aa & 66 Survey no 150. [Sr No. Discription i Nos. C B HID Qty. 7 [Excavation for foundation upto 4.50 mt. Depth including shorting out and stacking| lof useful Material and Disposing of the lexcavated stuff upto 50 mt. lead. for Wall Foundation 80 750 | 060 | 1.80 64.80 (Sr. No. 7 (a), Page No. 17) 8.0 5.15 0.60 4.80 44.50 \(S.O.R. 2015-16) lor column footings qo | 155 | 155 | 180 T784 Net Quantity| i 187.14 Providing and laying cement 1: 4: 8 : (1 \cement : 3 coarce sand : 8 hand broken [stone aggregates 40 m.m. nominal size! land curring complete excluding cost of fform work in :- (a) Foundation and [Plinth (Gr. No. 5.3.3., Page No.19) |(S.O.R. 2015-16) 20 750_| 060 | 0.30 2.70 40. 5.15 | 0.60 | 0.30 3.74 18.0 1.55 1.55 0.45 19.46, flooring concrete] 2.0 5.00 | 8.50 | 0.30 25.50 2.0 850 | 3.00 | 0.30 15.30, 20 8.00 | 3.00 | 0.30 14.40 2.0 2.25 | 8.00 | 0.30 10.80 INet Quantity 91.87 Providing and laying cement concrete| lwork 1:2:4 (1 cement: 2 coarse Isand : 4 graded stone aggregates 20 'm.m. nominal size ) and curing complete| lexcluding cost of form work and reinforced concrete work in : (@) Foundation footing base of columns| land mass concrete (St. No. 6.4.1., Page No. 20) (S.O.R. 2015-16) (Column rectangular section 18.0 0.23 0.45 1.80 3.35 [Net Quantity 3.35

You might also like