Technical bulletin

Tower crane collapse events


Risk management

The risk of tower crane Although there are many different Risk management: Health &
collapse events can types and configurations of tower Safety Executive guidance
cranes, the most common types we
increase due to associated The Health and Safety Executive
see consist of a tower section located
adverse weather, on a fixed base with a jib attached to (HSE) have investigated crane collapse
particularly during the the tower via a slew mechanism. This events and subsequently provided
winter months. mechanism allows the crane operator, guidance (available at www.hse.gov.
through a gearing arrangement, to uk/safety bulletins/luffing-jib-tower-
slew the jib around the construction cranes.htm).
site and then hold the jib in position via This document advises the following
a slew brake. In normal operation, the for all tower crane users:
slew brake is always engaged and the
operator, through his control inputs, − Ensure the most accurate up-to-date
disengages the brake and moves the information is being used for the
jib to the required position. The brake specific crane they are operating.
is then re-engaged until the next This may include discussions or
control input. correspondence with the supplier or
manufacturer as some
When the crane is left unattended, it is manufacturers may have changed
usually a requirement to leave the slew their guidance.
brake disengaged. This allows the jib − Check that the information includes
to move freely and weathervane with the correct minimum out-of-service
the wind. Allowing the jib to move radius for the specific crane being
freely greatly reduces the stress operated.
imposed on the tower section and jib − Check, both after erection and
section. However, if this brake is periodically in-service, the function
engaged in a period of high wind, the that releases the slew brake and
stress imposed upon the structure can places the crane in free slew.
lead to failure. This is a particular risk − Check, both after erection and
during winter months. periodically in service, that the
condition of the slew drive motors,
gearboxes and slew ring bearing
have not deteriorated to the extent
that the crane is prevented from
slewing freely.
HSB Page 2/2
Tower crane collapse events

− Check, both after erection and Key risk measures − presence of documentation and
periodically in service, the setting warning signs
Crane owners/users should have a
and function of any devices that warn − slewing mechanism, control gear,
robust planned preventive
the operator that the crane jib has safety devices, cables and pulley
maintenance (PPM) system along with
not been left parked at the correct block
prescribed safety checks. Detailed
out of service radius and/or the slew
requirements and checklists are In addition to a PPM system, cranes
brake has not been released.
included in BS7121-2-5, the Lifting also require periodic thorough
− Ensure that operators have been
Operation and Lifting Equipment examinations as prescribed by LOLER.
provided with instructions on how
Regulations (LOLER) and the Provision The thorough examinations would
the crane should be placed in free
and Use of Work Equipment (PUWER) need to be carried out at:
slew and the correct radius at which
Regulations, as well as detailed guides − specified intervals
the jib should be positioned when
produced by the Construction Plant- − after installation
leaving the crane unattended. This
Hire Association (CPA) including − after major alterations or repair
should include measures to routinely
TCIG-0801. − after exceptional circumstances
check that the operators understand
and are following the instructions Pre-use checks, regular in-service affecting the safety of the crane (e.g.
provided. inspections and maintenance checks adverse weather conditions)
− Undertake periodic checks that the are essential and need to be recorded. Examinations need to be undertaken
buildings under construction, other Key aspects to check during by a Competent Person. HSB’s team
cranes or high reach plant are not maintenance include (but are not of technically-experienced Engineer
preventing the crane from free limited to): Surveyors can perform the role of
slewing. Consideration needs to be Competent Person on tower crane
given to both front jibs and rear − general condition of structures (e.g.
inspections.
counter jibs. fatigue cracks), fastenings, ties and
machinery
− operation of alarms, warning lights,
indicators, motion limiters and cab
accessories

Why choose HSB?


Backed by over 150 years of technical risk knowledge, HSB, part of Munich Re, is a leading specialist engineering
inspection services provider. We provide inspection services in the role of ‘Competent Person’ for all service areas in
which we are accredited by UKAS to ‘ISO/IEC 17020 - In-Service Inspection Bodies’. With a network of competent,
technically-experienced engineer surveyors located across the UK and Ireland, HSB work with customers to
understand their inspection requirements, reduce their engineering risks and help optimise the efficiency of their
plant and equipment.

For more information on our inspection services, visit our website or contact your local HSB office.
www.hsbeil.com

© 2022 HSB Engineering Insurance Services Limited. All rights reserved.

HSB Engineering Insurance Services Limited, registered in England and Wales: 03010292,
Chancery Place, 50 Brown Street, Manchester M2 2JT. Registered as a branch in Ireland: 906105,
28 Windsor Place, Lower Pembroke Street, Dublin 2.

www.hsbeil.com HSBEI-1412-0622-4 Picture credits: Getty Images