CONTENTS
7. HOW WE MANAGE QUALITY AMONG SUPPLIERS ............................... 30 14. ISSUING INVOICES TO WABCO SITES IN EUROPE.............................77
7.1. PREVENTIVE SUPPLIER QUALITY MANAGEMENT ........................ 30 14.1. SENDING THE INVOICE IN PDF FORMAT......................................78
7.1.1. SUPPLIER PROCESS AUDIT (SPA) .......................................... 30
7.1.2. PRODUCT SAFETY MANAGEMENT (CUSTOMER 15. GLOSSARY OF TERMS ............................................................................79
PROTECTION) ...................................................................................... 32
7.1.2.1. SAFETY MANAGEMENT AUDIT .................................... 33
7.1.3. BUSINESS MANAGEMENT SYSTEM CERTIFICATION ........... 34
-2-
INTRODUCTION
Dear Supplier,
Today, the global economy is challenging. The market, industry conditions, and regulations both global and local – are all
increasingly complex. In this incredibly fast-paced, exciting industry, WABCO continues to pioneer innovations to address
key technology milestones towards the autonomous, connected and electric future of the commercial vehicle industry.
As WABCO’s Sourcing & Purchasing (S&P) team we support WABCO’s innovation by providing customers with exceptional
quality and delivery at the competitive cost, while also ensuring sustainability across our supply chain based on high ethical
and environmental standards.
Vital to success is a shared purpose with key supplier business partners. Having a shared purpose and collaborating
closely will help both parties to achieve the highest quality, sustainability and consistently high performance. This will also
accelerate value creation by applying automotive standards (IATF 16949) and frugal mindset, underpinned by solid Lean
and Design to Cost foundations.
To help WABCO suppliers perform to a high standard and in order to provide transparency with regard to our expectations,
we created the first edition of the WABCO Supplier Manual in 2014, which has now been upgraded based on the latest
standards and changes. This single source of reference, which comprises all relevant information and guidelines that
explain how we manage our supply base, was designed to make our processes easy to understand and follow.
In order to reflect the changing requirements of our customers and WABCO’s growing capabilities in the ACE domains, we
have updated our policies and processes, and are delighted to provide you with the third edition of the WABCO Supplier
Manual.
Adhering to the policies and processes contained within the WABCO Supplier Manual will underpin close collaboration and
foster strong relationships. Working better together will deliver business growth for our respective companies. To conclude,
implementing the policies and processes gathered in WABCO Supplier Manual will enable your company to be ranked as a
preferential supplier for future business. It also offers suppliers the potential to be nominated as a WABCO Integrated
Supply Partner.
We hope that you find the WABCO Supplier Manual helpful, and would like to take this opportunity to thank you for your
collaboration.
-3-
1. HOW TO USE THIS MANUAL
This is the third edition of WABCO’s Supplier Manual. Like the previous ones,
it has been created to help you understand what WABCO expects from its
suppliers to ensure that suppliers’ processes, systems, products and services
are aligned to our business priorities and customer commitments. The rules,
processes, and requirements described here apply to WABCO suppliers,
contractors, and vendors in every region of the world.
Each chapter of the manual is broken into sections that describe important WABCO
supplier processes.
-4-
2. SUPPLIER ENDORSEMENT POLICY
WABCO will not endorse any suppliers in press releases, articles, advertising,
websites, or other marketing materials. This is because suppliers’ products and
services are often linked to sensitive information that WABCO does not want to
disclose to competitors.
-5-
3. COMMITMENT TO COMPLIANCE AND CORPORATE
SOCIAL RESPONSIBILITY
PURPOSE WABCO is a global company with a powerful reputation for the excellence of its
products and services. Our reputation is also built on a strong foundation of
integrity and fair dealing in every aspect of our business. In this increasingly
complex, competitive, and dynamic world, protecting our reputation is a key pillar
to maintain the confidence and trust of WABCO’s diverse stakeholders. To
conduct business openly and honestly, WABCO will avoid conflicts of interest, and
comply with all applicable anti-corruption laws, including the US Foreign Corrupt
Practices Act. We will obey the law of the countries in which we operate, and
respect the dignity of every individual.
WABCO created its Code of Conduct to help all of us live up to the highest ethical
DESCRIPTION
standards, to meet our obligations to the law, our commitments to our customers,
and our responsibilities to each other and our shareholders. It protects our
reputation, and creates a culture in which we can all thrive. We build long term
relationships with suppliers and service providers, and award business to them
on the basis of the value they provide to our business or our customers. In return,
we expect them to share our ethical standards, uphold our Code of Conduct or a
code with equivalent provisions, and report on compliance in key areas, including
anti-bribery legislation, the use of conflict minerals, the environment, and human
rights protection, such as measures against child exploitation, compulsory,
forced, or slave labor. More generally, we require from them that they provide
assurance of their compliance with all applicable laws.
Our Code of Conduct details what is expected of you if you deal with us as a
supplier or as a service provider. Below we give you a brief overview of its most
important principles.
• require that you confirm your compliance with applicable laws, regulations,
and industry standards
• require that you review and respect our Code of Conduct, or a code with
equivalent provisions in your organization, to be reviewed and accepted
by us
-6-
• share our zero tolerance policy with regard to bribery and corruption, including the
prohibition of money laundering, and of political contributions
• refrain from accepting gifts, favors, or entertainment, of greater than nominal value
• provide fair and open information to you when you are competing for our business
• do not make unlicensed copies of software which you would license to us,
or incorporate it into your own software.
WABCO complies with national and international anti-trust laws in all countries in
which it does business, and we maintain an active, global program for educating
our employees in compliance with these laws.
And last but not least, WABCO is truthful and forthright about communicating its
performance, and we expect our employees to avoid situations that would
compromise their objectivity at work.
DESCRIPTION WABCO has a zero tolerance for any form of bribery, and does not allow direct or
indirect payments, or other items of value, to be offered, made to, or accepted,
from any party (including individuals, companies, and government officials) to
facilitate business, influence decisions, or accelerate actions.
• make or offer unlawful payments, or provide other items of value, for the
purpose of obtaining, retaining or facilitating business
• offer, authorize, or accept bribes, including ‘facilitation payments’ (small,
unofficial payments to speed up what should be a routine process), or any other
form of improper payment, with the intention of gaining a commercial advantage
for WABCO
• offer customers, or prospective customers, suppliers, or anyone else, gifts,
favors, or entertainment of greater than nominal value. Nor accept them
when offered
DESCRIPTION The Conflict Minerals Policy has been designed to support the humanitarian
objective of ending ongoing violence funded by the trade of conflict minerals from
the eastern portion of the Democratic Republic of the Congo and surrounding
countries (“Conflict Region”).
WABCO fully supports U.S. legislation on the supply of conflict minerals, including
the rules adopted by Securities Exchange Commission. Conflict minerals include
gold, tin, tantalum, and tungsten. The U.S. Secretary of State may designate
other minerals in the future.
-7-
WABCO endorses the objectives of the U.S. legislation to address the trade of
conflict minerals.
WABCO will not knowingly procure minerals from the Conflict Region unless
they are certified as conflict-free by an independent third party.
RESPONSIBILITIES We expect our suppliers to ensure compliance with U.S. legislation on the supply of
conflict minerals, including the rules adopted by Securities Exchange Commission.
We therefore require our suppliers to make an annual submission on their sourcing
practices.
Should you like to learn more, please visit our webpage where you will find WABCO
Conflict Minerals Policy.
WABCO respects applicable labor laws and regulations, and wants to create
DESCRIPTION
an environment in which people can freely contribute, excel, and be recognized
for their achievements. It expects its suppliers to adopt similar rules within their
organizations.
-8-
RESPONSIBILITIES We expect our suppliers to ensure compliance with all relevant environmental
legislation and regulations in force in the country where their products are
delivered. In terms of environmental management, suppliers must conform to the
latest version of ISO 14001. In addition, suppliers must comply with WABCO’s
environmental policy and the WABCO JED Standards to avoid hazardous
substances (JED-762).
Any complaints from WABCO suppliers should be addressed in line with REACH
Regulation (EC) No. 1907/2006 (Registration, Evaluation, Authorization and
Restriction of Chemicals).
Parts are only to be provided along with the material data MDS record (Material
Datasheet), which must include the IMDS ID number in the initial sample cover
sheet (PPAP PSW). MDS is recorded in the IMDS (International Material Data
System).
DESCRIPTION At WABCO we value people and take their health and safety very seriously. As
such, WABCO has implemented, and is certificated for, the Occupational Health
and Safety standard OHSAS18001 (ISO 45001). We lead by example, and nurture
a culture of responsibility for health and safety among our colleagues, customers,
and business partners.
WABCO has a specific policy for health and safety which we expect our suppliers to
RESPONSIBILITIES
adhere to. This includes:
-9-
In addition:
WABCO suppliers are responsible for making sure that their suppliers also meet
these environmental, health and safety requirements in order to protect WABCO’s
supply chain.
3.7. PROPOSITION 65
DESCRIPTION California Proposition 65, officially known as the Safe Drinking Water and Toxic
Enforcement Act of 1986, became law in November 1986. Proposition 65 requires
businesses to provide warnings to consumers (and others doing business in the
State of California) about significant exposures to chemicals that are known to
cause cancer, birth defects, or other reproductive harm. On August 31, 2016, the
State of California Office of Environmental Health Hazard Assessment (OEHHA)
adopted certain amendments to Article 6. Clear and Reasonable Warnings for
California Proposition 65, which became effective on August 30, 2018. For more
information on warnings, go to www.P65Warnings.ca.gov
WABCO suppliers shall always monitor the potential regulatory, safety, health, and
RESPONSIBILITIES
environmental impact of using their products. Whenever applicable, suppliers shall
place the appropriate warning labels, in line with the relevant regulation, on all
products supplied to WABCO. In addition, we also require our suppliers to make
an annual submission on their sourcing practices.
- 10 -
4. GET TO KNOW SOURCING & PURCHASING AT WABCO
PURPOSE The Sourcing & Purchasing (S&P) mission spells out our goal, guides our actions,
and provides a guide to decision making.
PURPOSE The S&P Differentiation Strategy ensures global satisfaction through operational
excellence in terms of cost, quality, and delivery.
The diagram below details the key components of WABCO’S S&P Differentiation Strategy.
- 11 -
We deliver a strategic roadmap to pursue this vision, with a progressive plan
of activities to improve our performance in each of these areas.
DESCRIPTION
S&P and Manufacturing & Logistics (M&L) are both part of WABCO’s Integrated
Supply Chain (ISC), while Supplier Quality (SQ) belongs to the independent Global
Quality Assurance organization at WABCO.
Regional Sourcing & Purchasing Leaders are responsible for WABCO’s S&P
organization within key WABCO regions (APAC, EMEA, India, Americas). They
leverage regional supply bases and ensure proximity to the business and suppliers.
- 12 -
Global Commodity Leaders are responsible for Global Strategy for WABCO
across the regions. They drive all necessary actions to achieve the best Quality,
Cost, Delivery (QCD) supplier performance by defining and implementing the right
strategy according to WABCO’s needs, and by managing globally the supplier
relationship.
WPCP Leaders lead and develop the project buyer team to achieve WPCP
projects and QCD targets. They anticipate market trends and bring proposals to
HUB leadership. They provide ideas for new customer projects.
Site Supplier Quality Engineers belong to the Quality organization, and drive all
necessary actions in partnership with the supplier(s) in order to achieve and
maintain the best quality during serial life, with the ultimate goal to achieve zero
defects.
PURPOSE To explain the purpose of the S&P organization structure and to give an overview of
what are we interested in buying.
DESCRIPTION WABCO S&P is the global group function that buys parts for six of the commodity
groups that support Direct Manufacturing. Those commodities are the following:
- 14 -
4.5. COLLABORATION
PURPOSE Supplier’s detailed input into the supplier profile questionnaire (SPQ) will help us to
identify potential partners for our “right” supply base. Suppliers are invited to
complete the SPQ and submit it together with any relevant supporting information.
SCOPE SPQ is applicable for both potential new suppliers and those who are already part
of WABCO’s supplier panel. Potential new suppliers should use SPQ to introduce
themselves to confirm their desire to support us in our mission to deliver the
highest quality products at a competitive cost. The SPQ can be found in the
‘Become a Supplier’ section of our website by following this link:
https://www.wabco-auto.com/suppliers/suppliers-information/
Registered suppliers and partners should update us frequently about their
company and organization by using the SPQ in the WABCO Supplier Portal
(WASP).
In this important section, suppliers should provide evidence that they fulfill the
standards required by WABCO. This includes automotive standards, as well as
legal demands.
Furthermore, the supplier may wish to share their company’s brochure and/or
further details.
Company Information
In the Company Information section, suppliers are asked to share legal form and
organizational structures as well as details on their ethical and environmental
policies.
KPI Section
This section is designed to provide WABCO with an overview of how a supplier is
performing internally, and across its entire business sphere.
Manufacturing Capacity
We are continuously on the look-out for potential partners that offer development
services. This section is the place to advertise all relevant skills and capabilities.
- 15 -
Quality
Highest quality is a core element of our S&P mission. We need to understand from
our partners if they are able to follow the standard automotive tool set.
Project Management
We collaborate closely with our partners and suppliers on all projects (e.g. those
dedicated to WABCO’s automotive business). This section is designed to help us
understand to what extent potential partners/suppliers are able to serve the
complex requirements within our business environment.
Logistics
The automotive business also places high demands on its partners in the logistics
sector. We want to understand whether our partners and suppliers can meet the
standards with regard to processes, communication, packaging, and transport.
Once the supplier’s profile has been revised and approved by the appropriate
WABCO Global Commodity Leader, the requesting supplier contact person will
receive individual logon-data by e-mail. Those logon credentials remain valid
throughout any collaboration on WASP.
Access to WASP is free of charge, and compliant with recent regulations on data
security and data protection (e.g. GDPR).
The initial supplier contact person will be assigned as the supplier's WASP
administrator, and held responsible for adding additional supplier contacts, and all
disclosed data updated in the WASP at all times.
In WASP, which can be accessed by clicking on the link below, detailed, up-to-
date user instructions can be accessed via the main navigation in the portal at any
time:
http://www.wabco-
auto.com/WABCO_Supplier_portal_getting_started/WABCO_
Supplier_Portal_User_Guide_output/story.html
- 16 -
5. HOW TO BECOME A WABCO TARGET PANEL SUPPLIER
PURPOSE Sourcing strategy and supplier panels allow WABCO to select and work with the
best suppliers in order to meet the demands of the market.
DESCRIPTION The aim of WABCO’s sourcing strategy is to establish a supplier panel for each
technology segment. Each supplier takes into account WABCO’s current and future
strategic needs in order to maintain innovation/technology leadership, global
capability, and excellence in execution.
Our ultimate goal is to work with a limited number of integrated, key partners that will
be part of WABCO’s ‘Target Panel’. This will allow us to differentiate ourselves in
the eyes of our customers, and to ensure a transparent process that gives equal
opportunities to capable companies.
- 17 -
In case of non-recovery, the supplier will be eliminated entirely from WABCO’s
supplier portfolio (This process is known as ‘Phase out’).
In accordance with our standard contract framework, our supply base is asked to also
monitor their own suppliers’ performance using WABCO’s Supplier Scorecard.
PURPOSE The purpose of Supplier Risk Management is to secure WABCO’s and its
customers’ supply chain by anticipating, recognizing and, subsequently minimizing
- or mitigating - the supplier’s financial risk.
SCOPE WABCO’s supplier risk assessment program applies to all current and potential
suppliers.
Low /
No Risk
Potential & Risk Result /
Panel Rating
Medium /
High
Risk
WABCO’s success depends on a healthy supply chain in which every supplier, and
sub-contractor, is financially stable. We therefore seek to manage any risk by
applying a risk rating to each supplier. The actual rating is based on external and
internally sourced data, and takes into consideration standard KPIs, as well as
empirical information, and geophysical set-up. The rating guides our decision-making
process when awarding contracts to suppliers, and is regularly reviewed.
- 18 -
Only when a supplier has been assessed no or low risk can it be awarded new
business from WABCO. For existing partners of our supply chain, we reserve the right to
put them on ‘New Business on Hold’ (NBoH) if there is a decline in performance vs.
our risk assessment criteria. If a supplier’s performance does not subsequently
improve, it is likely that it will be phased out from WABCO’s supply base.
CRITICAL SUPPLIERS
For critical suppliers, whose failure would result in a significant distress to WABCO
operations and who show signs of financial difficulties, WABCO reserves the right to
impose a risk mitigation and improvement plan, which includes frequent reviews.
Such response plans are derived based on the risk category, response cluster and the
nature of responses.
Response plans are specified for the risk levels “yellow” and “red”.
For each risk type identified in the risk assessment model, both mitigation and
contingency responses are specified, covering the following clusters:
- Contractual aspects
- Supply chain aspects
- Financial aspects
- Communication
SUPPLIER BANKRUPTCY
When a supplier files for bankruptcy it will have a significant, negative impact on
WABCO’s business. Therefore, suppliers are advised to warn WABCO as early as
possible, so that a mitigation plan can be put in place.
- 19 -
5.3. STANDARD SUPPLIER AGREEMENTS
PURPOSE To ensure compliance with the requirements of WABCO and its customers as
well as transparency in our dealings with suppliers.
SCOPE WABCO’s Standard Supplier Agreements apply to all potential and current WABCO
direct materials suppliers worldwide.
DESCRIPTION
The S&P NDA must be signed with any new potential WABCO supplier before the
supplier receives its first Request for Quotation (RFQ). Any RFQ shall be signed on
a product family/technology level (e.g. non-ferrous metal die castings). WABCO’s
S&P NDA protects the intellectual property of both WABCO and its suppliers.
The PPA is more of a frame contract that covers the whole or part of the current
business with a supplier after SOP. It is used mainly to formalize supplier
negotiations, and it includes new prices.
Before awarding any business, the supplier must send signed and scanned
agreements to the relevant buyer within WABCO. Two original copies must then
follow by post or courier. WABCO will sign both copies and return one document
to the supplier.
The QAA is a key contract that covers the supplier’s quality requirements and
quality management system.
The TA is a contract that defines the rules according to which and WABCO-owned
tool is left at the disposal of a supplier to produce dedicated parts for WABCO.
The LP contains a set of standards specifying the requirements and rules for
logistical exchanges between WABCO and suppliers to ensure awareness,
expectations, and clear responsibilities, in terms of data and information
exchange, flexibility, packaging and delivery performance.
- 20 -
The LP provides the supplier with clear guidance with regard to any outstanding
quality issues
SUPPLIER BENEFITS WABCO’s Supplier Agreements give clarity and business security to our suppliers
and define expectations clearly, helping to ensure a smooth relationship.
PURPOSE Supplier Targets are designed to set clear QCD targets for WABCO suppliers, and to
assess supplier performance by managing key performance indicators (KPIs).
SCOPE Supplier Targets are applied to all WABCO direct material suppliers worldwide.
QUALITY
As we believe that rapid and proactive problem solving is key to eradicate non-
quality, we measure supplier response time in QR6σ.
WABCO continuously aims to reduce PPM and CPB defects across its business
and execute a zero defect strategy. As a result, WABCO will implement prevention-
oriented supplier management activities in the introduction process of goods and
services. ‘On-time’ provision of qualification parts and documents and ‘release
without deviations’ will also be closely tracked by KPIs to ensure supplier quality.
COST
This Commodity organization is the team that drives WABCO’s Sourcing Strategy,
defines the supplier Target Panel, and builds its differentiation strategy. It is
therefore very important that suppliers submit all identified cost reduction ideas for
WABCO’s components and functions, so that the planning of the suppliers’ 36
months’ productivity can be performed. Those teams led by our Global Commodity
Leaders are the supplier’s preliminary contacts in order to engage in business
discussions on value creation, long term business agreements, and partnership
matters.
DELIVERY
Delivery targets are defined to ensure that the ‘right part at the right time in the right
quantity’ is delivered to WABCO. Targets will be measured on a monthly basis.
WABCO expects full support and cooperation from its suppliers. Every supplier
employee working on WABCO’s behalf should be aware of, and committed to,
achieving WABCO’s quality, cost, and delivery targets.
- 21 -
SUPPLIER BENEFITS WABCO’s Supplier Targets help suppliers monitor their performance and
ensure that they are meeting WABCO’s expectations. As a consequence, they
increase their chances of growing their business with WABCO.
PURPOSE The Supplier Scorecard ensures that both WABCO and each supplier have a
common understanding of actual performance versus targets. The Supplier
Scorecard’s performance rating charts the KPIs that are used to qualify existing
partners for new, additional, and continuation of business.
SCOPE The Supplier Scorecard applies to all WABCO’s direct material suppliers worldwide.
WABCO’s S&P organization drives business improvements by defining quality, cost,
and delivery targets, accompanied by compliance measures linked to automotive
standards ( e.g. IATF 16949), and compliance with, and contractual alignment to,
WABCO’s T&Cs. Each supplier can monitor its performance in WASP.
- 22 -
The Supplier Scorecard is updated on a daily basis and should be reviewed by
suppliers regularly, or at least once a month. The scorecard can be accessed via
WASP.
The supplier is expected to be familiar with the latest results in the Supplier
Scorecard, and its performance versus KPIs, at any time. Supplier Scorecard
performance is part of the standard agenda for management meetings and QCD
reviews.
- 23 -
6. HOW WE SELECT AND NOMINATE SUPPLIERS
PURPOSE To fulfill WABCO and automotive standard requirements and to nominate the best
supplier for new business, in order to ensure smooth project implementation and
excellent QCD performance in serial production.
SCOPE The selection and nomination process applies to each business award decision. We
handle both new projects and the reallocation of existing business.
PURPOSE To ensure that only suppliers that meet all stated requirements receive a RFQ from
WABCO.
The Pre-Sourcing Committee is applicable for any item required to follow the
SCOPE
nomination process.
- 24 -
Are able to fully meet customer requirements
Meet QCD performance requirements
Are validated by the panel versus current projects and other potential
RFQ candidates
CORE PURCHASING PROCESS
Supplier
Definition
Pre-Sourcing Sourcing Management in
of Supply RFQ Serial Production
Committee Committee
Customer Base QCDI)
Expectations
Milestone: CQP
Business Award
SOP
Organized by the lead buyer for the project, and with the participation of Global
Commodity and Product Line representatives, the Pre-Sourcing Committee ensures
that a number of potential suppliers and partners are selected for our business.
Based on the decisions taken by the Pre-Sourcing Committee, buyers are allowed to
send RFQs for particular business requirements to all identified suppliers (Target
Panel in the first instance).
PURPOSE The purpose of the RFQ is to collect suppliers’ quotations in line with WABCO’s
requirements for specified projects.
SCOPE eRFQ is open for current and potential suppliers, and provides guidance on any
change or creation of a supply chain (Quality, Cost, Delivery).
Details on access and navigation in the eRFQ can be found within WABCO Supplier
Portal and are described in point 4.5.2 of this Supplier Manual.
The WABCO eRFQ contains component drawings and/or specifications, as well all
relevant attachments that are mandatory to participation in the WABCO-RFQ, such
as Standard Agreements and Cost Breakdowns, Initial and Final Feasibility
Declarations, plus any project related obligatory documents. If marked ‘mandatory’,
these documents are to be considered and confirmed as feasible in order to submit a
valid quote.
RESPONSIBILITIES When submitting quotations, suppliers must use the Supplier Portal. Quotations sent
by email or in a different format than expected will not be considered.
SUPPLIER BENEFITS Providing a quotation in the predefined format will help WABCO to analyze and
feedback as quickly as possible, and in a structured and fair way. This will allow
suppliers and potential suppliers to understand the reasons behind WABCO’s
decision.
- 25 -
6.3. FEASIBILITY DECLARATIONS
PURPOSE The purpose of the Feasibility Declaration is to confirm that a supplier can comply
with WABCO’s specifications and requirements for each part number.
SCOPE The Feasibility Declaration must be completed by all direct material suppliers.
PURPOSE Purpose of SORM is to ensure that all requirements and specifications are
considered and reflected in the offer.
SCOPE A SORM meeting will be held to review all RFQs which have been positively
received.
CORE PURCHASING PROCESS
DESCRIPTION
When the deadline for the eRFQ has passed, the WABCO buyer reviews and
compares all of the supplier quotations that have been submitted. They then
organize a SORM, which is the first step in WABCO’s CQP process. The SORM is
attended by both the supplier and WABCO. During the SORM, the WABCO buyer,
Commodity Quality Engineer, and Engineering Expert will present the project and
discuss with the supplier the contents of their RFQ response including:
• Cost breakdown
• Tooling cost breakdown
• Process steps (including Safe Launch)
• Supplier technical recommendations included the Initial Feasibility Declaration
• Price
• Contractual situation
- 26 -
SUPPLIER BENEFITS The SORM gives both WABCO and the supplier the opportunity to clarify and align
all the RFQ requirements.
PURPOSE Safe Launch Concept (SLC) is a method to ensure that launch risks are mitigated
and that launch problems are corrected as quickly as possible during ramp-up.
The SLC will:
• Validate the supplier’s production control plan
• Protect WABCO plants from quality non-conformances during product launches
• Ensure that any quality issues that may arise are quickly identified, contained,
and corrected at the supplier’s location
• Increase involvement and visibility of supplier’s top management
SCOPE SLC applies from the start of project until the completion of launch, and for all
aspects of the containment area.
DESCRIPTION Safe Launch is a containment initiative designed to ensure a supply of defect free
parts to WABCO for SOP and the acceleration phase. The supplier is required to
identify all additional inspection, testing, and dimensional checks required in the
containment area based on Key Product Characteristics, Customer Interface, high
RPN, and/or issues identified during product and process development.
Containment must remain in place for a period of time or quantity of parts as
specified by WABCO Commodity Quality.
The exit criterion is shipment of 0 defects for the duration of this containment.
If a problem is identified in CSL1 or by WABCO, this activity shall remain in effect for
a minimum of 2 weeks after the supplier has implemented the permanent
corrective actions. If time or quantity is not specified, SLC will remain in effect
throughout acceleration or for a minimum of 3 months, whichever is longer.
Sub-supplier
involvement
- 27 -
RESPONSIBILITIES Suppliers shall present evidence as follows:
• Documented WI for additional inspections, functional testing, and dimensional
checks required at the CSL1 containment station and in process check
• Documented WI for the CSL1 containment station to ensure standardized work
• Documented evidence of execution and validation of the control plan utilizing
the I-chart or other format agreed upon by WABCO. The data must be readily
available for review by Commodity Quality
• Documented problem solving for both internal and WABCO quality concerns
utilizing an accepted customer format – to include problem description, root
cause, irreversible corrective action with break points and updated FMEAS and
Control Plans as appropriate
Tier 1 suppliers must ensure that sub-suppliers follow SLC rules for Critical
Components (please refer to chapter 6.5.). Appropriate evidence of Safe Launch
Concept deployment at the sub-suppliers must be provided to WABCO upon
request.
As a general rule, the duration of SLC is a minimum of 3 months from SOP and/
or related to piece numbers, in which case it is up to Commodity Quality to
decide and RSQL/CQL to validate the decision.
In order to exit SLC, the supplier will be eligible to exit after validation of the
effectiveness of the Process Control Plan and when they meet certain criteria. If the
supplier is unable to meet the exit criteria, or if the supplier’s SLC plan continues to
identify non-conformances, the supplier shall continue the necessary containment
measures to protect the customer until the quality concerns have been resolved to
the satisfaction of both the supplier and WABCO.
SUPPLIER BENEFITS SLC is a significant enhancement to the production control plan. Additional controls,
inspections, audits, and testing all ensure conformance and capability of the
manufacturing process, leading to higher quality throughout the process which
benefits both parties.
It should be noted that the SLC plan is not a substitute for the Production Control
Plan, but rather, it is a complementary process that is used to validate the
Production Control Plan.
- 28 -
6.6. SOURCING COMMITTEE AND BUSINESS AWARD
PURPOSE The Sourcing Committee and Business Award processes govern the selection of a
supplier to whom the business will be awarded.
SCOPE The Sourcing Committee is mandatory for all direct material business awards.
DESCRIPTION The diagram below shows the key stages followed leading to the Business Award.
Definition
Pre-Sourcing
RFQ
Expectations
Milestone: CQP
Business Award
SOP
After the successful completion of SORM, the Sourcing Committee is the next
meeting organized by the WABCO buyer. This purpose of this meeting is to review
supplier responses to the eRFQ and decide to which supplier WABCO should
award the business. This formal business decision meeting is supported by an
online approval workflow that allows full internal transparency and coverage of
automotive requirements in terms of documentation.
The Sourcing Committee procedure ensures that all relevant internal parties
approve acceptance of the quotation and the business award. This includes
S&P, as well as the interfaces with Manufacturing, Logistics and Engineering.
RESPONSIBILITIES Following the meeting, the nominated supplier receives a nomination letter and a set
of documents to be signed.
By accepting our nomination, the supplier must sign the contracts via e-sign, or
return scanned copies to WABCO by email, with hard copies following by surface
mail or courier service. Nomination is binding only once Project/Product related
contracts are signed by both parties.
SUPPLIER BENEFITS The supplier receives a new business award and the terms of engagement, and
the process and expectations for co-operation are clearly defined.
- 29 -
7. HOW WE MANAGE QUALITY AMONG SUPPLIERS
PURPOSE To manage supplier quality to ensure that WABCO products continue to meet the
acceptable PPM (defective parts counted per million), and in accordance with
thresholds set by our customers, and so, when incidents occur, corrective action is
in line with their expectations.
SCOPE We actively manage quality among all WABCO direct material suppliers.
DESCRIPTION
At WABCO, Supplier Quality Management is based on a ‘do it right first time on time’
philosophy. Following this principle, the Supplier Quality process map (see diagram
above) demonstrates the preventive and reactive processes we apply in order to
achieve our vision of perfect quality and zero defects. In summary, we:
• Manage quality by taking preventive action to avoid defects
• Drive continuous improvement at speed
• Aim to be recognized by our customers as the supplier of choice
The Supplier Process Audit (SPA) is carried out to assess the ability of potential
PURPOSE suppliers to meet WABCO’s requirements, and to re-validate the capabilities of
existing suppliers..
SCOPE All direct material suppliers will be subject to the SPA process.
DESCRIPTION The SPA is a systematic, independent process that allows WABCO to evaluate
supplier performance. The SPA is carried out using a standard questionnaire, which
also acts as the SPA report.
- 30 -
Suppliers are expected to reveal all relevant documentation, and grant access to
all processes which are used to create goods and services delivered to WABCO.
If deemed necessary, this also includes sub-suppliers and sub-contractors, in order to
understand important steps in the supply chain.
Suppliers are given two weeks’ notice of a SPA audit, and the results are circulated
five days after the SPA takes place.
Potential suppliers that have been recommended for a business award must pass
the SPA before the Sourcing Committee meeting that will determine the award.
In general, existing suppliers are audited at least every three years. However, they
may be audited more frequently should a specific need arise at WABCO.
The table below shows an overview of the possible SPA results and their
implications for existing and potential suppliers.
SUPPLIER
RESPONSIBILITIES
Before the SPA date, the supplier must review the SPA questionnaire and prepare
the required documentation. The supplier is encouraged to perform self-assessment
according to SPA questionnaire.
WABCO
Immediate feedback, including findings and a SPA score, are given to the supplier
during the closing meeting at the end of the SPA audit. The complete and signed
SPA questionnaire will be delivered to the supplier within 5 working days. The
score, once communicated, cannot be changed.
NOTE
The SPA is in line with the VDA 6.3 standard adapted to WABCO needs.
- 31 -
• Increases process efficiency by identifying incidences of waste and loss
• Is mandatory for any business award
All WABCO suppliers shall nominate a Product Safety Representative (Eng: PSR;
Ger: PSB), with responsibility for product safety:
For each stage of the manufacturing process
In every site across the supply chain
NOTICE
WABCO must be notified immediately in the event a non-conformance, or if a
potential customer safety risk is identified. There is no approval (or any deviation)
from WABCO in the event of non-conformities which might impact safety critical
features in road traffic or any other business in which we operate.
Product Safety should not be limited to products and/or components identified as
having Safety Characteristics (marked as SC <1>), but should also apply to
products/features for which non-conformity could create a risk of safety hazard at the
point of final application of the device on a vehicle.
WABCO recommends using Safety Management Audit (SMA), a specific
assessment audit, as a preventive process to assess supplier capability to meet
WABCO’s requirements for ‘safety critical’ components.
- 32 -
7.1.2.1. SAFETY MANAGEMENT AUDIT
SCOPE The SMA shall be applied for supplier components with identified safety
characteristics <1>.
3. Manufacturing
SUPPLIER
Before the SMA date, the supplier must review the SMA questionnaire and prepare
the required documentation. If WABCO recommends corrective action to be taken to
address problems identified in the audit, the supplier must draw up and implement a
plan to complete the action within 15 days, unless otherwise agreed with the auditor.
The supplier must not only confirm that corrective action has been taken, but also
provide evidence that it has been successful.
WABCO
Immediate feedback, including findings and a SMA score, are given to the supplier
during a meeting at the end of the SMA audit. The score, once communicated,
cannot be changed.
- 33 -
7.1.3. BUSINESS MANAGEMENT SYSTEM CERTIFICATION
DESCRIPTION WABCO suppliers must be compliant with IATF 16949 or have a plan in place to
achieve that compliance. Unless otherwise specified, conformity has to be
demonstrated by the third party certification to IATF 16949 or ISO 9001 (as a
minimum).
RESPONSIBILITIES As an IATF 16949 certified company, WABCO is obliged to cooperate with certified
suppliers and track their certification status. Therefore, suppliers who are not
certified as compliant will be asked to submit, and agree with WABCO, an action
plan to achieve certification by an agreed date. The supplier must keep the
information of its certification status updated in WABCO Supplier Portal. This
update includes the request to revise and attach a copy of the latest certificate as
described above.
SUPPLIER BENEFITS Appropriate certification of a supplier’s management systems gives them a decisive
advantage, demonstrating that their organization has achieved internationally
recognized automotive standards.
PURPOSE To plan, design, and develop a process that will enable the supplier to meet all
WABCO requirements in order to launch production on time and at ‘zero
defect’ level of quality.
SCOPE CQP is applied to all new component development and cost reduction projects,
including supplier relocation, material, design change, etc.
KPIs equate to a 100% score in WABCO’s Product Part Approval Process (PPAP),
which translates into ‘Right First Time on Time’ (PPAP RFTOT).
- 34 -
The full CQP process consists of seven standard reviews. These are shown below,
together with their predefined timing:
NOTE
In some of the scenarios listed below, a full CQP process will not be required. A risk
analysis will be undertaken, governed by WABCO’s CQP Applicability Matrix, to
determine which CQP steps might be skipped.
Each CQP review is conducted according to a standard agenda and finished with a
standard report available in the eCQP section on WABCO Supplier Portal.
The table below provides an overview of all CQP steps with their purpose, timing,
inputs and outputs, and required participants.
- 35 -
Review Purpose When? Input Output
Supplier Review supplier offer in order Before Sourcing - Clear project timing - All project requirements
Offer to confirm supplier Committee, before - Quotation with cost break down reviewed with supplier
Review commitment and ability to supplier nomination from supplier - Updated supplier quotation
Meeting meet the project - Tooling cost breakdown (if applicable)
(SORM) requirements on time, - Drawing with special characteristics - Tooling concept form – SORM
perform a pre-technical - Component Criticality Assessment part
review - Safe launch requirements - SORM report
- Sub-components and sub-processes
list
- Additional WABCO and customer
requirements not stated on the drawing
(e.g. X-Ray, CT-Scan, quality targets,
special analysis)
- List of required tests from
Product Engineering
Technical - Detail design and After supplier - Component drawing and/or - Design optimization
Review components requirements nomination, before specification proposals from supplier
(TR) review with supplier design freeze - Technical Component Risk - TCRA (part 1) reviewed with
- D-FMEA input to supplier Assessment (TCRA) indicating supplier
- Review supplier proposal for importance to function for every - Sub-supplier status list
optimization (cost, quality) dimension in the drawing (WABCO - Tooling concept form –
input) TR part
- SORM meeting validated - TR report
- Tooling concept form SORM part
revised
- CQP action plan followed
CQP 0 - Final technical review to Before design freeze, - Updated drawing with changes - TCRA (part 1 and 2) finished
confirm serial before tool order issue agreed during TR - Measurement methods
specification - TCRA (manufacturing and no agreed (for ISIR, PPAP, and
- Confirmation details of detection risk evaluated by supplier) serial parts)
supplier process planning - TR meeting validated - “Green light” to serial
- CQP action plan followed drawing release and tool order
- Tooling concept form (SORM and TR - CQP0 report
part) revised
CQP 1 - Check if process and tool After serial drawing - Serial drawing released - Reviewed supplier
preparation is according release - Tool order available at supplier preparation
to plan - CQP0 meeting validated - CQP1 report
- Review status and progress - CQP action plan followed
of quality planning (P-FMEA,
control method, capability
studies)
- Check Contingency Plans
of supplier and sub-
suppliers
CQP 2 - Perform Initial Samples During production of Initial - Attachment to Initial Samples PSO - Initial Samples
production trial at supplier in Samples - Serial tooling at supplier - Production order for Run Rate
order to confirm that they are - Sub-supplier PPAP (PPAP level 3 for - CQP2 report
fully off tool and meet components produced out of Special
WABCO’s quality Processes)
requirements - CQP1 meeting validated
- Confirm serial tool - CQP action plan followed
CQP 3 - Confirmation of serial During production of - Attachment to PPAP PSO - SPA questionnaire with audit
process at supplier, Supplier PPAP samples - Initial Samples PSW approved result
Process Audit (positive result of functional test) - Capacity Verification Report
- PPAP samples production - Serial tooling and process - PPAP samples
- Run@rate available at final supplier localization - CQP3 report
CQP 4 - Confirmation of supplier 6 months after SOP, - Component performance after SOP - CQP action plan closed
performance before project team - CQP action plan (no open issues)
- Release of project team dismantling - Pending issues - PPAP fully released
- PPAP status - CQP4 report
- SCR (Series Change Request) status
- Long term capabilities
- 36 -
7.1.5. PRODUCTION PART APPROVAL PROCESS (PPAP)
PURPOSE The PPAP process ensures that the supplier completely understands WABCO’s
engineering design records and specifications, and has the capability to produce
parts that consistently meet those specifications.
SCOPE The PPAP process is applied to all suppliers of production components parts, raw
materials and source products to WABCO for:
DESCRIPTION
WABCO applies the latest (fourth) edition of the Production Part Approval
Process (PPAP) manual from the Automotive Industry Action Group (AIAG).
The specific WABCO Initial Samples (IS) and PPAP requirements are determined
during the CQP process and will be stated by the Commodity Quality Engineer
(Commodity Quality) on every Part Submission Order (PSO) attachment.
Initial Samples are off-serial tool samples used for supplier tool validation and for
WABCO tests. IS documents need to be submitted by the supplier and confirmed
by WABCO. At this project stage WABCO requires release evidence, PPAP, for sub-
processes and sub-components.
PPAP samples are off-serial tool and off-serial manufacturing process samples.
PPAP documents need to be submitted by the supplier and confirmed by WABCO.
RESPONSIBILITIES WABCO
SUPPLIER
Suppliers are expected to obtain the PPAP AIAG manual and understand its
contents. Suppliers must obtain a Part Submission Warrant (PSW) signed by the
WABCO’s Commodity Quality, as evidence of PPAP approval.
SUPPLIER BENEFITS
The PPAP process:
• Gives the supplier confidence of formal part conformance and approval
• Ensures quality planning is aligned with WABCO’s requirements
• Helps to maintain design integrity
• Reduces warranty charges and prevents costs that result from poor quality
- 37 -
• Prevents production of unapproved and non-conforming parts
• Improves the overall quality of the product
• Drives customer satisfaction
PURPOSE Initial Samples are tested to validate that the part has been properly designed and
functions well.
SCOPE IS and supporting documentation must be submitted for all production parts, raw
materials, and source products provided to WABCO for:
• All WABCO businesses
• All types of supplied parts regardless of complexity, criticality, or cost
• All new part purchases
• All supplier changes (initiated by Supplier Initiated Change Request)
DESCRIPTION
RESPONSIBILITIES
At WABCO’s request, suppliers must submit physical samples produced during
CQP2 and supporting documentation for review. At this point, all open issues from
the CQP review must be completed, in line with the agreed action plan.
The request for IS is issued by WABCO in the form of an IS Part Submission Order
(PSO), which outlines exactly what is required in terms of the part and supporting
documentation, and to whom they must be submitted. The following are required in
every case:
• An IS in line with drawing specifications
• An IS Part Submission Warrant (PSW)
• A full dimensional report
- 38 -
The IS and supporting documentation is then reviewed by WABCO and is either
approved, approved under condition, or rejected, as described below:
PURPOSE The PPAP approval process helps suppliers to achieve or improve design quality
when introducing new or revised components to WABCO.
SCOPE The process applies to all suppliers of production parts, raw materials, and
source products to WABCO for:
DESCRIPTION
RESPONSIBILITIES At WABCO’s request suppliers must submit physical samples and supporting
documentation for review.
- 39 -
The process is initiated when WABCO issues a PPAP Parts Submission Order
(PSO). This will not be done until:
• All open issues from previous CQP stages have been resolved
• The suppliers production process has been audited by WABCO
• Initial Samples (see 7.1.6) have been validated and released
The PSO clearly outlines what samples and documentation are required, and to
whom they should be submitted.
The PPAP submission is then reviewed by WABCO, and the part is either approved,
approved under condition, or rejected, as described below.
All required PPAP steps Condition A: deviation to The supplier must implement
have been completed, and PPAP documentation (e.g. a selection loop and submit
required documentation documents are missing but new samples to WABCO
submitted to WABCO the process in place at the
supplier is in line with
WABCO’s requirements
Condition B: deviation to
production process (e.g. part
of the process is not in serial
condition, but this does not
impact part quality)
NOTE
The CQP process, as well as the PPAP release process, is supported by the
eCQP in WABCO Supplier Portal. This to ensure all involved parties are aware of,
and follow the correct sequence and process steps to achieve project goals as
expected. Details on the handling are listed in point 4.5.2.
The PPAP submission documents must be prepared by the supplier in line with the
guidelines contained in the following table.
- 40 -
Item Guideline
Customer Engineering - Evidence of WABCO Engineering approval for changes that are not reflected in the drawing
Approval
Dimensional results - Dimensional report with judgment OK/NOK from supplier to be made available
- All results to be in accordance with drawing (including e.g. hardness, roughness)
- Each sample measurement to be identified with number corresponding to Product Sample (PPAP samples submitted to WABCO)
- Drawing number with revision to be written on dimensional report
- Remarks including: “measuring ongoing” and “test still running” are not acceptable
- Corrections made by WABCO on supplier report are not allowed
- Any supplier corrections to the report must be confirmed with supplier signature
- Drawing marked with numbers corresponding to dimensions in measurement report
- Report to be signed by supplier and WABCO
Material, Performance - Composition and share of weight [g] to be recorded in IMDS database
test result, chemical - IMDS accepted by WABCO
composition, IMDS - Requested (on the drawing, in PSO) material, performance or functional tests results to be made available (e.g. SST)
- Material certificate to be made available
- Drawing number, drawing revision, test date, quantity of samples tested, methods/specification/standards, material name to
be written on report
- Result of measurement/performance OK to be included
Process FMEA - P-FMEA or P-FMEA summary (extract from P-FMEA) with highest scores to be made available
- Action plan to be initiated for agreed RPN
Initial Process Studies - Short term or long term process studies to be made available for all special characteristics and for other characteristics agreed
with supplier during TR and/or CQP0
- For safety characteristics <1> short term capability study ≥ 2 performed for more than 50 samples, long term process capability
≥1.67
- For significant characteristics <2> short term capability study ≥ 1.67 performed for more than 50 samples, long term process
capability ≥1.33
- If capability study does not meet requirements 100%, control shall be introduced to eliminate variation
Measurement System - Attach list of all gauges and measurement/test equipment with certification date used for component
Analysis (MSA) - MSA to be made available for all characteristics where gauges and measurement/test equipment used (e.g. gauge R&R, bias, linearity)
Sample Product (PPAP - Samples to be made available according to WABCO’s request (per cavity, mold, tool or pattern)
samples submitted to - Samples to be marked with the number corresponding to dimensional report, identified with cavity, tool or
WABCO) pattern (traceability on part according to drawing or clearly identified by marking)
- Samples to be identified as PPAP samples
Master Sample (PPAP - Master Samples to be available per cavity, mold, tool or pattern (traceability on part according to drawing or clearly identified
samples retained at by marking)
supplier) - Samples to be identified as Master Samples and marked with date of WABCO approval
- Supplier to retain Master Sample as described in latest PPAP manual edition. In addition to the master sample retention
period described in latest PPAP manual edition, the supplier shall retain master samples of latest PPAP revision level 15 years
after last day of production date or 1 year after last delivery out of stock (in case last production > 15 years ago)
- 41 -
Item Guideline
Checking Aids - Checking aids to be made available (e.g. fixtures, gauges, models)
- Preventive maintenance for checking aids to be made available
- Supplier to indicate for which drawing revision checking aids are valid
- Pictures and/or description of some special checking aids to be attached (if requested from supplier)
Records of compliance - Results of special tests, checks, etc. required by WABCO to be made available
with customer specific - Results to be recorded according to specification
requirements
Qualified Laboratory - Inspection/test result performed by qualified laboratory (internal or external) to be made available
Documentation - Name of laboratory to be indicated on report
- All checked material to be indicated on report
- Identification of related part (e.g. WABCO drawing number of supplier drawing number) to be written on report
- Specified method/standards used for tests to be written on report
- Result to be recorded according to specification
Appearance Approval Report - Report to include requested appearance features (e.g. colour, grain, surface appearance)
- Appearance according to requirements
- 42 -
7.1.8. SUPPLIER COMPONENT REQUALIFICATION (LAYOUT INSPECTION
AND FUNCTIONAL TESTING)
Any proposal for a product group based requalification must be approved by the
WABCO representative responsible for the particular supplier (Commodity
Quality/RSQL). The requalification plan must be integrated in the validated
control plan as part of the PPAP validation. Test results must be documented and
presented to WABCO on demand. The supplier shall inform WABCO
immediately should any deviations be detected. In this case, corrective actions
have to be defined and presented to WABCO.
PURPOSE QR6σ defines the problem solving culture WABCO insists upon. At the heart of
QR6σ is a Quick Response element, built around Six Sigma disciplines and the San
Gen Shugi approach. It is a mindset as well as a tool, and the key characteristics
are: speed of response, disciplined analysis of data, and rigorous pursuit of root
causes.
When a defect is found, the supplier must act to contain the damage, to replace
the poor quality parts, and to ensure that the defect does not recur. In doing so,
suppliers should follow this three-step process:
• 24 hours - quick reaction with containment actions to protect WABCO’s
production
• 10 working days – analysis of root cause and corrective action plan, proof that
the action plan has been implemented
• 30 working days – lessons learned card submitted to WABCO
When a defective part is found in a supplier delivery, WABCO works with the
supplier using the QR6σ methodology to find the root cause and take effective
corrective action. Our aim is to prevent reoccurrence and improve our supplier’s
production process. By doing so, we protect WABCO’s business and increase
our customers’ satisfaction.
This process is applied to all suppliers of production parts, raw materials, and source
SCOPE
products when a defect is found.
- 43 -
PROBLEM IT EXCHANGE
DESCRIPTION PORTAL
When a defect is found, WABCO informs the supplier and provides a 5W2H
Analysis. WABCO’s way of describing problems is as follows:
• What is the problem? (An adequate and precise description)
• Why is the problem? (What is known about the contributing factors)
• When detected? (At what moment and with what frequency?)
• Who detected? (The individuals that identified the problem)
• Where detected? (The location(s) of the problem)
• How detected? (Method, situation and procedure)
• How much/many? (The extent of the problem/defect in statistics)
WABCO and the supplier must work together to resolve the problem in a structured
way, following appropriate QR6σ steps as follows:
• Factor Tree Analysis
• ‘5 Why’ analysis for occurrence and for non-detection
• Defect reproduction
• Verification of effectiveness of implemented corrective actions
• Sharing of ‘Lessons Learned’
This is our key approach to problem solving and is based on San Gen Shugi
(GENBA, GENBUTSU, GENJITSU), which means REAL PLACE, REAL PARTS,
REAL DATA.
RESPONSIBILITIES WABCO
WABCO will inform a supplier about any defect found using a 5W2H problem
description and, if requested, provide an example of the defective part. We will then
review the situation with the supplier after 24 hours, and then ten days, working
constructively to resolve the problem. The problem is only considered closed when
a Lessons Learned Card (LLC) has been validated. The LLC captures the solutions
for future applications, to prevent the same problem re-occurring, and to inform
other potential risk processes.
SUPPLIER
The supplier must analyze the problem using the QR6s methodology, eliminate
its root causes, and implement effective action to prevent a reoccurrence. All
of this must be completed in a timely manner. The supplier will be called upon
to attend an escalation meeting (see 7.2.4.) with WABCO if the problem is not
resolved adequately or on time.
SUPPLIER BENEFITS The structured QR6σ methodology enables the supplier to achieve effective and
sustainable results in problem solving. As a consequence, defect recurrences are
reduced and the costs of poor quality minimized.
The COPQ&L process is applied to any supplier of production parts, raw materials,
SCOPE and source products to WABCO when there has been a quality incident.
DESCRIPTION
RESPONSIBILITIES WABCO
WABCO will provide the supplier with a detailed breakdown of the COPQ&L costs
and how they have been incurred. This is provided first as an estimate, which will
be confirmed after the claim is closed, and then invoiced to the supplier.
SUPPLIER
The supplier is expected to fully reimburse WABCO for its COPQ&L losses.
SUPPLIER BENEFITS
This transparent process enables suppliers to see clearly how poor quality is
affecting its business and its relationship with WABCO.
DESCRIPTION Supplier Quality Improvement and Escalation process consists of three levels as
described in the pyramid below:
L2 – Regional Escalation
L1 – Site Escalation
- 45 -
L1 – Site Escalation – managed by Supplier Quality organization, applicable if
supplier KPI’s (ppm result, number of incidents, reactivity time on claims) are out
of target for more than 3 months. Improvement plan and level 1 exit criteria are to
be set. The supplier will be informed by an official letter about the enrolment to L1
escalation. L1 can last maximum 6 months.
Improvement plan and level 3 exit criteria are to be set. Supplier will be informed
by an official letter about the enrolment to L3 escalation. L3 can last minimum 3
months. As per decision of WABCO organization, level 3 escalation can lead to
NBoH for supplier. If L3 exit criteria are not met, Phase Out activity can be initiated
for the supplier.
The supplier is responsible for assigning resources, and for the effective planning
and execution of actions agreed with WABCO in the improvement plan for each
escalation level.
DESCRIPTION
In addition, WABCO expects that suppliers will audit their Special Processes
according to AIAG requirements (CQI). This requirement shall be cascaded down
to n-tier suppliers if special processes are outsourced.
RESPONSIBILITIES
WABCO
WABCO will inform a supplier, during CQP process, when a component they are to
supply is classified as critical, and will outline the special requirements needed. In case
of a sub-supplier, these requirements, including PPAP Level 3, will be supervised by
WABCO.
- 46 -
SUPPLIER
Suppliers must have the capability to manage their supplier base, including
their new product and process development activities. Suppliers must release
all sub-components’ PPAP before production of Initial Samples (if applicable)
or PPAP samples for WABCO.
SUPPLIER BENEFITS WABCO’s Quality team supports the supplier’s management of its critical sub-
suppliers and, by doing so, helps to lower warranty risk.
PURPOSE To ensure an appropriate Change Control process and to protect WABCO and its
customers from risks cause by supplier changes.
Sourcing
Suppliers
& Purchasing
Commodity Commodity
Quality Buyer
Engineer
Propose change to
WABCO via
eSICR
eCQP
- 47 -
As previously mentioned, changes that impact fit, form, function, and reliability,
including but not limited to: changing cutting fluids, tool lubricants, adhesives,
material compound and chemistry, shall be all considered process changes requiring
WABCO approval. Off-Line rework (not included in the original Control Plan), is
considered a process change and suppliers shall obtain WABCO approval. Rework
shall be supported by operating and inspection instructions. This is not an exhaustive
list of process changes. Contact your WABCO Commodity Quality if any clarification
is needed.
Before the first delivery of new or changed materials and/or components, PPAP in
defined submission level must be delivered by the supplier and released by WABCO.
If, however, the change is to an electronic component, suppliers must follow the
requirements outlined by ZVEI outlined at www.zvei.org/ecs. An appropriate
Change Notification document can be found at www.zvei.org/PCN. When
completed it must be sent to PCN.electronic-components@WABCO-auto.com
3. An independent, third party audit (VDA 6.3), to include ALL affected sub-
suppliers involved, to be organized by supplier. The results shall be shared
with WABCO
- 48 -
Following WABCO’s Change Management process helps suppliers to avoid quality
SUPPLIER BENEFITS
and delivery issues that may have an adverse effect on WABCO’s customers.
The process makes sure that the supplier’s resources are used effectively to plan,
agree, and validate changes efficiently.
DESCRIPTION
separate
inspection
RESPONSIBILITIES WABCO
WABCO will inform the supplier about entry to CSL1 by sending a CSL1 Launch
Letter with the reason why this action has been taken. Unless otherwise defined, in
order to exit from CSL1, the supplier must meet the following criteria:
• No rejects for 20 successive days of production after permanent corrective
actions implementation (unless decided differently by Site Supplier
Quality
• QR6s closed (Lessons Learned Card validated) with focus on error proofing solutions
• Supplier’s production Control Plan updated
• Supplier’s P-FMEA updated
• Updated PPAP (if applicable) submitted by supplier and approved by WABCO
• Supplier Process Audit passed
If necessary, additional criteria might be agreed with the supplier. If exit criteria are met,
WABCO will accept the CSL1 Exit Application Letter from the supplier.
SUPPLIER
Return the signed CSL1 Launch Letter with approval of CSL1 to WABCO.
Set up a separate CSL1 containment area, totally isolated from the standard
production and:
- 49 -
• Notify all WABCO plants that use the affected component about the CSL1
details, and how the components after inspection have been identified
• Prepare CSL1 Control Plan using WABCO template, and obtain Site Supplier Quality
approval
• Submit CSL1 Daily Report (according to WABCO template) to Site Supplier Quality
• Display results from CSL1 in a public and visible location
• Ensure operator training, and display CSL1 Operators Skills Matrix on CSL1 area
• Conduct Daily Management Review on CSL1
• Solve the problem in production
When the CSL1 exit criteria have been met, prepare and send a CSL1 Exit
Application Letter to Site Supplier Quality.
SUPPLIER BENEFITS
• More time to solve problems
• No defects flow to WABCO
• No COPQ&L
SCOPE CSL2 applies to all suppliers of production parts, raw materials and source
products.
DESCRIPTION
separate
supplier
inspection
WABCO
RESPONSIBILITIES
- 50 -
• Supplier’s P-FMEA updated
• Updated PPAP (if applicable) submitted by supplier and approved by WABCO
• Supplier Process Audit passed
• If necessary, the additional criteria might be agreed with supplier
• If exit criteria met, accept CSL2 Exit Application Letter
SUPPLIER
PURPOSE WABCO provides professional training solutions to the commercial vehicle sector,
including WABCO suppliers and customers.
DESCRIPTION
WABCO offers services and consulting to its suppliers in the areas of business
process improvement and personnel development. Training modules on offer
include:
• Six Sigma Green Belt Certification
• QR6s (Quick Response Six Sigma) Workshop
• MMOG (Materials Management Operations Guideline) Workshop
• e-quality Workshop
• Lean Management consulting
• WABCO products & systems
- 51 -
WABCO works with suppliers to define exactly what their learning needs are and
then to define a program to meet them. During all modules, trainees work on real
projects, and will gain a full understanding of the approaches and tools needed to
improve processes and quality.
SUPPLIER BENEFITS WABCO supports suppliers as they drive towards process optimization and helps
ensure achievements and results.
- 52 -
8. HOW WE MANAGE TOOLING
PURPOSE Our tooling strategy is a key element of WABCO’s vision for differentiation. Good
products come from good tools, so we constantly strive to develop the best and the
most efficient tools possible. We expect our partners in the supply chain to do the
same. We use approaches such as: ‘Design to Cost’, ‘BCC tool manufacturing’, and
progressive extension of the tool lifetime, and deploy innovative technologies,
materials, and design processes.
SCOPE All non-standard tooling, used only for manufacturing WABCO parts with WABCO
or WABCO customer full or partial ownership, and covering every stage of the
tooling lifetime, from design to disposal.
DESCRIPTION
TOOLING CONTRACT
SUPPLIER SELECTION
If asked to quote for tooling, suppliers must use WABCO’s Tooling Cost Breakdown
form, which is sent to them together with the RFQ. The RFQ may include the 2D
Model - and can include 3D model - for both raw and machined parts, to support the
quotation process. The main criteria considered for Tooling offer selection are:
• Cost of the tool – shot price (cost of the tool divided by tool guarantee)
• Guarantee of life-time (number of only good parts to be delivered)
• Design concept and process simulation analysis result
• Lead time for ‘first off ‘ tool parts
• Improvement in cost and guarantee compared to previous tool (only for follow
up tools)
• Impact of tool design on piece price
- 53 -
The tool process is managed by the WABCO Tooling Experts and Commodity
Quality during the SORM meeting, when the Tooling Cost Breakdown and design
concept are reviewed.
BUSINESS AWARD
When WABCO awards business for tooling, the lead buyer sends the supplier a
dedicated Purchase Order with defined tooling specification, cost, and delivery
date (the date when the tool is to be finished. Good PPAP samples are to be
produced using the tool).
The Tooling Annex shall be updated with the new or transferred tools
accordingly. Each tool is ordered with a dedicated WABCO asset number.
Tool ownership, asset number, and part number, all have to be engraved either on
the tool directly, or on a label provided by WABCO. In the event that the tool is owned
by WABCO’s customer, a plate indicating the ownership by the customer has to be put
on the tool. In this instance WABCO’s tool plate shall also remain.
Tool manufacturing has to meet the delivery date mentioned on Purchase Order
which has been agreed with WABCO. Project milestones have to be provided to
WABCO on request of the buyer. If the supplier cannot achieve the delivery date for
good PPAP samples, the following must be respected:
After payment, all tools come fully under WABCO’s ownership and must be properly
marked. The transfer of ownership must be confirmed with a Tooling Hand Over
Certificate. On WABCO’s request, the supplier is obliged to provide WABCO with all
Tooling drawings and documentation.
SERIAL LIFE
A supplier can only start serial deliveries of a new tool after it has been released by
WABCO via a formal PPAP approval. Information about first usage date has to be
sent to WABCO to allow lifetime counting.
During the lifetime of the tool, the supplier is obliged to properly store, maintain, and
repair the tool in order to achieve the longest possible output (measured as number
of good parts). The supplier must ensure, at its own cost, that the tool achieves at
least the guaranteed number of good parts.
- 54 -
The supplier is not allowed to use a WABCO tool to produce parts for a third party.
In order to assure proper tool management, WABCO performs Tooling Audits at the
supplier’s premises to verify tool status (technical validation), maintenance, proper
labeling, and storing conditions. WABCO will ask the supplier in advance to make all
tools available for inspection. In addition, WABCO asks for tool confirmation on a
yearly basis to support the inventory review.
The supplier must inform WABCO before a tool has reached the end of its
guarantee so a tooling validation audit can be completed to decide whether the
guarantee should be extended, or whether the tool should be renewed, repaired,
or scrapped. The supplier can only scrap the tool with WABCO’s written
permission. All tools must be destroyed before they are scrapped and the destroy
report, documented by photographs, must be sent to WABCO’s Commodity buyer.
DESCRIPTION WABCO is developing and evaluating target tooling suppliers for selected projects.
Based on the offer review, a WABCO component supplier may be asked to source
tooling at a tool shop specified by WABCO. The supplier must take full responsibility
for tooling concept selection and management of the tooling sub-supplier.
- 55 -
9. SUPPLIER DEVELOPMENT AND LEAN DEPLOYMENT
WABCO’s Operating System reinforces the fact that a shared mindset for Six
Sigma Lean and Continuous Improvement can continuously power and enhance
our operating performance.
The supplier shall ensure that its Operating System (manufacturing and
business) is capable and stable by using the best Lean Manufacturing
Methodology and Quality Standards, with focus on the following:
Suppliers are expected to use Lean tools systematically to reduce waste on an on-
going basis and to stay focused on:
- 56 -
• Increase productivity and save space
• Flow Line Design: configure equipment for efficient, one-piece flow
• Lean Material Management: prepare, sequence, and deliver
parts efficiently to eliminate waste
• Standard Work: create optimal combinations of people, material,
and equipment in line with demand
• Gemba Kaizen: accelerated improvement workshops to deliver immediate
impact
• Shutdown/Startup
• Ensures suppliers monitor the risk associated with these activities
• Shutting down the operations for longer than 24 hours requires
proper planning to ensure critical points are being reviewed by the
management team
- 57 -
RESPONSIBILITIES WABCO
WABCO can offer systematic Lean training modules based on improvement plans
customized by the supplier. WABCO can also offer support to the supplier in
deploying the Lean roadmap.
SUPPLIER
Suppliers will develop capability to identify and eliminate waste systematically. They
SUPPLIER BENEFITS
will also be able to reduce costs in order to improve cash flow, significantly improve
quality, drastically reduce lead time, and improve employee morale and the
customer relationship, all of which contribute to boosting profitability.
- 58 -
10. HOW WE MANAGE DELIVERY WITH SUPPLIERS
PURPOSE To support our vision for Delivery: Bring the right part at the right time in the
right quantity and quality to each WABCO site and Distribution Center, and
to make sure suppliers understand all Delivery definitions used by WABCO.
SCOPE These definitions are relevant to all WABCO’s direct material suppliers.
A WABCO numeric reference used to identify a product. The Part Number has to
be used in all communications between the supplier and WABCO to identify the
particular product.
ORDER
FORECAST
A projected, non-binding WABCO demand for the next rolling 12/24 months,
communicated by WABCO to the supplier as a Delivery Schedule at least once a month.
DELIVERY SCHEDULE
LOT SIZE
VENDOR KANBAN
WABCO will place the order with reference to Kanban Parts. Kanban Parts are
the parts which are ordered based on a pull system, that takes into account actual
consumption of material, not predictions. The frequency for sending Vendor
Kanban call-offs to the supplier is not fixed and depends on the recent
consumption of material by WABCO.
ROUNDING VALUE
- 59 -
MINIMUM LOT SIZE
This is used only with reference to non-Kanban Parts, and refers to the time
period (defined purely on the basis of working days of ordering WABCO Site)
within which WABCO orders are fixed, and in respect of which WABCO commits
not to modify the quantities and dates, except in exceptional circumstances. The
planning Time Fence does not represent Production Lead Time of supplier, but
rather the time for placing goods at disposal plus transport time, as agreed with
WABCO.
Is used only with reference to Kanban Parts, and means the fixed time (defined
purely on the basis of working days of the ordering WABCO site) which is needed
to replenish the Kanban from the moment the supplier receives the order until the
parts reach the WABCO site. It includes the supplier’s reaction time, shipment
preparation, transportation lead time, and time for goods receipt at WABCO, but does
not include full production lead time at the supplier. Replenishment Lead Time does
not take into account the sending date of the Kanban call-off. Calculation of
Replenishment Lead Time starts the day after.
PURPOSE WABCO’s forecasts predict the future demand of WABCO customers. We share this
information with suppliers, so that they can ensure sufficient capacity to meet this
demand in a timely manner.
SCOPE The process applies to all direct material suppliers to all WABCO locations.
DESCRIPTION
- 60 -
The logistic parameters are maintained at WABCO for each part number, and can
be expressed by the suppliers as:
• Delivery Schedules with required delivery dates and quantities within the
Planning Time Fence
• Vendor Kanbans with required delivery dates and quantities within the
Replenishment Lead Time
The dates indicated on the orders are delivery dates when products are expected to
arrive at the relevant WABCO site.
WABCO sends the supplier an update of Delivery Schedules for the complete time
horizon according to an individually aligned sequence, but not less than once a week
in case of forecast changes.
If there are no changes in demand within a month, the Delivery Schedule will be sent
automatically once a month.
RESPONSIBILITIES If the supplier cannot accept the order for any reason, they must inform the lead
Value Stream or DC Logistics contact person at WABCO within 24 hours (1
working day) after receiving the order, and provide that person with a short-term
contingency plan.
SUPPLIER BENEFITS Through clearly defined forecasting and procurement processes, suppliers know
what WABCO expects and can plan production/deliveries accordingly to ensure that
the right products are available at the right place at the right time.
PURPOSE WABCO communicates its need for flexibility so that suppliers can ensure they have
sufficient capacity to cover short and mid-term demand changes from WABCO’s
customers, and to follow the requirements of automotive industry standards.
SCOPE The need for flexibility applies to all direct material suppliers to all WABCO locations.
DESCRIPTION
- 61 -
As soon as a supplier identifies any problem that might in any way delay or
jeopardize deliveries to WABCO, they must inform the lead Value Stream or
Distribution Center Logistics contact person at WABCO, and share all relevant
information to ensure a quick solution, which shall be agreed by both parties. Under
no circumstances will a supplier’s lack of capacity excuse it from meeting its delivery
obligations.
The supplier must set up and implement an action plan for all critical products. A
Part Number is considered critical when general demand is above the capacity
calculated on a production done over 5 days per week, 15 shifts per week, and
85% OEE.
In the absence of any notification from the supplier, WABCO’s forecast demand for
product(s) shall be deemed to have been accepted by the supplier upon receipt of
the Delivery Schedules.
RESPONSIBILITIES WABCO
SUPPLIER
Through a structured and proactive approach, the right capacity and flexibility to
deliver on time to WABCO can be ensured by suppliers. They will increase customer
satisfaction and avoid the extra costs associated with special freights and customer
line stoppages.
PURPOSE In order to ensure adequate and efficient information exchange between WABCO
and the supplier, data communication is principally carried out electronically.
SCOPE Data interchange is required from all direct material suppliers to all WABCO
locations.
DESCRIPTION
NOTE
- 62 -
Information Sent By
Kanban WABCO
RESPONSIBILITIES In the event that a supplier notices issues with the agreed communication system,
they must notify immediately the Value Stream Logistics contact person at WABCO.
Furthermore, an effective backup communications strategy must be presented by
the supplier.
SUPPLIER BENEFITS A well-established and reliable means of data exchange helps suppliers understand
and respond to customer demand in a timely manner.
PURPOSE To define rules and responsibilities for transportation between WABCO and
suppliers, and to outline the documentation required by WABCO to accompany or
follow each delivery of products from a supplier to WABCO.
DESCRIPTION
- 63 -
WABCO
If, according to the agreed Incoterms®, WABCO is responsible for transportation,
then the contact details of the forwarders to be used and the procedures that are to
apply will be specified in one of the appendices to the Logistic Protocol provided to
the supplier by WABCO.
The supplier is obliged to book the shipment with the named forwarder
according to that forwarder’s booking procedure. The supplier must then
ensure that the goods are ready for collection at the time agreed with the
forwarder.
SUPPLIER
It is the responsibility of the supplier to make sure that products are delivered to
WABCO on time. The supplier is responsible for following up the delivery, and
must inform the responsible Value Stream or DC Logistics contact person at WABCO
in the event of any incident that might affect delivery within one hour of becoming
aware of it.
In case dates specified on WABCO’s orders are the delivery dates when products
should arrive at the relevant WABCO site, suppliers must take into account the
delivery lead time from the supplier to the respective WABCO site.
Where the responsibility for transportation is shared between the supplier and
WABCO, the agreed Incoterms® will define the place where responsibility for
transportation passes from the supplier to WABCO.
It is the responsibility of the supplier to make sure that products are delivered to the
place named in the agreed Incoterms® in time to allow on-time delivery to WABCO.
The supplier is responsible for following up the delivery up to the point indicated in
Incoterms®, at which point responsibility passes to WABCO. The supplier must
inform the Value Stream or Distribution Center Logistics contact person at WABCO
in the event of any incident that may impact delivery within one hour of becoming
aware of it.
The supplier is obliged to book the shipment with the forwarder named by
WABCO to take over delivery of the products at the point when WABCO becomes
responsible for them. They must use the approved booking process of that
forwarder. The supplier must ensure that products are available at the right time and
place when WABCO takes over responsibility for them.
SPECIAL FREIGHTS
1. Delivery note
2. Packing list (optional in case of intra-EU shipments)
3. CMR waybill prepared by the forwarder*
4. Customs documents (only if applicable)
- 64 -
* If the supplier is responsible for transportation then they must ensure that the forwarder
prepares the CMR waybill. If WABCO is responsible for transportation, then the supplier
needs to provide WABCO’s nominated forwarder with the necessary information to create
the CMR waybill (from above mentioned excluding truck license plate number).
For deliveries going to WABCO plants in Europe, the invoice should not
accompany the goods delivered to WABCO. Instead, it should be issued to
WABCO, but sent directly to WABCO accounting at the following address:
NOTE
It is the supplier’s responsibility to ensure that all the information on each document
(origin, part number, purchase order number, etc.) is consistent, so that each load
can be identified easily. Any discrepancies can cause delays, detention at customs,
damages, and deterioration in quality.
SUPPLIER BENEFITS Appropriate documentation and transport organization helps suppliers to meet their
delivery performance targets.
PURPOSE Proper product packaging and labeling preserves quality and ensures that products
can be identified easily when moving through the supply chain.
SCOPE WABCO’s packing and labeling requirements apply to all direct material suppliers
to all WABCO locations.
DESCRIPTION
If a packing plan is not available on the WABCO website, the packing plan
provided by WABCO directly to the supplier will apply.
- 65 -
RESPONSIBILITIES PACKAGING IN GENERAL
It is the supplier’s responsibility to ensure the availability of packaging materials
for on-time deliveries to WABCO. Where on-time delivery to WABCO is
jeopardized due to non-availability of the necessary packaging and this is
caused by the supplier or any of their personnel, then the supplier must bear
the cost of all emergency freights, replacement packaging (returnable or non-
returnable) and all other costs to ensure on-time delivery to WABCO (use of any
replacement packaging needs to be validated by WABCO and the supplier).
WABCO will cover the cost of emergency freights, packaging, and all other
costs only if previously agreed in writing.
Any changes that a supplier wants to make to the agreed packing plan must be
submitted and approved in writing by the lead Value Stream or Distribution Center
Logistics contact person at WABCO, before delivery of the products.
The supplier shall, in all cases, respect the agreed number of products they should
be packing into the relevant containers. In all circumstances, different products must
not be mixed within the same single packaging unit.
At WABCO’s request, suppliers will use WABCO returnable packaging for deliveries
of products to WABCO. Suppliers are allowed to keep a stock of WABCO returnable
packaging for a maximum of two weeks and corresponding to the required quantities
as per their delivery schedule. Suppliers must order the returnable packaging they
need from WABCO’s named service provider.
POOL PACKAGING
At WABCO’s request, suppliers will use pool packaging for deliveries of products to
WABCO. When using such packaging, suppliers need to follow pool packaging
service provider rules and comply with WABCO requirements regarding condition in
deliveries.
- 66 -
LABELING
Correct packaging and labeling prevents logistics incidents and quality issues. This
SUPPLIER BENEFITS
means that unnecessary costs are avoided and that customer satisfaction is
protected.
The example below shows an acceptable delivery window when the due date for
goods expected at WABCO is April 5th:
• Material received and booked on April 4th or 5th is measured as on time (blue)
• Before April 4th it is too early but measured as availability (yellow)
• After April 5th, it is too late and a Fill Rate (FR) defect (red)
• Not later than on April 5th is measured as available (green)
• All products which arrive with WABCO on the due date specified on the order
or due date minus 1 working day are on-time
• All products which arrive with WABCO after the due date specified on the order are
considered late
• All products which arrive with WABCO before the due date specified on the
order minus 1 working day are considered to be too early
SCOPE WABCO’s communication requirements apply to all direct material suppliers to all
WABCO locations.
DESCRIPTION WABCO requires each supplier to define a daily contact person with the necessary
knowledge of logistical issues. The contact shall have good English language skills
and if possible language skills in the national language of the WABCO plant being
delivered to. Each daily contact person must have a trained substitute for absences,
holidays and unavailability.
The respective WABCO contact person for each part number/delivery destination
level can be found in the WABCO Supplier Portal.
SUPPLIER BENEFITS Disciplined communications between WABCO and its suppliers ensure that any
requirements and issues are addressed early enough to avoid disturbances in
supply chain and the extra cost those disturbances lead to.
The Logistics Audit ensures that supplier planning and logistics capabilities are
PURPOSE well established. It also identifies opportunities to eliminate waste and risk through
established action plans. As a result, disturbances in the supply chain are
minimized.
SCOPE The Logistic Audit can apply to all direct material suppliers to all WABCO
locations, according to internal selection process and criteria.
- 68 -
DESCRIPTION Information to selected suppliers
Suppliers are expected to assess their own performance and provide results to
RESPONSIBILITIES WABCO within an agreed timeframe. They must also provide objective evidence
to support their answers to all questions asked by WABCO and must accompany
WABCO representatives during the on-site assessment. In addition, suppliers must
define an action plan to close the performance gaps identified by the audit and
ensure that it is completed in a timely fashion.
Logistics Audits that follow the MMOG/LE standard allow suppliers to identify
SUPPLIER BENEFITS risk, mitigate any delivery disturbances, and ultimately increase the end
customers’ satisfaction in the most efficient way.
SCOPE The Capacity Assessment can apply to all direct material suppliers to all WABCO
locations.
DESCRIPTION
At WABCO’s request the supplier must present relevant capacity parameters and
WABCO is entitled to audit the described capacity on a supplier’s premise. The
common procedure is the WABCO Glide Path. This is a standard format to
visualize month over month demand.
- 69 -
RESPONSIBILITIES The supplier must:
• Perform a capacity self-assessment when requested to do so by WABCO and
compare by this delivery requests and their available capacities
• Provide WABCO with reliable data to enable a capacity check and to support
WABCO Glide Path process
• Define and complete an action plan to close any performance gaps identified
by the corrective action
SUPPLIER BENEFITS
Capacity Assessments allow suppliers to improve their understanding of WABCO’s
demands and their own capabilities to meet them. If performance gaps are identified
and closed, on-time delivery and customer satisfaction are protected.
- 70 -
11. ADVANCED PURCHASING & SUPPLIER INTEGRATION
PURPOSE One of the central challenges of supply chain is the effective integration of
suppliers. In order to improve the development of new products, WABCO’s Project
Management strives to integrate suppliers early or to offer for a proof concept.
- 71 -
11.1. SUPPLIER DESIGN CAPABILITY ASSESSMENT
This one and a half day audit is performed using a standard evaluation tool. The
output of the SDCA is a rating as per the diagram below:
SUPPLIER CATEGORIES
CATEGORY S0 S1 S2 S3 S4
The rating will help the Product Engineer and the Project Buyer to decide
which supplier should be invited for supplier integration, depending on the type
of development to be done.
The SDCA result is valid for three years, at which point a re-audit is required.
- 72 -
11.2. WABCO INTEGRATED SUPPLY PARTNER
The WABCO Integrated Supply Partner Program (WISP) applies to all WABCO
direct material suppliers worldwide. Eligibility is according to specific criteria.
SCOPE
DESCRIPTION
The purpose of the WISP program is to identify, within WABCO’s panel, strategic
suppliers that will become preferred partners through the supplier integration
process. All integrated supply partners support WABCO’s differentiation strategy.
The award for WISP is subject to full compliance with all WABCO and automotive
requirements and targets. Furthermore, suppliers must have the potential to
deliver value in terms of flexible resources for development tasks and/or
technology knowledge.
After the initial selection process, the supplier will be invited to work through
several steps in order to prepare, with support from the WABCO cross-functional
team, the WISP Charter and Dashboard. The WISP Charter and Dashboard
summarizes the shared business objectives, and underpins the collaboration
throughout its lifetime.
RESPONSIBILITIES
The top management from a supplier wishing to join the WISP program commits to
engaging their company in a transparent, trusting, constructive, and loyal
relationship with WABCO.
SUPPLIER BENEFITS
WISP suppliers are systematically considered for supplier integration in new
projects when required.
- 73 -
12. LONG TERM VENDOR DECLARATION (LTVD)
PURPOSE The Vendor Declaration is proof that a product qualifies for preferential agreements
between the EU and third countries.
SCOPE Long Term Vendor Declarations are obtained from all manufacturers and vendors of
trade materials across all WABCO’s sites.
In order to facilitate the process for vendors, WABCO will provide a Long Term
Vendor Declaration (LTVD) by mail or as a letter for all relevant products.
The vendor has to use the provided LTVD and to complete the document
accordingly.
The document has to be signed and stamped by an authorized person, and sent
back to WABCO by mail or as a letter.
The vendor has to ensure that only persons with the relevant knowledge (no
trainees) have filled the LTVD and signed the declaration.
It is absolutely mandatory that the Country of Origin of the product is shown in the
LTVD.
In the case of materials for which the vendor is unable to supply a LTVD, the vendor
must declare a non-preferential status and provide the Country of Origin.
Due to the far-reaching effect of the information provided, the supplier is fully liable for
false/incorrect data stated in the LTVD and the resulting damage and costs.
Important instructions:
https://www.stade.ihk24.de/blob/stdihk24/international/downloads/3762970/7bb
2f10d60c4abeebcfe53e50cade88e/Englische-Uebersetzung-der-Fussnote-
data.pdf
- 74 -
13. HOW WE CONTROL EXPORT
PURPOSE To ensure compliance with national, foreign and international trade and export
control laws and regulations.
SCOPE Export Control information is obtained from all suppliers for all WABCO sites.
The supplier shall advise in writing WABCO’s Export Control Department (GL-EC)
as early as possible but not later than 2 weeks prior to the Delivery Date of any
information and data required by the buyer, to comply with all Foreign Trade
Regulations for the Products and Services applicable in the countries of export
and import as well as re-export in case of resale. In any case, for each product
and service, the supplier will provide the buyer with the “Export Control
Classification Number” according to the U.S. Commerce Control List (ECCN) if the
Product is subject to the U.S. Export administration Regulations; and all applicable
export list numbers (e.g. EU Dual-Use-List); and the statistical commodity code
according to the current commodity classification for foreign trade statistics and
the HS (Harmonized System) coding. The supplier has also to clearly indicate on
all delivery notes or invoices the corresponding export control classification
number (e.g. 3A991 ECCN) and HS-Coding.
If one or more Technical Assistance Agreements (TAA) is required for the fulfillment
of a contract or an order, the TAA(s) and any amendments thereto shall be agreed
with the purchaser before being submitted to the export authorities. A copy of the
TAA signed by all parties and of the issued approval, including a copy of all provisos
that relate to the execution of the contract or the compliance obligations of the
purchaser shall be provided to the purchaser. If required, the supplier may redact
passages in the copies.
- 75 -
Notwithstanding anything to the contrary in the contract, the following provisions are
of essence for this contract:
LIABILITY
Notwithstanding any other provision of the contract or the order, the supplier shall
be liable for all damages, losses, and liabilities incurred by the Purchaser as the
result of the supplier’s negligent non-compliance with its obligations under these
provisions.
- 76 -
14. ISSUING INVOICES TO WABCO SITES IN EUROPE
Applies to all WABCO suppliers of direct and indirect materials issuing invoices to
SCOPE
WABCO sites located in Europe, including United Arab Emirates.
EXAMPLE
• Always include WABCO’s VAT-ID number (as shown on WABCO’s purchase order)
• Paper invoice: the invoice recipient address shall be stated on the order.
Important remark: WABCO’s centralized accounting address differs from
WABCO’s legal entity address
• Electronic invoice: send all invoices directly to our Accounts Payable team
using the correct e-mail address
• Send only one original of an invoice and do not create additional copies (this
refers to electronic and paper invoices as well)
In the event that a supplier uses an envelope with a “transparent window”, the
document shall be folded in a way that allows the invoice recipient’s address to be
visible in the window. In all cases, the billing address must be printed on the invoice
as mandatory.
- 77 -
EXAMPLE
Invoices that do not meet the above requirements will be returned to the
sender with a request to re-issue them properly. WABCO does explicitly
reserve the right no claim cash discounts on re-issued invoices.
PURPOSE To allow suppliers to convert paper invoices into a PDF format and expedite the
invoicing process.
SCOPE Applies to all WABCO suppliers of direct and indirect materials issuing invoices to
WABCO entities in Europe and the United Arab Emirates.
DESCRIPTION WABCO uses “PDF invoice format receipt” for WABCO entities in Europe and the
United Arab Emirates. This change allows suppliers to transfer paper invoices into a
PDF format.
In order to send invoices in a PDF format instead of a paper invoice, the supplier
has to contact his/her respective Commodity Buyer in order to sign an Electronic
Invoicing Agreement between WABCO and the supplier’s company
representatives.
- 78 -
15. GLOSSARY OF TERMS
SCOPE The Glossary of Terms applies to all direct material suppliers to all WABCO locations.
5W2H What is the problem? Why is the problem? When detected? Where detected?
Who detected? How detected? How much/many?
APQP Advanced Product Quality Planning
BCC Best Cost Country
BMS Business Management System
C0 Field Incident Incident on the basis of an operational fault that has been noticed in the vehicle after
vehicle was released to end customer for operation; caused by a faulty component from a
WABCO supplier
C1 Incident Customer complaint about a WABCO product that is on a vehicle which has not been released
to end-customer for operation (zero kilometers); caused by a faulty component supplied by a
WABCO supplier
C1M Incident Customer complaint on a Merchandise Goods product, on vehicle which has not been released
to end-customer for operation (zero kilometers); caused by a faulty component supplied
by WABCO supplier
C2 Incident Complaint detected in the WABCO manufacturing line; caused by a faulty component supplied
by a WABCO supplier
C4 Incident Logistic non-conformity identified by WABCO; caused by a faulty delivery or faulty delivery
documents by a WABCO supplier
COPQ&L Cost of Poor Quality & Logistic
CPB Claims per Billion
CQL Commodity Quality Leader
CQP Component Quality Planning
CRP Cost Reduction Project
CSL1 Controlled Shipping Level 1
CSL2 Controlled Shipping Level 2
FD Feasibility Declaration
FFD Final Feasibility Declaration
FR Fill Rate
FSMC Ferrous Metal Casting
GCL Global Commodity Leader
IFD Initial Feasibility Declaration
IMDS International Material Data System
IS Initial Sample
KPI Key Performance Indicator
LP Logistic Protocol
MMOG/LE Materials Management Operations Guideline/Logistic Evaluation
NDA Non-disclosure Agreement
NFMC Non-Ferrous Metal Casting
P/N Part Number
PA Project Agreement
PD Product Development
PPA Product & Pricing Agreement
PPAP Production Part Approval Process
PPAP RFTOT PPAP Right First Time on Time
PPM Parts per Million – Quality Performance Measurement indicating the quantity of non-conforming
parts resulting from C0, C1, C1M, C2 and C3 incidents; identified in a selected time period and
divided by the quantity of parts received in the same period of time, normalized over one million
parts
- 79 -
PSO Part Submission Order
PSR Product Safety Representative
PSW Part Submission Warrant
QAA Quality Assurance Agreement
QCD Quality, Cost, Delivery
QR6S Quick Response Six Sigma
RCL Regional Commodity Leader
RFQ Request for Quotation
RPL Regional Purchasing Leader
RSQL Regional Supplier Quality Leader
CSR Corporate Social Responsibility
SHEE Sheet Metals
SICR Supplier Initiated Change Request
SLC Safe Launch Concept
SMA Safety Management Audit
SOP Start of Production
SORM Supplier Offer Review Meeting
SPA Supplier Process Audit
SPIP Supplier Process Improvement Plant
SPQ Supplier Profile Questionnaire
SPRI Springs
SQ&LIM Supplier Quality and Logistic Incidents Management
SQAP Supplier Quality Assurance Plan
SQEP Supplier Quality Escalation Path
STAP Standard Parts
STRAP WABCO Strategic Planning Process
TA Tooling Agreement
TR Technical Review
TURN Turned Parts
TWS Top Worst Supplier
WCM WABCO Change Management
WOS WABCO Operating System
WPCP WABCO Product Creation Process
- 80 -
www.wabco-auto.com