Rabat Cimencek
Rabat Cimencek
Catatan : Posisi Patok untuk kelipatan 50 m harus diukur, misal untuk jarak +50 m, +100m dst
ketinggian diukur berdasarkan MSL (Mean Sea Level)
Diukur Oleh : Mengetahui :
P0 P1
1 P0 p0 p1
250
2 P1
250
P2 P3
3 P1.1
250
4 P2
250
P4 P4.1
5 P2.1
250
6 P2.2
250
P5 P5.1
7 P3
250
8 P3.1
250
P6 P7
9 P4
250
10 P5
250
P7.1 P8
11 P5.1
250
12 P6
250
P9 P9.1
13 P6.1
250
14 P7
250
P10
15 P8
250
16 P8.1
250
Diukur Oleh : Mengetahui :
P9.1
250
P2 P3
P10
250
P4 P4.1
P5 P5.1
P6 P7
P7.1 P8
P9 P9.1
P10
2 P1
250
P2 P3
3 P2
250
4 P3
250
P4 P4.1
5 P4
250
6 P4.1
250
P5 P5.1
7 P5
250
8 P5.1
250
P6 P7
9 P6
250
10 P7
250
P7.1 P8
11 P7.1
250
12 P8
250
P9 P9.1
13 P9
250
14 P9.1
250
P10
15 P10
250
125 P 10 125 P 10
125 P 9 125 P 9
125 P 8 125 P 8
125 P 7 125 P 7
125 P 6 125 P 6
125 P 5 125 P 5
125 P 4 125 P 4
125 P 3 125 P 3
125 P 2 125 P 2
125 P 1 125 P 1
125 P 0 125 P 0
Kabupaten : Tasikmalaya Bahan untuk perkerasan : Batu Belah,Split 2/3, semen, Pasir Beton Panjang Jalan : 450 m'
Kecamatan : Sodong Hilir Lebar dan tebal perkerasan : 2,5 x (0.02 + 0.12) Dimensi Saluran : 0.2 x 0.3 m'
Desa : Raksa Jaya Lebar badan Jalan ( termasuk bahu ) : 3,0 m' Jenis gorong-gorong :
Nomor Patok : 0 1 2 3 4 5 6 7 8 9
Kabupaten : Tasikmalaya Kecamatan : Sodong Hilir Desa : Raksa Jaya Panjang Jalan : 450 m'
Nomor Patok : 0 1 2 3 4 5 6 7 8
Target
KEGIATAN Volume
Penebangan pohon btg
50 50 50 50 50 50 50 50 15 20 30 5 45 50
Penebasan m2
Pembersihan m2
Galian lumpur/rawa m3
Timbunan m3
Penghamparan Sirtu m3
Galian batu m3
Pemecahan batu m3
Pemasangan batu m2
Penimbrisan m2
Gorong-gorong bh
Gebalan rumput m2
Angkutan gebalan
m2x 100
Kabupaten: Tasikmalaya Kecamatan: Sodong Hilir Desa: Raksa Jaya Rencana Panjang jalan : 450 m'
Mandays
Nomor Patok: 0 1 2 3 4 5 6 7 8 Target
Kemampuan kerja (HOK)
KEGIATAN
Penebangan pohon
Penebasan 10
Pembersihan 10
Timbunan 1
Pengadaan .......... 1
Pemasangan Bekisting 0.75 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 101.250
Pemasangan Telasah
Penghamparan Adukan 3 30.396 30.396 30.396 30.396 30.396 30.396 30.396 30.396 30.396 273.56
Pemasangan batu 4
Penimbrisan 20
Gorong-gorong
Gebalan rumput 50
Penamanan vegetasi
Harga Sampai Lokasi Harga Sampai Lokasi Harga Sampai Lokasi Keterangan
URAIAN Satuan Toko HD BELA Toko ROSANA Toko SUHUN JAYA Harga di RAB
Rp Rp Rp Rp
I. BAHAN
1 Papan Proyek bh 100,000
2 Prasasti bh 150,000
3 Batu Belah m³ 175,000 175,500 180,000 175,000
4 Pasir Pasang m³ 175,000 175,500 178,000 175,000
5 Pasir Beton m³ 200,000 200,000 205,000 200,000
6 Sirtu m³ 150,000 150,500 158,000 150,000
7 Semen zak 70,000 70,500 70,500 68,000
8 Split Batu pecah 2/3 m³ 200,000 200,000 200,000 200,000
9 Papan Alba 2/20 m³ 1,500,000 1,500,000 1,500,000 1,450,000
10 Kaso 5/7 m3 1,400,000 1,400,000 1,400,000 1,400,000
11 Pasir Urug m3 70,000 70,000 70,000 125,000
12 Buis Beton Q 40 cm bh 30,000 30,000 30,000 50,000
13 Besi Q 10 mm btg 75,000 75,000 75,000 75,000
14 Kawat Beton kg 20,000 19,000 20,000 19,000
15 Paku kg 11,000 11,000 11,000 11,000
II. ALAT
1 Molen hr 250,000 250,000 250,000 300,000
2 Pompa Air hr 30,000
3 Ember bh 5,000 5,000 5,000 6,000
4 Sekop bh 50,000 50,000 50,000 50,000
5 Cangkul bh 35,000 35,000 35,000 40,000
6 Prasasti ls 300,000 300,000 300,000 300,000
7 Papan Proyek ls 100,000
8 Meteran bh 10,000 10,000 10,000 15,000
9 Benang bh 2,500 2,500 2,500 3,000
III. UPAH
1 Pekerja hr 22,500 26,250
2 Tukang hr 30,000 33,750
Tanggal Survei :
Referensi :
1 m3 Beton 1 pc : 3 psr : 5 krkl ( Analisa Dinas Pekerjaan Umum Bidang Permukiman Kab. Tasikmalaya)
PNPM-Mandiri Perdesaan
REKAPITULASI KEBUTUHAN
A. KEBUTUHAN BAHAN
1 Batu pecah 2/3 = 117.4500 m3 = 118.0 m3
2 Plastik Dasar = 1341.9000 m2 = 1341.0 m2
3 Pasir Beton = 70.2000 m3 = 70.0 m3
4 Pasir Urug = 0.0000 m3 = 0.0 m3
5 Semen (50 kg) = 588.6000 zak = 589.0 zak
6 Papan Bekisting = 1.4424 m3 = 160.27 lbr = 1.5 m3
7 Paku = 6.7500 kg = 7.0 kg
B. KEBUTUHAN ALAT
1 Sewa Mesin Molen = 20.6550 Hr = 21 Hr
2 Papan Proyek = 1 bh = 1 Ls
3 Prasasti = 1 bh = 1 Ls
4 Benang = 3 bh = 3 bh
5 Sekop = bh = 1 bh
6 Palu = bh = 1 bh
7 Ember = bh = 30 bh
8 Cangkul = bh = 2 bh
9 Meteran = bh = 1 bh
C. KEBUTUHAN TENAGA KERJA
1 Pekerja = 328.1 = HOK 328 HOK
2 Tukang = 91.8000 = HOK 92 HOK
Tanggal Survei :
Referensi :
1 m3 Beton 1 pc : 3 psr : 5 krkl ( Analisa Dinas Pekerjaan Umum Bidang Permukiman Kab. Tasikmalaya)
PNPM-Mandiri Perdesaan
2. ALAT
2.1 Molen 21 4 17 hari II b 300,000 5,100,000 1,200,000 6,300,000
2.2 Pompa Air 21 21 - hari II a 30,000 - 630,000 630,000
2.3 Ember 30 10 20 buah II b 6,000 120,000 60,000 180,000
2.4 Cangkul 1 1 - buah II a 40,000 - 40,000 40,000
2.5 Sekop 1 1 - buah II b 50,000 - 50,000 50,000
2.6 Prasasti ( 40 X 60 ) 1 - 1 ls II b 300,000 300,000 - 300,000
2.7 Papan Informasi 1 1 ls II b 104,500 104,500 - 104,500
2.8 Papan nama proyek 1 - 1 ls II a 100,000 100,000 - 100,000
Sub Total 2) 5,724,500 1,980,000 7,704,500
3. UPAH
3.1 Pekerja 328 260 68 HOK III a 26,250 1,785,000 6,825,000 8,610,000
###
3.2 Tukang 92 60 32 HOK III a 33,750 1,080,000 2,025,000 3,105,000
###
Sub Total 3) 2,865,000 8,850,000 11,715,000
Catatan :
1 . Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom 'Volume dari swadaya'
2. Nilai RAB didapat dari kolom 'Volume' dikalikan dengan kolom 'Harga Satuan' yang kemudian ditotalkan
3. Sumbangan dalam bentuk Uang dimasukan dalam baris terbawah ( sumber dana Swadaya Uang tunai )
4. Swadaya dalam bentuk lahan ditulis dalam format lain
Kategori Biaya :
I.a Pembelian hasil tenaga manusia II.c Pembelian alat administrasi
I.b Pembelian bahan hasil industri III.a Pembayaran tenaga kerja untuk konstruksi
I.c Pembelian bahan administrasi III.b Pembayaran tenaga kerja untuk pengumpulan bahan
II.a Pembelian alat tangan III.c Pembayaran Honorrarium Tim Pelaksana
II.b Pembelian /Penyewaan alat mesin
No URAIAN Ukuran : : 450 m' Bobot Ukuran : Bobot Ukuran : Bobot JUMLAH TOTAL Bobot
(%) (%) (%) (%)
Jumlah : 1 Unit Jumlah : Jumlah :
No. RAB : 01 No. RAB : No. RAB :
(dalam rupiah) PNPM-MP Swadaya PNPM-MP Swadaya PNPM-MP Swadaya PNPM - MP Swadaya
BAHAN
I 72,410,500 9,505,000 89.40 72,410,500 9,505,000 80.7
(tidak perlu dirinci )
PERALATAN
II 5,724,500 1,980,000 7.07 5,724,500 1,980,000 6.4
(tidak perlu dirinci )
UPAH
III 2,865,000 8,850,000 3.54 2,865,000 8,850,000 3.2
(tidak perlu dirinci )
81,000,000 20,335,000 100 81,000,000 20,335,000 95
Jumlah
IV Operasional UPK 2% 1,705,000 2
V Operasional TPK 3% 2,557,500 3
Jumlah Total 81,000,000 20,335,000 100 85,262,500 20,335,000 100
PNPM + Swadaya 101,335,000
Jumlah Biaya Upah 2,865,000 8,850,000 2,865,000 8,850,000
Jumlah HOK Konstruksi 100 320 HOK HOK HOK 100 320 HOK
Jumlah HOK Pengumpul Bahan
90
1 PEKERJAAN PERSIAPAN 1,404,500 1.39 0.69 0.69
80
70
60
2 PENGADAAN BAHAN MATERIAL 81,915,500 80.84 11.55 11.55 11.55 11.55 11.55 11.55 11.55
50
40
30
3 PEKERJAAN RABAT BETON 18,015,000 17.78 3.556 3.556 3.556 3.556 3.556
20
10
0
TOTAL RENCANA 101,335,000 100
TOTAL REALISASI
Rencana kemajuan fisik bulan ini % 0.69 12.2 11.55 11.55 11.55 15.10 15.10 15.10 3.56 3.56
Rencana kemajuan fisik s/d bulan ini % 0.69 12.9 24.5 36.0 47.6 62.7 77.8 92.9 96.4 100.0
Realisasi kemajuan fisik bulan ini %
Realisasi kemajuan fisik s/d bulan ini %