Professional Documents
Culture Documents
Type of material
Plain concrete Reinforced concrete Sand aggregate water Brick steel Cement Gypsum Bitumen Poly ester mazyko Marble Form work Counter sheet Plastic paints
Unit
m3 m3 m3 m2 m3 1000 brick ton ton m m2 roll m2 m2 m3 sheet 12 kg
Cost /unit
446 L.E 450 L.E 25 L.E 55 L.E 3 L.E 675 L.E 4500 L.E 500 L.E 70 L.E 140 L.E 150 L.E 55 L.E 320 L.E 1500 L.E 400 L.E 300 L.E
Item
Equipment
Unit
cost
Rate of Production
cost/M
2 Bulldozers
Day
500 L.E
2250
Day 3*1200 L.E
M3/day
Day M
3
cost
cost/m3
For R.C.
3 carpenter 3 assistants
Day 3*100L. 21 Day E. 3 M /day 3* 80 L.E. 540 L.E. Day 3*120L. 18 Day E. 3 3*80 L.E. M /Day =600 L.E. Day Day
for column
3 carpenter 5 assistant
For slab
3 carpenter 3 assistant
3*120L. E. 5*80L.E. 760 L.E. Day 3*120 6 600/6=100 3 L.E. Day m /day L.E./m3 3*80L.E. =600 L.E.
R.W
3steel fixer Day 3*120L. 6.75 M3\da 6 assistant Day E 6*80L.E. y 840 L.E
Rate of cost/Unit Producti on 1 Leader Day 80 L.E. 300 180/300 3 =0.6 2 Leveling Day 2*50 L.E. m /day L.E./m3 &curing 180L.E.
content of crew
Unit
cost
Plastering crew
5 plaster 5 helper
Day Day
600 M2/day
masonry crew
3 mason 6 helper
Day Day
75 m /day
3
General Work
30 workers
Day
30 L.E.
Type of crew
content of Unit crew 3 steel fixer 6 assistant 3 steel fixer 6 assistant Day Day
Rate of cost/uni t produc tion 3*120 1.2 ton 840/1.2 =700L.E. L.E. /day /m3 6*80 L.E. =840 L.E. 3*120 0.6 ton L.E. ton/ 6*80 L.E. day =840 L.E. 840/0.6 =1400 L.E./m3
cost
Day Day
For slabs
Day Day
3*120L.E 0.81 840/0.81 . ton/day =1037 L.E./day 6*80 L.E. =840 L.E. 3*120l.E 0.75 840/0.75 6*80 LE ton/day =1120 lE/day =840 LE
R.W
Type of crew
Unit
cost
cost/Unit
Installation of Flooring
Day Day
Plumbing Work
2 plumber 5 helper
Day Day
30 l.m
Installation of Ceramic
2 helper
Day Day
20 m /day
2
2*120 l.E Day 3*70 450 l.E 75 m2 / day 25 l.m 450/25 =18 lE/lm