Area Operator Housekeeping Responsibilities
10 M.Ali 15 Area complete
10 Tanveer Ahmad 19 Area complete
10 Shahid Ali 10 Area complete including operator cabin
10 Umair dewan 11 Area complete
09 Demin Umer Draz Acid Caustic unloading station, Chemical Hall, T-940 & V-980 A-D
09 Demin G. Dastagir V-940 A-C, V-941, V-942 A-C, V-943A-C, & V-944 A-C
09 Demin Ayaz Ahmad ME-952 A/B, MP-952A-C, MK-920/940/942 & Gravel area
09 Demin Manssor Shah MP-901A, TP-901 B/C, MP-923A-C, MP-924, MP-925 A-C, T-901/902/920
09 Pre-treatment Usman Anjum Lime slacker, Cl2 cylinder room, Lime kiln area
09 Pre-treatment Imran Ali ME-920, MP-920 C/D/E, MP-926A/B, MP-902 A/B
09 Pre-treatment Mansoor Bhutto Chemical hall, FeSO4 storage, V-927, Bromine shed & MP-802 A/B/C
09 Pre-treatment Umar Farooq Canal intake pumps, Hypo dozing shed, Operator cabin
08 A.Razzaque 17 area, 18 area, E-800 I/J cell
08 Waryam Ali TP-800 A-D, MP-800E, E-801, TP-801 & MP-801
08 Abdul Rehman Oil Shed, Chemical dozing section & sand filters
08 Rashid Shehbaz CT Top MK-800 A-H & Operator cabin
16 Abu-ul-Hassan SWTP & chemical section & operator cabin
16 Ghufran Ali S-950A/B area, MP-1603 J/K/H, waste water disposal line
16 A. Lateef Area around MCC, MP-1603 A/B/C/D/E & T-1602
16 M. Aftab MP-1603 F/G, S-950C/D area & Diesel pumps

 Area operators to forward details of housekeeping performed in every shift to Fahad Ullah
 Assigned area operator will prepare his area for the housekeeping audit and is responsible for positive and negative housekeeping points
of his assigned area
 Area will be audited by Fahad Ullah, SE-PRD-UTY and DM-PRD-UTY as per above defined responsibilities
 Mujeeb ullah is overall housekeeping coordinator for WTCR