GAYATRI
PURCHASE ORDER
GPL/KIR/GM/SEC-2/15-16/161
01 April’'2015
To
Mis Sanfield (India) Limited
13-A, D Sector, Industrial Area,
Govindpur, Bhopal-462023, India
nail: marketing/@sanfieldindia.in
eting Executive)
Kind Attn: Adil Abdul (Sr. M:
Purchase Order for Supply of POT/POT-Cum-PTFE Bearings for 4 Laning of Pavils
. Rimuli Section of NH-215 from KM 0.00 to KM 163.000 in the state of Orissa under
‘NHDP Phase-II as BOT (Toll) Basis. on DBFOT Pattern + Supply of strip seal type
expansion joint for our NH-215 road work Section-Il, Keonjhar - Reg.
i
Ref; SIL/GPL/AA/710/2810 and your Email dated 03.12.2014.
ee anual
SL rot Proposed [aw [Rese Ane
iale ip Sealnge Epon THT STIW | a
Solome Aubongeegmbleat | 5008M
accommodating movement up to 80 mun geen |
Total
Dear Sir,
With reference to’ our telephonic discussiou had with your un dated 03.12.2014, we
Would like to inform that we accept your offer with the below mentioned following Terms &
Conditions.
‘Terms & Conditions
1 «The above rates are Ex-Works Bhopal Basis. (Freight extra from cur accouiit),
2. Exeise Duty: @.12.36 % extia arly variation in the rates, if appearing at the time of supply shall
be bore from our account
3. Sales Tax: C.6.1.@ 2% a in absence of °C"
rate will be chuirged extra
inst Borin Form VAT / C.8.1,, as por prevailing
4. Any now taxes as applicable shall be charged extra,
5. Delivery: Dispatch of material would commence ou 06-08 weeks (including Stmday aud Gov
J Holiday) from,the date of receipt of approved drawings and technically & commercially clear
Purchase Ordei chedule,
“The supplies will be completed in a phased manner as per our site
| Project oes |
Gayatri Projects Limited, Section