You are on page 1of 91

I.

Introduction-Page 1
Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

1.Department Manager's name

2.Department Supervisors' names


1st shift
2nd shift
3rd shift

3.Names of other people performing supervisory functions,


such as senior staff, lead people, etc.
1st shift
2nd shift
3rd shift

4.Department's total number of hourly employees/direct,


indirect, support, etc.

5.Department's hours of operation: (by shift, start/stop,


breaks, lunches, clean-up or "prep" time)

6.Organization Chart: Top Client on down. Name, title &


area of responsibility. Include names, hire date,
seniority, shifts, job class or position.

7.What are some of the problems that cause you to miss


your schedules, plans, etc.?
|::
II Work Flow-Page 1
Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What is the function of the department?

2.What are the types of work done or performed?

3.Define and give an example of each.

4.How does the department receive its work?

5.Where does it come from?

6.When complete, where does it go?


|::
II. Work Flow-Page 2

7.How?

8.Are collateral services, material or support required


in order to fulfill the department's responsibility?

9.What kind of coordination does this require?

10Does it concern required equipment?

11Does it concern required material?

12Does it concern required staffing?

13Does it concern required training?

14Does it concern required _______?


15Who is responsible for each?

|::
II Work Flow-Page 3

16Is there seasonality or "peaks & valleys" that affect


the department?

17What are they and what is the result?

18Are there any significant changes (methods changes)


that are going to occur in the next year, and what are
they?

19What effect will these changes have on the department?

20What is the timetable for these changes?

21List all of the major pieces of equipment in the


department. If known, what are the limitations
(capacities), speeds, feeds, and the common name they
are known by in the department. (Addendum).
22Draw a physical layout of the department, depicting the
major stations, machines or "steps along the way", and
showing how the "work" moves through the department
(Addendum).

|::
IIISTAFFING-Page 1
Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.How does the department determine its requirements for


personnel?

2.Who is responsible for making this determination?

3.Is there a basic difference in staffing requirements


from shift to shift?
4.How are breaks, lunches, wash-up, prep-time, etc.
handled?

5.Are there specific policies dealing with the


aforementioned?

|::
IIIStaffing-Page 2

6.What is the overtime if any (possible addendum)?

7.How is the need for overtime determined?

8.Does overtime, meaning "paid time", apply to management


& supervision as well as to hourly/non-exempt
personnel?

9.What is the turnover (attrition)%. Annual or monthly?

10What is the % of absenteeism by week or month?


11How do vacations impact the department? What is the
average vacation?

12When are vacations scheduled?

13Is there an annual "shutdown" of the department?

|::
III Staffing-Page 3

14How are vacations and absenteeism covered by this


department?

15Are people transferred in and out of the department?

16Are there paid holidays? What are they?

17What about the seniority (longevity) of the staff. How


long?

18Do you have a way of measuring your people? If so,


how?
19Do we know the individual performance levels of each
employee? (Addendum)

20Do we know it by group, or department?

21Are there staffing schedules ? (Addendum)

|::
III Staffing-Page 4

22Are the "supporting functions", such as stock clerks,


material handlers, expediters, etc., also included in
the staffing schedules?

23Current management or supervisory training programs,


current or past. Determine areas covered, techniques
used and results (Addendum)?

24Any formal Skills Training Programs for non-


exempt/hourly employees?

25What is the department Evaluation Procedure ?


(Addendum)
26When does it occur? Who conducts it? How are results
used?

27If there is a union, what are the ramifications, if


any?

|::
III Staffing-Page 5

28Are there work place rules, safety considerations,


special equipment or clothing that is required in the
area ? (Addendum)

29Is the department supervisor (1st line) a "working"


supervisor?

30Are "disciplinary measures" ever necessary? How are


they carried out?

31Is there a program for "positive reinforcement" when an


employee does a good job?
|::
IVJOB CLASSIFICATIONS/JOB DESCRIPTIONS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Do all of the "jobs" have written job descriptions ?


(Addendum)

2.What are the job "titles" in the department ?


(Addendum)

3.Whether there are "formal" job descriptions or not,


describe each position or "job", in laymen's terms.
(Addendum)

4.Prepare a Flexibility Chart for the department.


(Addendum)

|::
IVJOB CLASSIFICATION/ JOB DESCRIPTIONS-Page 2

5.How does the department obtain new people?

6.Who recruits? Who interviews? What are the criteria?

7.Are there some jobs that are "highly" repetitive ?


(Addendum)

8.Are there some "station fill" jobs ? (Addendum)

9.Depending on the amount of activity or volume in the


department, are there some positions that can be
combined from time to time?

10How are the assignments given to the staff?


11What happens if assignments are not completed on time?

|::
IVJOB CLASSIFICATION/ JOB DESCRIPTIONS-Page 3

12Does the department utilize Trainees?

13How are they trained?

14What is the learning curve?

15Are the personnel shifted to different functions during


the day?

16What happens if there are not enough people or


resources?

|::
V.DEPARTMENT SCHEDULING-Page 1
Dept. Concerned ___________
Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Where do the department schedules originate?

2.Are they received on time?

3.Who receives them?

4.Do the "front line" personnel, such as the supervisors,


get the schedules on time?

5.Are the schedules adequate?

|::
V.DEPARTMENT SCHEDULING-Page 2

6.Are there considerations for collateral items, such as


material, support documentation or required "paper
work"?

7.How is the work quantified on these schedules? How is


it counted?

8.Are due dates or completion times reflected in the


schedules?

9.Who establishes these "times"? Are they realistic?

10Do the schedules change? How often?

11Are the changes formal? Are the changes written or


oral?

12What happens when volume changes or the department


experiences a significant change of "mix"? Who is
responsible for any adjustments?
|::
V.DEPARTMENT SCHEDULING-Page 3

13How is "non-scheduled", or "emergency", or "unexpected"


work handled? How is it scheduled?

14Is "Backlog" monitored? Does it exist?

15How is "backlog" expressed? In Hours, Units, People,


Patients, etc.?

16Is there a "normal" backlog level in the department?

17How/who determines the priority or sequence of work to


be completed?

18How is "emergency" or "hot list" work handled?

19Is the flow of work into, or through, the department


predictable?
|::
V.DEPARTMENT SCHEDULING-Page 4

20Is the work forecasted or planned?

21Are there "standards" in the department ? (Addendum)

22How are they determined?

23Are the employees aware of these "standards"?

24Does the department ever get "off schedule"?

25Is the department "on" or "off" schedule now? How is


that known?

26What happens when the department is "off schedule" or


if "priorities" are changed?
27Are there "deadlines"?

|::
V.DEPARTMENT SCHEDULING-Page 5

28What happens when you don't meet the "deadline"?

29What happens if required material or information is not


available when the department is otherwise ready?

30How much advance notice is required to have the


required material or information there on time?

31Do you have any repetitive problems in the "scheduling"


area ? (Addendum)

32Are there any major steps, processes, machines, etc.


that can be identified as a restriction in the flow
("bottlenecks")?
|::
V.DEPARTMENT SCHEDULING-Page 6

33Are the "schedules" or "plans" that are received


converted into meaningful and useful tools for the
department?

34Is the management concept of "estimating" being used to


help manage the work?

35Do any of the "schedules" help in assigning work?

36Do the schedules highlight "off schedule" or variances?

|::
VIREPORTING-Page 1
Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________
____________________________

1.Are there any meetings held? Daily? Wkly? Monthly?


Who attends and purpose? Results?

2.Does the "key" supervisor or person responsible for the


department track important information from that
department--if so, what information?

3.Are the identifiable problems logged in any way ?


(Addendum)

|::
VIREPORTING-Page 2

4.Are there any "computerized" programs used for reporting


or "logging" in departmental information?

5.Is the supervisory technique of "follow-up" utilized to


any great degree in the department?

6.How is the process followed? What is the frequency?


7.Does the department feel that the current methods are
adequate?

8.Why?

9.Assemble & complete the Department's "System Flow"


(system explosion), with all required documents,
schedules, records, "paper-work", etc.

|::
VIREPORTING-Page 3

10Are there Operating Budgets? Are they connected to any


Forecasting techniques? Is it accurate? Is it used?

11Does the management/supervision know the department's


profitability? By service indicator? By customer? By
product?

12What personnel/manpower reporting exists? What is


reported? Is it by day? Week? Month?

13How is the output of "work" reported? Daily? Wkly?


Monthly? By $'s? Units? Standard Hours?

14How are the departments "costs" reported? Method?


Calculation? Timing?

15Is Overtime reported? Rework? Redo? Scrap? Yield? By


function? By process or step?

|::
VIREPORTING-Page 4

16What exists, daily/wkly, to manage the business of the


department? Who uses it?

17Is the use of inventory monitored? Is the level of


inventory known? Is it tracked to the budget?

18How is productivity reported? Measured? Who uses the


information?
19Is the department's reporting structured to feed back
to Corporate's goals, expectations or objectives ?

|::
VI QUALITY ISSUES-Page 1
Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What are the parameters of "Quality" in this


department?

2.How are they measured? Are they compared to any


"standard"?

3.Where and how were these standards originated ?


(Addendum)
|::
VI QUALITY ISSUES-Page 2

4.Have they been updated?

5.How does supervision (management) ensure quality


performance? Is it formal? Other?

6.Are there specific indicators reporting on how the


department is doing on quality of product, or service?

7.Is there any data on the acceptability of material that


is received? If so, include.

8.Are the various causes of "non-conformance" known and


documented? If so, include.

9.Is the cost of non-conformance known? If so, include.

10Of all acceptable material, what % is ultimately


scrapped?

|::
VI QUALITY ISSUES-Page 3

11What is the scrap/rework ratio?

12Rework/return ratio?

13Can scrap be summarized by "reason" codes? (Addendum)

14Are there prints, specs or other supportive


documentation available to explain the quality
parameters? (Addendum)

|::
VI ORDER ENTRY-CUSTOMERS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________
____________________________

____________________________

____________________________

1.Type of business--selling standard items, established


line-selling, made to order, made to stock, job shop,
etc.)?

2.How are the orders received? (mail-phone-telex-fax-


salesman-commission)?

3.How are the orders entered? (post to b/l, delivery


dates, products, automatic, manual)?

|::
VI ORDER ENTRY-CUSTOMER-Page 2

4.How is inventory checked to see if the order can be


filled?(If yes, what happens; if no, what happens)

5.How and when are delivery dates set? (standard, guess,


fact?)
6.What is their "on time delivery"? (do they
know/how/when/ report what is it / interruption/ good
or bad/ if bad-cause)

7.How and when do they pull from back-log (#of wks/mos.)?

8.If under "quota", or quote cycle, how many does the


customer get that are quoted?

9.Who prepares the quotes? Lead time? (When are


prints/specs drawn up/by whom?)

|::
VI ORDER ENTRY-CUSTOMER-Page 3

10On "make to order", how are tools & dies acquired?


Handled?

11How are orders tracked?


12Are customers notified when orders are going to be
late? Who? How?

13Who handles customer complaints? Are they summarized


by reason, type? If so, review.

14How many orders by type do they enter per


week/month/year?

|::
IXORDER ENTRY-MANUFACTURING-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________
1.What generates a production order? (forecast, plan,
inventory, customer)

2.What does a production order cover? (Raw to finished,


Raw to sub assembly, Raw to component, Raw to first
step. If there is an order for each step or sub-
assembly, how is it handled? Are there parts
explosions? How is the order identified? How
scheduled? How is it tracked? E.O.Q.?)

|::
IXORDER ENTRY-MANUFACTURERS-Page 2

3.How do they sequence (steps) the order? How are prints


and specifications handled?

4.Are there formal "process sheets"?

5.How do they check availability of material? How is it


requisitioned? Are the inventory records updated to
reflect any changes?
6.How are the lead-times determined?

|::
IXORDER ENTRY-MANUFACTURERS-Page 3

7.Are scheduled completion times (dates) set for each


step in the process?

8.What's the procedure for backlogs? In-process?


Finished? Available?

9.How are the tools, dies, and other requirements


coordinated? Are they in a controlled environment?

10How are the actual orders filed? Are they easily


accessible? Are they usable to determine status of the
order?

11Where are the orders kept? In the department? In


Production Control?

|::
IXORDER ENTRY-MANUFACTURERS-Page 4

12How are the orders released to the departments? How


are they controlled once they are released?

13What kind of an identification system is used


to constantly identify the product? Do the ID
numbers change as they "value add" to the product?

|::
X.INVENTORY CONTROL-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What are the different levels of inventory that are


maintained? (raw, finished, sub-assemblies, components)

2.How are they maintained? (manual systems, automated?)


How often? What are the parameters of reporting?

3.What are the procedures that are followed to keep


inventory current?

4. If there are records, how are they used? By whom?


When? How?

|::
X.INVENTORY CONTROL-Page 2

5.How are purchase orders or requests initiated?

6.How are production orders or requests initiated?


7.How many stock keeping units (S.K.U.'s) are there?

8.Do they know usage by S.K.U.? What is it?

9.What information is there on obsolete stock? What is


it? Why does it exist?

10Are there overstocks? How much?

11Shortages? How much?

12What is the current system for monitoring


shortages/overstocks? When does it happen?

13How are parts/inventory physically stored?

14What kind of a locator system exists? How does it work?


Computerized?
|::
XIPURCHASING-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What is the step by step procedure for initiating and


placing an order?

2.Do they have an "open to buy" procedure? Is there a


"signature" policy? How does it work? What are the
responsibilities? Do they issue "blanket" purchase
orders? If so, for which items?

3.Is there a Purchase Order Register to monitor status of


orders? (How many, late, early)? Are these production
or non-production type orders?

|::
XIPURCHASING-Page 2

4.Do they track vendor performance? Is there any type of


Vendor Rating System in effect?

5.How are vendor lead times determined?


6.What method is used to expedite "short" or "hot" items?
Who's responsible? How is it done? Frequency?

7.How does receiving coordinate with incoming orders?


What if they are late? What if they are expedited
parts/product?

8.What determines quantities ordered? (E.O.Q., discounts,


safety stock, production runs?)

9.Are the orders "cut" manually, or are they automated?

10Do they have alternate suppliers or vendors? How are


they authorized? Who's responsible?

|::
XIPURCHASING-Page 3

11How is the quality of vendor/supplier shipments


monitored? When? Who? How?
12Who has the authority to initiate a requisition?

13Are the requisitions prepared satisfactorily? Do they


follow their own procedure?

14How many purchase orders are issued per week?

15How is the Purchasing Department measured?

16Are there budgets? For material? (for entire operation)

17Is a bid or quote system used? How are they solicited?

|::
XIPURCHASING-Page 4

18On what basis are contracts awarded?

19Is there a policy of "charge backs" to vendors for poor


quality or service?
20What is the vendor return policy?

21Are demurrage charges a problem? If so, state the


problem.

22Are vendor shortages a problem in receiving?

23Are order quantities checked? 100% or random?

24Are checks done at other points in the flow?

|::
XIPURCHASING-Page 5

25Do you use any "off-site" storage or inventory? What's


the procedure?

26Is the department aware of the inventory levels? Are


they aware of the accuracy of the counts?

27How do book inventory and physical inventory quantities


compare? How often is inventory taken?

28Which technique is used to count the inventory?


(perpetual, actual count)

29Are inventory levels tied to the forecast?

30What is the financial investment in the inventory?

|::
XIPURCHASING-Page 6

31What is the inventory turnover?

32What indicates inventory turnover?


33Is the inventory system tied to updated sales
forecasts? How?

34Was there ever an inventory purge done? When?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Do they have man/machine loads? Covering what period?


How are they updated? By whom? When? What is the
concept? Is it by machine groupings?
2.What factor is used to determine the requirements?
Standards? Estimates? What calculation is done to
allow for increases in performance or improvement of
any kind?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 2

3.Is the concept of "ready back-logs" utilized? What is


known about it? How is it reported? What is the
format?

4.How is the "input" of work controlled?

5.How is Schedule Attainment monitored? How about Scrap?


Rework? Personnel or crewing? Performance?
Productivity? Efficiency?

6.Are there Daily Schedules? How effective are they?


What elements are accounted for? (vol, hrs req., stds?)
7.How are the various assignments made to the people?

8.Do they have a procedure for "1st piece" inspection?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 3

9.What is the procedure for ensuring that all


materials/support is available at the right time?
Responsibility? How?

10How do they report the actual completion of work? Who


does it? How? When? Does it make sense?

11What is their understanding of "Productivity"? How do


they calculate it?

12What happens if there are variances to the schedule/


plan? What action is taken? What are the indicators
for unacceptable variances?
13If it applies, how is downtime reported? Who? When?
How is the information used? How is downtime defined
(start/stop)?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 4

14Is "work-in-process" monitored? Is it controlled?

15What consideration is made for maintenance, P.M.? How


is it coordinated? How is it reported on?

16What about set-ups? What about other "preparation"


steps? How are they considered?

17Are "expediters" used? How many? where? when?


18Do they have "bills of materials"? Route sheets? Move
tickets?

19What kind of "production meetings" do they hold?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 5

20What types of production schedules are made? Ship


schedules? Warehouse schedules? Production
Manufacturing build schedules?

-Departmental schedules
-Assembly schedules
-Sub-assembly schedules
-Machine loading
-Work center loading
-Schedules for release dates

21What plant processes are the key scheduling indicators?

-lead times
-process time
-mix
-seasonality
-capacities
-customer orders
-inventory levels
22Do they have "floor" controls?

-do they, in fact, control the "physical" work of


the department?

-is there "sign out" of some type? Work orders? Batching?

|::
XI PRODUCTION SCHEDULING--FLOOR SCHEDULING-Page 6

23Do we know the value of a "machine hour?" a "run hour?"


or a "production hour?"

24Do they have norms/standards--when were they last


updated? By Whom?

25Are norms part of the union contract?

|::
XI ENGINEERING-Page 1

Dept. Concerned ____________

Data Source Dept.___________


People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Where does the department's workload come from? Who is


responsible for the "input"?

2.What is the frequency of the input? When is the


"workload" known by the department?

3.Are the projects estimated ? Are standards used ? How


are they derived ?

|::
XI ENGINEERING-Page 2

4.Do they know the backlog of work? How? By section,


function, type of work, skill, individual?
5.Is there a plan for completion? Hourly, daily, weekly,
or ???

6.What is the inventory of "projects"? How are we


monitoring progress? Are there key "decision points"
identified?

7.Is there a regular review of the projects to determine


if they are emergency, important, necessary, nice-to-
have, etc.

8.What is the process of follow-up to determine progress


of completion and attainment.

9.Can the department measure its performance or


productivity? How?
|::
XI ENGINEERING-Page 3

10Is support for engineering adequate to allow the


engineers to "engineer" rather than spend their time on
"non-engineering" tasks ?

11Is engineering scheduled by Project ?

12Do they know the status of the Projects ?

13Do managers "manage" or are they "working" managers ?

14Are projects "phased" to allow adequate management of


attainment or completion to a schedule ?

15Is there a lot of "think" time associated with the


scheduling of Projects ?

|::
XI ENGINEERING-Page 4

16Is lost time, or re-work easily identified ? Is it


monitored ?
17What does the backlog represent in "gross" manhours ?

18What are the percentages of on schedule, behind


schedule, past due, etc. projects?

|::
XI MAINTENANCE-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________
1.What crafts or skills are represented in the department?

2.What types of maintenance are required? (P.M., regular,


emergency, capital)

3.How are the people allocated, by shift, craft? How


many supervisors are there and how are they allocated?

|::
XI MAINTENANCE-Page 2

4.How is the work received? Work order? formal? phone


calls?

5.How much of the work performed is covered by work


order?

6.Do they estimate work? Who does it?


7.Is the concept of "backlogs of work" established here?
Is it recorded? Is it by category of work?

8.Are priorities determined for the various jobs? Who


does it? How is it done? When does this happen?

9.How do they assign the work to the people? When? How


much at a time?

10How do the people get their next jobs?

|::
XI MAINTENANCE-Page 3

11What is the "follow-up" procedure to determine if the


jobs are being completed? Can we determine if they are
being done on time?

12Review the current jobs--How many are currently


active--How many are "in process"--what %
complete/finished are they? When will they be
completed?
13Are large jobs "phased" into smaller, controllable
units? How is this done? When? Who?

14Is there some type of "status report" that illustrates


a current status or work complete/incomplete, by craft,
priority, backlog, or ?????

15Is there a daily or weekly report of hours used per


work order, or of "gross" hours used?

|::
XI MAINTENANCE-Page 4

16How is overtime authorized? Reported? Is it


justified?

17Are there any daily schedule controls?


18How are the manpower requirements determined? Who does
this? How are additional people acquired?

19How much overtime is used in the department, by shift?

20Is there a Work Order System? How is it used?

|::
XI MAINTENANCE-Page 5

21Is downtime recorded by anyone? Are there equipment


logs showing repairs?

22How is the inventory of spare parts handled? Is there


a critical parts program?
23Is there any management/supervisory report that
monitors backlog by craft of priority? % of regular
maintenance? % of breakdown work? % of P.M.? % of
capital work? % of routine maintenance?

24Do they have a leak-repair program; insulation program;


a steam-trap program?

25How well are the mechanics trained?

26Is there an on-going training program?

|::
X CLERICAL / ADMINISTRATIVE-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________
____________________________

____________________________

____________________________

1.How does the department know much work has been


completed?

2.How does the department know how successful it's been?

3.How do they measure output?

4.What is the "key" unit to "count"?

5.What documents are processed by the department?

|::
X CLERICAL / ADMINISTRATIVE-Page 2

6.Do they know "why" they are processing these documents?


7.Are there any records or "logs" of work that has been
processed?

8.Do they utilize the concept of "standards" to monitor


or measure work in any way?

9.How does the department control the work into, through


and out of the department?

10Is work "batched"?

11How is the work assigned?

12Are there "special" skills required in the department?


What are they?

|::
X CLERICAL / ADMINISTRATIVE-Page 3

13Are there backlogs?


14How are backlogs monitored?

15What should the backlogs be?

|::
XVFORECASTING-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What is the "type" of business that the client is in?


(Job shop, re-pack & ship, service oriented, customer
driven, retail, etc.)
2.Do they have a "sales" forecast? Items? Dollars?
Units?

3.Is the forecast, most properly defined as a Product


forecast? (how is it "exploded", to what level, how)

|::
XVFORECASTING-Page 2

4.Is it a Purchasing forecast? (vendor history,


performance)

5.Material/Inventory forecast? (R.O.P./E.O.Q. -- stock


levels)

6.Manufacturing forecast (forward loaded, machine loaded,


people, performance, or ?)

7.Capital improvement forecast (equipment, machines,


facilities)
8.Determine the availability and accuracy of the
following information:

a. Historical Data--What is available?

b. Market Potential--What is the potential?

c. Market Share--What is the share of the total


market? What improvements, if any, can we expect
in the share of the market?

|::
XVFORECASTING-Page 3

d. Geographic Penetration--Are there plans to sell


within a new geographic area? What is the new
market potential and the expected share of the
market?

e. New Market Strategy--Have they developed or are in


the process of developing a new marketing strategy
that could affect future sales?

f. New Product Development - -Are there any new


products that will affect the overall sales? Will
some of these new products help in the selling of
the existing product line?
g. Substitution--Will a new product be an improved
substitution of an existing product? What is the
anticipated effect of this substitution?

h. Trends-- Are there any long range or short range


trends?

i. Seasonality--Is there any degree of seasonality in


the products?

|::
XVFORECASTING-Page 4

j. Fashionability -- Is there any fashionability or


style in any of the products? Is the
historical data invalid because of it?

k. Product acceptance-- What is the overall image or


acceptance of the products in the market place?

l. Competition -- What is the competition doing?


Aggressiveness? Price? Quality? Customer Service?

m. Customer Service-- What is the customer service


level in relation to the overall industry? What
is being done to improve the customer service level?
n. Export vs. domestic-- Should exports be viewed
separately from domestic markets? Are world
conditions affecting the exports.

o. Economic Indices-- Are there any government or


commercial indices that affect the products,
either directly or indirectly? Money? supply?
Housing starts? Auto production?

p. Methods of Distribution and Warehousing--Are there


plans for new branch warehouses? Are there plans
for delivering with own trucks instead of by
common carrier?

|::
XVFORECASTING-Page 5

q. Important customers--Are we contemplating the gain


or loss of any large customers or distributors?

r. Cost reductions- -Do we anticipate any future


reduction in the selling price due to some
manufacturing cost reduction?

s. Capacity restrictions--Are there any upper limits


to the product sales due to some manufacturing
capacity restriction?

t. New Facilities--Are there any plans to obtain new


facilities for increased capacity? If so, how
much of this new capacity can be expected to be
sold?
u. Promotions--Are there plans for any sales
promotions? Will these promotions distort the
historical sales patterns?

v. Market Research Data--Is there any current market


research data (consumer sampling and/or geographic
test marketing areas) that give an indication of
the market potential?

w. Historical Distortions--Have there been any


strikes or other unusual events that have caused
potential distortions to the normal historical
sales pattern.

|::
XVFORECASTING-Page 6

x. Examples--As an example, just about anything can


be forecasted. In your discussions with the
client, these are some of the things that they
might be "forecasting":

Sales-Dollars
Inventory-Raw material
Inventory-components
Production-Std Hrs
Customers
Key Volume Indicators
Training Needs
Absenteeism
Sales in Units
Inventory-work in process
Inventory-Finished goods
Tooling requirements
Transactions
Energy requirements
Attrition

9.Do they really need to forecast? Or, is the future


already fixed by a firm order board position?

10How are they going to use the answer? For purchasing


raw material? To determine a financial budget? Are
they trying to determine our manpower planning?

|::
XVFORECASTING-Page 7

11What unit of measure is required? Std Hrs? Pieces?


Tons?

12What is the degree of accuracy required? Absolute


accuracy on some items, and relative accuracy on
others?

13How often must they forecast? Daily? Weekly? Monthly?


14How far in the future should they forecast? Is one
year long enough or not enough? Should they use a six
week horizon because of the fashionability of the
product? Should they use a 3 year horizon because of
the numerous long lead times?

15Must all or part of the items be classified stock


versus non-stock items. High value versus low value?
Export versus domestic orders? Important customers
versus others?

|::
XVFORECASTING-Page 8

16Will the answer capture 100% of the total or is some


piece of the action missing? How will they obtain the
missing pieces? What is the overall significance of the
missing segments ?

17Is there an easier, or simpler way of doing it?


|::
XV DATA GATHERING & STATISTICS -- ANALYTICAL STEPS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.What internal records must they recap? Record the


name, type of data, and how we will use the
information. As an example:

Sales, Revenue or Production $'s L/Yr

Forecast

Cost of Sales

Materials

Direct Labor

Indirect Labor

Support Labor

Total
Operating Profit

|::
XV DATA GATHERING & STATISTICS -- ANALYTICAL STEPS-Page 2

Inventory Dollars Month L/Yr Prv/yr

Raw Material

Work In Process

Finished Goods

Total

Bookings Dollars

Past Due Dollars

Perform/Prod/Efficiency

Overtime--Hours

Dollars

Turnover

Number of Ppl

Direct
Hourly ind
salary
exempt
non-exempt
professional
management
supervision
eng/technical

Union Contracts

|::
XV DATA GATHERING & STATISTICS -- ANALYTICAL STEPS-Page 3

2.Do they need to install any type of collection system


to collate the information? What information will be
required to establish base levels for manloading and
workload requirements?

3.Do they feel that the current organization is adequate


to meet department and company objectives? Span of
Control? Authority? Responsibility?

4.Are there any significant synchronization or


coordination problems that are immediately evident?

5.Is there a need to improve communication to any great


degree?
6.Do we know the "service level" requirements? Other
service factors?

|::
XV DATA GATHERING & STATISTICS -- ANALYTICAL STEPS-Page 4

7.List all of the potential problems, as they see them


at the moment.

8.Are there any safety or environmental needs that would


restrict implementation in this department?

|::
XV. CUSTOMER SERVICE-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________
____________________________

1.What is the method of determining promise dates?

2.What is the accuracy of the method that they use?

3.How can they determine what the "original" promise date


was compared to actual delivery? Are the changes to
these dates measurable?

|::
XV. CUSTOMER SERVICE-Page 2

4.Who can change a promise date?

5.What percentage of items are delivered to a promise


date as opposed to ASAP?
6.What policy is followed to acknowledge order due dates?

7.What techniques are in place to identify where a


customer's order might be in the process?

8.Is there a backorder policy? What is it? How does it


work?

|::
XV. CUSTOMER SERVICE-Page 3

9.What is the historical service level?

10How does this client compare to service levels in his


own industry?
11Some statistics: What % is the client ahead or behind
promise/schedule % on time? % late? Aging of early
or late?

12How do we measure "good" vs. "bad" customer service?

13What quality programs are in place or have been tried?

|::
XI DISTRIBUTION-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Are there remote stock locations?


2.Alternate shipping points?

3.Delivery costs? Who absorbs?

4.Modes of delivery/transportation?

|::
XI DISTRIBUTION-Page 2

5.Minimum/maximum weight considerations?

6.Partial shipment policy?

7.Drop ship policy?

8.Packaging considerations?
9.Delivery frequency?

10Economic transportation radius?

11Excess cost/late shipment penalty?

12Back haul potential?

|::
X LABOR-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Union/non-union?
2.Contract restrictions?

3.Labor availability?

4.Skill requirements?

|::
X LABOR-Page 2

5.Incentive systems?

6.Seniority rules?

7.Percent attrition?

8.Percent absenteeism?
9.Working hours?

10Direct People?

11Support?

12Indirect?

|::
XXMANUFACTURING ENGINEERING OR METHODS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________
1.Does each work station have formal procedures?

2.Are there engineering specs, at the proper engineering


level, for the operation?

3.When was the last review of the tools, jigs, fixtures,


methodology for the operation?

|::
XXMANUFACTURING ENGINEERING OR METHODS-Page 2

4.Do all of the workers understand the use of tools,


fixtures & jigs?

5.Do the workers all understand the proper operation of


the equipment?

6.Are the "setups" or "startups" scheduled to allow


reasonable time for the workers to achieve the
standards?
7.Are the setups pre-staged?

8.Is the actual, true output known for every piece of


equipment? How was it determined? Are there
manufacturing specs on speeds, feeds & output
(capacity)?

|::
XXMANUFACTURING ENGINEERING OR METHODS-Page 3

9.Is there a program to systematically check the


calibration of all of the equipment? some of the
equipment?

10What are the "bottlenecks" in the flow?

11Does the product have a logical "flow" through the


operation?
12Does the layout of the machines and equipment make
sense?

13Are there staging areas in the department? Are they


useful and are they convenient to the user?

14Is all floor space being economically utilized?

|::
XXMANUFACTURING ENGINEERING OR METHODS-Page 4

15Is the product being produced "value engineered?" Or


was it released for production before it was ready,
resulting in excessive re-work or "floor engineering"
to "make" it work?

16Is there a technique to update the prints and drawings


as changes are made to the product?
17Are there "mechanized" material handling systems? Are
they effective?

18Are the conveyors, forklifts, etc., properly maintained


to do the job?

19When were the norms last updated?

|::
XX BUDGET PROCESS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Is there a budget?

2.What preparation data is necessary to complete the


budget?

3.What period does it cover?

4.Who prepares it?

|::
XX BUDGET PROCESS-Page 2

5.Who has to approve it?

6.When is it done?

7.Who meets on the process and when?

8.What is the budget preparation sequence?

9.What "stretch" or improvement built into it from period


to period?

10What is the distribution?


11Is it tied to hours or volume?

12What overheads are looked at?

13Is it revised? how often? when?

|::
XX. BACKLOG CONTROLS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Does the client track backlogs?

2.Are they- ready backlogs?


in process backlogs?

input vs output?

work remaining at each work station?

3.How are the backlogs used?

given to production scheduling

tied into management decisions?

4.When are they reviewed?

|::
X BASE-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Do you currently have a productivity measurement method


for department ________________? If yes, go to ques.
2, if no, go to ques. 8.
2.What is this method?

3.When was it developed?

4.How often is it updated?

5.Who updates it?

|::
X BASE-Page 2

6.What is your impression of its accuracy?

7.What do you use this information for or who uses this


information?

8.How do you measure this department?

9.What do you feel are the best indicators for this


department?
10What data is available to measure this department?

11Where can I find this information?

l2Can you explain to me how the people in the department


are paid?

|::
X BASE-Page 3

13How does the payment of the people spit out?

Basic

Overtime

Benefits

Insurance

Bonus

14What are the other costs of employment?

Clothing
Canteen

Car

Transport

Insurance

Overhead

|::
X BASE-Page 4

15If you were to take a person off the payroll, what


would the savings be?

16What are the costs of reducing a person?

17How would you evaluate an increase in throughput?


|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.How much energy is the client using per year and what
types of energy are involved?

2.What types of machinery and equipment are used in the


plant?

3.Does the client have any energy programs working at the


present time?
|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 2

4.What are his plans for next year which would affect the
energy cost?

5.We will need one to two years of energy bills to help


develop base year data. We will also need degree day
data and all KVI's available.

6.What type of preventive maintenance programs do they


have? Example: Leak repair, Steam Trap Program,
Replacement of Pipe Insulation.

7.Do they have boilers? What size are they? How many?
Are they for process or heating?

Do they have a water treatment system? Do they control


the condensation return to the boilers?

Do they have a steam-trap program at the present time?

Are the boilers tested on a regular basis for air to


fuel ratios?
|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 3

Who makes the adjustments from the test findings?

Do they maintain a boiler log and a water treatment


log, and who monitors these logs?

8.Air Compressors: How many and what is the H.P of each


one? What is the total H.P.? What is the required PSI
that must be maintained? Is there a formal leak-repair
program? Find out where air is used throughout the
plant. How are they repaired and by whom?

9.Where are the major users of energy located throughout


the plant? By department throughout.

--Locate and identify the equipment. Examples:

a. Presses--HP of motors? Number of hours and shifts.

b. Ovens - Gas or electric? What are the sizes of the


ovens and at what temperatures do they run? What is
the cycle time and how many burners are on each oven?

c. Furnaces-Same as above. What is the process?


d. Cleaning lines - hot water and gas fired. Are
proper temperatures maintained?
|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 4

e. Paint lines - air usage - are there air leaks in


this area?

f. Utilization of equipment - is it at max? Could they


get more throughput? How reliable is the
instrumentation? Do they have a P/M program for
calibration of the instruments? How good are the SOPs,
and how are they monitored by supervision?

l0Lighting

a. How do they control and schedule lighting


throughout the plant and offices.

b. Do they have a daily and weekend start-up and


shut-down procedure?

c. Are security people used to turning off the


lighting when not needed?

d. Is the outside lighting left on during daylight


hours?

11Heating and Air Conditioning

a. How well are the temperatures controlled?


b. How often are the thermostats checked and
calibrated?

|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 5

c. Do they have a program for setting back the


temperatures on weekends?

d. How well do they fix the following:

Items for Heating:

i. Steam Leaks
ii. Steam Traps
iii. Pipe Insulation
iv. Clean Heating Units
v. Check and calibrate thermostats

Air Conditioning:

i. Fix Leaks (Duct work)


ii. Change Filters
iii. Clean Condensers
iv. Do an Air Balance
v. Check and Calibrate Thermostats

Ovens and Furnaces:

i. Burner conditions
ii. Do they check for air-to-fuel ratio and adjust on
regular basis?
iii. How good are door and cover seals? Are they
leaking? (heat loss)
iv. Is the fan vibrating? (dirty and out of balance)
v. Do they clean the duct work?
vi. Do they change the filters?
vii. How often are the instruments checked?
viii. How good is the insulation? (heat loss)
|::
X ENERGY QUESTIONS FROM ANALYSIS SEQUENCE-Page 6

P LAYOUT ITEMS TO CHECK

Product Flows

Bottle Necks

Material Handling

Machinery speeds and feeds

Cycle times

Product being moved too many times

Housekeeping problems

Improper storage

Lead time (in and out)

Forecasting and scheduling of orders

Equipment utilization

Improper tooling

Machine loading

Staging areas (in and out)

Sub-assembly (lead time and storage)


Proper loading of process equipment
|::
X RETAIL OPERATIONS-Page 1

Dept. Concerned ____________

Data Source Dept.___________

People Involved:
Name Position

____________________________

____________________________

____________________________

____________________________

1.Regarding the personnel contracts--how are they divided


among the people who work full time, part time, only on
the holidays, only in the evenings, etc. How many
hours does each type of contract log each week or
month? What are the differences in hourly wages? How
is overtime paid?

2.How are the goods ordered, delivered, and how do they


know when to stock the shelves with a given item? Do
they have stock outs? How do they control the
inventory on the shelves to ensure the proper turnover?

3.How is the quality of service measured? How is the


quality of the goods measured and followed?
4.How are leakage and wastage controlled?