ANNEX 9: Project Work Plan and Budget Matrix (Program Design)

Problem Title Patubig sa 4th Floor


Water supply in four-story building is very necessary for the student’s proper hygiene
especially those occupying the 3rd and 4th floor. The lack of water supply may lead to
Problem Statement
inconducive learning environment and urinary inffections among teachers and
students.
To provide water supply to the newly constructed four-story building in Campus A and
Problem Objectives outdoor sound system in the school covered court within the first year of the SIP
Implementation
Root Cause Gravitational pull that doesn’t allow the water supply to go up
Date of
Activity Output Persons Responsible Budget Budget Source
Implementation
Quotation Liaison officer
Scouting of water tank. January 2019 Php 500.00 MOOE
forms School Head
Inclusion of water tank in the budget
Installed Water School Head
proposal, purchasing and installation August 2019 Php MOOE
tank School Maintenance Personnel
of it on the 4th floor.