You are on page 1of 2

PROJECT : DRAINAGE IMPROVEMENT WORKS FOR MAYANJA – KATO SWAMP CROSSING UNDER MPIGI

STATION LOT12, PROCUREMENT REFERENCE NUMBER; UNRA/WRKS/2019-20/00033/12


CONCRETE WORKS AT CH 1+305km

DATE : 31 MAY 2022

TEST RESULTS FOR CONCRETE CUBES FOR DESIGN MIX RATIO 1:2:4 (CEMENT: SAND: AGGREGATES, 7 DAYS)
DATE MADE DATE DIMENSIONS WEIGHT DENSITY CRUSHING ULTIMATE COMP.
TESTED LOAD STRENGTH
(mm) (Kg) (Kg/m3) (kN) (MPa)
23.05.2022 31.05.2022 150 x 150 x 150 7.9 2341 234 10.4
(1:2:4)

’’ ’’ ’’ 8.0 2370 268 11.9

’’ ’’ ’’ 7.9 2341 263 11.7


PROJECT : DRAINAGE IMPROVEMENT WORKS FOR MAYANJA – KATO SWAMP CROSSING UNDER MPIGI
STATION LOT12, PROCUREMENT REFERENCE NUMBER; UNRA/WRKS/2019-20/00033/12
CONCRETE WORKS AT CH 1+305km

DATE : 22 JUNE 2022

TEST RESULTS FOR CONCRETE CUBES FOR DESIGN MIX RATIO 1:2:4 (CEMENT: SAND: AGGREGATES, 28 DAYS)
DATE MADE DATE DIMENSIONS WEIGHT DENSITY CRUSHING ULTIMATE COMP.
TESTED LOAD STRENGTH
(mm) (Kg) (Kg/m3) (kN) (MPa)
23.05.2022 21.06.2022 150 x 150 x 150 8.0 2370 365 16.2
(1:2:4)

’’ ’’ ’’ 8.0 2370 396 17.6

’’ ’’ ’’ 8.1 2400 358 15.9