Professional Documents
Culture Documents
K Kompeten
Competence
A Adaptif
Adaptive
H Harmonis
Harmony K Kolaboratif
Collaborative
2
Management
Board of Commissioners
Badrodin Haiti M. Fadjroel Ahmad Erani T. Iskandar Muradi Bambang Setyo Dedy Syarif Usman
Rachman Yustika Wahyudi
President Independent
Commissioner/ Commissioner Commissioner Commissioner Commissioner Commissioner Commissioner
Independent Commissioner
Board of Directors
Destiawan Taufik Hendra Hadjar Seti Adji Arijanti Erfin I Ketut Pasek Bambang Rianto Gunadi
Soewardjono Kusuma Senjaya Putra
President Director Director of Finance Director of HCM and Director of QSHE and Director of Operation I Director of Operation II Director of Operation III
and Risk Management System Development Business Development
3
Shares Ownership
As of 31st December 2020
Foreign Institution
3,96%
Domestic Institution
14,42%
Foreign Individual
0,10%
Domestic Individual
15,48%
Government of Republic
of Indonesia
66,04%
4
Business Line
Investment Construction Manufacture
• Build and Operate Realty and Property Develop infrastructure Civil, EPC, and Building • Listed in IDX on 20 Steel fabrication in
Toll Roads Development, focusing projects including : construction including : September 2016 by Cikande, Banten.
• Engage in 16 on highrise building • Power plants • Airport issuing new shares Producing steel
sections in Java & and landed house for : • Water treatment • Harbour amounting IDR 5,2 transmission tower and
Sumatera • Hotel facility • Road/Highway Trillion. toll road guardrail with
• 12 Toll roads are • Apartment • Pipelines • Railway • Produce high capacity of 4.000 ton /
operating and 4 in • SOHO • Etc • Bridges quality concrete month.
construction phase. • Office • Highrise building products including:
• Mixed Use • Power plants • Girder
• etc • Spun Pile
• Box Culvert
• Sheet Pile
• Etc
5
Group Structure
Public Government
33,96% 66,04%
PT Waskita Beton Precast Tbk PT Waskita Toll Road PT Waskita Karya Realty PT Waskita Karya PT Prima Multi PT PP Sinergi PT Jasamarga
Infrastruktur Terminal Banjaratma Jogja Bawen
99,99% 98,18% 75,00% 60,00% 60,00% 99,82% 55,00% 90,00% 60,00% 60,00% 94,70% 99,99%
PT Trans PT Waskita PT Waskita PT Tol Teluk PT Pemalang PT Waskita PT Cibitung PT Cimanggis PT Waskita PT Waskita Fim
Jabar Sriwijaya Tol Bali Balikpapan Batang Bumi Wira Tanjung Priok Cibitung Modern Perkasa Realti PT Waskita Sangir PT Waskita Wado
Tol Mandara Tol Road Port Tollways Realti Energi Energi
Tollways
8
Total Contract
Total Project Managed Total On Going Project
Based on Locations
108 Projects
As of 31st December 2020
Sumatra
Kalimantan
46 8 Sulawesi Papua
11 1
2020 Project Managed
Compositions (in USD)
Java & Bali
41 Nusa
Tenggara
1
1,9
4,6 Billion
2,7 Billion
Billion Infrastructure Infrastructure Building EPC &
Connectivity Water Resources Project Subsidiaries
12
Business Process
WTR, WKR & WKIcontribute new
contracts for construction service Participating in conventional
through investment construction tender held by Govt,
2 SOE, and Private entity
Improved equity will be used to
invest in new toll road and non Conventional
1
toll road infrastructure projects Tender
Investment
7 Construction 3
Supply Materials
9
Financial Performance
19
Financial Performance
Total Asset (USD Billion) Total Equity (USD Billion)
9,21
2,14
7,25 7,44
1,69
4,55 1,18 1,24 1,17
2,25
FY 16 FY 17 FY 18 FY 19 FY 20 FY 16 FY 17 FY 18 FY 19 FY 20
Total Interest Bearing Debt (USD Billion) Net Income (USD Million)
3,61
3,35 342,22
318,67
2,33
1,76
1,05 134,3
77,56 76,22
FY 16 FY 17 FY 18 FY 19 FY 20 FY 15 FY 16 FY 17 FY 18 FY 19
8
5 Piping Oil and Gas Piping Oil and Gas 1 1,8
Fertilizer Plant
Fertilizer Plant 1 12,1
2 Cement Silo Plant
11 Cement Silo Plant 5 29
3 Chemical Plant
12
Project Experience
26
No Project Picture Project Name Project Value Project Period
1 LRT South Sumatera IDR 6.172.732.104.563 2016 - 2019
USD 431.916.318,26
BUILDING PROJECT
Bakauheni –
Terbanggi Besar Toll
Road,
Lampung
Medan –
Krian Legundi Bunder Manyar Toll Road
East Java Kualanamu
–
Tebing Tinggi
Toll Road,
North Sumatera
Cimanggis-Cibitung Nusa Dua – Benoa
Toll Road, Toll Road,
West Java Bali
Terminal 2 Juanda
International APT Pranoto
Airport, East Java Airport, South
Kalimantan
Terminal 3 Soekarno
Hatta International
Airport, Banten
Suralaya Port, Port of Penajam,
Banten East Kalimantan
Noahtu Shipyard,
Lampung
Panjang Port,
Lampung
LRT Palembang,
South Sumatera
The First LRT in Indonesia
Trusted by the Ministry of Transportation of the Republic
of Indonesia, Waskita has successfully develop the first
ever LRT in Indonesia. Located in Palembang, South
Sumatra, LRT Palembang is one of National Strategic
Project with 23,4 km of length and 13 LRT stations.
SOEKARNO – HATTA
AIRPORT TRAIN
RAILWAY TRACK
CONNECTING FROM SHIA
(AIRPORT) TO THE HEART OF
JAKARTA
BI Office Building Plaza Mandiri
Jakarta Jakarta
Niaga Tower
Jakarta
Indonesia Supreme Court
Jakarta
HOTELS & RESIDENTIALS
Wisma BNI 46
The “Pen”
Dominating the skyline of Jakarta, the 262 meter
skyscraper is one of the most iconic building in
Indonesia. Designed by Zeidler Partnership Architects,
Waskita Karya in collaboration with Societe Auxiliaire
d’Enterprises were trusted to build this masterpiece in Kemayoran Athletes
1992. Village Jakarta
Other Buildings
Projects
Not only an expert in high rise buildings. Waskita
Karya has experience to build other projects such
as Aquatic Stadium in Jakarta, University of
Indonesia building, 2004 Tsunami Memorial
Museum and Baiturrahman Mosque in Nangroe
Aceh Darussalam.
Batakan Stadium
Home of the Home of the Persiba Balikpapan Football Club, the
stadium filled by 40,000 loyal fans during matchday and
easily one of the best football stadium in Indonesia. The
“Sun Bear” stadium proposed to be one of the venue to host the
2020 U-20 World Cup
Cahya Kawaluyan Hospital, Semen Padang Hospital,
West Java West Sumatera
02
02
03
03
Karian
Dam
04 04
Gondang Dam Started in 2015, the project is one of the longest transmission
line ever built in Indonesia and is a monumental masterpiece of
Waskita Karya.
918 transmission towers span for more than 350 KM from Jambi
to Riau province and will be ready to support electricity
distribution program in Sumatera Island.
Malinau Steam Muara Karang Steam
Power Plant, North Power Plant, Jakarta
Kalimantan
26
Toll Road Investment
Jakarta
• Bekasi - Cawang - Kp Melayu (16 km)
842 KM
North Sumatra • Cimanggis - Cibitung (25 km) Toll Road
• Kuala Tanjung - Tb Tinggi - Parapat (143 km) • Cibitung - Cilincing (34 km) Concession Length
• Depok - Antasari (22 km)
• Cinere - Serpong (10 km)
West Java
36
Traffic Comparisons FY19 vs FY20
Total Traffic Volume
• During the large scale social distancing
10,1 measures ”PSBB”) (April-June 2020) toll roads
8,8
traffic decreased by almost 50% from the
7,7
7,1 average normal daily traffic.
6,2 6,5
• During the new normal or PSBB transition to
end of year 2020, toll road traffic has returned
2,7
back to normal
1,2
• Toll road operational in 2020 :
0,1
Pasuruan - Probolinggo Bekasi - Kp Melayu Ciawi - Sukabumi Krian - Legundi - Bunder - Manyar
37
Realty Investment
• All realty investment are carried out by PT Waskita Karya Realty
• Focusing on high rise building (residential), superblocks, and landed house
• PT Waskita Karya Realty has 2 major brands : Vasaka (Residentials / Superblock) and Teraskita (Hotels and
Offices)
Investment
No Project Location Area Usage
Value
(in USD Mio)
1 Teraskita Hotel Jakarta Jakarta 0,3 Ha 23 Hotel & Office
3 Teraskita Hotel Makassar Makassar 0,2 Ha 10,2 Hotel & Office Vasaka Solterra, Jakarta Teraskita Hotel, Jakarta
8 88 Avenue Surabaya 3,4 Ha 76,8 Mixed Use Vasaka Bali, Bali Masion Teraskita Hotel, Bandung
12 Waskita Modern Realty Jawa Barat 600 Ha 549* Urban City Development
13 Wanakarta City Jawa Barat 200 Ha 343* Urban City Development Vasaka Reiz Condo, Medan Teraskita Hotel, Makassar
38
Realty Investment Performance
Hotel Occupancy Rate Hotel Revenue (USD Million)
87,10%
80,45%
2,7 2,9
59,62%
1,8 Brooklyn Office Block, Jakarta
17
13
159
0
39
Non-Toll Road Infrastructure
Sangir Mini Hydro Power Plant
• Capacity : 2 x 5 MW
Plant
• Prepared to become major player in the field of infrastructure Sangir Mini Hydro Power Plant Revenue (USD Million)
investment 4
3,5
• Invest and develop various infrastructure project such as:
✓ Power plant
1,9
✓ Water treatment plant 1,3
✓ Oil & gas pipeline
✓ Ports
2017 2018 2019 2020
40
Precast Concrete Manufacture
All precast concrete business is managed through PT Waskita Beton Precast. Listed
in Indonesia Stock Exchange since 20 September 2016 with total proceed of
USD 356 Million
Business Line
Construction Service
7%
Precast Readymix
45% 48%
41
Precast Concrete : Performance Highlights
New Contract Achievement (USD Million) FY20 New Contract Segmentation
840
757
457 482
FY20 New
Contract 46,0%
Internal
128 54,0% USD 128
Million
External
FY16 FY17 FY18 FY19 FY20
549 100%
487 513
80% 71% 70%
324 60%
40%
151 22%
20%
0%
FY16 FY17 FY18 FY19 FY20 2018 2019 2020
42
Steel Fabrication
Plant Location:
43
Thank You
Disclaimer:
This material is for information only, and we are not soliciting any action based upon it, This report is not to be construed as an offer to sell or the solicitation of an offer to buy any security in any
jurisdiction where such an offer or solicitation would be illegal, The information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or
complete, and it should not be relied upon as such, Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice, It is intended for
the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of
PT Waskita Karya (Persero) Tbk.
35