You are on page 1of 1

a b c d e

12000
a b c d e 3000 3000
12000 1500 1500
3000 3000
3000 3000 3000 3000
TO DRAINAGE
co
TO SEPTIC VAULT
co

1 up
1

1200
co
WC
FD
2500

1300
TO DRAINAGE
5000

5000
2 2
2500

2500
825
dn

675
3 3 FD LAV
825

825
LAV WC

TO DRAINAGE TO DRAINAGE
co co
TO SEPTIC VAULT
co

1 GF PLUMBING LAYOUT 2 2ND F PLUMBING LAYOUT


P 1 SCALE 1:100 P 1 SCALE 1:100

KS KITCHEN SINK
VERIFY VERIFY VERIFY
WC WATER CLOSET
100mmØ PVC 100mmØ PVC
INLET PIPE OUTLET PIPE

VERIFY
SHO SHOWER
C.O. C.O. C.O. C.O. C.O. C.O.
IN
0.5M x 0.5M 0.5M x 0.5M 0.5M x 0.5M OUT
MANHOLE MANHOLE MANHOLE
dn
LAV LAVATORY
LAV

FD FLOOR DRAIN
oC
cW
co
FD
CO CLEAN OUT
LAV 100mmTHK. CONC. TOP SLAB 0.50M x 0.50M MANHOLE 0.50M x 0.50M MANHOLE
REINF. W/ 10mm DSB @ 0.20M REINF. W/ (5) -10mm DSB REINF. W/ (5) -10mm DSB
WC up O.C. PROVIDED BOTH WAYS O.C. PROVIDED BOTH WAYS O.C. PROVIDED BOTH WAYS
(PROVIDE HANDLE) (PROVIDE HANDLE)

co
N.G.L. SV SEPTIC VAULT
FD
co

IN
AIR SPACE
OUT DS DOWNSPOUT

DIGESTIVE CHAMBER LEACHING LEACHING 10mmØ HOR. BARS


0.50M x 0.50M MANHOLE
CHAMBER CHAMBER
@ EVERY 3 LAYERS
REINF. W/ (5) -10mm DSB CB CATCH BASIN
O.C. PROVIDED BOTH WAYS
(PROVIDE HANDLE) 100mm CHB WALL WITH
16mm THK.PLASTER FIN.

10mmØ DSB @ .60m O.C.


F FAUCET
3% SLOPE

TO
D
WATER LINE
TO RAINA EARTH
SEP G
TIC E LEACHING 10mmØ HOR. BARS
VAU 100mmTHK. CONC. BOTT. SLAB @ EVERY 3 LAYERS
LT CHAMBER
REINF. W/ 10mm DSB @ 0.40M
O.C. PROVIDED BOTH WAYS
WASTE OR SOIL PIPE
100mm CHB WALL WITH
16mm THK.PLASTER FIN.

10mmØ DSB @ .60m O.C.

3 ISOMETRIC PLUMBING LAYOUT


P 1 SCALE NTS
4 SEPTIC VAULT PLAN SECTION 5 LEGEND
P 1 SCALE NTS
P 1 SCALE NTS

PROJECT TITLE SHEET CONTENT REVISION : APPROVED BY : SHEET NO.

GF PLUMBING LAYOUT DRAWN BY: lsc

9
2ND F PLUMBING LAYOUT
ISOMETRIC PLUMBING LAYOUT
DESIGNED BY:
SEPTIC VAULT DETAIL

REG.NO.: PTR NO.:


LOCATION :
PLUMBING LEGEND
CHECKED BY:

DATE:
O W N E R
P1
DATE ISSUED : PLACED ISSUED :

You might also like