You are on page 1of 1

NU1T2122

ABTECN5S - BUILDING TECHNOLOGY 5: ALTERNATIVE BUILDING CONSTRUCTION SYSTEMS (ARC 182)


WORK SCHEDULE 2:20 PM - 9:00 PM M RM 310HSH

1 AUG 23 ORIENTATION, DIAGNOSTIC ASSESSMENT, RAPPORT BUILDING, VIRTUAL SEAT PLAN, GROUPING

2 30 REVIEW OF CONVENTIONAL CONSTRUCTION MATERIALS AND METHODS OF BUILDING CONSTRUCTION

3 SEP 6 INTRODUCTION TO ALTERNATIVE BUILDING CONSTRUCTION SYSTEMS - IMPORTANCE AND APPLICATION/


CAST-IN PLACE & PRE-CAST CONC. FLOOR SYSTEM & ROOF SLAB SYSTEMS (FLAT SLAB, FLAT PLATE, RIBBED FLOOR SLAB, WAFFLE SLAB
LIFT SLAB, SPAN-STRESS FLOOR SYSTEMS, SLIP-FORM METHOD SYSTEM) (RESEARCH/REPORTING) (GROUP 1)

12 (MAKE-UP CLASS) WALL PANEL SYSTEMS: FLAT, RIBBED, WINDOW & WALL TYPES, TILT-UP WALL PANEL SYSTEM (RESEARCH/REPORTING) (GROUP 2)

4 13 PRE-STRESSED CONCRETE (PRE-TENSIONING & POST-TENSIONING) (RESEARCH/REPORTING) (GROUP 3)

5 20 COMPOSITE CONSTRUCTION METHOD - IMPORTANCE AND APPLICATION (RESEARCH/REPORTING) (GROUP 4)

6 27 CABLE/TENSILE/MEMBRANE STRUCTURE (RESEARCH/REPORTING) (GROUP 5)


MIDTERM EXAM

7 OCT 4 SHELL STRUCTURES (RESEARCH/REPORTING) (GROUP 6)

8 11 PRE-ENGINEERED BUILDINGS (RESEARCH/REPORTING) (GROUP 7)

9 18 GEODESIC STRUCTURES (RESEARCH/REPORTING) (GROUP 8)

10 25 KINETIC ARCHITECTURAL SYSTEMS (RESEARCH/REPORTING) (GROUP 9)

11 1 BUILDING AUTOMATION SYSTEM/SMART BUILDINGS (RESEARCH/REPORTING) (GROUP 10)

12 NOV 8 INTEGRATION

13 15 FINAL EXAM/SUBMISSION OF FINAL PLATE