You are on page 1of 2

MALAYA PATRICIA TORINO ROSARIO BUSINESS CENTER

LT 0023 BLOCK 14 BLK GEN. TRIAS


WOODCRESS PH 7 TAPIA ROSARIO
GENERAL TRIAS CAVITE TIN 000-101-528-000-VAT
Billing Statement No.: 4142046297440
Meter No.: 121BAS106872
Route Seq.: 4140 17 0005 Print Seq.: 247141 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 2063425291 07 May 2022
26 Mar 2022 to 25 Apr 2022 26 Apr 2022
Date of Meter Reading Electric Meter Number
25 Apr 2022 121BAS106872 Please Pay
Date of Next Meter Reading Current Reading
25 May 2022
Customer Type -
231
Previous Reading
� 2,384. 14

Residential 5 See the back of bill as you have other unpaid bills with earlier due dates that may cause disconnection.

=
Actual Consumption Bill Computation Summary
Your rate this month 226 kWh Remaining Balance from previous bill 5.32
� 10.53 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 2,378.82
Please see the back page of your bill for more details about your Generation 1,326.69
meter reading and consumption. Transmission 188.28
System Loss 121.86
Distribution (Meralco) 405.05
Subsidies 21.20
Your monthly consumption 28.9ºC Government Taxes
Universal Charges
248.58
44.94
Ave. temp this month 1.6 FiT-All (Renewable) 22.22
kWh deg higher than prev.

Total Amount Due � 2,384.14

kWh - - 5 226 - - - - - - - -

- - - - - - - - - - - -

Your consumption explained Your typical consumption


This bill is more than 100% higher 116 kWh 7.29 kWh � 76.7
(+221kWh) vs previous billing period
Ave. monthly Ave. daily Ave. daily
consumption consumption cost this bill
(last 2 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
226 kWh 0.1610 tCO * 2 7 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
5niLEdG2zqX
cCcbNKCHc4X
2063425291 � 2,384.14
Zs:ZBXIBfER
ucSZOnHUn1P Bfu:eqZcEvZYuFEwqEUJbeYFUw
Payment made after 26 Apr 2022 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 22046038878 Local Application No.: 700201780 Billing Period: 26 Mar 2022 to 25 Apr 2022 Print Seq. 247141 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
24 Feb-24 Feb 2022 01 Mar 2022 Rosario Business Ctr � 1,170.00 FiT-All (Renewable) 226 kWh 0.0983 22.22

What remains unpaid Energy Bill Amount


Base VAT
Billing Period Due Date Remarks Unpaid Amount VAT Sales 2,074.89 236.77
VAT Zero Rated 0.00
03 Mar-25 Mar 2022 07 Apr 2022 Please pay immediately � 5.32 Non-VAT 67.16

How your bill was computed Total Energy Amount 2,378.82


Service ID Number: 475550190101 Charges for this billing period � 2,378.82
Contract Holder: MALAYA PATRICIA TORINO
Service Address: LT 0023 BLOCK 14 BLK , WOODCRESS PH 7, Additional Bill Information
TAPIA, GENERAL TRIAS , CAV Voltage Level Class : Secondary
Your rate this month (price per kWh) is computed as Total Energy Amount
Metering Information divided by the Actual Consumption (in kWh)
Previous Current Note: The average temperature for the month represents the reading from
Meter Number Reading Reading Multi Registered the PAG-ASA weather station in Quezon City, Metro Manila.

121BAS106872 5 231 1 226 kWh


Rate Components Base Price Amount
Generation 55.77% 1,326.69
Generation Charge (PhP/kWh) 226 kWh 5.8724 1,327.16
Power Act Reduction 226 kWh -0.0021 -0.47
Transmission 7.91% 188.28
Transmission Charge(PhP/kWh) 226 kWh 0.8331 188.28
System Loss 5.12% 121.86
System Loss Charge (PhP/kWh) 226 kWh 0.5392 121.86
Distribution (Meralco) 17.03% 405.05
Distribution Charge (PhP/kWh) 226 kWh 1.3183 297.94
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 226 kWh 0.3377 76.32
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.7300 16.73
Supply Charge per kWh 226 kWh 0.5085 114.92
Dist True-Up 1 (PhP/kWh) 226 kWh -0.2761 -62.40
Dist True-Up 2 (PhP/kWh) 226 kWh -0.1923 -43.46
Subsidies 0.89% 21.20
Lifeline Rate Subsidy (PhP/kWh 226 kWh 0.0937 21.18
Senior Citizen Subsidy 226 kWh 0.0001 0.02
Government Taxes 10.45% 248.58
Current RPT (PhP/kWh) 226 kWh 0.0066 1.49
Local Franchise Tax 2064.57 0.5000% 10.32
VALUE ADDED TAX
Generation Charge 1327.16 11.2300% 149.04
Power Act Reduction 0.00
Transmission Charge 188.28 11.3900% 21.45
System Loss Charge 121.86 11.2500% 13.71
Distribution Charge 405.05 12.0000% 48.61
Subsidies and Others 33.01 12.0000% 3.96
Universal Charges 1.89% 44.94
Missionary Elec for NPC-SPUG 226 kWh 0.1544 34.89
Missionary Elec for REDCI 226 kWh 0.0017 0.38
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 226 kWh 0.0428 9.67
DU Stranded Contract Costs 0.00
Equalization Taxes & Royalties 0.00
FiT-All (Renewable) 0.93% 22.22

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like