You are on page 1of 10
reCOnsult review FOR APPROVAL DOCUMENT commerce Pr RBAONAR ERTRHRCONGUT REC-CS-HRSG-006-0002 Date: 2400 2013 PLTGU TANJUNG UNCANG 100 - 120 MW Ref_No_In Drawing Number Ret_No_Out | Rev. | Status Title_Deseription 781301/HRSG- : maopaaes 22033-790-21, ola Water Chemistry Specification Comment CONTRACTOR'S RESPONSE 1. Approved Reviewed By zz Fepisvot WATER CHEMISTRY SPECIFICATION Bi PT. PLN (BATAM) ht. “rmenuntesaees “Engineering, Procurementand Construction (EPC) Pembangkit Listrik ‘Tenaga Gas Uap (PLTGU) Tanjung Uncang 100-120 MW ‘CONTRACT NO. : 0970.Pa24DRUTI2019 PURPORE: FOR APPROVAL ° Teaued or Approval coo a e Fes ‘Oseten Dain —[ Pp | Gc [ ppd SonTRASTOR —™ ‘Plaza PP = Wma Subiyanto 3d Floor (pp) niopal estopeghs eas aaa rw APP, Tonioritate he poiveae aM Ener ov Node HRSG Stone NOM 2S2ESEE cnn “aan 13478604028, Tae 9478604 122 ee. Na Size Page No: ] BY 22033-790-21 IS0.A4 » | Tanjung Uncang CCPP 120MW Project (—& oo —N oeetana PP Pasar, eka 15760 EE Pree oes Fac (21) a4 sb02 Pr Plyaan ini Nesiral Baan ) Ss b right Ke ine uN ata NOM [ee vom fee Pools 10, PO Box 24, $40 HL Amb, Te Netends a “Tope #3178 4 12, Teac 9178681022 Water Chemistry Specification ond oagate oe | osnatse a : DINAG 22033-79021 0 ane Wat heise Prone Ne@M Semiment asso ra02! = Revision o Page 28 TABLE OF CONTENT. INTRODUCTION ennsnnnennnnin nnn 2. BOILER FEEDWATER OF HP AND LP SYSTEM enews 21 Bonen remowaren 22 FEEDWATER QUALITY. — : 23 Dosne. “Nuun Ln me 3 LP BOILER WATER enone 31 LPRoum waren ao - 5 32 LPBoLRwaTRQUALTY 33° Dose... 4 HP BOILER WATER. 41. HP Bonn waren 42° Dousnwarmquainy 5 HP AND LP STEAM SYSTEM cn eeoneennnnemieT SU HPSTEAISYSTIN ssn sn aot 52. HPANDLPHMANSTEAM —— oa 6 SAMPLING ensnnnnnennnen ee RELATED DOCUMENTS: PIO LP Economizer preestersystem 22088-105-11 PIO HP Economizer estan 22033-10813 PIO LP Bol ester 22008-10521 IO HP Bolo syetm 22088-10528, PAID LP Supetheater sytem 2208-10531 PID HP Superheaer system 2208:105.83, PAID HRSG Drane and vents 22083-10540, PID Blow down system 22038-10541 ‘WeilEregyby Meier ARSS Sens ——SSSSCS~S~S~S*« GTS Tanjung Uncang CCPP 120 MW Project, Name Wetor Chemisty Procedure Document 3 72099-700-29 Revison ° Page 3of8 1 IntRooucTion This document describes the water qualy contol and montorng concep for the HRSGS of the Tarjung Uneang CCPP 120 MW Projet, located in Batam, Indonesia. In order to protect the boter components fom deposis, corrosion and erosion, the water chemisty has to be contol in sovordance with exetng guidelines \VGE PowerTech gudeine: guidelines for Feed Water, Boller Water and Steam Qualy for Power Plans / Insta Panis (VGB-R 460 Le, Third Elton 2011) i sed a the waar Weabnent program In goneral the introduction of chemical shouldbe kept to a minimum tis required to add ammonium se phosphate to the boll inorder to anti the required values for pH. The use of demieralsed ‘make-up water aol inpet f hares sls andimpuris in the bol. FAC (Bow Ascetraed Gorosion) ato known as ersioncorosion, i @ major determining factor In boar etme and depends on the Walst qually, tamperatre, ow velecty and constuction detale. The Jomperature and velcles are determined by the operation mode ofthe baller. For the varous systems adequate constuction malaria ae selctad which, in cemblnazon wit th chemical teatment ofthe oie ter, minima the ik of FAC. ‘The use of organle amines and oxygen scavengors(7nyekazne substives’ i not recommended because of ‘ha ik poted by decomposition a reaction products, Reference is made tothe VGB gudsine chapter 52. and. ‘le importan thatthe pH value and be oxygen content of he bole fodvatr ar kept at adequate lov fn ‘order to protect the downveam feedwater sytem and economizer. The cancanaton of oxygen Wat pected inthe speciation protect he boler agains! FAC. Lower levels of oxygen (<5pp5) neanunetion ‘th high vee of reducing agents (oxygen seaverere sult In reacls wi the ferrous alloys t generate Conon products, Overfeedng reducing agents i therefore not recommended. A fow ppb of oxygen (it igh put feedwater considered beneficial im reducing the generation af ron oxides and thus FAC. bo the LP system, Ammonis Is apple at the feedwater ret re to te HRSG. Inthe HP eystom, _Bhoephate "Treatment (1) applied tte feedwater ne om LP integral deserter to HP economizer, Forte introduction of te specfed chemicals to the bor ane the deteminaton of water and steam «quality the minimums requirements are given fr sampling and dosing locatians. Choral dosing and sampling systems are not spe of supply of NEM. ‘EM Energybv-WoduarFRSG Same ——SSSSSSSCSCSCSCSCSCS~S« GTS Tanjung Uncang CCPP 120 MW Project Wale Chemisty Procedure 220387002" 408 2_BOILER FEEDWATER OF HP ANO LP SYSTEM 21 Boiler feoawater ‘The boiler feodwaler (BF) forthe HP and LP system is sent via the HP economizer and LP economizer (preheater tothe HP drum and LP irtgratod deaeraor,respecvely. The BFW ine aso supplies water for steam altemperaton between te HP superhesters, 22 Feodwator quality ‘The boiler feedwater quality of the HP and LP system during normal and constant operation shall ‘meet te following requirements atthe teinal point acording o Table 64 in VGB (Oru bollers witha copper fee condensate / Teed water system) Table 1 Parameter Value Tak] Rete ‘aid Condi BTC) a sien | VG tabe 6 Cana OSG) 43-66 TBiem [VSB abe 6a Sosa as Nay ay vate NEW Seanad Sica(as SO a <5 Wake | Vea abe 6 arc canes Vea ube ba Saen O 3020 Wake | Vea abe “Ttaon as Fe) a wang] Vas abeea Disowed Organ Carbon cor vigt | VSB abe AT (000 | eB par 7.10 23° Dosing ‘Ammonia (NH) s added tothe LP FW and Phosphate Treatment (PTs aded tothe HP FW inorder to contol the pH-value ofthe baler feedwater (ot pat of NEM scope of supply. The axygen content of the boiler feedwater downsteam LP economizer (preheater) i controled by the LP Integrated deaerator “WEN Enoraybv- Waar HRSG Swieme——SSSSSS~S*«S GOT Tanjung Uncang CCPP 120 MW Projet Name Water Chemisty recede Document 72035-780-21 Revision o Page Sofa 3 LPBOLERWATER 34 LP Boiler water ‘Te LP bolor food water passes thvough the LP Economizers(pre-heate) info the LP integrated deserater During normal operation end commissioning, Ammonia is used for pH contel and hardness contol ofthe BFW, LP boller water in te LP deserter extracted to HP econamizer, which fe considered ae a LP ‘continuous bow dour’, Therefore, the LP continuous bow down s nat necessary requied, 22 LP Boiler water quality The LP boller water qualty shall met te folawing requrements ‘able: Parameter Nana Tam] Unit | Reference operation limit aid condoeiay GC) <5 5 __[pSien_| VOB tbe 6 pH GSC) sas =] [ves tie 58 PO, —— Tra [- Si0s <2 >a) [make | VOB abe BT V8 fg.188 19, 33 Dosing ’An Ammonia dosing connection i foreseen on the LP feedwater ine, NEM Energy bv - Modular HRSG Stone Tanjung Uneang COPP 120 MW Project BeAog ID vane Wr Chi Precis NeM Docment azo 2" ’ Revision 0 Page, Bold, 4 HPBOLER WATER 44 HP Boller water The boler feed water passes through the HP Economizer ito the HP drum. During normal operation anc commissioning Phosphate Treatment (PT) is used fr pH contol and harness contro! ofthe BFW. ‘The HP contruous blow down i used to Koop the dct conduct in the bollr water st an coeplable level. The blow dou rates set by ung the continuous bow down contr valve 42 Boiler water quality ‘Te HP baller water quality shall meet he following requirements: Tables Parameter Normal operation) Alarm | Unit | Reference iit Dest conausiny 2) | 5-20 Fao | avon | VoBabC GT PRS) 95-100 [eaaarioa| - | VeSubOOT Phosphate FOF) a Trang | VB aEET Sica SO ca VGB ub 677 ad moro | yop fg. 188 19 Dissaved Organie vor - VGB bie 67/ Content DOC) ai mo! | vee par 7.10 43 Dosing | phosphate dosing connection is foreseen on te HP drum, “NEM Energy bv- Madar HRSG Systeme a rg OTS Tanjung Uncang COP 120 MW Project, Name Water Chemisty Procedure Document 7203870021 a 0 Revision Page Tote 5 -HPANDLP STEAM sysTeM 54 _ HP steam system ‘The HP saluatod steam ffom the HP steam drum is superhoated in the HP superhesters. A esuperneater spaced in between the HP supemheaer 3 and HP superheatr 4. The desuperheater ' fed with water coming fom the HP fecdwater ne. 52 HPandLPmainsteam ‘The same condone are vad for HP and LP main saam, The expected values during normal operation ae proved nthe abe alow. Table Parameter Vale ‘arm | Unit | Reference Tad Conducts BO) | OF 02 [pSiem | VEE TEE ES Sia (SO) =a 20 [pare | VER abEBS Tota Fe

You might also like