TOTAL

DEVELOP
(sq. m
MENT
FORMULA COMPUTATION unless
CONTROL
stated
S
otherwise)
Maximum *Based on Table VIII.1
Allowable of NBC 70% x 50.00 sq. m 35.00
PSO PSO = % of TLA
Using PSO in Table
VIII.1 70% x 50.00 sq. m 35.00
AMBF = PSO x TLA
Using PSO in Table
VII. 1 70% x 50.00 sq. m 35.00
AMBF = PSO x TLA
AMBF TOSL = 20%
Using Table VIII.G.6
100% - 20% = 80% 40.00
TLA – TOSL (in %)
AMBF = PSO x TLA
80% x 50.00 sq. m
Using Setbacks in L = 12.50 m - 3.00 m
Project Site Table VIII.3 L = 9.50 m 38.00
Features: AMBF = L x W W = 4.00 m
Project Site AMBF 35.00
Features: PSO PSO = 0.70 or 70%
TLA 50.00
- Group A
Max. no. of storey = 3
(Residential *Based on Table VII.2
/ Dwellings) BHL 6.30 m
of NBC
2.10m floor to floor height
- Division B-1
Maximum
- Basic GFA = TLA x FLAR 50.00 sq.m x 2.10 105.00
GFA
Residential
Using Table VII.1
3 (R-3) TGFA = BHL x PSO x 3 x 70% x 50.00 sq. m 105.00
- Inside (or TLA
Regular) Using Table VII.G.2
Maximum
Lot TGFA = GFA x 105.00 sq. m x 1.25 131.25
TGFA
- With MULTIPLIER
Firewall Using Table VII.2
TGFA = AMBF x BHL 35.00 sq. m x 3 105.00
TLA = 50.00
(no. of floors)
sq. m *Based on Table VIII.1
Maximum
of NBC 20% x 50.00 sq. m 10.00
*Based on ISA
ISA = % of TLA
Table VIII.G.7 *Based on Table VIII.1
Minimum
of NBC 10% x 50.00 sq. m 5.00
USA
USA = % of TLA
*Based on Table VIII.1
TOSL of NBC 30% x 50.00 sq. m 15.00
TOSL = % of TLA
Using Table VIII.1
MACA = PSO + ISA
70% x 50.00 sq. m 35.00
MACA = % of TLA
Using Percentage
Maximum
MACA PSO = AMBF/TLA 35.00/ 50.00 0.70 or 70%
TOSL = TLA - PSO 100% - 70% 30%
MIN USA = TOSL - ISA 30% - 20% 10%
MACA = PSO + ISA 70% + 20% 90%
Initial Using Table VII.G.1
35.00 sq. m x 6.30 m 220.50
AMVB AMVB = AMBF x BHL