Table [4-] shows material resources:

Type of material
Plain concrete Reinforced concrete Sand aggregate water Brick steel Cement Gypsum Bitumen Poly ester mazyko Marble Form work Counter sheet Plastic paints

Unit
m3 m3 m3 m2 m3 1000 brick ton ton m m2 roll m2 m2 m3 sheet 12 kg

Cost /unit
446 L.E 450 L.E 25 L.E 55 L.E 3 L.E 675 L.E 4500 L.E 500 L.E 70 L.E 140 L.E 150 L.E 55 L.E 320 L.E 1500 L.E 400 L.E 300 L.E

Table [4-] show equipments:

Item

Equipment

Unit

cost

Rate of Production

cost/M

2 Bulldozers

Day 2*2500 L.E

loader Excavation 3 Hammer Excavator Bucket Excavator 4 Trucks

Day

500 L.E

2250
Day 3*1200 L.E

M3/day

10100/ 2250 =4.5 L.E./M


3

Day M
3

1000 4*7 L.E 10100 L.E

Table [4-] show labor:

Type of crew Carpe nter crew For P.C.

content of Unit crew 3 carpenter 3 assistants

cost

Rate of produc tion

cost/m3

For R.C.

3 carpenter 3 assistants

Day 3*100L. 21 Day E. 3 M /day 3* 80 L.E. 540 L.E. Day 3*120L. 18 Day E. 3 3*80 L.E. M /Day =600 L.E. Day Day

540/21 = 25.70 L.E. /M3 600/18=33. 5 L.E./M3

for column

3 carpenter 5 assistant

For slab

3 carpenter 3 assistant

3*120L. E. 5*80L.E. 760 L.E. Day 3*120 6 600/6=100 3 L.E. Day m /day L.E./m3 3*80L.E. =600 L.E.

680/6 = 6 113.5 3 M /day L.E./M3

R.W

3steel fixer Day 3*120L. 6.75 M3\da 6 assistant Day E 6*80L.E. y 840 L.E

840\6.75 =124.5 lE\day

Type of crew Pouring crew

Rate of cost/Unit Producti on 1 Leader Day 80 L.E. 300 180/300 3 =0.6 2 Leveling Day 2*50 L.E. m /day L.E./m3 &curing 180L.E.

content of crew

Unit

cost

Plastering crew

5 plaster 5 helper

Day Day

5*100 L.E. 5*40 L.E. 700L.E.

600 M2/day

700/600 =1.2 L.E./m2

masonry crew

3 mason 6 helper

Day Day

3*70 L.E. 6*50 L.E. 510 L.E.

75 m /day
3

510/75 =6.8 L.E/m3

General Work

30 workers

Day

30 L.E.

Type of crew

content of Unit crew 3 steel fixer 6 assistant 3 steel fixer 6 assistant Day Day

For R.C. Steel foundati Fixin ons g For Crew columns

Rate of cost/uni t produc tion 3*120 1.2 ton 840/1.2 =700L.E. L.E. /day /m3 6*80 L.E. =840 L.E. 3*120 0.6 ton L.E. ton/ 6*80 L.E. day =840 L.E. 840/0.6 =1400 L.E./m3

cost

Day Day

For slabs

3 steel fixer 6 assistant

Day Day

3*120L.E 0.81 840/0.81 . ton/day =1037 L.E./day 6*80 L.E. =840 L.E. 3*120l.E 0.75 840/0.75 6*80 LE ton/day =1120 lE/day =840 LE

R.W

3 steel Day Day fixer 6 assistant

Type of crew

content of crew 1 2 helper

Unit

cost

Rate of Productio n 25 m2/day

cost/Unit

Installation of Flooring

Day Day

80 L.E. 2*50 L.E. 180L.E.

180/25 = 7.2 L.E./m2

Plumbing Work

2 plumber 5 helper

Day Day

2*100 L.E. 5*60 L.E. 500L.E.

30 l.m

500/30 =16.70 L.E./m2

Installation of Ceramic

2 helper

Day Day

2*100 L.E. 4*50 L.E. 400 L.E.

20 m /day
2

400/20 =20 L.E/m3

Installation of Marble insulation

2 Technical Marble 3 helper

2*120 l.E Day 3*70 450 l.E 75 m2 / day 25 l.m 450/25 =18 lE/lm