In close cooperation with the client, a training day is scheduled, starting at 9:00
ending at 16:00. The group size is 6 to 15 people. Two sessions are used to help
students increase their knowledge and insight into the optimal management of the
biological waste water treatment.
During a tour of the waste water treatment plant (+ / - 1 hour), based on a checklist,
the performance of the purification becomes clear. It is imperative that all process
parameters are set optimally. In the afternoon, the performance of the purification is
discussed and explained. Common problems are discussed. The training day can
end with a short test. (approximately 20 minutes).
Workshops
- The process engineers can write their own Wwtp protocol Daily process operation,
list of the optimal setpoints of the Wwtp;
- Determination of activated sludge;
- A trouble shooting matrix / this matrix presents causes of failure of the Wwtp +
actions to be taken to restore the Wwtp performance in time.