Home Construction Timeline Checklist

This document appears to be a construction schedule for a home project outlining the planned start and end dates for each stage of construction from demolition through final inspections and completion. The stages of construction include demolition, concrete work, framing, roofing, plumbing, HVAC, electrical, insulation, drywall, exterior stone, casework, flooring, millwork, painting, countertops, decks, doors, appliances, plumbing, electrical, bathroom glass, garage door installation, inspections, cleanup, and completion of the project planned from September through May.

Uploaded by

Regine Borjal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views6 pages

Home Construction Timeline Checklist

This document appears to be a construction schedule for a home project outlining the planned start and end dates for each stage of construction from demolition through final inspections and completion. The stages of construction include demolition, concrete work, framing, roofing, plumbing, HVAC, electrical, insulation, drywall, exterior stone, casework, flooring, millwork, painting, countertops, decks, doors, appliances, plumbing, electrical, bathroom glass, garage door installation, inspections, cleanup, and completion of the project planned from September through May.

Uploaded by

Regine Borjal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Insert Details or LetterHead Here

9/18 11/7

Start date
Demo Prep
Demolition
Excavation
Concrete
Pre backfill
Framing
Roof
Plumbing
Windows
HVAC
Electrical
A/V
House wrap
Insulation
Drywall
Exterior stone
Exterior case work
Laundry/furnace room flooring
Hardwoods
Tile
Cabinets
Plumbing -hang sinks
Interior doors
Millwork
Interior painting
Stone Counters
Schedule Buffer
Decks
Interior doors- hang & hardware
Appliances
Plumbing
Electrical
Bathroom Glass
Garage Door dress up
FINAL Inspections
Garage Door dress up
FINAL Inspections
Wrap up
House Cleaning
Complete
12/27 2/15
4/6 5/26