2erem | —___oA/ae ‘General Services Ine. RECORD ‘24. AUG. 2022 oe aaa mite Cheipe upeort 10MM 20MM Plate 1 Pipe (Thickness) 10 MM 20 MM a vs © otertow RT-AccHPeD accoance with the requirements of Section IXPASME Boller and Pressure Vessel at OM CENT Aiea fiz eee % Qa win ‘DNiLascuna/MGMac Avia wisw SB Spec project Manse Sar ens =| QA/QC ‘WELDERS PERFORMANCE QUALIFICATION Guides end Test Result: N/A race Bend Root Bend Macro Test [aitersative Test Result other Test —RT-ACCEPTED. Fit or Specimen evaluated by Mechanical Test Conducted by Welding Supervised by ‘We certify that the statements nth visual examination of Completed Weld (QW -3024) comcamarsion |__| coe RECORD es Pesaran SN oT Tap fiscrtone Ouse fesrotorsty er ches ‘ea Vas Tange TTT os si ‘ss rm ye sata ia cing Mate con Se TOT Gree Cope (iment von sn Plate ~— 1 Pipe (Thickness) 10 ™M 20 MM ie TEES fierce En eT etn See Les iron mL orn etchant Der vs O moss craw atyrenm, : . ves © east uw ~aiyerame SO “Test Result Fille: Weld Test Macro Tes: KENT ADRIAN M, PANALIEAN his record are true and correct and shat the test weld were ‘acadance with the requirements of Section IX ABME Hier and Pressure Vessel ACCEPTED prepared, welded and tested in ae SOT zl ae | TY Accseaaat A 4 et WLascuna/MGMacktarigay RAs a Wi/sWi ‘SHIFT eld Sesser Manager zepm | ___0a/ae = “General Services Ine. RECORD 23 AUG. 2022 a ie process1 —GTAW ——Stayersimin, YO e * js «= bert RF -AccePTeD im or Specimen ected y ec Test Conde by fling super sv aoa vaca cei are tates ihc aftr nearest anh el weld re prepare, wll andes n sceolane Wie aquest Son XPSME oor an Press Ve aa ow T GENT Bret ascuhamcmacatay | edsia wiswi SPA Specie Project Manager Sar cem QA/QC Es ‘WELDERS PERFORMANCE QUALIFICATION cemconsteuction and y RECORD General service ne 18 AuG.2022 [iraaers name LOTTE BORON Da 15-Aug-22 JwciderstDNo, comswor Jwrs otlwedty Welder contwes.2022.001, [specication and eppe/grade tase materials] A106-GR.8 Thickness 5.54 MAL Tesiing Variable and Qual aon Linite ‘Actual Vales Tange Qualified Welding Process craw ctaw Process type MANUAL p-xo. ROL 7 WOT ROUGH NOISE acang Matera Twiniour TWiT OR WITHOUT Plate Pipe fee 2 tnent 25MM TO UNLIMITED Pine pe cries) sss mm 108 mw net 5 ALL TEREST ter Mets cass ase To 9 On HUA ter Meta or Electrode Speciation (SEA) A510 15.18 ter Meta No. F.NO.6 TILENOG Poston 06 TALL POSITION Weta Progression Tonic UPL as Backing Fi Type NONE NONE etic haracterstes Dest DosP leurrene De Dc paany TRA air ve process! GTAW ayers, ae » O ve O procs? NONE Slayersmin, NS Test Result Visual amination of Completed Wl (QW-2024) nccerreD Jide tend Test Result: N/A Plt Weld Test, : ace bend Macro Test oot vena acres: atzernative Test Resuk lotmer test RT-ACCEPTED em or Specimen evahated by Mechanica Test Conducted by JWeding Supervised by ENT ADRIAN M. PANALIGAN. ‘We certify thatthe statements this record are true and earrectandfhat the test weld were prepared, woldel and tested in accodance with the requirements of Section IX PSME Her and Pressute Vessel oN CENT ngs WiSWh seins aes ucrem |—___ea/oc oa ‘WELDERS PERFORMANCE QUALIFICATION aes nance a Plate alate 2 wwe 25 MM TOUNLIMITED a Plate (Thickness) 554 uM 11.08 ™M Ys vs O aiternative Test Result other Test RT-ACCEPTED ens oF Specimen evaunted by Mechanical Test Conducted by velding Supervised by MARVIN MACATANGAY ‘We cert thatthe statements in this record are true and correct and Jha the test weld were prepared, welded and ested in aceodance with the requirements of Section IX SME Boiler and Pressure Vessel eM. ) ae asclna/ MGMacatagay | reseria wi/swh pect fret ansaee _eepm Qajac WELDERS PERFORMANCE QUALIFICATION General eve oe 18 AUG. 2022 faders Name PARLOCRIZAT Tae 15-Aug-22 fetes LD Ne, CPM-W009 JwPs lowed by Welder crm.aves.2022001, [srcicaon and ype/grad oasematerialis) _ AL06-GAL 8 Thickness ___ 54 MM “Testing Variable and Qualieation nits ‘Actual Values Range Qualified welding Process raw craw Process Type MANUAL MANUAL wo. rm ToT Tao PO scking Mater wort wiilon wri Triste pe (rear Tube 2 twat 25M TOUNLMITED Pate Pipe ices) 1108 wm tate ETON iter Mott css wee Ton on UATE iter Metal or eto Speciation (SA) A518 roy iter Metal. E0.6 TILE NOE poston rm TLL POSITION sa Proresion Tu PTL is tacking Fe Typ NONE NONE tec Characterstis Desi Des Jearrnt De m etary TRA Twa . O roost! GTAW layers, saa ms vw O ve O ress? NONE layrsmin rs « o “ost Rost sun examinston of competed We (QW 3024) cere sie tod Test Res N/A Flee Weld Tet Face Bon Macro Test: oot tend Macro Test [aiternative Test Result other Test -RT-ACCEPTE Fim or Specimen evaluated by Mechanical Test Conducted by Welding supervised by DARREL ARANAS. Weecertty tha the statements in this record are true and correct and that the test weld were prepared, welded and tested in acodance with the requirements of Section IX ABME Boiler and Pressure Vessel Avis] CM Co 2S my ge EATANGAY. Sipscuna/MGMacatangiip =! wis SPA Special Project Manger CENT 2ePm | __oa/ae = esc WELDERS PERFORMANCE QUALIFICATION Cena Brent RECORD Sencar Waters Name BENIGNO CATER Tao 15-Aug-22 Hwee’ Ko, com.wooe hwestotowedty Weider cPMwns022.001 syecticstonand eype/eadeotiae ates) A106 GRO ‘Tweiness ssa “Testng Variable and Qulation Lins ‘etual Vals Range @vatited Welding Process craw craw ProcesType MANUAL ANU p.xo NOL FN. TROUGH PROSE cain wmouT ‘WIT ORWITLOUT Pate ED ripe Pe or Tae Diameter) 2 ow roUNLMTED Plate ED Pipe crhickness) Peta i SaniGvh ik ner ‘ALL THICKNE itr Metal class TT RO 00 HUTA itr Metal Eecrode Specification (SFA) A518 15.18 ter Metal FNo, ENO-6 AILF.NO-G pesiion oo TALL POSITION wt Progression Tet PHL sacking Flux Type NONE NONE aractersites Das? Des De De. STRAIGHT STRAIGHT yes recess 1 GTAW Sayers min, on Na STE vrs O Process 2 NOM Slayers min, Process 2 IN aye bees ‘Test Result yisuct Examination of Completed Weld (QW 302.4) ACCEPTED Jcuidet Bend Test Result: N/A Fillet Weld Test : race Bend Macro Test: Root vend Macro Tes: seer aaa Sen spent a aa ised fa aT pee oe Sa caer QA/Qc “WELDERS PERFORMANCE QUALIFICATION RECORD 23 AUG. 2022 fraaersnameAMINSAY Dae Te-Aug 2 bveders D0, canons Hwrs towed by Welder cPMuns-on2 con sveciicton and ype/arde of baeneneals) —_A06-6R. 9 Twicimes S54 "Testing Variable and Queen His etal Vales Tange Qualified lang Process craw craw Process Type ETT AUN wo, FNO TNO. TROUGIE NOL sacking Matra WirnouF TWIT OR WITHOUT Pit ripe (Pcornne 2 wwe 25 MM TO UNLIMITED a Plate [X] Pipe (Thickness) 54 MM 1.08 MM nee TERNS itr Metal class TSS 7 ROME OR HUNAN iter Metal or lero Specification (SFA) 15.10 58 ter Meta F No. ENO.6 AELENOS poston c TALL POSITION Weta Progression PTL ce Backing Fh Type NONE lecteclCharacteries Des curren 0 Paarny SAG SHRarca aw ves process taW tyersmin, ED $ ve O Process? NONE ayersmin, Test Result sna Examination of Completed Weld (QW 302.) accerreD ides Ren Test Res: W/A rc Weld Test : ace ten Maceo Tes: oot Bent acres Jaternative Test Result Jomner test RT-ACCEPTED a or Specimen evaluated by Mechanical Test Conducted by welding Supervised by ENT ADRIAN ML PANALIGAN ‘We certify that the statements in this recor are true and correct nd hat the test weld were prepared welded and tested in Accodance withthe requirements of Section IX SME Boiler and Pressure Vessel, ohm CUENT A estria lr Gatun eMac una/MGMacatangai = Spee Sap aT wis aSPm | ___oa/ae — pacers ‘WELDERS PERFORMANCE QUALIFICATION Caner eres ne RECORD aia aan AC ces okieneinn pocionceriicn _ctearoadiins Led satel eau cine nieve sane sae ig Varta Saino Tai casi Vans Tange Gated king roces CTAW/SunW cTAW MAW pemere ts a wa fe eee cng Mae one eer : easera Cl rite ripe (Hoe < Raglan oO Plate [XK] Pipe (Thickness) 1097 uM 294 MM ne TCT iter Nt css mane beeen pe tsa eset ste a ier beet Fa Tm RO ees = ae re Progesion ah ca erent ane at oa Sereoets Tr DP See ee fe te paerty STRAT SAT : : = © freee cr shyrenin, vs © frm? sua styeemia YE a ol east ad vf pocaPren peodteatachonnes pie WaT : ec Berd Moca To ot end Nao Te eens eat tortor Rr accePren opine meray octet sang Superviny siieteecne Shcoeter tot sac arose tse preescntpes oil lin ii ilocos eine wl av saves saa end Hoo Vee or CaF One ee es ae lascuna/MGMaata | Ware ast ee sa QA/QC tee itler Metat lass Fitler Meta or Electrode Specification (SFA) rier Metal F No. Posi [veta Progression as Hacking/ Flax Type tetrealCharactersitics Potarty Yes rocess 1G Slayers min tf raw ye oe process? SMAW = layersmin, : No visual Examination of Completed Wold (QW 3024) Guides fend Test Result: N/A Face tend oot Bent acroTest Jakernative Test Result other test RT-ACCEPTED Fino Specimen evaluated by Mechanica Test Conducted by velding Supervised by ‘WELDERS PERFORMANCE QUALIFICATION cxmconsteuction and RECORD = tera eres 18 AUG. 2022 fvaraname GENTGNO GAYETA Tae 15-Aug-22 fweisersto ne, com-wooe Jwrs Folowedty Welder cont. ws.z02z002 becteonand pera afb waters) _AD6 68.8 Thicnes 1097 MM “Testing Variable ane Qulicton mits ‘Aetual Vales Range Qualified Weteng Process crAW/sMAW craw /SHAW Process Type MANUAL MANUAL wo rom PEND. THOUGH P NOLS Backing Matera winiout Wit ox WITHOUT [Pinte 1D Pipe (ireor Tube ° 73MM TOUNLIMITED Piste pe (Thetness) 1097 xm zi94 Mat ALL THORNS Feros G/ETOLH TES G/eTONEOR HQT G10) 25:8; 7NO.6/ F.NOE TAULELNO. 6/ NOT 6G ‘ALL POSITION. TPH UPHILL NONE NONE DeSP/DCRP esr /DCRP DC DG, Siac SRAGT o el Oo o Test Result accurreD Fillet Weld Test : Macro Test BEBERLEN MEDRANO ‘We certify thatthe statements inthis record are true and correct and thatthe test weld were prepared. welded and tested in ‘aceodance with the requirements of Section IX ARME Boiler and Pressure Vessl | Ta) CPM. ‘CENT "Gi ase i soe dasha) tact) adda SS wis “see fre cem |= oA/oe _ P= WlEes PERFORMANCE QUALIFICATION crm MAN eeninele. 18 AUG. 2022 Resse sha, omar Weraaly sar clips aaa maid eomirons aan comers omryve ry Pro eg care ae eae oO Dante) 6 73MM TO UNLIMITED ao Ptate [EJ Pipe (Thickness) 10.97 wM 2198 ™M ie AES er Mtl Ca ea eee Re a es Spar aa fa cr Wend preg eNa | eR esd ereion TL a cing ype aa oat Panty Ta TA Yes ones caw steam ED : vs st? sa alge, ED Test ent oat bat TTA mwa Tt ; ace bend mone eeeas ee name cle SS oe ant eer y ae oe _Aascuna/cMacstanga afcatria CO wis ‘SPM _ SpeciallProject Manager SHIFT aGPN baa ga/gc —- ™ WWELDEs PenronMANct QUALIFICATION cmcomuasionn — . ee ae NtersL0 on svcn fsratowity Wer cnveszozon sca ats Tags aod ving Paes craves casa ces ye man AL Pipeor abe : Pine re Ween ¥ "anaetoumuir ao Plate [E] Pipe (Thickness) 1097 mM ier treet) 78 rc reson i vii ca characters BED Best OP rent a ve pany saa SAT |Process 1 craw sayeremin, YES o = @ Process: s Slayersmin, Ye ocss2 MAW a 4 Teste ac Bond NsoT ot end Macro Test: atcernative Test Result loner Test RT-ACCEPTED Fim or Specimen evaluated by Mechanical Test Conducted by Weiding Supervised by DARREL ARANAS ‘We certilythat the statements inthis fecord are true and correcta Yhat the tet weld were prepared, welded and tested in accodance with the requirements of Section IX ASME Boer and Pressure Vessel nae cuENT ae came : QA/QC moe WELDERS PERFORMANCE QUALIFICATION es comtrcion ane EREERD = 18 AUG. 2022 fWatars Name VICTOR ANOS aa Taeeen [vcicr's 0a. cOmwors Ps Fotowou by Weta ‘cma. 2022.002 syecieston and ype /grade ct bse materia) ADS-B thickness 097M Tein Varlable and Qualcaton Lie ‘etal Vales Range Qualiied Welding Process crAW/SHNW GrAW/SMAW Proc Type MANUAL ANAL P.xo om THO FROUGH FNOLTSF acing Matera wou TWiT ORWITHOUT Pine 1) Pipe ee ‘ ‘72MM TOUNLIMITED. I Pnte ED Ppe erhitness) 1097 wot 2194 mw x AUTOR ier Metal Class ER7OS-G/E7OTD___[peraorsnomen onsonmn ier Metal or Eietrode Specification (SFA) ASO/AS ‘AS ter Mea No, TNO 6/ ENO ULENO. 7 ENO Peston my ‘A POSITION Wet Progression Tt PLL ls Backing/ Fax Type NONE ONE ecscal Characterstics Dese/OCRP DSP /eRP lurrent Dc Dc otxaty Shaan STAG ve Process Gt tayarsmin, J AD ve © Process? SMAW hyrsmin, “est Result sua Examination of Completed Wed (QW 302.) accerreD hie Bend Test Res: N/A Fillet Wold Test . ce Bend Macro Test oot Bent Macro Test Jakernative Test Resuit Jotser Test RT-ACCEPTED Fins or Specimen evaluated by Mechanical Test Condaced by Jvetding supervised by MARVIN MACATANGAY We certify that the statements in this ecard are true and correct anefthat the test weld were prepared, welded an tested in ecodance with the requirements of Section IX fSME Boiler and Pressure Vessel a OM CENT SW] 8 log a LCATANOAE L wiswi — SPU Special Project Manager

You might also like