FANMES MINING

DATE: WEEKLY WEEKLY 17 - 23 AUGUST 2019 AVAILABILLTY


day

Engine Hours Percussion Hrs


Total Pre Shift
Total Tot.
Total Total Hrs. Availabilit Utilisation Check/ Total No.
MACHINE Available MTBS MTTR Reliability Downtime REMARKS
Programmed Hrs Start End start End Working y (%) (%) Planned Brake Downs
Hrs. Hrs
Service Hrs.

BOOMER 01(BUSKET BOLTER) 126.0 1210.0 1213.0 2520.0 2549.0 107.5 62.0 85% 49% 10 3 81 15.0 3.5 6

AVAILABILITY % UTILISATION %
AVAILABILITY UTILISATION 90%
% % 85%

80%

BOOMER 01 85% 49%


70%

60%

50% 49%

40%

30%

20%

10%

0%
ER 01
BOOM
MAJOR BREAK DOWNS
BOOMER 04 HOSE BURST
LOADER ENGINE PROBLEM 4%
4%

BOOMER 03 M
BOOMER 02 MAIN PUMP PUMP,UPPER CYLIND
40% ING,ELECTRI
53%

BOOMER 03 MAIN PUMP,UPPER


CYLINDER LEAKING,ELECTRIC
BOOMER 02 MAIN PUMP
LOADER ENGINE PROBLEM
BOOMER 04 HOSE BURST
EAK DOWNS
HOSE BURST
4%

12

35

4.45

12

20
BOOMER 03 MAIN
PUMP,UPPER CYLINDER LEAK-
ING,ELECTRIC
53%

30
23
2
2
serv prog serv day
boome 2 1