Dubai Municipality Dubai Municipality Dubai Municipality Dubai Municipality Dubai Municipality Dubai Municipality
Submit Application through Stage 1 Stage 2 Stage 3.1 Stage 3.1 Stage 4 Stage 5
DM web-site Project Prequalification Concept Approval Design Drawings Review Period Drawing Approval Completion Certificate
Final building Permit
Application
1. Form
1. Design Report 1. Full Architecture Package
2. Scheme Design drawings 2. Full Structural Package Architectural Approval
Pre Application 2. Colored Site Plan: (With 3. Checklists + forms 1st Review: 10 days
plot coordinates / plot size 4. DM approved Masterplan 2nd Review: 10 days
Submit Preliminary on plan / stamped by DMCC) 5. Approved Affection plan
Development Concepts 6. RTA Approved TIS Structural Approval
7. Aviation Authority clearence 1st Review: 10 days
8. other special Approvals 2nd Review: 10 days
Comments Issued on 3. Artist rendering
Preliminary Concepts,
Includes Ext. Agency Input Note:
4. Approved Affection Plan - Submission prepared by Temporary fence
Dubai Municipality
consultant
Stage 3.2 Permit issued
Note: repeat Process as - DM masterplan approval
Required for Inclusion of 5. Official trade License provided to consultant by Building Permit Application
Comments from DM owner representative (DM)
6. Appointment Letter
Excavation
1. Temporary Fence permit / Site Permit issued
Concept Application TIS Note: preparation / Mobilization
(RTA) - Submission prepared by Consultant 2. Excavation Permit
- Information provided by 3. Foundation & Sub-structure
Submit CMP Submission to be completed owner representative (DM) Permit 9terminated on time
( Concept Master Plan ) by Consultant starting at of issuance of the Building
Foundation / Sub-Structure
concept master plan stage (7days) Permit 9terminated on time Permit issued
1st (5 days)
DM and External Agencies ( 12 days)
Review Period TIS Application Form
Submitted by Consultant
Executive Summary
Submitted by Consultant
ADDC / Electrical
Contractor Procurement of Submit design to TPI Incorporate Comments and Consultant stamps drawings Contractor stamps drawings Start installation of Gas TPI Inspects gas Network Contractor to compile all final DMCC to Submit Documents Final Connection issue copies of NOC and
Detailed Application Formal Sign-off Dubai Supply Authority DSA approved TPI Resubmit Network Installations documents to DSA Approvals to DMCC for
Approval Issued by RTA record
DSA /Natural Gas
ADDC / Water Detailed Design completed
Submit DMP (Detailed Documents issued to DMCC (2 Commissioning of Network (2
Master Plan) / Regulations TPI Procured Review and Comments Issued TPI stamps drawings Drawings issued to Contractor Drawings issued to DSA (7 Work Completed Inspection report Issued from DSA to issue NOC to DMCC for
days) days)
(21 days) (31 days) (21 days) (7 days) days) TPI (21 days) Operation (7 days)
Start cicil works to Etisalat Submit as built drawings and Start Etisalat Installation
room Inspection Request issue copies of NOC and
Approvals to DMCC for
Aeronautical Survey record
(DCAA) Approval Issued from
DM Affection Plan Issuance Aeronautical Survey Etisalat Work Completed Inspection and approval Work Completed
Etisalat / telecom (14 days) FOC Installation
Conducted by approved
Submit for plan approval
(21 days)
Consultant
DCAA NOC application Start GSM room civil works Start Etisalat Installation
issue copies of NOC and
Submitted by Consultant GSM design Issued Approvals to DMCC for
from Etisalat
(31 days)
Formal NOC Work Completed Work Completed
Approval Issued by DCAA
- Reviewed and complied by DMCC Development Team issue copies of NOC and
Approvals to DMCC for
- Approval management by DMCC Development Team Installation of network and Consultant Inspection Comments addressed by
equipment contractor
DM / Stormwater NOC Issued by
Submit LDN and plan Consultant
drawings to Consultant
(21 days)
Work Completed Comments issued to Confirmation Issued by
Contractor (7 days) Contractor
RTA - Services Reservations DEWA - LV Etisalat - Telecoms DM - Environment Submit Elec. Application Submit Civil shop drawing Start HV cabling, jointing test Submit Inspection request for DEWA Inspection retreive signatures on
Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP (NOC, Forms and drawings) switchgear civil works / HV room (7 days after confirmation) clearance to energise
DEWA / Electricity NOC Issued by
Issue NOC Issue NOC Issue NOC Issue NOC Submit LDN for Approval (all signatures except for
Consultant metering and cabling
to Consultant
RTA - NOC Department DEWA - MV DU - GSM DM -Sewerage (21 days) engineers)
LDN Approval Issued by Approval issued by DEWA Work completed Inspection date confirmed (7 Apptroval issued by DEWA
Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP Review: (1) CMP (2) DMP DEWA ( 21 days) (14 days) days) (30 days)
Issue NOC Issue NOC Issue NOC Issue NOC Clearance to energise form