You are on page 1of 29
UNIQUE ENGINEERS A-301, MIDTOWN RHYTHM, ist MAIN, 7th CROSS, RAMAGONDANAHALLL, BANGALORE $60 066 : BRIDGE OVER INDRAVATI RESERVOIR ON MAHULPATNA-KENDUGUDA- GOPINATHPUR ROAD CLIENT : ODISHA P.W.D. CONTRACTOR : M/s BRIJESH AGRAWAL SUBJECT : DESIGN OF PIER & ITS FOOTING FOR P1,P2,P12,P13,P14 & P15 DATED DESIGN NOTE NO: 1409/DN/02 Sept 11,2022 - APPROVED THIS DESIGN 1S THE PROPERTY OF M/s UNIQUE v ENGINEERS AND IT SHOULD NOT BE COPIED, LENT OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION. SHNOsT i ROCK —180 Ta 25 ANCHOR owas one Ws BEF] _u_| Foome sze waza | onan taza | sson500 as. | ssonss00 ‘2710-00300 080 | —sonsa00 080 | — 00800 INDRAVATT” BRIDGE, 2 2 2 b) ay a) +1 D.L. reac DESIGN OF PIER AND ITS FOOTING 0 Data span c/e brgs Gap span between bros Roadway Formation level, Top of pier cap High flood level Founding level Top of hard rock Bearings Live load 0 VERTICAL LOADS 3.2. Min LL Case Due to IRC Class 70R RA (200x4.12 = RA = 0.0 t Me = 1.00 [ moo = 2.158 [ wheeled 7 645. 643. 642. 625. 626. Neoprene one lane of IRC Class 70R (or) JOB NO 1409 30 00 $0 a7 v7 00 10 10 on of superstructure — 20x3.2]/23.3 (P2,P12 and P13} paunnaaa 2371 Ket 38 36 120 137 178 say 0.075 x Precast beans : 3x Web thickening - 3x Deck slab = 8.45 ¥ Diaphragms 3x 4.80 x crash barriers 2x -2 Surfacing per span ~ Wearing coat 7.50 x 3 Lib, reactions 3.1 Max LL Case Due to IRC Class 70R wheeled RA = [100x19.18 - 20x3.21/23.3 RAI = 0.0 t RB = 100.0 - Me 1.00 [ 79.6 = 0.0) Mo = 1.155 [ 79.64 0.0) Due to two lanes of IRC Class A RA [2x50x18.59 - 10x3.2]/23.3 RAY =[2x5.4x20.55 + 1.08x3.2]/23.3 RB. 100- 78.42 21.6 ¢ Me 1,00 [ 78.4 - 9.7) mM o= 0.700 [ 78.44 9.71 say 24.20 25.30 25.30 278 25.30 36 79 20 9 91 68.7 61.7 14. 85. aay an. geo em tm si xo DL. two lanes of IRC Class A +50 50 105.1. 1s 106.9 12.3 38.0 269.7 35.6 INDRAVATI. BRIDGE JOB NO 1409 b) Due to single lane of IRC Class A RA (50x4.71 - 10x3.2)/23.3 : RAY 0.0 & 50 - 8.7 Me 1.00 f 0.0) - ma 2.45 [ 0.0) a 2.4 Pier cap [6.40 x 1.20 - * x 2. slat 2.5 Pier column 0.785 x 2.00 x 2.00 x 2. 125.4 t 2.6 Footing = $.50 x 5.50 x 0.90 x + elt 2.7. Water on footing [ 30.28 - 3.14] 1.00 = 433.8 t 2.8 Uplift under footing 30.25 x -16.90 x = 7255.6 t Recapitulation | Max.LL case | Min.LL case {One span! | 1008 | 208 | 1008 | 208 | case | aa Working loads - ' on pier @ RL 626.00 | 577.4 | 513.7 | 512.7 | $00.8 | 342.3 | on ftg. @ RL 625.10 | 823.6 | 759.9 | 759.0 | 747.0 | 588.5 | Factored loads - 1 on pier @ RL | 05.8 | 720.3 | 708.8 | 680.9 | 469.3 | on ftg. @ RE 1 1075.8 | 980.3 | 978.9 | 960.9 | 739.3 | 3.0 LONGITUDINAL HORZ. FORCES (Hl) AND MOMENTS (Mt) 3.1 Due to braking & friction - | Max.LL case | Min.LL case —JOne Span! HI=B/2+Feh where | 1008 | 208 | 1008 | 208 | Case | Fsh = 3.30 t I I+ t HL @ RL 643.47 | 10.33 | 2.33 | 10.33 | 2.33 | 3.30 It Me on pier @ RL 626.00 | 180.5 | 40.7 | 180.5 | 40.7 | 57.7 itm Mt on ftg. @ RL 625.10 | 189.8 | 42.8 | 189.8 | 42.8 | 60.6 itm IL i 1 ‘ 3.2. Mt due to LL ecc. | 79.61 15.91 14.9} 3,0 1 185.5 Itm Recapitulation | Max.L case | Min.Lt case One span/ | 1008) 208 ) 1008 | 208 | case | =I Working loads - 1 Total AL } 10.33 1 2.33 1 10.33 1 2.33 1 3.30 It Mt on pier @ RL 626.00 | 260.0 | 56.6 | 195.4 | 43,7 | 213.2 itm Mt on ftg. @RL 625.10 | 269.3 | 58.7 | 204.7 | 45.8 | 216.1 Jem Factored loads - 1 Total HL 19.30 | 2.10 9.30 | 2.10 | 2.97 It Mt on pier @ RL 626.00 | 281-8 | 60.5 | 184.8 | 41.1 | 285.1 |tm Mt on ftg. @RL 625.10 | 290.1 | 62,4 | 193.2 | 43.0 | 287.8 itm 4.0 TRANSVERSE HORZ. FORCES (Ht) & MOMENTS (Wl) | Max.LL case | Min.LL case |One span| | 1008} 208 | 1008 | 208 | case | I 4.1 ML due co LL eee. 191.9) iB.4 W731 3S 1 itm 1 st vo 3 | 3.2 Water forces - Max velocity of flow (V) = 1414 x 2.00 = 2.83 m/s Pressure at HFL (52KV*2) 214 kg/m*2\ since K 0.66 Pr.on pier @RL 626.10 : 0 Kg/m-2 Force on pier O58 [ 274+ 0] 15.90 x 2.00 = 4364 Kgs BM at pier base = 4.364 x 10.700 = 46.7 tm BM on ftg. 46.7 + 4.364 x 0.90 = 50.6 tm =I Recapitulation | Max.tL case | Min.LL case One span| | 1008 | 208 | 1008 | 208 | case Working leads ~ 1 =I 1 Total Ht | 4.36 | 4.36) 4.36 1 4.36 1 4.36 1 Mion pier @ RL 626-00 | 138.6 | 65.1 | 63.9 | 50.1 | 46.7 1 ml on 625.10 | 142.8 | 69.0 | 67.9 | $4.1 | 50.6 | Factored loads - 1 Total Ht 14.36 1 4.36 1 4.36 1 4.36 1 4.36 | ML on pier @ RL 626.00 {| 184.6 | 74.3 | 72.6) $1.9 1 46.7 1 Mion ftg. @ RL 625.10 | 198.5 | | 76.5 1 55.8 1 50.6 1 5.0 WIND FORCES (Hw) AND MOMENTS (Mw) Overall depth of exposed deck Wind pr. (Pz) = 56/84 Wind force on decking @ RL 644.97 0.056 x 2.70 x 25.30 x 2.0 x 0.084 x 2.70% 12.65 x 2.0 # 25087) aco) 1.95 14.90 (Max LL @ Min LL) 11.13 t (One span) Vertical force (Vw) on decking cL 0.75 0.056 x 8.45 x 25.30% 2.0% 0.78 = 17.9408 Wind force on LL @ RL 646.97 - co = 1.20 0.056 x 2.10% 20.0% 2.0% 1.20- S.6ee Reaction on pier Max LE 5.64 x 19.5 7 472 Min LE 8.64 x 3.8 / 0.92 & Wind force on pier above GL@RL 634.59 cD = 1.00 0.084 x 17.17 2.008 2.0% 1.002 Ss. 6 Recapitulation | Max LL case | Min LL case lonespan | | Trans | Long. | Trans | Long. | Trans | =I Working loads ~ 1 Total Hw 25.36 | 6.34 1 21.56 | 5.39 | 16.87 It Ma on pier at RL 626.00 | 430.9 | 107.7 | 351.2 | 87-8 | 190.6 [tm Mw on piles at RL 625.10 | 453.7 | 113.4 | 370.6 | 92.7 | 202.5 tm Factored loads ~ 1 Total HW 122.82 | 5.71 | 19.40 | 4.85 | 25.30 It Mw on pier at RL 626.00 | 387.8 | 97.0 | 316.2 | 79.0 | 285.9 tm Mw on piles at RL 625.10 | 408.3 | 102.1 | 333.6 | 83.4 | 303.7 [tm INDRAVATI. BRIDGE JOB NO 1409 sx vo § 6.0 SEISMIC FORCES (Heq) AND MOMENTS (Meq) For'a unit force applied at CG of deck, lateral movement of deck comprises of shear deformation of neoprene bearing and static deflection of pier at its top. Shear deformation of neoprene bearing - Effective size 348 x 348 x 50 mm = Gs = 0.80 MPa No. of brgs over pier = 6 Shear deformation due to one KN force from deck 1000 / 6/ 348 / 348 / 0.9 x $0.0 = 0.0765 mm Deflection at pier top = PL°3/3EI where be 17.17 m E of M35 Conc = 32000 MPa MI. of pier column = 0.75x@pi.d*4/64 = 0.589 m4 Deflection for one KN force = 0.0895 mm Total movement at pier top= 0.0765 + 0.0895 = 0.1660 mm Force "F" for one mm movenent 1/ 0.1660 = 6.0 KN Load ">" = 311.0 + 3.0 = 314.0 t de, 3080 KN Time period T = 2.0[D/1000F]*0.5 1.430 sec Sa/g for xock = 1.00/T Seismic intensity as per IRC:6 for 0.5 x 0.16 x 0.699 x 1.20 0.699 one IIT 1.00 = 0.067 6.1 Along longitudinal direction - Seismic effect | W | Heq lacting | Meq @ RL 1 on 1 (e) 1 Ce) 1 @ RE | 626.00 | 625.10 5 ' Deck | 311-0 | 20.88 | 643.47 | 364.7 1 383.5 1 Pier cap | 61.4 | 4.22 | 642.87 | 68.3.1 72.1 | Pier column | 125.4 | 8.42 | 633.99 | 67-2 1 74.8 | Pile cap | 68.2 | 4.57 | 625.551 = | 2a I 1 Recapitulation | Heq | Veq | Meg @ RE 1 I 1 | 626.00 | 625.19 | Work- [Max LL case | 37.99 | 25.33 | 500.3 | 532.4 | ing IMin LL case | 37.99 | 25.33 | $00.3 1 $32.4 1 loads |Onespan case 113.77 1 9.18 1 259.0 | 170.3 1 1 Fact~ Max LL case | 56.98 | 37.99 | 750.4 1 798.6 | ored [Min LL case | 56.98 | 37.99 | 750.4 | 798.6 1 loads |Onespan case | 20.66 | 13.77 | 238.4 | 255.5 | Seismic effect | W | Heq lacting | Meq @ RL on ete Cee lee Vee Oe Deck | 311.0 | 20.88 | 644.87 | 394.0 | 412.8 Pier cap | 61.4 | 4.22 | 642.57 | 68.3 | 72.2 Pier column | 125.4 | 8.42 | 633.99 | 67.2 1 74.8 Pile cap | 68.2 | 4.57 | 625.55 1 - 2a Max LL 1 25.9 | 1.07 | 646.67 | 22,2 1 23.0 Min LL | 3.0 | 0-20 | 646.67 | 0 a | 43 INDRAVATI BRIDGE 0B No 1409 sn wo 6 Recapitulation | Heq | Veq | Meq @ RL 1 1 1 1 626.00 | 625.10 | Work- [Max LL case | 39.06 | 26.04 | 551.6 | 584.7 | ing. Min LL case | 38.19 | 25.46 | 533.7 | 566.0 | loads |Onespan case 113.77 | 9.18 | 166.3 | 177.6 | 1 Fact- [Max LL case | $8.58 | 39.06 | 827.4 | 877.0 | ored Min LL case | 58.58 | 39.06 | 827.4 | 877.0 | loads |Onespan case | 20.66 | 13.77 | 249.4 | 266.5 | 7.0 RECAPITULATION OF FORCES & MOMENTS ON PILE GROUP [Working loads) a 5.50 x 5.50 = 30,25 m2 2 5.50 x 5.50 “2/6 = 27.73 m3 we = 5.50 x 5.50 72/6 9 = 27.73 m3 case | Wo | Mt {Mt W/R | Me/Zd | ML/at | W/Ae/— (HEM) /21 eb em 1 (tm | (t/sqm | (t/sqm | Pmax | Pmin I Normal i Max.tL | 823.6 | 269.3 | 142.5 | 27.23 | 9.71 | 5.14 1 42.08 | 12.37 Min.tL | 759.0 | 204.7 | 67.9 | 25.08 | 7.38 | 2.45 | 34.92 | 15.26 Onespan| 588.5 | 216.1 | 50.6 | 19.46 | 7.79 | 1.83 | 29.07 | 9.84 Wind 1 1 1 1 1 1 4 Max.UL | 841.5 | 382-8 | $96.2 | 27,82 | 13.80 | 21.80 | 63.12 | -7.49 Min.LL | 741.0 | 297.4 | 438.5 | 24.50 | 10.72 | 15.81 | 51.03 | -2.04 Onespan| 570.6 | 266.7 | 253.1 | 18.86 | 9.62 | 9.13 | 37.61 | 0.12 Seismic along LL ' Max.tL | 794.1 | 777-5 | 305.8 | 26.25 | 28.04 | 11.03 | 65.32 | -12.82 Min.tL | 712.8 | 764.6 | 283.3 | 23.56 | 27.57 | 10.22 | 61.38 | -14.23 Onespan! 576.1 | 446.1 | 122.6 | i 14.42 1 Seismic along Max.LL | 795.1 Min.tL | 712.6 | 261.4 | 818, Onespan| 576.1 | 274.3 | 858.3 | 26.28 | 9.89 | 30.95 | 67.13 | -14.57 43 1 29,50 | 62.49 | 15.37 | 285.2 | 290.4 | 19.08 | 10.28 | 10.47 | 39.80 | -1.71 NOTE: Seismic forces are enhanced by 358 in above Table. Max base pressures 42.08 < 80.00 t/sqm (Normal) 72.19 < 100.00 t/sqm (Seismic) 7.2 check £ uplift @ base pressures - Min LL case with EQ along TT - eB/B = 261.4 / 712.6 / 5.50 = 0.07 x= 0.32 x 5.50 = 1.76 eL/L 818.1 / 712.6 / 5.50 = 0.22 y= 0.82% 5.504 4.51 Contact area =[1~xy/2]100 = 96.9% Q* 2.75 » 26.25 = 72.19 e/m*2 Max LL case with EQ along TT - e5/B 274.3 / 798.1 / 5.50 = 5.50 = 1.54 eL/E 858.3 / 795.1 / 5.50 = 5.50 = 4.84 Contact area =[1-xy/2]100 = 87.78 Q= 2.70 % 26.28 = 70.97 t/m*2 S.No: 7 TL eieeuyae Cosmine Ke valnes ave tabnlated eelor. EET ou ous o€e 965 O60 ass ann G2 $M 720 20 obs oD 07S oto Ono tae Bee ely 0s eas 08s ko Bee ae TEA Ae Be Soha Gave ge eles of Gs concentrated lead om feeding alae se ene Tian! | ee ase AES ee re bee coe | [Et Aeeacpuctp Pam Packs WARS @ “FooupaTion DigGN by We: Tene INDRAUATE BRIDGE 08 wo 1408 su 10 8 na RECAPITULATION OF FACTORED FORCES 6 MOMENTS ON FOOTING Mi/2e | W/ae/~ (eel) /2 1 (t/sqm | pmax | Pain wa | Mea (t/sqm | (e/sqn 1 Hl t I 1 Sus Wax tL | @4.5 | 337.4 | au4.@ | 27,02 | aad? | 14.96 | S44 : (rare conbn.) [in LL | 755.4 | 260.3 | 290.3 | 24.97 | 9139 | 10.47 | 44.89 t onespan | $74.2 | 2161 | 253.1 | 18.98 | 7.79 | 9:13 1 35.90 1 ~ = Jeo i 1 sus Wo Le 751.2 | 94.91 50.6 | 24.03) 9.42 | 1.03 1 30.08, ' (GP comb. onespan | 592-1 | 2858 | 50.6 | 19:57 | 6.70 | 1.83 | 28.10 ' ~ 1 - ot ous Imax 2 36.10 1 14aa | 2152 1 71.77 (Basie) Iii ob 9197 144.79 Jonespan | 723.2 | 207.8 | 354.3 | 23:82 ous Wax LL | 995.7 | 1140.6 | 499.4 1 32.92 | 42.33 | 5.63 | 89.68 (Seismic-L) [Min LL | 945.6 | 1121.2 | 411.0 | 32.26 | 40.43 | 14.82 | 86.52 lonespan | 733.8 | 632.7 | 158.5 | 24.26 } 22.62 | 5.72 | $2.79 fl H i i i 1 i i rl r i i 276.6 i I 1 i 1 ~ I ous Iax LL 1 1 i +1 Hl t i 1 ' i i | i 1 Hl I f i 1 | 6.39 1 2038 | 12.78 | 47.07 | I f V i i 1 i i k I 1 i 1 i 1 i 996.2 | 385.8 | 1262.2 } 32.93 | 13,91 | 45.52 | 92.36 (Seismic-T) [in LL | 948.2 | 366.5 | 1239.8 | 32.24 | 13.22 | 44.71 | 9017 onespan | 733-8 | 391.3 | 410.3 | 24.26 | 24.21 | 14:80 1 83.17 Seienic forces are enhanced by 258 in above Table Foorme Provide 430 concrete & FeS00 Grade reintt. Bending about any axis - Consider BQ-T7 max LL case 28/3 = 385.8 / 996.2 / §.50 = 0.07 3.00 « 98.79 e/m-2 eL/L 2126212 / 996.2 / 5.505 0.23 Net upward pr. at edge = 98.79 1.35 * 0.90 x 2.90 - 16.0 « 0.5 = 87.75 timed Net uprard prat "a" from pier face 87.75 - 45.52 7 2.75 x 1.054 = 70132 tym? Net upward pr. at pier face 87175 = 45152, 72175 x 11866 = $6190 tim? Cantilever moment @ pier face = (S6.90/2430.85/3] ¥ 1.964 2 = 6418 twin R= wult/bd"2 630 x 1000 / 810 “2 = 01360 As/bd = 0.973x13.4/435 x (1-(1-2.058x0.960/13.4]°0.5) = 0.0023 Min Ast = 0.26Pctm/Fyk.bé (er) 0.001364 Ae/od = 0.26Fetm/Fyk 0.26 x 2.50 / 435 = 0,001 < 0.0023 Ast required = 2.289 x 10°-3 x 6100 = 18.58 en*Z/m Provide T16 @ 100 ers at bottom longitudinally, Uitinate shear at "a" from col.face 0.5 {87.75 + 70.31 1 1,054 = 63.30 t/m K= 1+ (200/4)"0.5 sist «20 l= 20.10 / €100 = 0.0025 vamin = 0,031.K*1,5.Fck"0.5 = 0.310; Fep= 0 Videw{0.12K(80.pL-#Ck)"0.33+0.25Fep] bd = 0.324 x 810 = 262.2 KiW/m Hence shear reingt is required, © 8172 em Min shear reinft= 0.072. (Fck)*0.5/¥" = 0.0008 Providing 712 legs @ 200/180 cre, haw provided = 1.13 7 0.200 / 0.180 = 37.67 em*2/nv2 Shear resistance by yielding of shear reinte ~ Vode = (Asw/o ).2 . Fywd, cot(0) where cot(0) = 1.00 + zo 0.9% Blo 729 am Fwd = 0.8% 438 = 348 Mpa veds = 37.67 » 0.729 x 3480 x 1.00 x03 = 95.6 > 03.30 t/m Vedsax = 1:00 x 1000 x 729. 0.60 x 13.40 x10°-3/9.81/2 = 299 t/m Check for stresses [SiS rare conbn) Net upward pr. at edge = 54.94 - 1.95 ¢ 0.90 x 2.50 - 16 x 0.5 = 43.91 t/m 2 Net upward prat "é" from pier face 43.91 - 12.17 f 2.75 x 1.054 = 3el2e tm? Net upward pr. at pier face ater | 12117 72175 11864 = 35166 tym? Cantilever menent € pier face = — (35.66/2+8.25/3] | 1.064 “2 = 27.38 tem Ast provided = 2010 cm"2/m m= 260/3.Foe = 9.33 as) 81 em Solving depen of novtral axis “nv = 15.65 om Cracked Mt, =" 920937 cav4/m Fat = 1798 < 3000 Rg/em*2 OK Foc = «46,2 < «144 ‘Kg/em"2 OK INDRAVATI. BRIDGE 0B No 1409 8.3. Check for crack width of SLS-oP Conn. Net upward pr. st eage = 30.08 - 1.35 x 0,90 x 2.50 Net upward pr at "é" from pier face 19.04 - 3.42) 2.75 Net upward pr. at pier face 21900 ez 22.75 Cantilever monent @ pier face = — (16.72/242.32/3] ¥ 1.864 Ast provided = 20,10 cm-2/m m= 280/2.Foe = 3,93 a alee Solving depth of neutral axis “a” cracked MI. = 928937 emré/m Fee 128 Spacing of reinfe 200 mm Dia of main bar = 16 mm Pett = As/ne clear cover = 75 am S2=3.4c#(0.425.%1. cracked Hat. = 0.0093 ma Sieetsse] Stress in reinge = 72.54 MPa Een-fom = 217.62 2.5ihed) > 207.8 me crack width (ho/3 5247.8 ae nl 438010 mm 9.0 PER coumat 9.2 Factored forces & monents on pier base - Load case 1 ae RL 626.00 bow po me tom Low em tem SUS IMaKstL | $95.3 | 324.7 1 997.2 (Rare MinsLL | 509.2 | 248.1 | 274.7 Comb) fOnespan | 335-2 | 213.2 | 237.3 Sus Mo LL | 505.0 | 90.2 1 (OP) lOnespan | 345.9 | 184.3 1 OLS IMax.tL 821.9 | 669.6 | 572.4 (Basic) [min-LL | 692.7 | 263.8 1 388.7 lonespan | 458.9 | 872.0 1 332.6 tus Maxtk 721.7 | 810.9 | 922.5, (Bgrlt) [Mist | 679.8 | 392.6 1 300.2 lonespan | 468.2 | 523.6} 121.5, Dus IMax.tL | 722.0 | 265.6 | 901.7 (Be-77) [Minsk | 679.2 | 266.2 | 079.3 Ionespan | 465.2 | 356.7 | 296.1 Check for Sis stresses in pier column ~ Concrete M40 and FeS00 grade steel | Sus (Rare) 1 sis «ap 1 | Case 1 | Case 2 I case 1 | Case 2 | [evtreeeneenceeees bs rl we ok | 595.3 | 335.2 1 505.0) 345.9 1 Me tm | 513.0 | 319.0 1 90.2 | 184.3 5 pe emt 200 | 2001200 | 200 As = cm'2 | 235,68 | 238.68 | 235.68 | 235.68 | ct om 6001 6.001 61 6.00 t m= 260/Eck | ie ae a 7 ibe cae lee (2!1) areca ait ee mentite asso] ate 0.82 | 0.561 ERR | 0.29 1 8 0:30 | 0.28 | eRR | 0-52 | ce {0.06 | 0.08 | eRR | 0.23 | 25 rad 1-1,39087 [1.33166 | ERR 11.023833 | i i 1 i 1 nett cm'2 | 13886 | 12429) ERR | 22076 | ° om 46.8 | 49.2) BRR | 27.4 | ere cm | 38:3 | 4B; ERR | 25.9 | 1 1 1 1 1 nett om 0.1541 | 0.1458 | ERR | 0.2996 1 Me (em 1 1 1 512.0 1 37011 | 319,0 | i 90.2 1 1a) ao 60.9 | 157.07 69.8 | 131.28 1 872.7 | 137.06 346.5 | 128.66 537.8 1 945.8 | 137.13, 918.7 | 128.60, 463.6 1 As * aanost25 = 16 x 0.5 = 19.06 t/m2 x 1.08, = 17173 tw x Lise = 16172 tm? "2 = 11.05 tev = 15.65 om Ko/en2 = 0.0097 x2.phi} /Pott 10-6 > 0.117 am © 0.30 mm sn vo 4 IoRavAT BADGE 1081No 2409 Fores a Pier base for Quai Permanent Load combination (Hofer Sh = sino LO S.No. Case . ft * aad ag te ara x : : = nl ae oe eee | aeaaeince fat a {eee teat {See ‘Grace of Concrete 40 one a eae ames a eae ele a i ee pce ae cn nea : : Bae eee: ‘oan ee ee : Wi a eencncoyne: STOO, watson ndominte nis — Soe nnasemmems ona ae reece Seed enn a : ue Si iaecum-n . eee Seetonccemee ae secre tc i ie se on n= Malad ee eee —— een tee y= (UAE ce 10 “Ar mkrkf(/ro) See ome 2 ae ai a en om Bi eee oe oe eee PR rE re FOR ———————— ip ee eee = eee a ae ee a INDRAVATI BRIDGE JOB Ho 1408 y cm | 289 1 25.5) ERR S28 I a om | Bl | 76.3) BRR | 125.0 | It fl 1 1 Foe Kgfem*2 | 124.7 | 00.7 | 27.6 1 974 | |< 192) Ke/em2 "|< 192 Kgem2 | | ret kg/en2 | USP | a7 |= ad |< 3000 Kg/em"2 1 < 3000 Kg/emr2 NOTE: "ERR" means th section 19 uncracked. 9.3. Check for erack width undex SUS (QP Comb) - Spacing of reinfe Dia of main bar Clear cover Cracked MT Stress in reinge 2.5thed) = 131.3 hex) 9 = 41203 n= 100020 9.4 By Linie state theory ~ 1 case 1 Po tt) | 621.9 Mo (em) | 1037.3 D (a) 2.00 Fok (e/ar2) 4900 Po/{ek.0°2) | 0.081 H i 1 Mu/tFek.a™3} | p/Eck | 0.010 Pot as (em'2) 1 9.5 continenent in pier column ~ Gross area of pile (Rel Max load on pile (Ned) Fok = 4000 t/mn2 Ned/{ae.Fek] = 0.065 123 am Pete = As/Ac = 0.0308 25 mm 40. re Sr=3.4o+(0.428.21-42 phi) /PeEe 0.2996 ane 2275 om 142 ea Eemtom = 43.3 e106 crack width = 0.02 mm ©0130 am, Refer Chart No 59 - SPI6 case 2 | Case 3 | 722.0 | 455.9 | 1083.0 | 660.8 2.00 | 2.00 | 4900 | 4000 0.045 | 0.028 0.034 | 0.021 0.018 | 0.006 | 0.72 1 0.24 1 226.2 TBA m2 OK 2.142 m2 e219 t 0.08 Hence no confinenent is required sano LY wi 00 1-0 0.9 0-8 Pe/Meyd™ 44 0-05 0-10 tye Spewen Chart 59 COMPRESSION WITH BENDING — Circular Section 500 N/mm’ | 4/0 = 0-05 0 (3) A, =pRO/400 Le axis oF senomns o Ma/texd™ 15 0-20 0-25 DESIGN AIDS FOR REINFORCED CONCRETE i ene an DESIGN OF PIER P14 AND ITS FOOTING 1.0. Data Span c/e brags 23.30 m Gap span between bres 2.00 » Roadway 7.50 Formation level 645.46 m Top of pier cap 643.16 m High flood level 642.00 m Founding level 630.50 m ‘Top of hard rock 631.50 m Bearings Neoprene Live load One lane of IRC Class 70R (or) two lanes of IRC Class A 2.0 VERTICAL LOADS 2.1 D.L. reaction of superstructure 275 t 2.2 Surfacing per span ~ 36 t 2.3 LL. reactions 2.3.1 Max LL Case a) Due to IRC Class 70R wheeled RA = (100x19.28 - 20x3.21/23.3 = 9.6 RAY = 0.0 t RB 100.0 - 79.65 20.4 ¢ ue 2.00 [ 79.6 - 0.0) 79.6 tm ML 1.155 [79.6 + 0.0) 91.9 tm b) Due to two lanes of IRC Class A RA (2x50x18.59 - 10x3.2]/23.3 = Bat RA' = (2x5.4x20.55 + 1.08%3.2]/23.3 ea osc RB 100- 78.4 = 21.6 ¢ Me + 1.00 [ 78.4 - 9.7] = 68.7 tm M1 + 0.700 ( 784+ 9.71 = 61.7 tm 2.3.2 Min LL Case a) Due to IRC Class 70R wheeled RA (100x4.12 - 20x3.21/23.3 - lage RAY 0.0 t RB* 100- 14.9= 85.1 t Mt 1.00 [ 14.9- 0.0) = 149 tm Mo 1.185 [ 14.94 0.0] = 17.3 tm b) Due to single lane of IRC Class A RA = (50x4.71 ~ 10x3.2]/23.3 sare RA = 0.0 t eRe 0) ete rears tcl Mt moot 97.67 x 0.729 x 39480 x 1,00 x10™3 = 9516 vednax = 1100 x 1000 x 729 x 0.60 x 13.40 ¥10°-379.: Check for stresses [S18 rare conbn} Net upward pr. at edge = 50.86 - 1.95 x 0.90 x 2.50 Net upward prlat "a" from pier face 42.23 - 11.16 / 2.60 Net upward pr. at pier face = 2123 nae 72160 Cantilever moment @ pier face = (34,87/247.36/3} 1.714 Ast provided = 20.10 cm'2/n m= 280/3.Fbc = 9.33 ere Solving depth of neutral axis * cracked Mr. =| 920937 cm'd/m Fat = 1618 < 3000 Poe as {1-2,055x0.695/13.4)°0.5) 0.0016 Min Ast = 0.26Fetm/Fyk.bd (or) 0.001364 Ae/od = O.26FetR/Fyk = 0.26 x 2.50 / 435 = 0.0018 < 0.0016 Ret requited = 1.662 x 20°-3. x @100 = 13.31 curd/m Provide T16 @ 125 crs at bottom longitudinally. uitinate shear at Td" from col.face 0.5. ( 4 79.81) 0.554 = 46.51 t/m Ke 1+ (200/4}70.5 21a < 20 pl = 16.08 / 8100 = 0.0020 vanin, = 0.031.K°1.5,8ck"0.5 = 0.3110, reps 8 \Vedew{0.12K(80.p1-ck)*0-330.18Fep] bd 0.301 x 810 = 243.6 RW/m Hence shear reinft is required, < 436.3 mm Providing 712 Legs @ 250/200 crs, sw provided 1.13 / 0.250 / 0.200 22.60 em*2/n*2 Shear resistance by yielding of shear reinte - Vess = (Agu/s ).2 . Fywd. cot(O) where cot(0) = 1.00 + zo 09x Blo e729 mm Fy 0.8 435 = 348 Mpa veds = 22.60 x 0.729 x 3480 x 1,00 103. = 5713 > 46.51 t/m Vednax = 1100 x 1000 x 729. % 0.60 13.40 x10°-3/9.81/2 = 299 t/m Check for stresses (SiS rare conbn} Net upward pe, at edge = 48.58 - 1,35 x 0.90 x 250 - 2.6 x 0.5 = 44.24 t/m2 Wet upward pr at "a" from pier face 44.24 - 9.99 / 2.25 x 0.554 = ale eee Net upward pr. at pier face = 4424 9199 72128 x 1364 = 3ele tmz Cancilever moment @ pier face = (38.18/246.06/3] 1.364 “2 = 22.85 ta/m Ase provided = 16.08 cm*2/m m= 280/3.Fe = 9.33 a Bl cm Solving depth of neutral axis “nY = 14.20 om cracked WE, = 765136 ent4/m Fst = 2862 < 3000 Rg/em*2 Of Fee a2 © 184 Kg/em"2 Ox TWORAVAT BRIDGE 408 wo 2408 saxo 26 8.3. check for crack width of SLS-QP Conn. ~ Net upward pr. at edge = 28.20 - 1.38% 0.90 x 2.80 - 2.6 0,5 = 19.91 t/ma Net upward pr at "d” from pier face 19,91 - 2168 / 2.25 x 0655, = 19tas erme2 Net upward pr. at pier face < 39.81 = tea / 2128 e136 = 18.88 t/m2 Cantilever moment @ pier face = (18.68/241.03/3} x 1.364 “2 = 10,08 tm Ast provided = 16.08 om2/m m= 260/3.Fe = 9,33 oom Solving depth of neutral axis = 14.20 on cracked Mt. = 765136 cné/m Fee = 622 Kg/om"2 Spacing of reinft = 100 sm Dia of main bar = 16 am Pett = As/Ac = 0.0097 Clear cover = 5 om Sre3.4e+(0. 4252.42.94 )/ cracked ¥.1. = 0.0077 ma $36 am Stress in reinft |= 82.11 MPa Bem-om = 246.32 x 10-6 2.5(hd) = 207.5 mmm crack width = 0.132 mm. (iw) /3 252.7 mm < 0.30 am na 2 480.0 am 9.0 PIER coLnat 9.1 Factored forces & moments on pier base - Load case 1 Re RL 639.40 1 bow om yom ye a 1 seseroeens= | 165.6) 216.7 | 73.8 | 102.2 | 1 i 490.1 | 139.6 SUS Max.tt (Rare |winstt | 403.9 | 70.7 | 228.8 | 168.9 Corb) [Onespan asco | amas Us imax (Gqrt) fminste | $38.4 | 786 | 306.2 | 316.2 1323.0 | 2681 | 80.01 276.0 501.6 1 98.0 | 328.6 | 342.9 Sus No LL | 399.7 | 1 (OP) lOnespan | 240.6 | 1 on a OLS IMaxsLi 1679.6 | 265.9 | 287.9 1 1 (asic IMin.tz 1 550.6 | 80.9 | 110.0 1 lonespan | 313.7 | 311.01 66.9 | 1 - 1 OLS tMax.tb 1501-21 251.01 118.7 1277.7 | (eqn) Iminskt 1 $38.9 1 231.6 1 96.3.1 250.9 1 lonespan | 323.0 | 308.1 | 24.9 | 309.2 1 1 1 1 i 9.2 check for SUS atresses in pier colunn - Concrate M40 and Fe500 grade steel. As =32No9T20 1 sus (Rare) 1 sus cap) | Case 1 | Case 2 | case 1 | Case 2 1 i 1 wet 1490.2 1 229.9 | 399.7 1 rey 216.7 | 174.8 | 21.0 1 Qo 8 ty ot 1 as= cm'2 | 100.48 | 100.48 | 100.48 1 eC i ms 20/Fek Ti aya 1 Be cm F422 | 78,8 | ERR 1 ae 10.22 | 0.541 BRR i Be 10.60 | 0.29 | ERR i e= 10.34 | 0.05 | ERR i as rad 2.005945 [2.36769 | BRR i ' ' ' 1 Aete ce'2— | 24485 | 12306 | ERR i emt 2003 | 50.9 | ERR 1 eee om 2319 | 28 | ERR 1 1 ' 1 Inoavari anit Joano1409 Forces at Per base for Quasi Permanent Load combination (Refer Sh.) e. 2 B es ice t ma T Hove tasd Zuo 2 ‘rasnan divoace 20 1622 Critical eases for Pir design ULS case (Refer ShNo_) 5. No. Case: e a z in, a orc. Cae, ULS BAST Ed 335 2 in force Case US BASIC. sue 166 x os san done ase.5 BASIC a “BL * be a free Case, €Q S81 a7 5 Ba 5359 2503 5 ne span dodge case, €Q LL 323.0 300.1 7 a, Aa force Case. OTT BEL. 32g a in. ea force Case, EQ TT 3354 3162 2 ne span cisadge case, £0 TF 323.0 276.0 sino 27 S00 PGR SRST TRERRR& SLENDERNESS RATIONCHECK (Ch 11,2; 1RGHI2:201 9): BRIBE Si PN SLR Grae of Conerte = Na Daneter oe Courn : 2.00 m fe 1787 Mpa Grass ea of % : 2.4606 mn! fyd= 8 Mpa reo oflengtinal enforcement : 135619 mn! 48No. 25mm arasong ret ea of enereta ® : 3.126406 mn? ler Base LM. = 63940 m Neth of ler ha C 377m Pre Top Lv = 6637 m Grr Cover : 50 mm A= si+0290) 085 eter cep rato Oe * Orta = oss ig = rst rder BI in uts-permanet asd combination in 5 1622 em ges Fest rer Bn desn oa exmbinton in U.S 3635 tm (ei) = utinate ep coeicet 2 rable 69, 12-2011) B= V 1420, where, = AfAfa) sar ® ose C17 te a7 ts = i Eectve length of coun = KL 565m Parke 15 (robe tts, men122011) ads gyration of, i osm Stensernese Ra = lt 4 43 ose Ne = NaltNta) | Aae20ABCa z 76d az Ba nm eo an - xa z 5506.0 aid He > 3 5 Star 5 Ses ‘Second order eftects maybe lgnored-short column + Soi 0 ao 5 S580 a0 cn $ S00 5 27 + S60 00 on = S540 010 a 2 B00 os ar second ordermrents Myst; EQULE IRC 112 ess (unnile co Afr set) oe = es = oon2s73013 Be 200000 pa A= tea eth = 190m nrltee 1.184 os Ur = ee 0458) = ons 7; a RTT p= OSD] MOT Dae am aan ce Ts Mal Ata) erie Se] ure z 7980) Tr L0G Tas] 14 os | or z $505.1 ocd 00 355] 1398-0 | — nro 550 HI S70 aE 7:00 360 —] 110 008 —[ # Sen oH £0 0265] 135 ‘nig [383 z 30 86 00 C51 1a ‘010 —[ 533 é S00 5 100 016s | “Lae ‘ais —| 30 7 Sie 0 00 0363—| “1335 0010 —| 564 = am Ts £0 O57 aa Sao z S00 Os 00 0.165 a8 3005 —[ 90 woman parece oR wo 1408 an vo 28 9.2 Here wd | 0.3686 1 0.0950 1 ERR | 0.1230 | y emt 6258 130.7 | ERR | 36.9 | 5 em} ade | 9.8 1 ERR | g2cd | 1 i 1 ' 1 Foc Kg/em-2 | 48.6 1 48.5) 15.4 1 40.7 | |< 192 Kg/em*2 | < 192 Ro/en2 | Fee Kg/em2 | 16 | 486 | 70188 { < 3000 Kg/en"2 |< 3000 Kg/em"2 | NOTE: “ERR" means the section is uncracked. Check for crack width under SUS (QP Comb) — Spacing of reinft = 185 om Pete = Asie = 0.0136 Dia of main bar = 20 om Clear cover = 40 oe Aor (0. 425.21 -K2-phb /Peee Cracked = 0.0950 mvs 2386 am Stress in reingt = 48.88 MPa Esm-ten = 98.5 x 10~6 2.5thed) = 125.0 am (hen) = 400.6 am crack wiatn = 0.04 am 2 = 100010 am ©0130 am By Limit state theory - Refer chart No $9 - sP16 case 1 | case 2 | case 2 1 sai.e I 1 Pu ie F337) mu fem) 1342.8 | 318.1 | D im) 1 "2.00 | 2.00 1 Pek (t/m"2) 1 4000 | 4000 1 Pu/{Pck.0°2] 1 0.036 | 0.020 1 u/ {Fek.a~3} 4 0.011 | 9.010 1 piFck 1 0,000 | 0.002 3 P 1 0,00 | 0.08 5 As (em*2) O02. x2 OK Confinement in pier column - Gross area of pile [Ac] = 3.142 2 wax load on pile Nea) sie.a Fok = 4000 t/mr2 Ned/ [ae Fek) 0.084 < 0.08 Hence no continenent is required.

You might also like