ANNEX 9: Project Work Plan and Budget Matrix (Program Design)
Problem Title Patubig sa 4th Floor
Water supply in four-story building is very necessary for the student’s proper hygiene especially those occupying the 3rd and 4th floor. The lack of water supply may lead to Problem Statement inconducive learning environment and urinary inffections among teachers and students. To provide water supply to the newly constructed four-story building in Campus A and Problem Objectives outdoor sound system in the school covered court within the first year of the SIP Implementation Root Cause Gravitational pull that doesn’t allow the water supply to go up Date of Activity Output Persons Responsible Budget Budget Source Implementation Quotation Liaison officer Scouting of water tank. January 2019 Php 500.00 MOOE forms School Head Inclusion of water tank in the budget Installed Water School Head proposal, purchasing and installation August 2019 Php MOOE tank School Maintenance Personnel of it on the 4th floor.