ANAS BRA i]
2 rage
meee larbela 5‘ Extension Hydropower Project Management Department
POWERCHINA Power Construction Corporation of China Limited
Our Ref. No. PCCCL/TS-CIVIL/2022- 724 Date: 7” September, 2022
Project Manager
Tarbela 5 Consultants (TSC)
HPD Office, Tarbela Dam Project
Ghazi, KPK
Subject: Request to Close the NCR-ENV(04)-18
Ref: T5C-T5C-XXXX-MEM-EN-000030, Dated 1“ September 2022
Dear Sir,
Reference is made to your above letter, wherein a NCR was attached regarding
“Unacceptable Practice of Sulfur melting at Batching Plant”.
According to the detailed description of the non-compliance activities in subject report,
series rectification measures have been taken immediately by the Contractor, and reported as
below:
Sen Description Measures been Taken
The Contractor has provided with an
electronic device with a proper head for
the sulfur melting activity that does not
release sulfur gas into the air.
‘We observed the Contractor heating
the solid sulfur to molten sulfur for
capping the cubic cylinder in the
batch plant vicinity. Molten sulfur
can cause thermal burns and may
evolve Hydrogen Sulfides which may
accumulate in storage container, |!
1 | Sulfur fires burn, very hot and can
readily damage the mechanical
integrity of plant equipment. High
concentration may cause immediate
unconsciousness - death may result
unless victim is promptly and
successfully resuscitated. Hydrogen
sulfide causes eye irritation.
TensTon Hydropower Project
FE (ODVO9R-RIOGY Fax: (921 093R-2R1077 Femail: PCC. TS@163 eamDa TMsseptomber, 20.
The melting of Sulfur was
undertaking without effective
protective measures. During the
process of sulfur melting, it release
sulfur with the presence of oxygen, it
makes sulfur dioxide which have
negative impact on environment and
the worker also effect due to inhaling
the mentioned gas. During the
activity the unpleasant smell is all
around the plant and make the work
environment more uncomfortable.
The Contractor has provided a separate
container for the de-sulfurization activity
from which cannot release gas to the
environment.
The contractor has provided proper PPE to
the workers for the sulfur melting activity.
The use of waste or wood to fire for
the melting which also release
smoke. This practice is the violation
of Sub-Clause 4.44 of the
Specification Volume ~ 2 (Part 2A)
of the Contract and Environment
management plan E4 section14.1.
The Contractor has been provided an
electronic device for desulfurization which
is smokeless.
‘Site ald: China Camp, Terbela 5” Extension Hydropower Project, Tarbela Dam, RPK, Pakistan 23470
PR (9WAIRIRING— Fax: (920093RPRTOTT Femail: PCT. TS@1E comOr No PCCCLES. CW 2022-] dp Date: T*September, 2022
Based on the above measures which have been taken by the Contractor, you are kindly
requested to close the NCR-ENV(04)-18.
This is for your information and review.
Yours Faithfully,
Power Construction Corporation of China Ltd.,
Z
Bye
Acting Project Manager
cc
1) CE/PD, Tarbela 5" Extension HPP, WAPDA, Ghazi, KPK
2) File
‘Site add: China Carnp, Tarbela 5" Extension Hydropower Project, Tarbela Dam, KPK, Pakistan 25470
FR (PWIND — Faw: (921 00RR-PRIOTT Ramails PCCET. SIAR comSection B: Proposed Larrective Acti
derail
Ny The contractor has Proviclel with an electronic olevied
latith a Proper heaol for the sultar meltivg activit
that oloes not release Suber Jas into the air.
P)Ae contractor has Provilecl a Se Pavote
leontainer for the phe-tultnrization ax tvith
Hrom chic cannot release Gat to the ewiomu
BI 7he Contractor has Proviclesl PrePer PPE
to the workers tor the Suttur melt
Contractor Rep: a
Name:
Signature
ne ‘/, “pr
lacttvith =
Scheduled Estimated Estimated cost (if
completion Programme Employer has
date for implication: liability}:
cr
Section ¢: Actual Corrective Action
Detal of actual Corrective Action
Accorlick to above Section-B, Comerrtiul
faction her heen taken.
Contractor Rep:
Name YEE
signatures
owe 6/4 -2%
r t
Actual Actual ‘Actual Cost (if t
completion programme Employer has
date for CA Implication: labity:
Section D: Resolution / Correction i 2
Tests to confirm adequacy of Corrective Action: TSC Site Rep:
Name:
Signature:
Date:
Measures to be taken to avoid repeats of this NCR in the future:
The above noted corrective action is: Acceptable Not acceptable
Decision verified by Eng Rep:
Name:
Signature:
Date:
Reasons for non-acceptance and details of the next step
Distribution:
Tatbla §Congutans: Mol MaeDoraa Lind, In assocaton wih NOM Pakistan and AFRY (CH)
Ste Ofc, Tarte Dam Projet, Ghai, Harpur KPK Design Office 203-Upper Mal, Lahore T +92-42:97594656.60
Mow MacDonag,Vcory Howse, Tata ce, Brenton BN AY, UK 703273 365000
Wot Macdonald inted Repiereain thant ane Wes no, 124967 RepsteneOtee Mots MacDorala House, -10Sjdemnam Re, Croydon CRO 6,