Weeks 1 2 3 4 5 6 7 8
Item: A
Week 1 2 3 4 5 6 7 8
S/R
POH
Item: C
Week 1 2 3 4 5 6 7 8
S/R
POH
Item: E
Week 1 2 3 4 5 6 7 8
G/R 1200 1600
S/R 150
Week 1 2 3 4 5 6 7 8
S/R
Legend: G/R= gross requirements, S/R = scheduled receipts, POH = planned on hand, N/R = net
ITEM A
Quantity 300
Planned Order Receipts 400 since there is no lot size for item A
Planned Releases 400 in week 7 since it requires 1-week lead time.
ITEM C
Planned Order Receipts 800 since there is no lot size for item C
ITEM E
Planned Order Receipts 1600 since there is no lot size for item E
POH is the S/R (150) from week 1 which became on hand on week 2 and inventory on hand (50)
in week 1. The POH in week 2 are carried over to week 3.
ITEM F
300*2 = 600
(500/10)*50 = 500
Planned Releases
POH is the inventory on hand (100) in week 1. The POH in week 1 are carried over to week 3.