You are on page 1of 2

MATERIAL LIST

Part
Part No.
Name
DESCRIPTION Size QTY

16"
- P2
613
2 4-1
1 01
200mm
5 3
4
e
lin
in
6 dra
2"
400mm

CLIENT

SHELL IMPORT FACILITIES TABANGAO

CONTRACTOR

CONSOLIDATED PROJECT MANAGEMENT


CONSTRUCTION AND GENERAL SERVICES, INC.

PROJECT

Sectional Replacement of 2" Ado Drain Line


Inside T6 / T6 Bundwall
ISOMETRIC LINE NO.

DRAWN BY

DATE

APPROVED BY:

DESIGN OPERATING TEST PRESSURE DATE


LINE NUMBER LINE CLASS LINE SIZE INSULATION PAINT CODE NDE
T / oC P / barg T / oC P / barg (barG) SHT

REV.
RT - 100%
80 16 65 1 16"-P26134-1101 1101 16" NONE LC1-N DPT - 100%
n/a
JOB CODE
MATERIAL LIST
Part
Part No.
Name
DESCRIPTION Size QTY

16"
- P2
613
4-1
1 01

e
lin
in
dra
2"

CLIENT

SHELL IMPORT FACILITIES TABANGAO

CONTRACTOR

CONSOLIDATED PROJECT MANAGEMENT


CONSTRUCTION AND GENERAL SERVICES, INC.

PROJECT

Sectional Replacement of 2" Ado Drain Line


Inside T6 / T6 Bundwall
ISOMETRIC LINE NO.

DRAWN BY

DATE

APPROVED BY:

DESIGN OPERATING TEST PRESSURE DATE


LINE NUMBER LINE CLASS LINE SIZE INSULATION PAINT CODE NDE
T / oC P / barg T / oC P / barg (barG) SHT

REV.
RT - 100%
80 16 65 1 16"-P26134-1101 1101 16" NONE LC1-N DPT - 100%
n/a
JOB CODE

You might also like