You are on page 1of 1

How to load Universal Terminal

For use with an Ag Leader ISO system on a GreenStar™ 3 2630 Display


NOTE: This document is only intended to be used a guide. If this content appears to differ from a Greenstar™ 3 2630 Display,
please refer to the manufacturer’s operator’s manual, local equipment dealer, or the manufacturer’s technical support team for
assistance.

1. Once modules and cabling are


connected the display will load an object
pool. The display should load the object
pool automatically. The VT screens can be
accessed by pressing the appropiate icons
outlined in Figure 1.
If the object pool does not load for the
module that is installed, proceed to step 2.

Figure 1

2. Verify the Implement Bus is activated.


a. Press the Menu button

b. Press the Display button


c. Press the Diagnostics button
d. Press the Multiple Displays tab
i. Press the Change Settings button > Press the Next Page button
ii. Verify that “Implement Bus” is check marked (Figure 2). If it is not, check mark
the box, then press Save Settings and Restart Display.

Figure 2

3. Object Pools should now load to the Main Menu. If the object pool still does not load, verify
installation of cable and modules.

NOTE: For feedback on the content of this document, please contact Ag Leader Technical Support at 515-735-7000 Ex. 1.