No.

Merk Deskripsi

1 LABOLYTIC® 1 Package - Cold Room Suhu - 18 ~ 23 deg C ( 6,69 m x 4,087 m x 2,8 m )

I. Sandwich Panel
A. 100 m2 Dinding, Lantai & Atap Bahan Polyurethan, Density +/-40kg/m2, Thickness 100 mm
Skin Galvanis Color Bond 0,45 - 0,55 mm
Full Knock Down Panel
B. 1 Unit Manual Sliding Door, Thickness 100 mm
C. 1 Unit Plastic Curtain
D. 30 m2 Lantai Cor Pondasi Tinggi 10-20 cm dan Epoxy Ukuran m2 Cold Room

II. Mesin Pendingin


A. 1 unit New Condensing Unit (CDU)
Specification :
Compressor : Bitzer / Emerson / Copeland / Tecumseh
Refrigerant : R-404a
Room Temp : - 18 ~ -23 deg C
Required Capacity : 10 HP
Power Consumption : 10 kW - 15 kW - 380V/3Phase/50Hz

Sudah Termasuk :
Pressure Gauges
Receiver Tank
Solenoid Valve & Stop Valve
Sight Glass
Condensor
Danfoss Pressure Switch

B. 1 unit Evaporator Unit (Cooling Unit)


Specification :
Refrigerant : R-404a
Room Temp : - 18 ~ -23 deg C
Required Capacity : 10 - 12 HP

III. Material Instalasi Pipa Tembaga


A. 20 m Pipa Tembaga Standard ASTM B280 (Liquid & Gas)
B. 20 set Insulation 1" Pipa Tembaga
C. 2 can Refrigerant R-404a
D. 1 lot Material Aksesoris Instalasi Pemipaan

IV. Material Instalasi Kabel dan Kontrol


A. 20 m Kabel Power Evaporator ke CDU 4 Besar (NYY 4 x 10)
B. 30 m Kabel Power CDU ke Panel Cold Room (NYY 4 x 16)
C. 50 m Kabel Kontrol AWG
D. 30 m Cable Tray 30 x 10 cm
E. 1 lot MCB Condensing Unit + Panel (35A + 20A + MCCB 80A)
F. 1 pcs Contactor Power Unit
G. 1 pcs Time Delay Relay +relay
H. 1 set Automatic Safety Control Panel
I. 1 lot Heater, Aksesoris dan Material Bantu Instalasi Kelistrikan Cold Room

V. Aksesoris Cold Room


A. 8 set Rak Besi 4 Tingkat
B. 1 set Alarm dan Lampu Indikator Temperatur

VI. Pekerjaan Jasa Pemasangan


A. 1 lot Pekerjaan Instalasi Cold Room dan Aksesoris
B. 1 lot Pekerjaan Instalasi Kelistrikan dan Aksesoris
C. 1 lot Pekerjaan Pengecoran dan Epoxy
D. 1 lot Commissioning Test dan Running Test