In casting maintain the temperature 1160 to 1180 degree.
In holding time when scrap is not charging in the furnace maintain the temperature 1110 to 1170 degree. Every 4 to 6 hour later change the coal. Every half an hour put CB-6 2 piece. Every 20mins later put dry bamboo inside the metal. Coal level minimum 4” above the metal. Graphite flux minimum 3” above the metal. Every 24 to 36 hour later remove burned graphite flux from top side and add more graphite flux. Before casting check water& air pressure if both are fine then start casting. Never open the metal in casting time if metal open then oxygen from in the metal and metal will cracked. Scrap must be clean properly inside scrap zinc, aluminium, Led, iron, nical etc.do not exist. If those are available hen conductivity will be poor. Sometimes copper rod color will close to red it will happen due to oxygen or requirement of graphite flux. If 12 stand in running and there one stand is faulty then check die setting, production cup will cracked, cooler water circulation inlet or outlet problem then clean the pipe with acid(HCL) Sometimes water leakage in the cooler. Must check where leak happen and solve it then set the cooler. Compressor solenoid valve may become faulty if that happen the water will pass inside whole system. Running time check the cooler by hand if it cool then run casting if not then never run it. Flow meter down if always water flow if water is not flowing but meter down then must have check the flow meter.