You are on page 1of 4
ANAS BRA i] 2 rage meee larbela 5‘ Extension Hydropower Project Management Department POWERCHINA Power Construction Corporation of China Limited Our Ref. No. PCCCL/TS-CIVIL/2022- 724 Date: 7” September, 2022 Project Manager Tarbela 5 Consultants (TSC) HPD Office, Tarbela Dam Project Ghazi, KPK Subject: Request to Close the NCR-ENV(04)-18 Ref: T5C-T5C-XXXX-MEM-EN-000030, Dated 1“ September 2022 Dear Sir, Reference is made to your above letter, wherein a NCR was attached regarding “Unacceptable Practice of Sulfur melting at Batching Plant”. According to the detailed description of the non-compliance activities in subject report, series rectification measures have been taken immediately by the Contractor, and reported as below: Sen Description Measures been Taken The Contractor has provided with an electronic device with a proper head for the sulfur melting activity that does not release sulfur gas into the air. ‘We observed the Contractor heating the solid sulfur to molten sulfur for capping the cubic cylinder in the batch plant vicinity. Molten sulfur can cause thermal burns and may evolve Hydrogen Sulfides which may accumulate in storage container, |! 1 | Sulfur fires burn, very hot and can readily damage the mechanical integrity of plant equipment. High concentration may cause immediate unconsciousness - death may result unless victim is promptly and successfully resuscitated. Hydrogen sulfide causes eye irritation. TensTon Hydropower Project FE (ODVO9R-RIOGY Fax: (921 093R-2R1077 Femail: PCC. TS@163 eam Da TMsseptomber, 20. The melting of Sulfur was undertaking without effective protective measures. During the process of sulfur melting, it release sulfur with the presence of oxygen, it makes sulfur dioxide which have negative impact on environment and the worker also effect due to inhaling the mentioned gas. During the activity the unpleasant smell is all around the plant and make the work environment more uncomfortable. The Contractor has provided a separate container for the de-sulfurization activity from which cannot release gas to the environment. The contractor has provided proper PPE to the workers for the sulfur melting activity. The use of waste or wood to fire for the melting which also release smoke. This practice is the violation of Sub-Clause 4.44 of the Specification Volume ~ 2 (Part 2A) of the Contract and Environment management plan E4 section14.1. The Contractor has been provided an electronic device for desulfurization which is smokeless. ‘Site ald: China Camp, Terbela 5” Extension Hydropower Project, Tarbela Dam, RPK, Pakistan 23470 PR (9WAIRIRING— Fax: (920093RPRTOTT Femail: PCT. TS@1E com Or No PCCCLES. CW 2022-] dp Date: T*September, 2022 Based on the above measures which have been taken by the Contractor, you are kindly requested to close the NCR-ENV(04)-18. This is for your information and review. Yours Faithfully, Power Construction Corporation of China Ltd., Z Bye Acting Project Manager cc 1) CE/PD, Tarbela 5" Extension HPP, WAPDA, Ghazi, KPK 2) File ‘Site add: China Carnp, Tarbela 5" Extension Hydropower Project, Tarbela Dam, KPK, Pakistan 25470 FR (PWIND — Faw: (921 00RR-PRIOTT Ramails PCCET. SIAR com Section B: Proposed Larrective Acti derail Ny The contractor has Proviclel with an electronic olevied latith a Proper heaol for the sultar meltivg activit that oloes not release Suber Jas into the air. P)Ae contractor has Provilecl a Se Pavote leontainer for the phe-tultnrization ax tvith Hrom chic cannot release Gat to the ewiomu BI 7he Contractor has Proviclesl PrePer PPE to the workers tor the Suttur melt Contractor Rep: a Name: Signature ne ‘/, “pr lacttvith = Scheduled Estimated Estimated cost (if completion Programme Employer has date for implication: liability}: cr Section ¢: Actual Corrective Action Detal of actual Corrective Action Accorlick to above Section-B, Comerrtiul faction her heen taken. Contractor Rep: Name YEE signatures owe 6/4 -2% r t Actual Actual ‘Actual Cost (if t completion programme Employer has date for CA Implication: labity: Section D: Resolution / Correction i 2 Tests to confirm adequacy of Corrective Action: TSC Site Rep: Name: Signature: Date: Measures to be taken to avoid repeats of this NCR in the future: The above noted corrective action is: Acceptable Not acceptable Decision verified by Eng Rep: Name: Signature: Date: Reasons for non-acceptance and details of the next step Distribution: Tatbla §Congutans: Mol MaeDoraa Lind, In assocaton wih NOM Pakistan and AFRY (CH) Ste Ofc, Tarte Dam Projet, Ghai, Harpur KPK Design Office 203-Upper Mal, Lahore T +92-42:97594656.60 Mow MacDonag,Vcory Howse, Tata ce, Brenton BN AY, UK 703273 365000 Wot Macdonald inted Repiereain thant ane Wes no, 124967 RepsteneOtee Mots MacDorala House, -10Sjdemnam Re, Croydon CRO 6,

You might also like