CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x MECH MECHANICAL
Nylon Sheet
0
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). x SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( (Report No) 2022 \ 2 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (8K/ m²) AT DEPTH OF (-3.00m) ON GROUND SLAB
BELOW THE EXISTING N.G.L. MEMBER (mm) Typical Sec. Of Ramp
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF COLUMNS 40
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D)
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
FORMED FOUNDATION 50
LIQUID LIMIT ≤ 25%.
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 2-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø10
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø10@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 1000 1250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND. A
WATER STOPS SHOULD BE FACTORY MOLDED.
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG
. all dim. from ARCH D.W.G. DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF.
EXTENDING IN THE SHORT DIRECTION.
L<2000, h=200 , A=B=2-Ø12
SEC. ( a - a ) GENERAL NOTES
L<5000, h=400 , A=2-Ø12 , B=2-Ø16 designed project manager
DR..ENG : Majid Albana
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5) checked scale date
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT ENG : Majid Albana
2
drawn job no. sheet no.
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT ENG : Majid Albana
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
0.80
E
Ø16@175 B. MESH
6
D
4.8
C
Ø16@175 B. MESH
4.8
T16@150mm
B
0.80
0.80 7.2 7.2 7.2 7.2 4.8 4.8 7.2 4.8 6 0.80
11
10
1
4
2
6
3
9
BOTTOM. MESH
no. date initials revision
job title
Foundation Plan MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
(A)
drawing title
Ø16@175 T. MESH
6
D
4.8
C
Ø16@175 T. MESH
4.8
B
0.70
6
A
0.80
0.80 7.2 7.2 7.2 7.2 4.8 4.8 7.2 4.8 6 0.80
11
10
1
4
2
6
3
9
TOP. MESH
no. date initials revision
job title
Foundation Plan MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
(A)
drawing title
BAR DIA.(mm) 10 12 16 18 20 22 25 PLAN OF FOUNDATION
THICK. = 600 mm
LAP LENGTH (mm) IN 400 500 600 650 700 800 900 REINFORCEMENT&SEC.
COLUMNS designed project manager
LAP LENGTH (mm) IN 400 600 700 800 900 1000 1250 DR.ENG : Majid Albana
scale date
checked
. all dim. from ARCH D.W.G. ELSE WHERE ENG : Majid Albana 1-100 7 /2022
drawn job no. sheet no.
ENG : Majid Albana
approved 3 ST/D/02
B
2.6
250
2.95
12 No. Ø12
0
2/15
Ø1
00
2/2
Ø1
2.95
0.500
600
2.95
5Ø16mm Ø16mm@200
4.8
B
Slab Reinf.
6
5
250
50 Slab Reinf.
2/1
250
Ø1
Ø12/200 00
2/2
Ø1
Ø12/200
200
600
job title
screed 5cm
Lean Conc.
Well compacted subbase 95 % blinding 10cm (A)
drawing title
Stairs detail
designed project manager
DR.ENG : Majid Albana
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
COLUMNS SIZE
6
C1 C1 C2 C2 C2 C2 C1 C1 C1 C1 C1
C1 400 400
4.8
C2 400 400
C
C1 C2 C2 C2 C2 C1 C1 C1 C1 C1
4.8
B
C1 C1 C2 C2 C2 C2 C1 C1 C1 C1
C1
6
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
A
0.80
0.80 7.2 7.2 7.2 7.2 4.8 4.8 7.2 4.8 6 0.80
B
11
10
1
4
2
9
no. date initials revision
job title
(A)
drawing title
approved 6 ST/D/02
12 - Ø16 12 - Ø16
Ø10@200 Ø10@200
2Ties/Set 2Ties/Set
Main Bar Roof Floor
Ties
Column Reinf.
Rest See
C 35
400 400
Section
400 400
2 rd Floor
Section
Ground Level
400 400
foundation
level
12 - Ø16 14 - Ø16
Dowels
C1 C2
job title
(A)
drawing title
SCHEDULE OF COLUMN
designed project manager
DR.ENG : Majid Albana
Typ. Sec. For Column scale date
checked
1-100 7/2022
drawn job no. sheet no.
TYPICAL INTERNAL COLUMN TO BEAM DETAIL TYPICAL EDGE COLUMN TO BEAM DETAIL
approved 7
B1 B1 3-16
E
2-12
6
700
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
10@250 mm
Ø12@150 B. MESH
Ø12@200 T. MESH
B1
3.00
3.00
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
D
L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m
3-16
4.8
250
B1
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
Ø12@150 B. MESH
Ø12@200 T. MESH
C
L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m
Ø12@200 T. MESH
4.8
Ø16@200 B. MESH
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
B
L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m L= 3m
Ø12@200 T. MESH
6
Ø12@150 B. MESH
A
B1 B1
7.2 7.2 7.2 7.2 4.8 4.8 7.2 4.8 6
11
10
1
4
2
9
5
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : Majid Albana
checked
project manager
scale date
ENG : Majid Albana 1-100 7 /2022
drawn job no. sheet no.
8
ENG : Majid Albana
approved ST/D/02
B1 3-16
E
250
2-12
700
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
B1 B1 10@250 mm
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m L= 3m L= 3m
3.00 3.00 3.00
3-16
250
Ø12@200 T. MESH
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
Ø12@150 B. MESH
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
Ø12@150 B. MESH
Ø12@200 T. MESH
C
L= 3m L= 3m L= 3m L= 3m L= 3m
B1 3.00 3.00 3.00
B1
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
L= 3m
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
B
L= 3m L= 3m L= 3m L= 3m L= 3m
3.00 3.00 3.00 3.00 3.00
B1
Ø12@200 T. MESH
Ø12@150 B. MESH
A
B1 200
B
1
4
3
9
800
2Ø10
250
Ø10@250
2Ø16T+B
Sec.in oppening at roof
SLAB REINFORCEMENT FIRST FLOOR )
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
TOP REINFORCEMENT job title
Slab Reinf.
(A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
all dim. from ARCH D.W.G. designed
ENG : Majid Albana
checked
project manager
scale date
ENG : Majid Albana 1-100 7 /2022
drawn job no. sheet no.
9
ENG : Majid Albana
approved ST/D/02
B1 3-16
E
250
2-12
700
add Ø16@200 T
add Ø16@200 T
B1 10@250 mm
3.00
3.00
B1
L= 3m
L= 3m
L= 3m L= 3m
3.00 3.00
3-16
250
Ø12@200 T. MESH
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
Ø12@150 B. MESH
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
Ø12@150 B. MESH
Ø12@200 T. MESH
C
L= 3m L= 3m L= 3m L= 3m
3.00 3.00
B1
B1
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
add Ø16@200 T
3.00
3.00
3.00
3.00
L= 3m
L= 3m
L= 3m
L= 3m
add Ø16@200 T add Ø16@200 T add Ø16@200 T add Ø16@200 T
B
L= 3m L= 3m L= 3m L= 3m
B1
3.00 3.00 3.00 3.00
Ø12@200 T. MESH
Ø12@150 B. MESH
A
B1 200
B
2
4
3
9
800
2Ø10
250
Ø10@250
2Ø16T+B
Sec.in oppening at roof
SLAB REINFORCEMENT SECOD FLOOR )
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
TOP REINFORCEMENT job title
Slab Reinf.
(A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
all dim. from ARCH D.W.G. designed
ENG : Majid Albana
checked
project manager
scale date
ENG : Majid Albana 1-100 7 /2022
drawn job no. sheet no.
10
ENG : Majid Albana
approved ST/D/02
B1 3-16
E
250
2-12
700
B1 10@250 mm
D
Ø12@200 T. MESH
Ø12@150 B. MESH 3-16
250
add Ø16@200 T
3.00
L= 3m
add Ø16@200 T
C
L= 3m
3.00
B1
add Ø16@200 T
B1
3.00
L= 3m
add Ø16@200 T
B
L= 3m
3.00
A
B1 200
B
5
7
800
2Ø10
250
Ø10@250
2Ø16T+B
Sec.in oppening at roof
SLAB REINFORCEMENT PENT HOUSE FLOOR )
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
TOP REINFORCEMENT job title
Slab Reinf.
(A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
all dim. from ARCH D.W.G. designed
ENG : Majid Albana
checked
project manager
scale date
ENG : Majid Albana 1-100 7 /2022
drawn job no. sheet no.
11
ENG : Majid Albana
approved ST/D/02