2.690.830,84 2.668.696,63 2.919.019,33 2.860.807,44 2.503.764,13 2.735.594,57 2.782.167,71 2.846.157,14 5.145.946,10 2.792.130,95 4.801.602,01 5.286.994,50 2.765.386,14 2.812.116,92
331 7.11.(9) Sambungan Siar Muai Tipe Modular, Lebar …….. M3 321.248,59 329.485,18 329.045,18 338.580,30 344.638,35 319.928,59 334.169,57 336.391,03 339.052,49 421.944,20 332.806,64 420.314,06 429.950,06 329.012,98 333.246,64
332 7.12.(1a) Landasan Logam Tipe Fixed Buah 2.151.478,29 2.253.945,81 2.237.249,68 2.434.388,38 2.408.910,09 2.099.677,82 2.301.210,45 2.337.971,08 2.386.063,81 4.195.518,03 2.336.894,20 3.956.297,03 4.319.717,33 2.308.993,81 2.352.305,86
333 7.12.(1b) Landasan Logam Tipe Moveable Buah 2.271.958,33 2.385.166,67 2.363.166,67 2.607.458,33 2.545.583,33 2.205.958,33 2.424.858,33 2.467.996,67 2.532.475,00 4.792.425,00 2.487.503,33 4.442.306,00 4.924.590,00 2.464.330,00 2.508.843,33
334 7.12.(1c) Landasan Logam Tipe ……. Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
335 7.12.(2) Landasan Elastomerik Karet Alam Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm
Buah 1.254.458,33 1.316.736,67 1.304.966,67 1.437.278,33 1.405.983,33 1.218.928,33 1.339.048,33 1.362.496,67 1.397.385,00 2.620.805,00 1.372.103,33 2.434.586,00 2.693.790,00 1.358.830,00 1.383.543,33
336 7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran ….. Mm x ….. Mm x……..
Buah
Mm 1.045.458,33 1.097.286,67 1.087.606,67 1.196.928,33 1.171.903,33 1.016.198,33 1.116.078,33 1.135.456,67 1.164.185,00 2.174.865,00 1.142.973,33 2.022.152,00 2.235.530,00 1.131.790,00 1.152.433,33
337 7.12.(4) Landasan karet Strip M1 375.718,75 394.185,00 390.995,00 428.023,75 421.547,50 366.038,75 401.293,75 407.907,50 417.601,25 759.618,75 409.612,50 710.902,50 781.412,50 405.157,50 412.802,50
338 7.12.(5) Landasan Tipe Logam Berongga (Pot Bearing) Buah 14.137.090,98 14.580.625,58 14.485.951,14 15.471.342,02 15.313.115,49 13.840.011,30 15.268.453,82 15.467.340,00 15.649.280,07 23.951.085,11 15.081.710,06 23.324.723,70 24.886.766,65 14.821.410,77 15.046.483,29
339 7.12.(6) Landasan Tipe Logam Jenis Spherical Buah 15.327.414,81 15.569.020,84 15.512.846,40 16.065.308,71 16.003.725,03 15.145.835,13 16.125.399,07 16.249.595,26 16.319.555,33 20.624.651,80 15.883.246,74 20.486.316,38 21.204.373,34 15.669.666,03 15.820.048,54
340 7.13.(1) Sandaran (Railing) M1 190.272,50 199.355,48 198.024,20 214.994,73 213.527,60 186.052,08 202.941,48 206.044,03 210.506,18 365.842,95 206.168,60 345.407,48 375.817,20 203.404,03 207.414,90
341 7.14.(1) Papan Nama Jembatan M1 612.336,74 642.128,58 638.003,41 688.878,92 689.337,08 599.961,57 658.307,58 668.143,58 681.939,42 1.153.448,49 664.770,25 1.103.453,11 1.193.873,83 657.143,58 668.812,75
342 7.15.(1) Pembongkaran Pasangan Batu M3 363.762,03 375.753,67 374.948,41 390.442,43 401.018,89 361.774,12 392.252,09 393.246,96 397.535,54 516.648,21 385.218,11 528.395,53 538.462,54 374.507,08 383.281,41
343 7.15.(2) Pembongkaran Beton M3 535.317,95 553.043,66 551.918,96 574.549,62 590.518,60 532.607,55 577.402,36 578.719,67 585.069,89 758.789,34 566.882,75 776.950,11 791.037,37 550.941,13 563.979,81
344 7.15.(3) Pembongkaran Beton Pratekan M3 485.003,14 498.784,40 494.407,65 527.299,35 523.638,06 475.043,82 516.447,49 521.414,15 535.389,98 803.274,64 519.924,25 774.414,64 829.343,10 513.097,44 519.691,08
345 7.15.(4) Pembongkaran Bangunan Gedung M2 294.412,02 301.550,48 299.379,15 318.135,47 316.200,70 289.696,52 323.742,59 328.341,30 331.426,92 480.034,74 315.714,21 473.754,47 501.414,99 310.022,76 313.582,36

BIDANG BINA MARGA BM - 8 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

346 7.15.(5) Pembongkaran Rangka Baja M2 1.180.107,59 1.211.983,05 1.202.059,94 1.277.372,58 1.269.494,52 1.157.664,67 1.251.486,43 1.261.502,10 1.296.268,66 1.909.753,08 1.260.179,69 1.846.156,76 1.971.038,64 1.244.075,35 1.259.440,37
347 7.15.(6) Pembongkaran Balok Baja (Steel Stingers) M1 434.970,83 447.413,50 443.692,88 472.471,23 470.041,25 426.555,95 462.699,89 466.455,22 479.572,64 713.393,80 465.681,08 690.039,82 736.863,72 459.102,61 465.322,02
348 7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 163.726,75 170.882,33 170.794,40 176.960,07 185.137,05 163.527,86 173.973,99 174.062,75 174.369,69 222.416,39 172.680,82 228.716,62 229.823,32 167.039,85 172.675,43
349 7.15.(8) Pembongkaran Jembatan Kayu M2 46.184,92 46.380,31 46.353,92 46.642,65 46.754,15 46.125,23 46.527,33 46.553,97 46.646,09 48.962,63 46.529,65 48.901,29 49.233,45 46.398,40 46.528,04
350 7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3/ km 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
351 7.16.(1) Dreck drain Buah 152.900,00 160.600,00 159.225,00 174.625,00 171.875,00 148.775,00 164.010,00 166.650,00 170.610,00 314.270,00 167.475,00 294.910,00 325.050,00 165.825,00 168.685,00
352 7.16.(2a) Pipa Drainase Baja diameter 150 mm M1 107.923,97 112.030,64 111.517,31 118.593,97 118.813,97 106.292,31 112.158,97 114.707,31 116.540,64 177.168,97 114.523,97 172.090,64 183.457,31 112.873,97 115.037,31
353 7.16.(2b) Pipa Drainase Baja diameter ……. Mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
354 7.16.(3a) Pipa Drainase PVC diameter 150 mm M1 249.608,33 262.111,67 259.955,67 284.405,00 280.650,33 243.067,00 195.818,33 272.701,00 279.334,00 363.311,67 273.170,33 478.341,60 525.990,67 89.349,33 91.149,67
355 7.16.(3b) Pipa Drainase PVC diameter …… mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
356 7.16.(4) Pipa Penyalur PVC M1 249.608,33 262.111,67 259.955,67 284.405,00 280.650,33 243.067,00 195.818,33 272.701,00 279.334,00 363.311,67 273.170,33 478.341,60 525.990,67 89.349,33 91.149,67
357 7.17.(1) Pengujian Pembebanan Jembatan Buah Jembatan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
H DIVISI 8. REHABILITASI JEMBATAN 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
358 8.1 (1) Cairan Perekat (Epoksi resin) Kg 146.376,16 152.241,23 150.867,47 162.926,63 161.067,60 142.814,51 156.460,91 158.566,31 161.116,45 265.055,93 157.450,77 253.186,26 274.212,77 155.150,37 157.968,81
359 8.1 (2) Bahan Penutup (Sealant) Kg 142.969,40 149.517,42 148.162,13 162.247,02 159.071,69 138.925,10 152.283,97 154.735,63 158.186,24 285.516,67 155.140,79 266.922,91 293.606,45 153.417,04 156.349,03
360 8.1 (3a) Tabung Penyuntik, penyediaan Buah 96.673,15 101.410,70 100.552,70 110.636,25 108.311,79 93.967,15 102.862,70 104.644,70 107.218,70 200.045,53 105.502,70 185.802,73 205.325,53 104.329,15 106.360,70
361 8.1 (3b) Tabung Penyuntik, penggunan Buah 121.653,12 126.809,95 126.237,95 134.643,24 135.407,62 119.849,12 129.197,92 131.174,79 133.679,66 209.080,18 129.853,50 200.373,85 213.389,05 128.177,08 130.425,50
362 8.2.(1) Penambahan (Patching) M3 3.348.941,13 3.515.598,81 3.482.224,10 3.848.866,01 3.749.512,79 3.006.153,94 3.305.528,24 3.366.054,67 3.455.923,68 6.590.044,07 3.394.347,00 6.097.645,44 6.771.917,74 3.522.580,31 3.826.392,04
363 8.2.(2) Perbaikan Dengan Cara Graut M3 4.713.705,21 4.913.196,70 4.865.263,98 5.294.919,21 5.215.743,20 4.590.765,03 5.066.302,86 5.139.987,76 5.243.003,98 8.938.504,88 5.104.896,24 8.506.498,39 9.259.650,50 5.023.343,51 5.119.416,97
364 8.3.(1a) Pengecetan protektif pada elemen struktur beton, tebal 200µm M2 43.807,06 45.549,12 45.215,73 48.812,56 48.402,51 42.900,98 47.345,83 48.010,95 48.795,17 80.748,60 47.381,77 77.313,79 83.602,61 46.675,64 47.476,38
365 8.3.(1b) Pengecetan protektif pada elemen struktur beton, tebal : ……µm M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
366 8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 43.807,06 45.549,12 45.215,73 48.812,56 48.402,51 42.900,98 47.345,83 48.010,95 48.795,17 80.748,60 47.381,77 77.313,79 83.602,61 46.675,64 47.476,38
367 8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada daerah
368 8.4.(1) M2 700.942,58 734.593,72 728.224,32 802.404,14 783.366,98 680.088,40 746.761,18 760.307,69 779.731,16 1.466.356,34 765.186,84 1.359.428,64 1.506.352,49 758.355,05 772.074,90
kering
369 8.4.(2) Perkuatan Struktur dengan bahan FRP jenis e- glass-per lapis pada daerah basah M2 757.592,58 794.076,22 787.140,32 867.551,64 846.814,98 735.038,90 807.263,38 821.829,59 842.952,56 1.587.360,74 827.275,24 1.471.187,76 1.630.529,29 819.876,95 834.729,80
370 8.4.(3) Perkuatan Struktur dengan bahan FRP Laminasi jenis glass pada daerah kering M2 700.942,58 734.593,72 728.224,32 802.404,14 783.366,98 680.088,40 746.761,18 760.307,69 779.731,16 1.466.356,34 765.186,84 1.359.428,64 1.506.352,49 758.355,05 772.074,90
371 8.4.(4) Perkuatan Struktur dengan bahan FRP Jenis carbon per lapis pada daerah kering M2 700.942,58 734.593,72 728.224,32 802.404,14 783.366,98 680.088,40 746.761,18 760.307,69 779.731,16 1.466.356,34 765.186,84 1.359.428,64 1.506.352,49 758.355,05 772.074,90
372 8.4.(5) Perkuatan struktur dengan bahan FRP jenis carbon per lapis pada daerah basah M2 278.102,58 291.106,72 288.470,72 316.633,14 309.786,18 270.428,60 296.797,38 301.887,09 309.120,36 566.428,74 303.032,84 527.551,44 582.044,49 299.934,45 305.197,50
373 8.4.(6) Perkuatan struktur dengan bahan FRP lainasi jenis carbon pada daerah kering;ll M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
374 8.4.(7) Pemasangan Perkuatan Pelat Lantai dengan Steel Plate Bonding Kg 1.167.754,05 1.220.772,29 1.212.941,72 1.313.204,33 1.303.442,88 1.142.986,85 1.241.406,65 1.261.665,57 1.289.046,88 2.202.198,87 1.259.705,83 2.076.464,70 2.254.480,13 1.244.689,23 1.267.374,73
375 8.4.(8) Perkuatan external stressing jembatan beton bentang …… m Buah 71.670.597,55 75.176.920,81 74.449.571,56 82.187.601,52 80.063.782,88 69.386.692,22 76.256.408,80 77.636.201,49 79.681.361,82 151.566.171,00 78.276.545,53 140.249.040,05 155.705.910,75 77.574.921,13 78.917.594,37
376 8.5.(1a) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M25 Buah 128.858,85 134.143,71 133.373,71 143.719,01 142.624,31 126.328,85 136.789,01 138.439,01 141.079,90 234.287,45 138.435,92 222.501,19 240.563,19 136.340,62 138.985,04
377 8.5.(1b) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M20 Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
378 8.5.(1c) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
379 8.5.(2a) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M25 Buah 183.858,85 191.893,71 190.573,71 206.969,01 204.224,31 179.678,85 195.529,01 198.169,01 202.349,90 351.767,45 198.715,92 331.005,19 361.123,19 196.070,62 199.815,04
380 8.5.(2b) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M20 Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
381 8.5.(2c) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
382 8.5.(3a) Penggantian Baut Biasa Grade A diameter M25 Buah 128.858,85 134.143,71 133.373,71 143.719,01 142.624,31 126.328,85 136.789,01 138.439,01 141.079,90 234.287,45 138.435,92 222.501,19 240.563,19 136.340,62 138.985,04
383 8.5.(3b) Penggantian Baut Biasa Grade A diameter ……. mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
384 8.5.(4a) Penggantian Baut Biasa Grade B diameter M25 Buah 112.358,85 116.873,71 116.213,71 124.799,01 124.144,31 110.378,85 119.299,01 120.509,01 122.709,90 199.307,45 120.395,92 190.029,19 204.483,19 118.410,62 120.835,04
385 8.5.(4b) Penggantian Baut Biasa Grade B diameter …….. Mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
386 8.5.(5a) Penggantian Baut Biasa Grade C untuk anchor bolts diameter M25 Buah 101.358,85 105.323,71 104.773,71 112.149,01 111.824,31 99.708,85 107.529,01 108.629,01 110.389,90 175.767,45 108.405,92 168.447,19 180.503,19 106.530,62 108.625,04
387 8.5.(5b) Penggantian Baut Biasa Grade C untuk anchor bolts diameter ……. Mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
388 8.5.(6a) Pengencangan Baut Biasa Grade A diameter M25 Buah 33.113,47 33.981,22 33.981,22 34.927,87 35.874,51 33.113,47 34.927,87 34.927,87 35.085,64 41.791,03 34.375,66 42.816,56 42.816,56 33.429,01 34.217,88
389 8.5.(6b) Pengencangan Baut Biasa Grade A diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
390 8.5.(7a) Pengencangan Baut Biasa Grade B diameter M25 Buah 33.113,47 33.981,22 33.981,22 34.927,87 35.874,51 33.113,47 34.927,87 34.927,87 35.085,64 41.791,03 34.375,66 42.816,56 42.816,56 33.429,01 34.217,88
391 8.5.(7b) Pengencangan Baut Biasa Grade B diameter ……. mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
392 8.6.(1a) Pengelasan SMAW pada baja Grade 30 M1 88.480,84 90.226,49 89.685,52 93.866,07 92.703,65 87.121,75 91.714,47 92.540,00 93.385,33 128.308,05 92.033,65 123.799,02 131.209,66 91.305,35 92.146,75
393 8.6.(1b) Pengelasan SMAW pada baja Grade ….. M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
394 8.6.(2a) Pengelasan SAW pada baja Grade 30 M1 78.446,54 81.193,44 80.660,49 85.604,90 85.697,14 77.111,48 83.336,07 84.429,56 85.534,85 126.464,32 83.149,88 122.730,09 129.964,50 81.869,61 83.254,97

BIDANG BINA MARGA BM - 9 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

395 8.6.(2b) Pengelasan SAW pada baja Grade …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
396 8.6.(3a) Pengelasan GMAW pada baja Grade 30 M1 79.648,15 82.459,14 81.910,17 86.990,76 87.042,95 78.281,05 84.617,79 85.735,32 86.880,66 129.027,76 84.471,65 125.109,29 132.608,05 83.175,37 84.592,77
397 8.6.(3b) Pengelasan GMAW pada baja Grade ….. M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
398 8.6.(4a) Pengelasan FCAW pada baja Grade 30 M1 78.847,08 81.618,01 81.077,05 86.069,52 86.145,74 77.504,00 83.768,65 84.862,14 85.983,45 127.329,48 83.590,47 123.523,16 130.845,68 82.302,20 83.703,57
399 8.6.(4b) Pengelasan FCAW pada baja Grade …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
400 8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 109.586,14 114.041,38 113.182,49 121.956,17 121.173,27 107.289,28 117.847,29 119.741,20 122.163,23 197.999,75 117.840,81 189.607,74 203.906,24 116.139,94 118.050,79
401 8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 184.976,22 192.176,89 190.801,08 204.586,87 204.046,95 181.408,39 199.229,37 202.366,04 206.215,94 322.935,15 198.223,31 311.702,15 332.797,66 195.163,53 198.333,02
402 8.7.(1c) Pengecatan struktur baja pada daerah kering tebal …… mikron M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
403 8.7.(2a) Pengecatan struktur baja pada daerah basah/pasang surut 360 mikron M2 184.976,22 192.176,89 190.801,08 204.586,87 204.046,95 181.408,39 199.229,37 202.366,04 206.215,94 322.935,15 198.223,31 311.702,15 332.797,66 195.163,53 198.333,02
404 8.7.(2b) Pengecatan struktur baja pada daerah basah/pasang surut 500 mikron M2 184.976,22 192.176,89 190.801,08 204.586,87 204.046,95 181.408,39 199.229,37 202.366,04 206.215,94 322.935,15 198.223,31 311.702,15 332.797,66 195.163,53 198.333,02
405 8.7.(2c) Pengecatan struktur baja pada daerah basah/pasang surut ….. mikron M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail)
406 184.976,22 192.176,89 190.801,08 204.586,87 204.046,95 181.408,39 199.229,37 202.366,04 206.215,94 322.935,15 198.223,31 311.702,15 332.797,66 195.163,53 198.333,02
8.7.(3a) 80 mikron M2
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail)
407 184.172,79 191.306,51 189.944,08 203.582,57 203.082,83 180.645,13 198.336,67 201.451,02 205.260,75 320.480,22 197.294,90 309.514,13 330.307,01 194.248,51 197.391,22
8.7.(3b) 160 mikron M2
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail)
408 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
8.7.(3c) ….. mikron M2
409 8.8.(1) Perbaikan Elemen Struktur Baja dengan Cara Pelurusan LS 6.512.877,62 6.696.750,51 6.668.333,31 6.950.852,64 6.984.956,82 6.358.993,19 6.932.190,33 7.108.738,85 7.000.042,07 9.260.625,45 6.782.396,59 9.066.235,04 9.395.935,07 6.703.103,08 6.786.730,84
410 8.8.(2) Penggantian Elemen Struktur Baja Grade 250 (Kuat Leleh 250 Mpa) Kg 1.189.185,92 1.241.151,84 1.231.496,92 1.347.077,31 1.316.100,58 1.153.967,00 1.260.695,79 1.284.144,23 1.310.200,49 2.383.808,53 1.288.194,43 2.214.635,00 2.445.532,81 1.278.421,51 1.299.628,53
411 8.8.(3) Penggantian Elemen Struktur Baja Grade 345 (Kuat Leleh 345 Mpa) Kg 1.201.890,92 1.254.548,74 1.244.710,12 1.361.744,71 1.330.330,18 1.166.347,50 1.274.332,71 1.297.907,87 1.324.387,85 2.411.082,37 1.302.141,77 2.239.740,21 2.473.427,49 1.292.185,15 1.313.759,57
412 8.8.(4) Penggantian Elemen Struktur Baja Grade 485 (Kuat Leleh 485 Mpa) Kg 1.193.737,38 1.249.198,58 1.239.246,66 1.359.561,08 1.330.246,88 1.157.854,06 1.270.519,32 1.295.451,14 1.323.287,79 2.437.173,82 1.297.561,46 2.264.245,45 2.500.425,34 1.286.474,78 1.309.292,57
413 8.8.(5) Penggantian Elemen Struktur Baja Grade …….. Kg 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Pekuatan dengan external stressing untuk jembatan baja dengan bentang
414 56.963.464,11 59.726.928,50 59.168.410,81 65.257.571,33 63.606.481,06 55.152.287,16 60.632.217,93 61.708.113,81 63.319.991,94 120.145.338,70 62.196.353,02 111.228.075,59 123.429.873,78 61.624.114,00 62.696.656,74
8.9.(1) ……….m Buah
415 8.10.(1) Penggantian Lantai Kayu M3 6.991.529,00 7.325.932,93 7.263.150,43 7.988.517,93 7.806.393,29 6.795.261,50 7.443.624,29 7.579.375,29 7.768.256,29 14.488.569,57 7.627.853,86 13.445.922,32 14.873.528,72 7.561.303,86 7.689.019,36
416 8.10.(2) Perbaikan Lantai Kayu M3 8.642.412,54 9.042.816,46 8.969.033,96 9.848.401,46 9.622.276,82 8.402.145,04 9.182.507,82 9.351.258,82 9.573.139,82 17.745.453,11 9.410.737,39 16.478.405,85 18.218.412,25 9.333.187,39 9.482.902,89
417 8.10.(3) Penggantian Gelegar Kayu M3 5.992.771,71 6.287.603,35 6.229.602,37 6.872.162,05 6.704.887,05 5.817.754,94 6.392.907,29 6.508.301,59 6.676.814,60 12.617.293,73 6.557.041,59 11.693.381,34 12.964.169,12 6.497.770,53 6.612.284,61
418 8.10.(4) Perbaikan Gelegar Kayu M3 5.938.295,78 6.230.955,38 6.173.346,72 6.811.218,80 6.644.869,02 5.764.582,67 6.335.336,68 6.449.814,49 6.617.412,43 12.515.949,77 6.498.513,97 11.597.882,59 12.860.156,69 6.440.010,53 6.553.507,29
419 8.10.(5) Penggantian Balok Kepala Tiang M3 5.693.154,10 5.976.039,55 5.920.196,28 6.536.974,19 6.374.787,92 5.525.307,46 6.076.268,95 6.186.622,58 6.350.102,70 12.059.901,92 6.235.139,64 11.168.138,20 12.392.100,78 6.180.090,56 6.289.009,36
420 8.10.(6) Perbaikan Papan Lajur Kendaraan M3 6.183.437,45 6.485.871,22 6.426.497,16 7.085.463,42 6.914.950,13 6.003.857,88 6.594.404,42 6.713.006,40 6.884.722,17 12.971.997,62 6.761.888,29 12.027.626,98 13.328.212,61 6.699.930,51 6.818.005,22
421 8.10.(7) Pengantian Papan Lajur Kendaraan M3 9.831.021,05 10.298.763,65 10.211.575,76 11.237.591,24 10.978.021,94 9.544.129,57 10.468.883,04 10.659.462,24 10.926.198,01 20.435.405,96 10.723.107,39 18.954.028,76 20.980.195,89 10.630.567,08 10.804.927,37
422 8.10.(8) Perbaikan dan/atau Penggantian kerb kayu M3 10.975.195,46 11.467.506,30 11.368.901,27 12.469.300,51 12.178.938,37 10.665.250,04 11.668.304,01 11.878.554,29 12.141.777,34 22.231.947,93 11.931.489,84 20.703.056,00 22.855.008,79 11.820.095,17 12.012.575,73
423 8.10.(9) Perbaikan dan/atau Penggantian sandaran Kayu M3 6.847.751,00 7.176.690,95 7.112.609,17 7.828.268,33 7.647.094,12 6.652.527,52 7.296.295,89 7.425.895,67 7.608.592,31 14.202.261,76 7.475.264,00 13.187.748,57 14.590.498,26 7.403.652,85 7.534.377,20
424 8.10.(10) Pengecatan/Perlindungan Gelegar M2 76.396,55 79.765,11 79.138,42 85.875,10 84.926,53 74.596,34 81.426,81 82.619,99 84.261,99 144.636,17 82.435,03 136.459,73 148.360,27 81.245,35 82.847,79
425 8.10.(11) Pengecatan/Perlindungan Lantai Kayu M2 76.396,55 79.765,11 79.138,42 85.875,10 84.926,53 74.596,34 81.426,81 82.619,99 84.261,99 144.636,17 82.435,03 136.459,73 148.360,27 81.245,35 82.847,79
426 8.10.(12) Pengecatan/Perlindungan Tiang Pancang Kayu M2 76.396,55 79.765,11 79.138,42 85.875,10 84.926,53 74.596,34 81.426,81 82.619,99 84.261,99 144.636,17 82.435,03 136.459,73 148.360,27 81.245,35 82.847,79
427 8.10.(13) Pengecatan/Perlindungan Balok Kepala Kayu M2 76.396,55 79.765,11 79.138,42 85.875,10 84.926,53 74.596,34 81.426,81 82.619,99 84.261,99 144.636,17 82.435,03 136.459,73 148.360,27 81.245,35 82.847,79
428 8.10.(14) Pengecatan/Perlindungan Sandaran M1 76.396,55 79.765,11 79.138,42 85.875,10 84.926,53 74.596,34 81.426,81 82.619,99 84.261,99 144.636,17 82.435,03 136.459,73 148.360,27 81.245,35 82.847,79
429 8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 4.671.359,67 4.878.202,68 4.860.422,37 5.156.957,87 5.243.094,74 4.614.746,87 4.982.024,63 5.049.765,76 5.135.370,94 7.757.041,47 4.971.162,76 7.523.216,82 7.919.331,43 4.898.735,52 4.998.803,71
430 8.11.(2) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Silicone Seal M1 746.963,15 775.995,84 771.699,26 824.972,25 821.459,42 734.088,46 788.210,64 797.903,08 812.635,75 1.297.561,41 796.325,30 1.233.114,66 1.326.227,57 787.786,19 800.424,64
431 8.11.(3) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Strip Seal M1 1.368.198,68 1.436.573,12 1.422.977,12 1.572.769,78 1.532.533,99 1.327.410,68 1.460.080,75 1.486.445,24 1.526.179,12 2.913.140,56 1.499.385,79 2.694.886,96 2.992.933,94 1.485.971,92 1.512.528,59
432 8.11.(4) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Compression Seal M1 1.387.145,27 1.456.332,93 1.442.668,95 1.593.682,71 1.553.716,31 1.346.153,33 1.480.111,64 1.506.747,20 1.546.842,80 2.944.209,22 1.519.440,19 2.724.673,92 3.024.207,39 1.505.642,78 1.532.650,97
433 8.11.(5) Penggantian Sambungan Siar Muai Tipe Modular, lebar …….. M1 210.862,94 221.282,48 219.192,95 242.061,85 235.963,00 204.631,78 225.024,45 229.112,72 235.167,48 446.148,16 230.862,74 413.232,03 458.501,68 228.730,79 232.834,11
434 8.11.(6) Penggantian Sambungan
Penggantian Sambungan Siar
Siar Muai
Muai Tipe
Tipe Dobel
Finger Siku
Plate,dengan
lebar ……..
Penutup Karet M1 4.131.042,94 4.337.471,48 4.296.180,15 4.750.268,85 4.626.564,60 4.007.206,38 4.407.947,15 4.488.059,72 4.608.094,28 8.811.993,56 4.527.765,24 8.147.656,53 9.052.306,68 4.487.677,79 4.567.805,41
435 8.11.(7) Neoprene M1 423.136,59 443.691,58 439.552,45 484.494,04 472.925,46 410.906,40 451.972,19 460.074,71 471.752,95 884.746,55 462.738,83 821.473,72 909.575,31 458.200,76 466.243,46
436 8.12.(1) Penggantian
Penggantian Landasan
Landasan Logam TipeKaret
Elastomer ……Alam Berlapis Baja Ukuruan …. Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
437 8.12.(2) mm x …… mm
Penggantian x ……. Elastomer
Landasan mm Sintetis Berlapis Baja Ukuran ….. mm x Buah #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
438 8.12.(3) ….. mm x …….. mm Buah 8.613.678,65 8.879.738,22 8.824.072,09 9.378.686,97 9.371.491,17 8.474.549,50 9.417.563,99 9.502.341,09 9.647.228,30 14.135.415,55 9.207.644,60 14.115.241,75 14.883.854,44 9.011.656,03 9.154.585,85
439 8.12.(4) Penggantian Landasan Karet Strip tebal …. mm M1 4.368.558,59 4.469.475,73 4.466.285,73 4.624.167,16 4.727.740,02 4.358.878,59 4.861.437,16 4.867.707,16 4.933.628,59 6.128.637,16 4.625.644,31 6.529.398,59 6.599.908,59 4.499.992,88 4.562.834,31
440 8.12.(5) Penggantian Landasan Logam Berongga (Pot Bearing) Buah 12.045.678,65 12.483.338,22 12.393.352,09 13.325.486,97 13.215.331,17 11.803.589,50 13.079.573,99 13.230.901,09 13.475.668,30 21.459.435,55 12.969.424,60 20.886.445,75 22.407.414,44 12.740.216,03 12.949.695,85
441 8.12.(6) Penggantian Landasan Logam Jenis Spherical Buah 8.996.808,59 9.329.165,73 9.279.665,73 9.946.737,16 9.911.380,02 8.848.308,59 9.799.887,16 9.895.917,16 10.096.478,59 16.005.537,16 9.698.734,31 15.660.960,59 16.746.088,59 9.528.202,88 9.680.804,31
442 8.12.(7) Penggantian Stopper Lateral dan Horisontal Buah 8.745.678,65 9.018.338,22 8.961.352,09 9.530.486,97 9.519.331,17 8.602.589,50 9.558.473,99 9.645.781,09 9.794.518,30 14.417.235,55 9.352.294,60 14.375.611,75 15.173.154,44 9.155.096,03 9.300.555,85

BIDANG BINA MARGA BM - 10 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

443 8.13.(1) Perbaikan Sandaran Baja M1 297.454,10 303.996,29 302.915,05 315.566,04 313.836,94 294.210,37 306.923,76 309.304,65 312.895,32 430.207,76 309.249,92 414.076,05 437.785,66 307.790,02 310.299,44
444 8.13.(2) Penggantian Sandaran Baja M1 408.375,00 428.363,10 424.850,80 465.699,30 457.802,40 397.611,50 435.688,00 442.756,05 453.732,95 831.336,00 444.948,35 775.211,03 853.376,70 440.116,05 448.460,65
445 8.13.(3) Perbaikan Tembok Sandaran Beton M1 552.711,72 579.769,91 575.084,19 629.651,09 619.829,13 538.324,98 591.131,25 601.439,55 616.368,32 1.121.762,51 602.743,70 1.049.298,67 1.153.787,41 597.039,55 607.347,85
446 8.13.(4) Perbaikan Sandaran Beton-Baja M1 2.790.273,16 2.928.925,92 2.901.738,63 3.203.816,40 3.124.730,45 2.708.125,44 2.976.761,22 3.030.547,46 3.111.056,06 5.907.677,01 3.055.407,36 5.471.787,09 6.071.062,28 3.027.490,66 3.080.883,81
447 8.13.(5) Penggantian Sandaran Beton-Baja M1 3.144.852,12 3.300.505,96 3.270.238,60 3.608.042,52 3.521.567,52 3.053.247,89 3.355.908,66 3.415.648,70 3.505.686,61 6.630.694,41 3.442.324,35 6.147.349,64 6.814.881,04 3.409.854,17 3.470.474,81
448 8.14.(1) Penggantian Deck Drain Buah 142.744,78 149.808,26 148.398,01 163.899,15 159.764,85 138.529,43 152.425,35 155.130,30 159.207,84 302.571,24 156.344,23 280.140,55 310.884,91 154.896,64 157.598,27
449 8.14.(2) Penggantian Pipa Penyalur, Pipa Cucuran PVC diamter …… mm M1 797.242,37 836.819,99 829.033,55 916.253,35 892.728,24 773.259,96 626.902,75 866.011,57 889.036,73 1.250.317,94 873.339,98 1.570.055,00 1.743.920,53 305.045,67 311.890,39
450 8.14.(3) Penggantian Pipa Penyalur, Pipa Cucuran Baja diamter …… mm M1 365.478,62 383.453,89 379.999,25 419.682,55 409.152,84 354.434,96 389.893,45 396.804,37 407.400,63 776.299,34 400.027,58 718.092,68 797.295,73 396.446,87 403.572,09
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
I DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
451 9.1.(1) Mandor Jam 27.897,22 29.599,60 29.599,60 29.599,60 33.004,37 27.897,22 33.004,37 33.004,37 33.004,37 38.111,51 31.301,98 38.111,51 46.623,41 31.301,98 33.004,37
452 9.1.(2) Pekerja Biasa Jam 20.956,75 21.807,94 21.807,94 22.659,13 23.510,32 20.956,75 21.807,94 21.807,94 21.807,94 27.766,27 21.807,94 26.063,89 27.766,27 20.956,75 21.807,94
453 9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam 25.212,70 26.063,89 26.063,89 26.915,08 27.766,27 25.212,70 26.915,08 27.766,27 28.617,46 35.426,98 26.063,89 35.426,98 34.575,79 26.063,89 27.766,27
454 9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 556.941,38 569.392,05 566.682,21 590.148,68 595.415,94 549.404,86 594.901,83 603.756,10 600.834,17 785.801,72 587.221,87 775.194,76 806.546,14 579.025,57 586.308,83
455 9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam 412.652,89 427.104,01 422.475,01 456.597,31 450.222,85 402.570,40 438.032,40 442.776,52 456.071,36 738.025,62 444.897,28 701.544,29 761.298,16 438.884,60 445.872,26
456 9.1.(5) a Truk Bak Datar 3 - 4 ton Jam 325.481,90 332.741,90 330.404,40 348.860,83 344.048,33 320.669,40 341.919,04 344.366,54 350.750,47 502.244,04 341.989,76 486.461,01 517.714,76 338.080,83 341.655,83
457 9.1.(5) b Truk Bak Datar 6 - 8 ton Jam 335.777,48 343.830,24 341.266,24 360.288,92 354.601,30 325.817,19 357.877,19 365.729,88 361.519,65 516.040,12 352.542,73 499.284,15 530.970,32 348.633,80 352.435,82
458 9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 321.691,03 329.887,74 327.282,61 346.408,11 340.561,58 310.796,03 344.818,92 353.653,05 347.519,19 502.589,27 338.503,01 485.656,65 517.421,33 334.594,08 338.437,32
459 9.1.(7) Bulldozer 100 - 150 PK Jam 726.712,95 741.474,83 736.849,17 765.527,26 754.194,44 696.468,60 765.075,41 792.793,25 753.361,16 986.959,47 748.567,94 948.446,55 998.803,80 744.944,82 751.490,89
460 9.1.(8) Motor Grader min 100 PK Jam 364.800,32 371.426,23 369.348,87 383.842,59 378.769,52 351.406,19 389.691,39 401.931,30 386.239,23 501.008,23 377.799,95 489.951,02 512.670,78 374.592,27 377.536,89
461 9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 262.780,11 267.755,59 266.189,26 277.749,21 274.017,77 253.753,44 282.374,02 290.418,93 281.507,62 372.823,26 273.592,70 365.765,38 383.490,84 270.735,65 272.983,25
462 9.1.(10) Loader Roda Berantai 75 - 100 PK Jam 364.800,32 371.426,23 369.348,87 383.842,59 378.769,52 351.406,19 389.691,39 401.931,30 386.239,23 501.008,23 377.799,95 489.951,02 512.670,78 374.592,27 377.536,89
463 9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 543.926,53 555.738,70 552.013,72 577.582,46 579.676,07 533.880,31 589.990,20 608.465,73 586.605,88 793.504,30 576.419,60 767.698,91 810.484,03 571.739,30 577.133,30
464 9.1.(12) Crane 10 - 15 Ton Jam 693.144,24 705.373,65 701.516,30 727.968,03 718.886,50 672.148,37 728.631,86 747.081,76 725.752,64 939.671,42 715.448,53 912.789,24 957.125,20 710.651,35 716.217,89
465 9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 491.094,02 498.871,76 496.454,01 512.272,37 506.065,16 472.036,43 522.355,87 540.430,63 513.714,51 637.786,81 504.939,86 624.751,48 649.270,41 501.631,90 504.970,54
466 9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 290.882,65 297.740,16 295.565,04 311.628,10 306.683,59 281.064,26 312.234,75 320.407,45 313.840,26 443.214,95 305.278,42 430.294,45 456.415,79 301.790,24 304.980,70
467 9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam 94.632,05 95.111,53 94.969,95 97.097,49 96.626,78 92.292,14 105.123,53 107.532,98 104.557,55 117.894,40 98.131,88 123.351,09 124.110,13 96.517,96 96.682,45
468 9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam 524.506,21 536.307,27 532.580,20 558.375,00 549.670,26 505.021,90 558.232,53 575.173,46 556.513,62 765.366,56 546.341,19 739.404,83 782.688,34 541.614,13 547.013,13
469 9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam 200.702,39 206.491,71 204.640,20 219.121,32 217.077,55 196.710,23 219.492,28 223.768,18 224.166,05 341.509,93 215.926,48 330.804,83 354.440,36 212.601,92 215.385,67
470 9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam 95.902,87 97.797,87 97.195,32 102.968,69 101.657,88 93.911,87 106.755,86 108.213,64 109.270,04 153.634,67 102.344,90 154.387,05 162.054,14 100.206,98 101.112,11
471 9.1.(19) Pompa Air 70 - 100 mm Jam 53.214,98 53.665,00 53.520,63 56.115,45 55.810,79 52.832,61 61.689,90 61.935,05 63.602,56 81.610,08 57.164,42 86.553,98 88.437,07 55.452,74 55.671,37
472 9.1.(20) Jack Hammer Jam 50.813,44 50.813,44 50.813,44 52.384,87 52.384,87 50.813,44 58.670,58 58.670,58 60.242,01 69.670,58 53.956,30 75.956,30 75.956,30 52.384,87 52.384,87
473 9.2.(1) Marka Jalan Termoplastik M2 369.925,44 387.995,57 384.364,81 424.175,42 413.377,27 359.066,25 394.180,66 401.346,80 411.872,72 779.721,52 404.429,21 721.581,89 800.683,15 401.161,82 407.984,36
474 9.2.(2) Marka Jalan Bukan Termoplastik M2 98.321,74 98.346,12 98.338,34 98.401,74 98.394,74 98.304,15 98.400,51 98.408,37 98.440,39 98.946,50 98.393,23 98.914,68 99.012,59 98.376,25 98.387,89
475 9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 475.658,61 503.671,15 493.881,72 560.509,05 525.325,72 456.305,59 511.895,86 509.974,15 534.669,08 990.272,31 519.919,81 916.212,04 1.016.435,65 509.744,43 521.759,87
476 9.2.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade Buah 823.859,27 871.468,95 855.670,19 967.848,96 911.709,01 791.534,93 885.672,13 884.982,09 925.264,65 1.721.992,67 900.974,88 1.592.980,44 1.767.728,36 884.654,50 904.810,09
477 9.2.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 473.888,74 501.568,91 492.111,85 557.742,07 523.921,46 454.901,33 509.793,62 508.569,89 532.566,84 988.834,81 518.149,94 914.807,78 1.015.031,39 508.340,17 520.156,18
478 9.2.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 821.308,33 868.419,46 853.119,25 963.802,36 909.706,48 789.532,40 882.622,64 882.979,56 922.215,16 1.719.940,29 898.423,94 1.590.977,91 1.765.725,83 882.651,97 902.508,43
479 9.2.(5) Patok Pengarah Buah 105.956,89 112.924,90 109.601,05 126.864,74 114.544,32 100.575,70 112.355,14 108.676,58 119.125,31 205.925,46 114.826,37 194.668,26 215.265,19 111.487,13 114.659,58
480 9.2.(6a) Patok Kilometer Buah 417.088,10 441.690,95 432.391,75 490.912,98 458.233,91 399.613,40 439.586,29 433.973,21 467.697,38 841.691,64 454.319,38 794.385,76 880.797,59 445.393,85 455.926,66
481 9.2.(6b) Patok Hektometer Buah 117.309,54 127.053,05 120.916,60 146.542,69 122.874,66 108.859,60 125.158,57 115.307,10 133.339,43 212.836,19 126.163,48 203.705,14 224.485,78 119.854,91 124.676,59
482 9.2.(7) Rel Pengaman M1 531.151,66 560.983,57 550.639,26 620.647,38 583.594,82 510.516,32 569.254,47 567.166,32 592.820,87 1.078.130,06 577.944,56 999.111,24 1.105.907,82 567.166,32 579.853,66
483 9.2.(8) Paku Jalan Tidak Memantul Buah 214.572,33 224.493,89 222.490,35 244.343,94 238.326,39 208.547,85 227.693,68 231.631,46 237.325,06 439.315,53 233.490,35 407.425,16 450.908,87 231.631,46 235.459,24
484 9.2.(9a) Paku Jalan Memantul Bujur Sangkar Buah 221.172,33 231.423,89 229.310,35 251.933,94 245.696,39 214.927,85 234.733,68 238.781,46 244.695,06 453.395,53 240.750,35 420.493,16 465.428,87 238.781,46 242.719,24
485 9.2.(9b) Paku Jalan Memantul Persegi panjang Buah 234.372,33 245.283,89 243.060,35 267.113,94 260.546,39 227.797,85 248.923,68 253.191,46 259.545,06 481.775,53 255.270,35 446.629,16 494.468,87 253.191,46 257.349,24
486 9.2.(9c) Paku Jalan Memantul Bulat Buah 222.272,33 232.523,89 230.520,35 253.143,94 247.016,39 216.027,85 235.943,68 239.991,46 246.015,06 455.815,53 241.960,35 422.671,16 467.848,87 239.991,46 243.929,24
487 9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 168.365,90 178.326,57 174.464,30 198.247,91 184.089,66 161.220,66 180.918,39 178.963,20 188.312,70 338.917,87 183.014,19 314.129,38 347.551,04 178.963,20 183.325,77
488 9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier) M1 145.142,47 154.163,99 150.284,53 172.213,96 157.711,49 138.425,30 156.346,94 153.385,44 162.577,01 288.310,68 157.484,80 267.342,71 295.521,47 153.385,44 157.436,96
489 9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) M1 149.044,92 158.261,38 154.343,08 176.701,60 162.082,25 142.210,50 160.510,54 157.624,78 166.929,63 296.637,88 161.761,96 275.041,61 304.075,81 157.624,78 161.752,04
490 9.2.(10d) Kereb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 171.963,20 182.606,70 178.143,84 203.902,46 187.290,81 164.109,04 185.230,39 182.090,77 192.718,49 344.247,22 186.798,48 319.065,13 352.935,37 182.090,77 186.840,79

BIDANG BINA MARGA BM - 11 dari 12


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2021

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

491 9.2.(10e) Kereb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 209.079,13 221.577,44 216.744,40 246.584,79 228.860,65 200.110,50 224.831,42 222.411,59 234.118,31 423.449,27 227.477,93 392.288,14 434.294,26 222.411,59 227.881,40
492 9.2.(10f) Kereb Pracetak Jenis 6 (Kereb dengan Bukaan) Buah 87.562,55 97.805,20 90.272,01 119.214,92 88.300,01 78.213,36 99.616,60 86.333,75 103.251,82 157.435,06 94.401,64 146.141,69 160.723,38 85.998,07 91.487,22
493 9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 658.262,26 697.023,54 683.799,70 775.503,23 727.483,67 631.775,73 708.525,39 706.311,63 739.817,48 1.375.252,65 719.896,13 1.272.031,79 1.411.712,37 705.975,95 722.534,19
494 9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 654.762,37 692.068,70 679.946,69 766.717,86 723.886,74 629.427,29 702.759,27 702.697,70 733.270,64 1.362.831,71 715.212,03 1.260.829,62 1.398.841,17 702.697,70 718.415,40
495 9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 654.762,37 692.068,70 679.946,69 766.717,86 723.886,74 629.427,29 702.759,27 702.697,70 733.270,64 1.362.831,71 715.212,03 1.260.829,62 1.398.841,17 702.697,70 718.415,40
496 9.2.(11) Kereb yang digunakan kembali M1 28.058,46 28.949,93 28.771,93 30.733,58 30.198,85 27.523,00 29.252,89 29.598,36 30.117,47 48.283,89 29.770,19 45.408,83 49.318,48 29.598,36 29.943,83
497 9.2.(12a) Perkerasan
PembengkokanBlokUbin
BetonEksisting
pada Trotoar dan MedianBlok Beton Eksisting pada
atau Perkerasan M2 49.376,62 50.055,00 49.941,99 51.525,07 51.072,72 48.924,27 50.245,35 50.578,73 51.019,19 65.588,15 50.685,80 63.312,41 66.469,06 50.578,73 50.798,82
498 9.2.(12b) Trotoar atau Median M3 9.178,72 9.377,21 9.313,86 9.790,52 9.733,53 9.035,43 9.621,90 9.685,84 9.906,98 13.790,37 9.681,58 13.372,63 14.169,95 9.582,94 9.677,70
499 9.2.(13) Beton Pemisah Jalur (Concrete Barrier) M1 631.770,21 638.535,64 631.770,21 652.066,50 624.328,24 624.328,24 638.535,64 624.328,24 638.535,64 625.004,78 631.770,21 624.328,24 624.328,24 624.328,24 628.387,49
500 9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 9.974.701,45 10.479.089,28 10.372.831,05 11.487.944,15 11.161.648,28 9.668.622,68 10.648.282,48 10.827.067,88 11.130.364,08 21.254.807,22 10.930.495,85 19.650.281,40 21.832.088,28 10.827.067,88 11.024.229,94
501 9.2.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah 12.614.701,45 13.251.089,28 13.118.431,05 14.523.944,15 14.118.448,28 12.229.422,68 13.465.162,48 13.695.097,88 14.075.284,08 26.888.567,22 13.824.155,85 24.858.869,40 27.619.408,28 13.695.097,88 13.943.519,94
502 9.2.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 8.104.701,45 8.515.589,28 8.428.031,05 9.337.444,15 9.067.248,28 7.854.722,68 8.652.992,48 8.795.477,88 9.044.324,08 17.264.227,22 8.880.755,85 15.960.749,40 17.732.608,28 8.795.477,88 8.956.339,94
503 9.2.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 8.874.701,45 9.324.089,28 9.228.831,05 10.222.944,15 9.929.648,28 8.601.622,68 9.474.582,48 9.631.917,88 9.903.204,08 18.907.407,22 9.724.675,85 17.479.805,40 19.420.448,28 9.631.917,88 9.807.739,94
504 9.2.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 8.379.701,45 8.804.339,28 8.714.031,05 9.653.694,15 9.375.248,28 8.121.472,68 8.946.362,48 9.094.237,88 9.351.114,08 17.850.967,22 9.182.155,85 16.503.269,40 18.335.408,28 9.094.237,88 9.260.489,94
505 9.2.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 9.424.701,45 9.901.589,28 9.800.831,05 10.855.444,15 10.545.648,28 9.135.122,68 10.061.322,48 10.229.437,88 10.516.784,08 20.080.887,22 10.327.475,85 18.564.845,40 20.626.048,28 10.229.437,88 10.416.039,94
506 9.2.(20) Pagar Pemisah Pedestrian Carbon Steel M' 631.950,33 642.141,01 631.950,33 662.522,38 620.740,58 620.740,58 642.141,01 620.740,58 642.141,01 621.759,65 631.950,33 620.740,58 620.740,58 620.740,58 626.854,99
507 9.2.(21) Pagar Pemisah Pedestrian Galvanised M' 758.170,09 801.074,13 786.546,13 888.275,86 838.587,00 727.383,88 812.370,27 812.039,93 847.773,90 1.582.982,80 827.103,13 1.464.174,50 1.625.302,83 812.039,93 829.976,26
508 9.2.(22a) Stabilisasi dengan Tanaman M2 72.165,38 75.630,38 74.937,38 82.560,38 80.481,38 70.086,38 76.785,38 78.055,88 80.134,88 150.705,38 78.748,88 139.455,68 154.632,38 78.055,88 79.441,88
509 9.2.(22b) Stabilisasi dengan Tanaman VS M2 234.371,55 245.825,01 243.540,40 268.465,12 261.967,34 227.441,36 250.041,91 254.336,59 260.741,13 490.464,52 256.023,20 454.573,52 503.650,61 253.533,29 258.213,59
510 9.2.(23) Semak / Perdu…………………. M2 117.374,96 123.111,46 121.964,16 134.584,46 131.142,56 113.933,06 125.015,56 127.137,46 130.555,16 247.386,16 128.284,76 228.796,60 253.924,56 127.137,46 129.432,06
511 9.2.(24) Pohon Jenis ……………………. Buah 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96 6.494,96
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
J DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
512 10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 556.941,38 569.392,05 566.682,21 590.148,68 595.415,94 549.404,86 594.901,83 603.756,10 600.834,17 785.801,72 587.221,87 775.194,76 806.546,14 579.025,57 586.308,83
513 10.1.(2) Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan M3 381.610,35 397.675,62 394.801,84 426.383,97 423.305,66 373.325,58 405.938,98 411.055,88 419.095,46 698.262,74 411.346,87 663.111,11 717.678,30 404.999,05 413.088,60
514 10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1.757.462,22 1.837.105,18 1.802.764,00 1.983.614,37 1.949.015,26 1.706.347,65 1.837.768,77 1.882.252,17 1.911.869,15 3.322.174,35 1.879.603,28 3.142.568,51 3.427.053,02 1.859.973,77 1.885.820,92
515 10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 1.312.738,32 1.452.074,97 1.409.684,25 1.659.872,53 1.433.148,81 1.397.191,39 1.732.106,31 1.439.563,74 1.615.558,27 2.149.672,58 1.476.090,12 1.623.217,63 1.689.453,84 1.324.481,01 1.353.971,51
516 10.1.(5) Perbaikan Lapis Fondasi Agregat Kelas B M3 1.146.948,06 1.273.344,92 1.271.038,21 1.378.671,07 1.345.051,82 1.317.268,34 1.558.843,50 1.353.488,71 1.438.242,79 2.004.930,68 1.344.824,19 1.496.885,84 1.554.166,12 1.240.628,52 1.244.281,11
517 10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 1.200.006,31 1.296.462,64 1.294.149,33 1.411.938,36 1.355.276,73 1.327.695,34 1.571.864,23 1.363.618,18 1.449.471,42 2.021.450,63 1.355.148,63 1.506.238,07 1.563.986,38 1.249.699,16 1.253.292,01
518 10.1.(7) Perbaikan dan
Perbaikan dan Perataan
Perataan Permukan
PermukaanPerkerasan
JalanTanahBerbutir Tanpa Penutup M2 11.435,00 11.654,57 11.591,35 12.018,55 11.811,54 10.934,27 12.055,71 12.453,28 11.898,94 15.305,94 11.729,50 14.900,98 15.577,81 11.641,11 11.744,45
519 10.1.(8) Aspal M3 12.024,83 12.265,68 12.200,95 12.654,74 12.461,92 11.517,28 12.679,06 13.082,30 12.523,40 16.131,51 12.346,93 15.723,03 16.418,00 12.240,68 12.361,67
520 10.1.(9) Perbaikan Campuran Aspal Panas M3 4.823.430,16 5.074.711,31 4.993.987,28 5.600.967,14 5.333.099,27 4.683.163,98 5.210.806,72 5.246.160,54 5.434.719,97 10.069.401,91 4.949.481,78 8.712.943,86 9.648.145,45 5.217.140,09 5.320.522,88
521 10.1.(10) Perbaikan Campuran Aspal Panas dengan Asbuton M3 4.505.978,16 4.746.651,51 4.669.921,06 5.242.306,56 4.986.260,95 4.376.821,69 4.867.370,52 4.894.785,75 5.080.446,50 9.395.829,37 4.611.905,63 8.113.778,32 8.984.299,58 4.866.730,58 4.971.248,70
522 10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 2.548.184,83 2.680.397,59 2.642.529,47 2.948.391,56 2.823.231,55 2.463.017,76 2.743.029,99 2.760.648,58 2.858.692,30 5.226.320,31 2.783.658,40 4.866.130,13 5.375.360,04 2.739.790,27 2.795.594,98
523 10.1.(12) Perbaikan Lapis Penetrasi Macadam tanpa atau dengan Asbuton Liter 3.150.041,84 3.309.603,38 3.261.252,47 3.678.407,35 3.461.774,02 3.056.610,30 3.401.839,26 3.416.625,91 3.533.720,57 6.417.712,32 3.128.526,48 5.410.852,79 5.971.410,25 3.387.518,69 3.447.174,12
524 10.1.(13) Residu Bitumen untuk Pemeliharaan M3 419.976,07 432.877,75 429.333,94 459.174,79 455.092,17 409.842,96 448.689,96 453.660,80 463.122,15 705.379,99 448.292,32 681.458,11 729.432,69 442.439,27 448.564,76
525 10.1.(14) Perbaikan Perkerasan Beton Semen M3 1.934.335,14 2.027.980,21 1.979.001,03 2.214.775,44 2.144.760,44 1.861.592,26 2.014.224,84 2.074.739,95 2.104.481,37 3.961.600,94 2.079.585,14 3.697.602,27 4.100.100,46 2.068.720,92 2.090.920,99
526 10.1.(15) Perbaikan Lapis Fondasi Bawah Beton Kurus M3 1.708.884,14 1.848.160,56 1.745.091,04 2.138.909,72 1.801.211,60 1.582.179,82 1.869.296,43 1.771.234,91 1.937.063,19 3.192.735,44 1.832.073,01 3.006.522,56 3.302.393,82 1.742.046,09 1.801.918,49
527 10.1.(16) Perbaikan Pasangan Batu M2 1.610.307,83 1.682.910,44 1.654.954,54 1.815.300,80 1.787.256,55 1.565.935,78 1.689.055,84 1.727.066,28 1.755.944,76 3.031.585,56 1.724.336,77 2.867.899,35 3.122.801,19 1.705.007,69 1.730.476,06
528 10.1.(17) Pengecatan Kereb pada Trotoar atau Median M1 32.852,53 34.293,17 34.071,31 36.843,12 36.603,52 32.186,94 35.306,71 35.714,25 36.474,50 61.690,34 35.557,45 58.900,42 63.765,41 35.004,26 35.684,65
529 10.1.(18) Perbaikan Rel Pengaman Buah 513.660,14 541.220,53 533.949,65 596.125,33 572.122,44 496.451,37 550.703,23 555.084,85 574.793,26 1.073.807,45 562.012,98 995.743,75 1.103.090,40 553.830,05 565.307,82
530 10.1.(19) Pembersihan Patok Buah 18.558,53 19.386,61 19.367,90 20.053,40 21.003,15 18.497,39 19.895,14 19.939,79 19.930,55 25.587,52 19.664,82 26.539,54 26.780,64 19.090,65 19.666,35
531 10.1.(20) Pembersihan Rambu M1 18.558,53 19.386,61 19.367,90 20.053,40 21.003,15 18.497,39 19.895,14 19.939,79 19.930,55 25.587,52 19.664,82 26.539,54 26.780,64 19.090,65 19.666,35
532 10.1.(21) Pembersihan Drainase Buah 298.825,64 306.717,90 304.966,73 320.118,12 322.258,05 294.432,30 318.422,59 322.071,12 324.377,74 445.200,99 316.768,32 436.678,42 457.871,02 311.789,45 316.431,37
533 10.1.(22) Pengendalian Tanaman M2 2.862,44 2.935,78 2.935,78 2.990,78 3.082,44 2.862,44 2.972,44 2.972,44 2.972,44 3.412,44 2.954,11 3.504,11 3.504,11 2.899,11 2.954,11
534 10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
535 10.2.(2) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
536 10.2.(3) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
537 10.2.(4) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
538 10.2. (…..) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

BIDANG BINA MARGA BM - 12 dari 12