Master Plan

2020 – 2030
2020-2030 MASTER PLAN

New Building Location


Full Building Renovation
Partial Building Renovation
New/Improved Parking
River Campus Development
Drop-Off Shelter
Central Campus
Athletics/Recreation Campus
Public-Private Enterprise Strategic Growth Zones
Green Space/Pathways Improvements
Tree Canopy Improvements
Landscaping/Hardscaping Improvements
2

Table of Contents
LETTER FROM THE PRESIDENT............................ 5 STUDENT PROGRAMS...........................................24
Housing Program Descriptions
EXECUTIVE SUMMARY............................................6
Student Recreation and Activities Program Descriptions
Goals
Athletics Program Descriptions
Themes
Planning Issues CURRENT LAND USE AND
Vision and Implementation Plan BUILDING PLACEMENT.........................................28
Land Use
LONG-RANGE PLAN Building Condition Assessment
FOR TRANSFORMATION...................................... 10
Building Efficiency Assessment
The Process
OUTDOOR SPACES.................................................31
CAMPUS CONTEXT................................................. 11
Overall Campus
Mission
Main Quad, Moffett Quad and the Governor’s Quad
Vision
Adams Street Corridor
Core Values
Fairfax Street Corridor and Heth Plaza
Overview
Downey Street Corridor
Statistical Background
Tyler Avenue Corridor
Planning Influences
East Main Street Corridor
Community Influences
Jefferson Street Corridor
ACADEMIC PROGRAMS........................................22 Athletics/Recreation Campus
Academic Program Descriptions
3

INFRASTRUCTURE.................................................33 STRATEGIC PLANNING AND


Sustainability FUTURE NEEDS..................................................... 45
City of Radford Existing Utility Infrastructure Stakeholder Input
Electric Projected Enrollment Growth
Steam Comparative Space Analysis
Stormwater Academic Program Growth

Chilled Water Student Program Growth

Water Space Needs and Facilities Projections

Sanitary Sewer Overall Infrastructure Needs

Information Technology Multimodal Campus Access Needs

MULTIMODAL CAMPUS ACCESS........................ 40 IMPLEMENTATION PLAN...................................... 51


Security and Emergency Systems and Access Proposed New Building Locations

Accessibility Proposed Academic Facilities Actions and Phasing

Transit System Proposed Student Facilities Actions and Phasing

Pedestrian Ways Infrastructure Improvements

Bikeways Multimodal Campus Access Improvements

New River Access and Greenways Outdoor Space Improvements

Vehicular Access and Parking SUMMARY................................................................78


REFERENCES..........................................................78
ACKNOWLEDGMENTS..........................................79

2020-2030
Master Plan
5

Letter from the President


On behalf of the Radford family, I am pleased to present Radford University’s
2020-2030 Master Plan, which reflects the University’s commitment to
optimizing the function and utilization of existing and future facilities and
enhancing the development and overall engagement with the community
by serving as a critical partner with the City of Radford and in the New River
Valley.  This plan capitalizes on the scenic beauty of the main campus’ ideal
location in the Blue Ridge Mountains and along the New River, as well as further
expansion into the broader region, specifically the City of Roanoke, with the
establishment and operation of Radford University Carilion, which is located in
the Star City’s Innovation Corridor.  
Due to the dedicated work of the Master Planning Committee and its various
subcommittees, as well the active engagement of the campus community,
the 2020-2030 Master Plan provides the infrastructure to accomplish the
visionary goals and strategies outlined in the University’s 2018-2023 Strategic
Plan: Embracing the Tradition and Envisioning the Future and establishes the
foundation for our sustained growth and success.  This plan represents yet
another significant step forward in continuing our rich tradition of teaching and
learning, while, at the same time, creating bold opportunities for collaboration
and innovation.
 
With Highlander Pride,

Brian O. Hemphill, Ph.D.


President
@BrianOHemphill

2020-2030
Master Plan
6

Executive Summary
GOALS { Strategic Enrollment Growth 4. Plan for transportation and parking systems
to enhance access to campus, improve user
The Radford University 2020-2030 Master Plan { Student Success satisfaction and encourage multimodal means of
was developed to support the Radford University transportation.
2018-2023 Strategic Plan: Embracing the Tradition 2. Plan for key building footprint components.
and Envisioning the Future. The 2018-2023 Strategic 5. Plan for infrastructure systems that anticipate
{ Construction of the new Center for Adaptive
Plan contains goals and strategies to support the growth rather than react to demand. Plan for
Innovation and Creativity (CAIC) to replace
vision of transforming Radford University into a systems that continue to support and enhance
College of Visual and Performing Arts (CVPA)
premier, innovative, student-centered university in the University’s initiatives to maximize overall
space and also create interdisciplinary
the Commonwealth of Virginia and beyond with resource efficiency. Plan for systems that
student spaces serving the Waldron College
a keen focus on teaching, research and service. respond to the challenges of sustainability,
of Health and Human Services and the Artis
This Master Plan includes both overall guidance including reductions in energy use and
College of Science and Technology.
and specific actions for enhancing the University’s greenhouse gas emissions.
physical built environment as an integral part of this { Renovation and repurposing of McConnell
comprehensive strategic vision. 6. Enable connectivity with the City of Radford and
Library for current and future uses.
greater Southwest Virginia through enhancement
The Master Plan identifies actions to facilitate
{ Renovationsto multiple existing residence halls of existing facilities and virtual infrastructure
accomplishment of the goals and strategies
to enhance quality of on-campus residential environment, as well as the establishment of new
associated with these areas of emphasis.
accommodations. locations and programs.
The goals of the Master Plan are multi-pronged.
{ Repurposing of existing spaces to facilitate
1. Support the 2018-2023 Strategic Plan by
efficient use of current building footprint and THEMES
enabling the University’s physical resources to
promote cross-discipline collaboration. Several themes have been identified as overarching
accommodate future needs of the University. The
2018-2023 Strategic Plan is built around six areas influences in the preparation of the Master Plan.
{ Potential
new building footprints as identified
of emphasis. 1. Consistent Aesthetic Campus Brand: Buildings
during the master planning process.
and landscape aesthetic characteristics will be
{ Academic Excellence and Research
3. Provide a detailed, long-range plan for the complementary to the existing campus built
residential life system that provides additional environment, in terms of massing, color palette,
{ Brand Identity
beds in residence halls either on-campus or materials, style, density, green space and other
{ Economic Development and Community off-campus, plans for the systematic renovation important current components.
Partnerships of existing residence halls and improves
the variety of offerings in a manner that is 2. Efficiency/Effectiveness/Collaboration of Building
{ Philanthropic Giving and Alumni Engagement financially sustainable. Space: Buildings will be efficient in their usage
and effective in their support of overall University
goals and education delivery.
7

3. Anticipate/Enable Growth: Building spaces and groups of students, faculty and staff, as well as Campus, cause traffic congestion as vehicles
locations, exterior environments and overall representatives from the City of Radford and move from lot to lot searching for a parking
campus infrastructure will anticipate and facilitate other appropriate stakeholders. The goal of these space, while the allocation to various user
future growth and development. meetings was not only to understand physical groups appears to be unbalanced.
needs and criteria, but to better understand
4. Accessibility and Connectivity: Buildings the qualitative needs and the cultural aspects { Most off-campus students live in
and exterior campus elements will enhance of the campus community. The result of the neighborhoods adjacent to campus across
accessibility for all users and occupants and data collection process yielded vital information Tyler Avenue to the west or across Jefferson
encourage connectivity for students, faculty that informed the plan. The findings of the data Street to the east. This circumstance generates
and staff across both academic and student life collection process are summarized as follows. significant pedestrian traffic crossing these
programs. major vehicular routes.
{ Thecentral areas of the campus are beautiful,
5. Sustainability: Buildings and infrastructure but not readily seen by visitors; therefore, the { Central Campus has limited remaining
elements will achieve sustainability goals as set campus needs to connect more effectively to opportunities for large new building footprints.
forth by the University and in accordance with the surrounding community. Significant growth in the built environment,
stated core values. if identified in the future, will likely rely on
{ The addition of a large amount of occupied acquisition and development of current off-
6. Safety: Buildings and exterior spaces will provide building square footage over the last decade campus locations.
safe environments for all users and occupants. has brought about potentially inefficient and
unbalanced space usage across several types of { New off-campus residential apartment
use groups and occupants on-campus. footprint adjacent to the Central Campus
PLANNING ISSUES needs to be incorporated into the overall
{ Changing academic delivery methods and
In order to understand and address the overall University housing plan.
pedagogies have created the need to rethink
goals, the Master Plan work began with data
current learning spaces and provide new { Transitservice needs to be revised to
collection in the fall of 2017. This process started
convergence spaces to facilitate cross- accommodate the changing needs of students,
with compiling all current and historic information
disciplinary activities. faculty and staff. More efficient routes and
relative to campus buildings, infrastructure,
student, faculty and staff populations and other stops will help incentivize ridership.
{ The Athletics area of campus is separated
information from outside relevant resources, from the main campus by East Main Street { The
University needs to continue its
along with field investigation and collection of and the railroad tracks. This separation commitment to overall sustainability across
technical engineering data from the Facilities appears to impact use of the recreation campus assets and programs.
team, transportation and parking assessments and facilities near the Dedmon Center and
analysis of existing green space and landscape attendance at athletic events. { Themerger of Jefferson College of
elements. Health Sciences brings about a significant
The process also included information gathering { Parking is an issue on campus. Several small new presence in Roanoke as Radford
meetings and work sessions with multiple lots, particularly those within the Central University Carilion (RUC).

2020-2030
Master Plan
8

VISION AND
IMPLEMENTATION PLAN
Through multiple iterations of analysis by the Master
Planning Committee; input from the University
community and other major stakeholders; and
subsequent refinement by the Executive Steering
Committee, the final version of the Master Plan was
approved by the Board of Visitors in December
2019. The major tenets of the Master Plan are
far-reaching and will enhance the Highlander
experience for generations to come. { Primary Strategic Future Growth Areas: In { Improved Parking System: This will provide a more
{ Existing Space Usage: Based on current the long term, the campus will likely expand service-oriented business model by providing
utilization of space, proposed student primarily to the east across Jefferson Street balanced, reliable, convenient parking on or
population can generally be accommodated in and along East Main Street. Short-term adjacent to the Central Campus, while providing
existing on-campus academic built footprint development is planned with an eye toward this additional parking on the Athletics/Recreation
with a few specific exceptions. Current long-term vision. Campus or off-campus with associated transit
academic and administrative spaces will be service.
repurposed to enhance new learning methods { Secondary Strategic Future Growth Areas:

and support environments where appropriate. The Tyler Avenue Corridor is also a location for { TransportationOptions: The transit system
anticipated future growth of the campus, along will be improved to better serve commuter
{ Existing Residences: Based on the recent with related student and family services and students, provide better access to the Athletics/
acquisition of more than 600 beds in amenities. This growth will need to be carefully Recreation Campus area and allow easier access
apartment buildings located off-campus and coordinated with the City of Radford, given the to downtown and connection to other localities.
adjacent to Central Campus, along with the number of established retail, housing, religious
current available on-campus residence halls and and government occupancies along Tyler Avenue. { Infrastructure
Improvements: Campus systems
off-campus apartments, no additional new on- and components will be analyzed and improved
campus beds have been identified for the next { Enhanced and New Off-Campus Programs: to ensure continuing services and to enhance
10 years. Radford University Carilion, the result of overall campus sustainability.
merging with Jefferson College of Health
{ CentralCampus and Athletics/Recreation Sciences, is a major focus for expanding { Landscape/Hardscape Improvements:
Campus New Building Locations: A number of program services in Southwest Virginia. The Comprehensive landscape and hardscape
locations have been identified on both Central Roanoke Higher Education Center and the provisions will be undertaken to continue the
Campus and Athletics/Recreation Campus as Southwest Virginia Higher Education Center landscape heritage of the overall campus, while
potential locations for identified new academic both offer growth opportunities for multiple improving perimeter aesthetics, pedestrian
and student programs buildings and future existing and proposed academic programs in experiences and overall wayfinding.
buildings as the need arises, along with the the region.
proposed River Campus development.
9

2020-2030 MASTER PLAN — OVERALL SUMMARY

Construct Evaluate and Upfit


• CAIC — Highest priority • Classrooms and labs — Scheduling, efficiency,
delivery methods and REAL General Education
• Hurlburt Addition
• Student study and collaboration spaces
• Administrative Services Addition
• Event and meeting spaces
• Welcome Center

• Public Safety Building


Enhance
• Sustainability
• Athletics Ticketing/Concessions Building
• Utilities
Renovate
• Transit
• McConnell Library
• Campus perimeter
• Tyler/Norwood/Muse Halls
• Green spaces
• Dedmon Center Arena
• Brand identity
Repurpose
• Programmatic expansion through selective
Create
repurposing of areas within Davis, Cook, • Greenway/Riverway — River Campus
Walker, Peters, Kyle and Young Halls
• Roanoke locations — RUC/RHEC
• Waldron College growth
• Hotel
• CEHD programs
• Public-private/retail spaces
• Tech Talent Pipeline
• Other opportunities as identified
• Venture Lab

• Tourism Lab

2020-2030
Master Plan
10

Long-Range Plan for Transformation


THE PROCESS workshops and prepared surveys to collect { Radford University’s 2020-2026 Six-Year Plan
information regarding academic programs, student and Six-Year Capital Plan
The planning team developed a five-phase process programs, land use, infrastructure and other areas
to study and prepare the Radford University Master of interest. { Radford University’s 2016 Virginia Department
Plan. This process included work in the following of Historic Resources Campus Survey Report
areas. The team utilized the 2018-2023 Strategic Plan:
Embracing the Tradition and Envisioning the Future { Radford University’s 2014 Athletics Master Plan
{ Kickoff and Charge as its basic guide with specific goals for each of the
following areas. { RadfordUniversity’s 2011 ADA Campus
{ Discovery and Data Collection
Accessibility Audit
{ Academic Excellence and Research
{ Analysis and Options
{ RadfordUniversity’s most recent Campus
{ Brand Identity
Master Plans from 1993, 2001 and 2008
{ Master Planning and Concept Refinement
{ Economic Development and Community
{ Implementation and Documentation
The team then engaged in multiple iterations of
Partnerships
analysis and feedback with Radford University’s
To understand existing campus conditions and the { Philanthropic Giving and Alumni Engagement Master Plan Executive Steering Committee. Based
perceptions of these conditions, the Master Planning on this feedback, the planning team refined
Committee and the Document Preparation Team { Strategic Enrollment Growth concepts and added supporting detail to the Master
conducted a series of meetings with various groups Plan. The final draft iteration was then presented to
{ Student Success the Board of Visitors for review and comment. Upon
during 2018 and 2019. Additionally, the team toured
campus, assessed building and space use, reviewed incorporation of these final comments, the 2020-
The team also utilized a number of other previously
University Facilities existing technical documents 2030 Master Plan was finalized for publication.
prepared documents and studies for broad
and engaged with developers of the City of Radford
background in addition to the 2018-2023
Comprehensive Plan. The team also conducted
Strategic Plan.

Phase 1 APRIL 2018 -


FEBRUARY 2019 Phase 2 FEBRUARY 2019 -
AUGUST 2019 Phase 3 AUGUST 2019 -
DECEMBER 2019

PROCESS DATA STAKEHOLDER DRAFT IDEA FINAL


REFINEMENT GATHERING SESSIONS PREPARATION ANALYSIS PREPARATION

STAKEHOLDER WEBSITE IDEA WEBSITE FINAL DATA WEBSITE


SESSIONS DEVELOPMENT DEVELOPMENT DEVELOPMENT GATHERING/ DEVELOPMENT
STAKEHOLDER
DATA SESSIONS IMAGES/
GATHERING GRAPHICS
11

Campus Context
MISSION Inclusiveness — We are committed to a spirit of
cooperation and collaboration, embracing and
As a mid-sized, comprehensive public institution honoring the diversity of our community.
dedicated to the creation and dissemination
of knowledge, Radford University empowers Community — We foster relationships and a culture of
students from diverse backgrounds by providing service within and beyond our University community.
transformative educational experiences, from the Intellectual Freedom — We encourage and defend a
undergraduate to the doctoral, within and beyond fearless exploration of knowledge in all its forms.
the classroom. As an inclusive community, the
Innovation — We inspire and support creativity in
University specializes in cultivating relationships
research, scholarship, pedagogy and service.
among students, faculty, staff, alumni and other
partners, thereby providing a culture of service, Sustainability — We are committed to integrating
support and engagement. The University embraces sustainable practices into all aspects of our
innovation and tradition and instills students with operations and engage students across the
purpose and the ability to think creatively and curriculum to learn, discover and contribute to
critically. The University provides an educational positive current and future environmental solutions.
environment and the tools to address the social,
economic and environmental issues confronting our OVERVIEW
region, nation and the world.
Campus Evolution
VISION Radford University was founded in 1910 as the State
Normal and Industrial School for Women to train
Radford University aspires to be the premier,
teachers in the western part of Virginia and has
innovative, student-centered university in the
been in continuous session since its 1913 opening.
Commonwealth of Virginia and beyond with a keen
The School became Radford State Teachers College
focus on teaching, research and service.
in 1924 and was authorized to award Bachelor of
Arts degrees in 1935. The College steadily grew for
CORE VALUES the first 30 years of its existence, up until World War
Student Empowerment and Success — We engage II. After the war, the College became the women’s
and support our students in the discovery and division of nearby Virginia Polytechnic Institute in
pursuit of their own unique paths. 1944 and was renamed Radford College. In 1964,
the College separated from Virginia Tech and
Excellence — We expect our community to strive for
again became an independent entity and was also
the highest standards.
authorized to award Master of Science degrees.
The College became coeducational in 1972 and was
renamed Radford University in 1979.

2020-2030
Master Plan
12

The campus is located in the Blue Ridge Mountains although off-campus parcels identified for potential building or major campus modifications should be
on approximately 204 acres within the City of expansion have not always been fully executed. viewed with the potential Historic District in mind.
Radford and adjacent to the New River. The primary The relatively long history of the campus and the
transportation links to campus are U.S. Route 11 various discrete growth periods have created a Off-Campus Locations
(Main Street) and State Route 177 (Tyler Avenue), mixed-use campus with academic, administrative, The University has a presence at a number of off-
both of which provide connections to Interstate student services, athletic and residential usages campus locations
81, the major north-south transportation corridor co-located across the campus. This mixed-use
{ Radford University Carilion (RUC) — Leased
serving Southwest Virginia. Topography varies environment creates a diverse set of activities and
space in Roanoke comprising the recently
dramatically from an approximate elevation of 1920 interconnections throughout the campus footprint.
acquired health and human services programs
ft. at the south end of campus to an elevation of
1720 ft. at the north end of campus at the New River. Campus Overall Aesthetics
{ Roanoke Higher Education Center (RHEC)
The campus is mainly surrounded by residential The original campus structures utilized an overall — Leased space supporting several program
areas, mostly populated with students, along with Georgian architectural theme, including such offerings in Roanoke
limited commercial development. elements as red brick facades, stone/precast
accents and sloped slate roofs. These elements { Southwest Virginia Higher Education Center
The campus has experienced several periods
have been carried forward through the years with (SWVAHEC) — Leased space supporting
of growth during its history, as shown on the
the recent introduction of a more modern design several program offerings in Abingdon
illustrated campus maps. The original campus
comprised of approximately 12 buildings within and materials for the newer structures around the
{ Corporate Park — Leased space supporting
a triangular footprint in the City of Radford and perimeter of campus, particularly along Main Street.
several academic program offerings in Radford
served students well for its first three decades. The Building heights are generally three to four stories.
first significant growth period occurred during a The existing open green spaces have been largely
{ SeluConservancy — Leased space for
building campaign undertaken post-World War II preserved with a number of prominent quadrangles
academic programs, conference, recreation and
with the addition of more than 25 buildings from and pathways throughout campus.
other outdoor purposes for both the University
the late 1940s through the early 1970s. These and the community
Historic Resources
buildings stretched the campus to the south and to
the east and incorporated several additional streets A reconnaissance-level architectural survey
and properties. Another period of campus growth was prepared in 2016 and approved by the
occurred during the 1980s, which most significantly Commonwealth of Virginia’s Department of
brought about the addition of the Athletics/ Historic Resources in September of that year. While
Recreation Campus. Campus growth was fairly no buildings on University-owned property are
steady until the mid-2000s with the addition of designated as historic, the original campus area
approximately 10 major signature buildings during is eligible for listing as a Historic District given
the last decade. These buildings mostly expanded its history in higher education in the state and
the campus even further to the east, absorbing its adherence to early campus master planning
another existing block-width of properties. documents. The illustrated map indicates the extent
of the eligible portion of the campus. In general, the
There have been several Master Plans prepared
buildings facing the Main Quad, Moffett Quad and
throughout the history of the campus, as shown
the Governor’s Quad contribute to the potential
by the illustrated maps. The Master Plans have
Historic District. While the University has to date
been useful in providing an overall framework for
not chosen to seek this designation, any proposed
the growth of the campus throughout the years,
13

CAMPUS GROWTH THROUGH HISTORY

1949 1969

1989 2019

2020-2030
Master Plan
14

BUILDING CONSTRUCTION/RENOVATION DATES

2007-2019
1996-2006
1975-1995
1955-1974
Older than 1954
15

PREVIOUS MASTER PLAN MAPS

FT
A
R
D
FT
A
R
D
FT
A
R
D
1911 1968

10 years out the plan

2008 - 2018 CAMPUS MASTER PLAN


HANBURY EVANS WRIGHT VLATTAS + COMPANY

1993 2008

2020-2030
Master Plan
16

VIRGINIA DEPARTMENT OF HISTORIC RESOURCES (VDHR) PROPOSED BOUNDARIES


FOR POTENTIAL RADFORD UNIVERSITY CAMPUS HISTORIC DISTRICT
17

STATISTICAL BACKGROUND PLANNING INFLUENCES


It is instructive to understand a number of basic Campus Open Space
statistics about the campus.
In order for new development to complement and
{ Total students: 11,870 extend the qualities of the campus, it is important
to understand existing campus density. The Floor
{ Total faculty and staff: 1,835
Area Ratio (FAR) analysis is a helpful benchmark for
{ ~55buildings (academic, administrative, overall planning. In simple terms, FAR is computed
auxiliary and athletics) by dividing a building’s total floor area by the
building’s supporting site area. For example, a one-
{ ~2,800,000 total building square footage story building that completely covers the building’s
(academic, administrative, auxiliary and supporting site area would have an FAR of 1.0, while
athletics — broken down by various use groups a five-story building that covers the site would have
and space types) an FAR of 5.0. While FAR can vary significantly
depending on many factors, values ranging from 0.5
{ ~3,400 residential beds to 3.0 are generally accepted as representative on
campus environments. Lower FARs are appropriate
{ ~204 total campus acres Flood Analysis
for open-space areas, and higher FARs are
These basic statistics can be used to characterize representative for denser housing areas. Further, Radford University borders the New River at the
several key measures of efficiency and effectiveness new development FARs should not vary drastically northern portion of campus at the Athletics/
and benchmark the campus against other peer from the FAR of the various existing campus areas. Recreation Campus and commuter parking areas.
institutions. The current FEMA flood analysis shows that a good
Slope Analysis and Topography amount of the northern portion of the Athletics/
Another characteristic of University land is the Recreation Campus is in either a 100-year flood
somewhat significant topographical challenges. plain, 500-year flood plain or the floodway at the
Within the existing Central Campus, grade approximate Base Flood Elevation (BFE) of 1740
changes are fairly gradual, consisting of a series ft. Due to these concerns, minimal development
of plateaus decreasing in elevation from south can occur on this land at this elevation or lower;
to north with most areas between approximate however, development can occur in the 100-year
elevations of 1880 ft. and 1800 ft. However, more flood plain if the structure is designed to be capable
dramatic slopes occur near the perimeter of of resisting the effects of floodwaters, or if the
campus, particularly at the south end of Jefferson development is located in the areas at elevations
Street. The Athletics/Recreation Campus lies higher than 1740 ft. Limited development may
between approximate elevations of 1780 ft. and also occur in the floodway if a “no-rise condition”
1740 ft. as it approaches the New River. can be met with no impediment or increase in the
BFE. Recreational and associated uses appear
to be one of the logical uses for portions of this
area of campus. Although, other elements can be
considered as long as all regulatory requirements
are achieved.

2020-2030
Master Plan
18

FLOOR AREA RATIO BY DISTRICT

District 1 Residential - 1.05 FAR


District 2 Residential - .56 FAR
District 3 Academic - .47 FAR
District 4 Student Support - .69 FAR
District 5 Academic - .72 FAR
District 6 Residential - 1.25 FAR
District 7 Support/Service - .11 FAR
District 8 Athletics/Recreation - .04 FAR
19

COMMUNITY INFLUENCES bicycle safety were mentioned


specifically as needs for
City of Radford Comprehensive these areas, particularly at
Plan 2017 Update the “gateway” entry points
The City of Radford Comprehensive Plan 2017 to the City of Radford.
Update identifies a variety of goals and strategies This Master Plan agrees
to provide guidance for future development in the with these focus areas and
City of Radford. These goals and strategies are presents an opportunity for
organized around main broad focus areas, including the University to work with
specific items as they pertain to the University’s the City of Radford on these
areas of mutual interests. improvements.

{ Economic Development: Community Existing land use, as noted


Development Opportunity locations identified in the City of Radford
by the City of Radford near the University Comprehensive Plan, identifies
include the Jefferson Street Center at the the University’s campus as
intersection of Jefferson Street and East Main a “public/institutional” area,
Street; the East End Downtown area; and the while the areas to its east
Radford University Recreation area. and west are identified as a
combination of “single-family
{ Infrastructure
and Public Spaces: Opportunities and multi-family residential”
to improve transit, bike paths, trails, pedestrian and the areas to the north
paths and viewsheds are identified, particularly along Main Street are identified
concentrating on the East and West Main Street as “commercial.” In the future
and Tyler Avenue gateway entries to the City land-use diagram, the City
of Radford. of Radford plan maintains
Radford University as a “public/
{ Housing: A detailed housing study within the institutional” zone; however, the
City of Radford to evaluate age, size, use, areas directly adjacent to Tyler
capacity, occupancy and market value has Avenue and Jefferson Street
been undertaken. and along East Main Street
are now mostly identified as
{ Land Use: Future land uses adjacent to the
“corridor business commercial.”
University include corridor business commercial
Though these land-use zones
along East Main Street and Tyler Avenue and
are accurate for existing uses, all
residential along and east of Jefferson Street.
areas adjacent to campus may
The City of Radford Comprehensive Plan is clearly well be transformed into more
focused on “areas for revitalization” surrounding “public/institutional” areas as Radford University
the campus, along East Main Street, Tyler Avenue acquires land for growth. It will be critical for the
and Jefferson Street. Streetscaping, landscaping, City of Radford and the University to work together
crosswalks and improvements to pedestrian and as development of these areas moves forward.

2020-2030
Master Plan
20

City of Roanoke Comprehensive Plan


Vision 2001-2020 and Downtown
Roanoke Plan 2017
The City of Roanoke’s Comprehensive Plan Vision
2001-2020 and the Downtown Roanoke Plan
2017 identify a variety of goals and strategies to
provide guidance for future development in the
City of Roanoke. The framework for the Downtown
Roanoke Plan 2017 is structured around six themes
that serve to build on the success of downtown and
aid in its continued revitalization and growth over
the next 20 years, including specific items as they
pertain to the University’s areas of mutual interests.
1. Build on Strengths

2. Fill in Gaps

3. Expand

4. Enhance Public Space

5. Strengthen Connections

6. Maintain and Market

The Expand theme includes Policy 3-B: Capitalize


on the expansion of the South Jefferson
Redevelopment Area. In 2001, the South Jefferson
Redevelopment Area Plan was approved and
paved the way for a major economic development The proposed area in its entirety extends from Given the University’s current significant presence
initiative for the City of Roanoke, Carilion Clinic Franklin Road at Wonju Avenue to the South in the RHEC located in the Carilion Roanoke
and Virginia Tech. The Virginia Tech Carilion Jefferson Redevelopment Area and north through Community Hospital, the University is integrally
School of Medicine opened in 2009, and the downtown on Jefferson Street and across to the located along the identified Innovation Corridor
Virginia Tech Carilion Research Institute opened in Hotel Roanoke and Conference Center and the and Academic Health Center location. This presents
2010 with the area between the core of downtown Roanoke Higher Education Center (RHEC). The area a significant opportunity for the University to
and the South Jefferson Redevelopment Area to the south includes seven distinct districts with the work with the City of Roanoke on the continuing
identified as a potential Innovation Corridor and area to the north identified as the Creativity District. development of this corridor.
Academic Health Center.
21

INNOVATION CORRIDOR DISTRICT

Corridor
Transitional
River
Campus
Recreation
Hospital
South Support
Main Corridors

2020-2030
Master Plan
22

Academic Programs
ACADEMIC PROGRAM The University is organized into a variety of College of Education and Human Development
Colleges, Departments and Schools. (CEHD)
DESCRIPTIONS
y Counselor Education
Artis College of Science and Technology
Goals y Health and Human Performance
(Artis College)
The University desires to accomplish a variety of y Recreation, Parks and Tourism
y Anthropological Sciences
goals relative to academic programs.
y Biology y Teacher Education and Leadership
{ Provide state-of-the-art classroom, laboratory,
y Chemistry
faculty and support spaces for the University College of Humanities and Behavioral Sciences
y Geology (CHBS)
as a whole, for each college and school at all
locations and for all shared academic spaces. y Geospatial Science y Communication
y Information Technology y Criminal Justice
{ Provide academic spaces that enhance and
y Mathematics and Statistics y English
facilitate interdisciplinary study and research
across all University programs/units and fields y Physics y Foreign Languages and Literatures
of study. y History
Sandra C. Davis and William C. Davis College of
{ Maximize the efficiency and utilization of all Business and Economics (Davis College) y Interdisciplinary Studies
academic spaces with respect to all legislative y Accounting, Finance and Business Law y Philosophy and Religious Studies
and University guidelines and requirements. y Economics y Political Science
y Management y Psychology
{ Anticipate the accommodation of the
enrollment targets as set forth in the 2018-2023 y Marketing y Sociology
Strategic Plan.
Waldron College of Health and Human Services College of Visual and Performing Arts (CVPA)
(Waldron College) y Art
Current Academic Programs
y Clinical Health Professions y Dance
The University offers 76 bachelor’s degree
programs in 47 disciplines, three associate y Communication Sciences and Disorders y Design
degrees and six certificates at the undergraduate y Nursing y Music
level; 27 master’s programs in 22 disciplines and y Occupational Therapy y Theatre and Cinema
six doctoral programs at the graduate level; and y Physical Therapy
14 post-baccalaureate certificates and one post- College of Graduate Studies and Research
y Physician Assistant Studies
master’s certificate.
y Public Health and Healthcare Leadership
y Social Work
23

Existing Academic Buildings


There are approximately 15 buildings with a primary
function to support academics, and a number
of them were established in the earliest years
of operation. However, the University has built
a significant amount of new academic footprint
over the last decade or so. In fact, each of the
six undergraduate colleges has occupied new or
significantly renovated buildings since the late
1990s with the exception of most departments of
the CVPA and the College of Graduate Studies and
Research. A capital project is currently underway to
renovate Reed and Curie Halls, which will complete
the main complex for the Artis College. Detailed
planning is also complete for a capital project for
the Center for Adaptive Innovation and Creativity
(CAIC), which will replace the existing McGuffey Hall
and Porterfield East and West Halls. This project will
mainly support the CVPA, but will also include multi-
disciplinary spaces including Waldron College, such
as music therapy.

2020-2030
Master Plan
24

Student Programs
HOUSING PROGRAM Existing On-Campus Residential Housing
DESCRIPTIONS Muse Quad
Goals y Muse
The University desires to accomplish a variety of Main Quad
goals relative to student housing.
y Tyler
{ Redefine the atmosphere and social
environment associated with living on-campus, y Norwood
thereby providing students with a memorable y Jefferson
and life-shaping undergraduate housing
y Madison
experience.
y Washington
{ Reinforce the sense of community, belonging
The University has undertaken a program to bring
and identity associated with living on-campus Moffett Quad
all existing campus housing to a common level
by reinvigorating the community within y Ingles of condition and accommodations. All residence
existing residence halls and developing new
y Draper halls have been renovated since 2002 with the
communities that address student desires for
exception of Norwood, Tyler, Muse and Ingles Halls.
increasing levels of independence. y Moffett
All renovated dormitories have air-conditioning,
{ Develop spaces that offer opportunities for
y Bolling single bathrooms and enhanced program and
students to engage with faculty, thereby y Pocahontas collaborative spaces.
enhancing their potential for academic success.
Governor’s Quad
Off-Campus Residential Housing
{ Increase
the number of upperclassmen living The University has current lease agreements with
y Floyd
on-campus, thereby increasing the potential for several privately managed residential properties.
mentorship and leadership development. y Peery The Radford University Foundation has also recently
y Trinkle acquired more than 700 beds in 32 existing off-
{ Increase the opportunities for non-traditional campus buildings adjacent to campus, and these
student housing, including married, military y Stuart
spaces have been leased for use by the University.
veteran and graduate students. These units will be renovated, where feasible, and
appropriate for use as off-campus residences. If not
{ Facilitate
innovative new programs, such as
feasible, the sites might be used for other potential
support for local community college students.
uses, such as academic/administrative spaces or
{ Anticipate the accommodation of the enrollment parking areas. The University also has current lease
targets as set forth in the Strategic Plan. agreements with The Patrick Henry in Roanoke to
support RUC student housing.
25

2020-2030
Master Plan
26

STUDENT RECREATION
AND ACTIVITIES PROGRAM
DESCRIPTIONS
Goals
The University desires to accomplish a variety of
goals relative to student recreation and activities.
{ Provide a variety of recreation and related
facilities and programs for the enjoyment of
students.

{ Provide opportunities that enhance and


facilitate the interaction between recreation
activities and overall academic programs.

{ Facilitate interactions with the surrounding


community to enhance the use of these
facilities.

{ Utilizethese facilities and programs to support


University growth through the recruitment and
retention of students.

The University has invested significantly in the


Existing Recreation and Activities Facilities addition of recreation and activities facilities and
With over 300 clubs and organizations, Radford programs over the last decade. Primary additions
University offers many opportunities for student include the on-campus Student Recreation and
engagement, leadership development and Wellness Center, which provides significant
community service. Many of these activities are opportunities for a wide variety of indoor student
located in the Hurlburt Student Center, which also and intramural activities. Another recent addition is
includes bowling, movies and food service options. the Student Outdoor Recreation Center, located a
The University provides dining options in a total of few blocks from campus, which provides significant
seven locations across campus, including full meals capability for outdoor intramural activities for both
and dining areas, takeout options, such as pizza students and the surrounding community. Other
and sandwiches and a variety of small foods and facilities include the New River entry point for
snack options. rafting and RU Able and RU Outdoors programs at
various off-campus locations.
27

ATHLETICS PROGRAM
DESCRIPTIONS
Goals
The University desires to accomplish a variety of
goals relative to intercollegiate athletics.
{ Provide state-of-the-art training and
performance facilities for all intercollegiate
athletic teams and individuals at Radford
University.

{ Maximize the efficiency and effectiveness of all


athletics facilities to ensure appropriate return
on the University’s financial investment.

Existing Athletics Facilities


A member of the Big South Conference, Radford
University competes in 16 men’s and women’s NCAA
Division I athletics programs.
{ Men’s and Women’s Basketball

{ Men’s and Women’s Cross Country

{ Men’s and Women’s Golf

{ Men’s and Women’s Soccer

{ Men’s and Women’s Tennis


The majority of Radford Athletics facilities are the outdoor track and field, lacrosse and soccer
{ Men’s Baseball located on the Athletics/Recreation Campus. programs; the Williams Field at Carter Memorial
The Dedmon Center is the main venue for many Stadium for baseball; the softball field; and the
{ Women’s Lacrosse
indoor athletic activities, including basketball, Sioros Center indoor hitting practice facility for
{ Women’s Indoor and Outdoor Track and Field
volleyball and indoor track and field, along with the baseball and softball, are located adjacent to the
main administrative offices for Radford Athletics. Dedmon Center, as are the outdoor tennis courts.
{ Women’s Softball Patrick D. Cupp Memorial Stadium, which serves

{ Women’s Volleyball

2020-2030
Master Plan
28

Current Land Use and Building Placement


LAND USE Off-Campus Facilities
The current Radford University real estate portfolio The University owns several off-campus sites and
consists of three main components: Central buildings, including 1101 Grove Avenue and the
Campus, Athletics/Recreation Campus and off- recently developed Student Outdoor Recreation
campus facilities. Center. The University also leases a number of
spaces from the Radford University Foundation
Central Campus and other private owners in the City of Radford,
Radford University’s original Central Campus was including housing, warehouse and office and
based on a master site plan developed by Charles support spaces. The Vinod Chachra IMPACT Lab
Robinson in 1911. The initial buildings surrounding is located in space leased from the Foundation
the original triangular-shaped campus site were at the Corporate Park. The University’s Printing
completed prior to World War II. After the war, Services are located in space leased from the
the buildings comprising Moffett Quad and the Foundation at 219 East Main Street. These facilities
Governor’s Quad, in addition to several other are located adjacent to or near campus.
buildings along Adams Street and East Main Street, The University leases the Selu Conservancy from the
were completed by the late 1960s. The most recent Foundation. Located about 15 miles from campus, Radford University Carilion (RUC), the result of the
additions to Central Campus during the last two Selu includes facilities for academic, conference, merger with Jefferson College of Health Sciences,
decades are located between the Adams Street recreation and other outdoor purposes for both enhances the offerings in healthcare education
pedestrian corridor and Jefferson Street, along the the University and the community. Facilities include in the Roanoke Valley. This significant presence
east side of campus and East Main Street. academic research spaces, an observatory, a provides undergraduate and graduate classes
working farm and period farmhouse, an access point and other training and certification programs for
Athletics/Recreation Campus for the Little River and conference support spaces. a variety of users, many of whom are working,
The Athletics/Recreation Campus is located on while attending classes. The coordination of these
The University has a significant leased presence in
land originally donated to the University by Norfolk offerings at RUC with those on Central Campus
RHEC, located in Roanoke approximately 45 miles
Southern (NS). The overall parcel lies between the is critical to ensure maximum leverage and
from campus, for a number of academic outreach
East Main Street/NS tracks corridor and the New effectiveness of this new academic footprint.
programs in Southwest Virginia. In particular, the
River. Starting with the Dedmon Center in 1980, a School of Nursing offers opportunities for academic The University also currently leases space in the
variety of facilities have been constructed here with and clinical engagements in the newly-expanded SWVAHEC, located in Abingdon approximately 100
many supporting Athletics. The University’s Facilities Clinical Simulation Center. The building has miles from campus, for academic program offerings
Management operations units are located on the approximately 100,000 total square feet of leasable and continuing education.
Athletics/Recreation Campus, along with several space, and the University is currently the largest
large parking lots. tenant with approximately 25,000 square feet of
leased space.
29

BUILDING CONDITION { Norwood Hall FCI = 0.73 STATE COUNCIL OF


ASSESSMENT HIGHER EDUCATION FOR VIRGINIA
{ Tyler Hall FCI = 0.42
2012-14 FACILITY CONDITION REPORT
The University maintains a database that captures
{ McConnell Library FCI = 0.60
the overall condition of buildings, including the Institution Facility Condition
various building operating and infrastructure { Davis Hall FCI = 0.67
support systems. This database compiles condition Christopher Newport .02
information collected by the Facilities team for { Muse Hall FCI = 0.59
each building system and related equipment George Mason .25
and components, such as roofing, HVAC and fire The current Six-Year Capital Plan includes projects
detection and alarm systems. This information for a significant renovation or complete replacement James Madison .33
is then compiled and totaled for each specific for each of these buildings except Davis Hall. None
building, and an associated Facility Condition of these existing buildings has been significantly Longwood .23
Index (FCI) value is calculated. The FCI value is renovated for the last several decades, and many
computed by dividing the approximate costs of the associated existing building systems and
Mary Washington .32
of anticipated required equipment and systems components are at their end-of-life. These buildings
repairs/replacements by the overall value of the are among the least energy-efficient on campus
Norfolk State .12
building, such that the lower the FCI value, the and do not include up-to-date safety, security and
better the building overall condition. FCI values in accessibility capabilities.
Old Dominion .32
the range of 0.00 to 0.20 indicate buildings that Further, the Facilities team utilizes the results of
are generally in reasonable condition, while values the condition database to identify and prioritize Radford .20
of approximately 0.50 and above indicate building projects to be funded by the Commonwealth’s
conditions requiring attention in the relatively short annual Maintenance Reserve funding. This process University of Virginia .09
term. This database is regularly updated to include is instrumental in ensuring that all campus buildings
recent renovations and equipment maintenance are consistently reviewed and maintained in a UVA’s College at Wise .03
and is used by both the Facilities team and the consistent manner. For example, it is planned that
Commonwealth of Virginia to prioritize various new annual Maintenance Reserve funding will be utilized
Virginia Commonwealth .21
construction, renovation and upgrade projects. to upgrade certain systems and components in
The current database FCI values show the overall Davis Hall, due to its FCI score and the fact that it is
Virginia Military Institute .28
average condition of all existing campus buildings, not on the current list for capital renovation.
including minor buildings and non-permanent Several existing properties have been identified Virginia State .66
facilities, to be approximately 0.13. This indicates to become unoccupied in the future, due to their
that the overall condition of campus buildings, on functionality, location, condition or other factors. Virginia Tech .16
average, is comparatively good. However, there are These include 615 Fairfax Street, Calhoun Hall,
several specific major campus buildings, which show the modular buildings adjacent to the Armstrong William and Mary .27
clear requirements for major renovation. Complex and potentially the Buchanan House.
{ Porterfield West Hall FCI = 0.41 Alternate locations for the occupants of these
All .19
buildings will be determined as part of future space
{ Porterfield East Hall FCI = 0.55 development and utilization.

2020-2030
Master Plan
30

BUILDING EFFICIENCY { Overall:


The net assignable square feet per
student is currently 124, which is slightly less
ASSESSMENT than institutions similar to Radford University,
Given the addition of substantial occupancy which are typically at 135-145 NASF/student.
footprint over the last decade, the University
undertook a review of the overall usages and MAIN CAMPUS
efficiencies of all existing campus buildings.
SCHEDULED CLASSROOM USE BY DAY AND TIME - FALL 2017

cheduled Use by
The state requires the University to report on
(Darker colors indicate a large percentage of rooms are scheduled).
the efficiency and occupancy of academic
classrooms and laboratories, and this information

ay + Time
is compiled annually; however, various
other building occupancies have not been
systematically reviewed for overall usages
and efficiencies.
scheduled use
This by dayincluded
review and time grid to
visits illustrates the spaces
all campus intensity of
eduled use
to as indicated
identify by the
current use,darker color. furnishings,
occupancy,
equipment and other salient information. As a
re are 26secondary
blocks of time where 80% or more rooms are scheduled.
task, each space was also reviewed for
en 80% ofitsclassrooms are scheduled consistently throughout the
overall condition. Additionally, the University
it is an indicator that there are not enough classrooms of the right
engaged a nationally recognized campus space
acity andplanning
configuration throughout the campus.
firm to review the current situation. The
inventoryresults of this review
is particularly provided
strained several
during the observations.
Tuesday and Thursday
0AM through 4:00PM
{ Classrooms: The current and planned future during
time blocks and Monday and Thursday
11:00AM time block.classroom inventory is strained during peak
hours. Adjusting the classroom capacity mix
zation is the lowest
andon Monday, practices
scheduling Wednesday, andhelp
should Friday afternoons.
alleviate
patterns of highthe
andstrain.
low use illustrated on this chart are common in
her education. { Labs: The current and planned future labs do

ent industry trends notsuggest


meet utilization targets and
that institutions areshould be more
scheduling
reviewed for their use going forward.
nday-Wednesday courses, allowing classrooms to be used on Fridays
non-traditional {academic experiences.
Faculty/Staff and Overall Administrative and
Support
rses not scheduled Spaces: The
on a common gridexisting inventory
can create appears and
inefficiencies
to be
ks of unusable time. sufficient, and any new or reconfigured
office spaces should be standardized going
forward for consistency.
31

Outdoor Spaces
OVERALL CAMPUS semicircular space hosting seating and landscape to
screen the Covington Center’s utility area below on
The Master Plan provides an opportunity to improve East Main Street.
and upgrade existing landscape and hardscape
elements and components, while providing
guidance on improving and expanding the overall
FAIRFAX STREET CORRIDOR
current environment. To provide a framework for AND HETH PLAZA
this work, the overall campus was reviewed based The Fairfax Street Corridor serves as the major
on a number of specific locations of “outdoor east-west pedestrian and vehicular corridor across
rooms” and current design elements. Central Campus. Parking Lots DD, EE and JJ are
located along this thoroughfare. At the midpoint
MAIN QUAD, MOFFETT QUAD of the corridor is Heth Plaza, which is a highly
AND THE GOVERNOR’S QUAD recognizable space nearly in the center of Central
Campus. Its clock and brick pavers clearly identify
The Main Quad is the oldest part of Radford’s the space’s importance to campus.
original campus and hosts some of the University’s
oldest buildings. Its landscape is the most mature on Fairfax Street and the parking lots along it have
campus with graceful old trees lining the pedestrian been developed in an organic fashion over the
walks and shading the buildings. The existing decades, as the buildings fronting this corridor are
walkways designed decades ago respond well to the highly variable in their age and history on campus.
forms an important connector between the Main
asymmetrical shape of the Main Quad, successfully Russell Hall, one of the original campus buildings,
Quad and facilities to the east.
linking adjacent buildings, while emphasizing key is located west of Heth Plaza and is currently
occupied by student, parent and alumni service
vistas and axes within and through the space. The
ADAMS STREET CORRIDOR organizations. In many ways, it is the current “front
sweeping pedestrian arc at the front of Heth Hall
is appropriate and engaging, and the existing bulb The Adams Street Corridor serves as a primary door” to the University as prospective students and
form of the walks extending from the front of Muse north-south pedestrian route on campus. Much parents, alumni and other visiting groups meet here
Hall is also of value. of the Adams Street Corridor has been converted for tours and activities. Dalton Hall, which houses
to a major pedestrian mall. The two ends of the the University Bookstore, Post Office and dining
The Moffett Quad landscape is also among the most operations, is also located along Fairfax Street.
pedestrian mall are areas of key importance. Kyle
mature on campus with similar components as Main
Hall is located at the uppermost end of Adams
Quad. The field space in the Moffett Quad is used
Street Corridor. The front of the building addresses
for many functions, including Commencement and
not just the pedestrian corridor, but also the axis
various student and alumni activities.
from Heth Hall passing at the front of the Peters
The Governor’s Quad is an established and mature Hall entry at Moffett Quad. The lower end of
recognized outdoor space, as well, and should be Adams Street Corridor, adjacent to the Covington
maintained in its current configuration. This Quad Center for Visual and Performing Arts, provides a

2020-2030
Master Plan
32

DOWNEY STREET CORRIDOR EAST MAIN STREET CORRIDOR


Another significant entry to campus from the east Currently, a number of relatively new, tall buildings
is along Downey Street, which is located between with paved parking lots in front dominate the
the Covington Center for Visual and Performing campus’s western East Main Street facade (Tyler
Arts and the Student Recreation and Wellness Avenue to University Drive). This stretch of East
Center. The use of Downey Street, as a pedestrian Main Street was improved as part of an overall
way, is inhibited by these buildings’ requirements road realignment project and includes medians and
for parking and service entrances. bicycle lanes. Although plantings were established
within the parking lots, they have not yet had the
time to grow sufficiently to screen buildings or
TYLER AVENUE CORRIDOR shade the parking area. The campus’s eastern East
Fronting onto the City of Radford’s most Main Street facade (University Drive to Jefferson
prominent entry corridor, the University’s Tyler Street) was not impacted by the road realignment
Avenue street front currently appears more as project and thus lacks the attractive landscaped
a rear campus facade than as the front edge of medians and bicycle lanes of the western portion of
a historic University. Improvements, along Tyler the street.
Avenue, have enhanced the street’s visual quality
and pedestrian safety by adding attractive and
well-maintained landscaping to the medians in the
JEFFERSON STREET CORRIDOR
center of the road and adding colored crosswalks Currently, the Jefferson Street campus edge is
at Tyler Avenue’s intersections with side roads. visually disorganized, bearing little visual relation to
Existing trees, along Tyler Avenue, should be the older, statelier parts of the academic campus
preserved; in particular, the historic oak grove surrounding the Main Quad and Moffett Quad.
at the rear of Muse Hall should be preserved to
enhance the established facade of the University. ATHLETICS/RECREATION
Parking areas exist at both Walker Hall and Tyler Hall CAMPUS
and include utility areas and assorted mechanical The only existing entry to the Athletics/Recreation
equipment. Along most of the length of Tyler Campus is the bridge over the railroad on
Avenue, bicycle lanes have been installed on both University Drive. In its current condition, this
sides of the street; the exception is a three-block bridge is an uninviting place for pedestrians, with
stretch of the west side of the road with parking four wide lanes, narrow sidewalks on either side
located at the side of the road with no dedicated for pedestrians and no safe accommodation
bicycle lane. for bicyclists.
33

Infrastructure
SUSTAINABILITY
The University is committed to reducing greenhouse
gas emissions and enhancing campus climate
resiliency, and it has been a leader in developing
and implementing plans, strategies and upgrades to
conserve energy use on the campus and operate in
a more sustainable and efficient way. The University
has established the Sustainability Office and also
receives input and guidance from the Sustainability Commonwealth of Virginia policy requires a
Steering Committee, a multi-discipline group minimum of LEED Certified for all capital new
providing a forum to discuss a variety of strategies construction and renovation projects, while the
to reduce energy use and greenhouse gas emissions University has set a target of LEED Silver minimum.
generated by the campus community. The Steering The University has been able to achieve these
Committee is broken down into five strategic minimums, and in most cases achieve LEED Gold
working groups: Operations; University Services; ratings, for all capital projects since the beginning
Education and Research; Outreach, Student of the state mandate. The illustrated map indicates
Involvement and Campus Culture; and Tracking, the LEED ratings for capital new construction and
Assessing, Modifying and Funding. renovation projects completed during the period of
state-mandated LEED compliance. The total LEED
The University continuously measures and
Gold-rated and Silver-rated facilities represent more
monitors commitment to sustainability through
than 30% of all campus buildings.
multiple tools and reporting mechanisms. The
University recently submitted information into Another measure of overall campus sustainability is
the Sustainability Tracking, Assessment and the EPA’s Energy Star certification program. Energy
Rating System (STARS) as administered by the One specific measure of overall campus Star certified buildings save energy, save money and
Association for Advancement of Sustainability in
Higher Education (AASHE) and earned a Silver Radford University
sustainability is the U.S. Green Buildings Council
Leadership in Energy and Environmental Design
help protect the environment by generating fewer
greenhouse gas emissions than typical buildings.
Institution rating. The University also annually (LEED) rating system. This is the most common To be certified as Energy Star, a building must earn
completes a greenhouse gas (GHG) inventory to rating system used in the United States for a score of 75 or higher, indicating that it performs
help identify areas for emphasis in sustainability documentation of sustainable practices for design better than at least 75% of similar buildings
and greenhouse gas emission reductions and and construction of the built environment. The nationwide. The University has a number of Energy
provides information for The Princeton Review’s ratings are Certified, Silver, Gold and Platinum, Star certified buildings, including Heth, Moffett,
“Guide to Green Colleges.” the highest rating for overall sustainability. Ingles, Stuart, Norwood and Floyd Halls.

Awarded on May 21, 2019 and valid for three years.


2020-2030
Master Plan
34

CAMPUS LEED BUILDINGS

Campus Building
(Prior to LEED)
LEED Gold
LEED Silver
35

CITY OF RADFORD EXISTING UTILITY


INFRASTRUCTURE
The City of Radford and the University work closely on the connectivity
between utility systems and components. The City of Radford has stated
that the current capacity and overall condition of the utility infrastructure in
the areas adjacent to University property is adequate and should continue to
support the current needs of the University.

ELECTRIC
Electrical service is provided to the Central Campus by the City of Radford
Electrical Department and is delivered to a substation located on East Main
Street near the Allen Building. From there, it is distributed to each Central
Campus building at 4160 volts through buried concrete duct banks. Five
existing loops serve the various parts of Central Campus with the capability
within each loop to keep buildings online in a redundant fashion to minimize
issues given problems in any single building. Each building has a transformer,
which reduces the voltage to 208 or 480 volts as required. Athletics/Recreation
Campus buildings and other off-campus buildings are fed directly from Radford
Electric Department overhead lines.
The University maintains the distribution system on Central Campus and owns
the underground carrier lines and switches. The City of Radford maintains
ownership of the transformers and overhead lines. Off-campus buildings are fed
by lines maintained by the City of Radford Electrical Department.

2020-2030
Master Plan
36

STEAM
The University produces steam from a central boiler plant located on the
Athletics/Recreation Campus. The central steam plant provides a constant flow
of medium pressure steam to all areas of Central Campus through a looped
distribution system on a 24-hour, seven-days-a-week basis. The plant consists
of three 50,000 pounds per hour boilers, one 14,000 pounds per hour boiler
and one 6,800 pounds per hour boiler. Each boiler has the capability of burning
natural gas or No. 2 fuel oil. The system operates and distributes at 90 psig
pressure in the heating season and at 50 psig pressure during non-heating
seasons by utilizing the smaller boilers. The Armstrong Complex and the
various other Athletics/Recreation Campus facilities utilize stand-alone boiler
units and are not connected to the central steam system.
Steam is distributed across campus via steam tunnels with condensate return/
recapture piping. Steam is utilized on-campus to satisfy building space heat
requirements in addition to domestic water heating. Laboratories utilize steam
at lab stations, autoclaves and other appliances as required. The existing steam
distribution system consists of a single 8-inch main, which crosses East Main
Street from the steam plant into Central Campus. All building steam service
lines extend in radials from the main loop. In some cases, portions of the main
loop are routed through existing buildings.
The current connected load to the central steam system is approximately
39,500 pounds per hour with the existing central boiler plant having a current
firm capacity of 100,000 pounds per hour, based on the capacity of only two of
the three largest 50,000 pound per hour boilers.
37

STORMWATER
Central Campus Jefferson Street/Adams Street Systems
The dividing lines for the drainage basins in the Central Campus area and in the
areas east of Jefferson Street are shown on the adjacent map. The drainage
from the Jefferson Street/Adams Street basin flows toward the north and west
and discharges into a stormwater management (SWM) facility north of East
Main Street and south of the NS tracks. This facility manages the quantity flows
from much of the area extending from just east of Jefferson Street to west
of Adams Street, including most of the Central Campus. For the most recent
building projects in the Jefferson Street and Adams Street corridors, this SWM
facility provided credit for quantity treatment requirements.

Athletics/Recreation Campus Systems


All current development on the Athletics/Recreation Campus is directly
tributary to the New River.

East Jefferson Street Systems


In the areas east of Jefferson Street, the general slope of the ground is towards
the north or northeast. There are a few small valleys/swales between Jefferson
and Whitehall Streets, but the largest valley is located between Madison and
Wilson Streets. The City of Radford has indicated that as drainage was directed
toward Main Street over time, discharges were piped to the south edge of the
Norfolk Southern Railway and discharged into a large gravel drainage ditch on
the railway property that parallels the commercial properties, along the north
side of East Main Street. Most or all of those culverts through the commercial
properties (draining to the drainage ditch) were installed years ago, and there
are no easements or rights-of-way for them. CHILLED WATER
A further complication is that the gravel drainage ditch on the railway property The existing chilled water system at Radford University consists of unitary,
drains toward a large arch pipe structure that then crosses the railway and mostly air-cooled chiller equipment. Four existing loops provide chilled water
drains toward the Dedmon Center, eventually discharging into the New River. to multiple Central Campus buildings, which reduces energy costs and provides
The City of Radford cleaned out the channel and culvert after the 1985 floods redundancy: Moffett Quad loop; Cook/Waldron loop; Governor’s Quad loop;
after debris from the railroad blocked the arch culvert. This blockage caused a and the Martin/CFTS loop. These loops supply the chilled water needs for
backup in the drainage system and flooded several basements in the area east 20 buildings. Single system chillers supplying only those buildings serve the
of Jefferson Street. remaining buildings, which results in higher overall operating costs and shorter
system life span compared to loop systems.

2020-2030
Master Plan
38

WATER
There are currently no significant issues with overall supply availability or
pressures for the potable and fire supply systems at the Central Campus and
Athletics/Recreation Campus. The Central Campus is on the City of Radford’s
Low System. The Facilities team indicates there are some line pressures in
excess of 100 psi. There have also been improvements to the City of Radford’s
Middle and High systems to the south and east of the campus. The area east of
Jefferson Street is served from the water mains along East Main Street.

SANITARY SEWER
The existing sanitary sewer infrastructure within the Central Campus is
presently sufficient for the existing building infrastructure. As new capital
projects have been constructed, new sewers have been constructed and older
lines abandoned to facilitate the new construction.
In the area east of Jefferson Street, the sanitary sewer infrastructure is in less
than ideal condition. Most of the lines are old, and there are a lot of infiltration/
inflow (I&I) problems with these older lines. This sewer shed drains toward an
8-inch diameter main running east, along the south side of East Main Street. A
new 15-inch diameter sewer then intercepts that main and crosses under East
Main Street and runs north toward the east side of the baseball and softball
complex at the Dedmon Center, where it transitions to a trunk line running back
west, along the river toward the City of Radford pumping station. The City of
Radford believes that the system has good capacity back up to the end of the
15-inch main under East Main Street.
39

INFORMATION TECHNOLOGY
Telecommunications service including voice, video and data for the Central
Campus and the Athletics/Recreation Campus is delivered by external
telecommunication partners to wiring and network distribution points located
in Jefferson Hall and the Armstrong Complex and then distributed to campus
buildings via the campus steam tunnels and various buried conduits. Each
building is connected via the use of fiber optic cabling back to Jefferson
Hall and/or Armstrong Complex. Porterfield East is currently used as a fiber
consolidation and splice point consolidation point for most fiber going to
Armstrong Complex. This fiber network currently provides a minimum of
one-gigabit connectivity from each building to the data center and 10-gigabit
connections between data centers. Most academic buildings are connected at
10 gigabits. The University is continuing to enhance redundancy of the fiber
network with intentions of providing a fiber path from each building to both
Jefferson Hall and Armstrong Complex.
All campus buildings include WiFi access points supporting the 802.11 WiFi
standard with 802.11 ac available in most areas to provide coverage for mobile
devices. Outdoor areas are not targeted by WiFi coverage, but WiFi is available
for users when they are in close proximity to campus buildings.
The primary campus data center is currently located in the oldest portion
of McConnell Library. This data center was constructed in the early 1980s.
Inefficient cooling, due to the configuration of the space and a water-based
fire suppression, make this facility less than ideal as a data center. An additional
data center is located in the Armstrong Complex and is shifting to be the
primary data center.
Radford University has partnerships with Virginia Tech and two other
telecommunications providers to establish a 10-gigabit connection between
Radford University and RUC. This connection allows technology services to be
provided seamlessly at RUC.
Fiber optic cabling was installed during the summer of 2019 to all University-
operated, off-campus apartments. This was completed by a long-term contract
with external telecommunications providers, which coordinated with the City of
Radford for installation.

2020-2030
Master Plan
40

Multimodal Campus Access


SECURITY AND EMERGENCY accessible routes to the north edge of the Main Quad.
At the lower northern end of Adams Street Corridor,
SYSTEMS AND ACCESS accessibility is achieved with compliant ramps and
Radford University has deployed a number of paths at the east side of McGuffey Hall with access
exterior security and emergency systems across to the Covington Center for Visual and Performing
campus, including emergency phones, public Arts building through the adjacent Porterfield Hall.
address speakers, outside emergency lighting and On the north edge of Central Campus, the primary
designated vehicle access routes. The University pedestrian paths parallel to East Main Street are
regularly tests these systems for effectiveness, accessible, along their full length. Internal accessible
including mock events, test announcements routes within all buildings, along the north edge
and exterior night lighting inspection tours. The of Central Campus, allow for negotiation of the
University also closely coordinates with the City of remaining grade change down to East Main Street.
Radford Emergency Services on access routes and
emergency system component locations.
TRANSIT SYSTEM
with babies, individuals with visual impairments
The Radford Transit system currently has multiple
ACCESSIBILITY and those who use motorized wheelchairs and
routes that provide ridership opportunities for
service animals. The designers of new buildings and
Radford University is committed to making its various University riders. In general, these routes
renovated facilities are instructed to acknowledge
programs and facilities accessible and improving travel the perimeter of Central Campus along
a wide range of issues to ensure that the campus
circulation and parking on-campus for students, Tyler Avenue, Jefferson Street and East Main
serves the entire community of stakeholders.
faculty, staff and visitors with disabilities. In 2011, Street; connect across University Drive to serve
the University commissioned a study of the campus Handicapped accessibility is a challenge on Central the Athletics/Recreation Campus; and travel along
with respect to exterior accessibility of buildings, Campus due to the intense changes in topography, East Main Street to serve the Student Outdoor
parking and pedestrian pathways. The University particularly along north-south routes. As the Recreation Center and adjacent housing. There
has been using the results of this study to undertake principal pedestrian routes across the campus, are numerous stops on both campuses with time-
continuous accessibility improvement projects both the Adams Street and Fairfax Street corridors checks at the stops at Waldron Hall, Lot A and
across campus and coordinate with new capital and are required to be compliant with the Americans Fairfax Street. Radford Transit also has routes that
renovation projects. with Disabilities Act, along with several other connect University riders to Fairlawn, Christiansburg,
primary routes. Blacksburg and the Roanoke Valley.
Along with a commitment for accessibility, the
University is committed to inclusivity and has At the southern upper end of the Adams Street The University works closely with Radford Transit
been providing facilities to ensure that the campus Corridor, there are accessible parking spaces closest to ensure adequate coverage for riders, while also
is welcoming. Recently, the University identified to the south main entry of Kyle Hall. The building’s imposing minimal disruptions to pedestrian patterns.
restroom facilities throughout campus that can internal accessible routes then allow for negotiation It appears there might be opportunities to improve
be used by all genders. Facilities are also provided of the grade change from the south parking area the timeliness and frequency of numerous routes,
in support of other members of the campus to the southern head of the Adams Street Corridor. including increasing the frequency and number of
community, such as disabled veterans, parents Once this grade is achieved, it is possible to utilize stops along the Central Campus perimeter.
41

connections are also throughout this area. The only of substantial occupancy footprint over the last
existing pedestrian connection between the Central decade and associated displacement of parking, the
Campus and Athletics/Recreation Campus occurs at University undertook an overall review of the usages
the University Drive Bridge. and efficiencies of the current parking situation.
The University engaged a nationally recognized
BIKEWAYS parking and planning firm to engage in this review.
The results of this review provide the following
Existing bike paths run along Tyler Avenue and observations.
Jefferson Street and a portion of East Main Street,
and bike racks are located throughout Central { Ingeneral, the University parking and
Campus. The City of Radford has modified several transportation system appears to be well
Pedestrian Walking Distances organized and efficiently operated.
adjacent streets with bike lanes, including Tyler
Avenue and East Main Street.
{ Based on peer comparisons, parking count
PEDESTRIAN WAYS survey and total permits, there are adequate
On the Central Campus, the primary pedestrian NEW RIVER ACCESS available total parking spaces (71% filled and
paths are the Adams Street Corridor running AND GREENWAYS 29% available at time of survey.)
north-south and the Fairfax Street east-west central The New River is directly adjacent to the Athletics/
pedestrian corridor. Other significant pedestrian { The condition and capacities of existing parking
Recreation Campus with boat access points at
routes extend across the campus, including the path lots are in good condition overall.
several locations near University property. Also,
radiating from Muse Hall on the north to Heth Hall an extensive partially developed greenway/trail { Current parking conditions are less than
and then on to Kyle Hall on the south; the north- system parallels the river and extends to Bisset optimal, mainly with respect to the distribution,
south path through Moffett Quad across Fairfax Park and other City of Radford facilities to the west allocation and location of spaces.
Street to Muse Hall; the east-west route from the of campus.
Hurlburt Student Center through the Governor’s { Certainparking areas, while conveniently located
Quad to Whitt Hall; and the east-west route running
from Jefferson Street along the old Downey Street VEHICULAR ACCESS adjacent to various campus buildings, are not
well designed for overall circulation purposes.
Corridor between the Student Recreation and AND PARKING
Wellness Center and the Covington Center for Visual The main traffic routes, adjacent to campus, include { Manyof these parking areas have been
and Performing Arts and through the Main Quad to Jefferson Street, East Main Street, Tyler Avenue “organically” developed through the years as
Muse Hall. and University Drive with building and parking new buildings, renovations and pedestrian
access primarily from these streets. Fairfax Street pathways have evolved.
On the Athletics/Recreation Campus along the
New River, the primary pedestrian route extends pierces Central Campus from both Tyler Avenue
{ Themix of Faculty/Staff and Commuter parking
from Cupp Stadium eastward to the parking areas and Jefferson Street to Heth Plaza in the center
areas needs to be reviewed for appropriateness,
at the eastern periphery of the space, connecting of campus, creating the greatest potential for
along with the potential to add spaces around
playing fields and indoor sports facilities. Secondary pedestrian/vehicle interactions. Given the addition
the perimeter of campus.

2020-2030
Master Plan
42

EMERGENCY DEVICES

Fire Hydrant
Emergency Speaker
Emergency Phone
43

CAMPUS ACCESSIBILITY

2020-2030
Master Plan
44

CAMPUS PARKING LOTS AND TRAFFIC CIRCULATION

Campus Parking Lots


Traffic Circulation
45

Strategic Planning and Future Needs


The 2018-2023 Strategic Plan requires the Master used to bring focus to specific themes and areas
Plan to develop the University’s physical assets to of concentration to be incorporated into the
support the six stated areas of emphasis. Master Plan.
{ Academic Excellence and Research The Committee solicited input from a variety
of campus stakeholders using various methods
{ Brand Identity and in a number of different venues, including
presentations to the University’s Leadership
{ Economic Development and Community
Council; the Faculty Senate; the Administrative
Partnerships
and Professional Faculty Senate; Staff Senate; the
{ Philanthropic Giving and Alumni Engagement Student Government Association; the Academic
Affairs Leadership Team; and the Alumni
{ Strategic Enrollment Growth Association Board of Directors. The Committee also
held multiple campus open forums with students,
{ Student Success faculty and staff.
The Committee administered a survey with Division
STAKEHOLDER INPUT of Academic Affairs faculty and staff concerning
PROJECTED ENROLLMENT
the overall campus learning environment and GROWTH
The Committee was organized into subcommittees
administered a separate survey with students The 2018-2023 Strategic Plan indicates the following
to concentrate on several specific areas of the
concerning overall instructional spaces and projected enrollments by Fall 2023.
Master Plan.
related technology.
{ Undergraduate Students – 7,870
{ Academics
{ Classrooms/Labs – Comments on the number
and sizes, scheduling, furnishings, discipline- { Graduate Students – 1,371
{ Student Activities and Services
specific uses and IT/AV capabilities
{ Competency-Based Education Students – 2,125
{ Land Use
{ Student Spaces – Comments on the number,
{ Total Students – 11,366
{ Transportation locations, scheduling, furnishings, IT/AV
capabilities and access for commuters It is anticipated that the Central Campus student
{ Infrastructure and Sustainability
population will be approximately 8,500 with the
{ EventSpaces – Comments on the number
{ Public-Private and Community majority of the remaining growth occurring in
and sizes
Roanoke at RUC or in CBE-based programs.
Each subcommittee met several times to identify
specific issues and needs in their particular area of
interest and finalize recommendations based on
these issues and needs. All of this information was

2020-2030
Master Plan
46

COMPARATIVE SPACE Offices and Support Spaces { The Criminal Justice and Forensics Studies
programs in CHBS are anticipated to continue
ANALYSIS Based on the current academic office and support
their recent growth.
space inventory, office space appears in general to
Overall be adequate. The distribution of office sizes and { Spacefor the Venture Lab was identified as
Based on the current space inventory and existing support spaces also does not appear to match the a need.
needs along with the stated growth projections, needs in some instances.
the overall University footprint when viewed in { Theexisting Center for Interprofessional
terms of square feet of usable space per student ACADEMIC PROGRAM GROWTH Education and Practice (CIPEP) is scheduled
is slightly less than peer institutions. This would to expand.
indicate that the campus, as a whole, is relatively New and Expanded On-Campus Programs
{ The Vinod Chachra IMPACT Lab anticipates
efficient with respect to space usage. { Waldron College is nearly at capacity in its
continued growth, but it is preferable that this
current locations, so it is likely that up-fits
Classrooms program remain in leased off-campus space
and renovation projects will be necessary to
to allow ease of expansion/contraction in the
Based on the current classroom inventory, classroom continue to accommodate the students in
future.
space is strained during the peak delivery times these buildings. Further, the Radford University
between 9 a.m. and 3 p.m. Monday through Carilion merger likely will drive additional needs
Thursday. The distribution of various classroom New and Expanded Off-Campus Programs
for Waldron College.
sizes also does not appear to match the needs in { RUC is located in space leased from Carilion
some instances. { Severalprograms in the CEHD will require Clinic in Carilion Roanoke Community Hospital
some additional footprint. One example is (CRCH), and is likely to remain in the current
Both the student and faculty surveys indicated issues
the development of the Tourism and Special space at present; however, it is projected
with various aspects of class scheduling, existing
Events Resource Lab, which will require space that the space in the RUC facility will need to
furniture/furnishings and IT/AV delivery tools.
and be led by faculty and staff from the expand as programs grow. Further footprint
Class Labs CEHD. The Health and Human Performance development in Roanoke is also probable as the
program will also need extended research and current programs evolve and new programs are
Based on the current class labs inventory, class lab
training space, and the Nutrition and Dietetic established to meet the needs of the region.
space is somewhat underutilized during normal
Laboratory will need to be relocated from
delivery times. The distribution of various class lab { Toprovide greater support for a number of
McGuffey Hall.
sizes and attributes also does not match the needs programs in Roanoke, it is anticipated that the
in some instances. { The Artis College will need to accommodate leased space in the RHEC may need to grow.
As with classrooms, both the student and faculty the requirement to supply individuals with Although the existing Clinical Simulation Center
surveys indicated issues with various aspects of specific education and skillsets for the was recently expanded, it is expected that it
class lab scheduling, existing furniture/furnishings Commonwealth of Virginia’s “Tech Talent may need to be expanded again going forward,
and IT/AV delivery tools. Pipeline” over the next 20 years, mostly in the given the growth of related activities in the
Information Technology and Cyber Security Roanoke region.
Computer Science areas. The Artis College
will also need to establish the related Security
Studies Initiative and the Geohazards and
Unmanned Systems Research Center.
47

{ The Appalachian Community Outreach Institute { Theconstruction has been completed for the success and allows students to cross-credit those
is not projected to need additional leased space Venture Lab. The space includes an office, competencies with general education areas.
in the SWVAHEC for current and envisioned student collaborative and virtual maker spaces,
From a footprint standpoint, while the REAL model
future programs, although the current space conference and pitch rooms and other support
may ultimately influence the required number of
could be better utilized. spaces. The total square footage is 4,500
classrooms across campus, the more profound
square feet.
impact is the requirement for classrooms and other
STUDENT PROGRAM GROWTH { Theexisting Center for Interprofessional learning spaces to be as flexible as possible to
Education and Practice (CIPEP) requires an allow use as multi- and cross-disciplinary learning
New and Expanded Student Programs additional 1,300 square feet for clinical, meeting environments.
{ Develop the overall Greek Life and other and office spaces. A final factor is the requirement of the current
thematic communities: Panhellenic Council higher education environment to maximize the
(PHC), Interfraternity Council (IFC) and National Classroom and Class Lab Enhancements utilization of the campus built environment, in order
Pan-Hellenic Council (NPHC). This could include to ensure the most cost-effective campus delivery
Current modern academic building design
certain outdoor areas of campus and potential of education. This requires a culture of shared
incorporates flexible instructional spaces to allow
alignment with identified contiguous off- spaces and cross-disciplinary delivery, along with
multiple uses and delivery methods. Examples
campus housing in coordination with the City proactive scheduling techniques.
include multiple displays and white boards, movable
of Radford.
furniture with ample power and data capabilities. A To meet all these ongoing trends along with the
{ Enhance student and visitor amenities, number of factors, including changing instructional certainty that the academic environment will
potentially including a welcome center, student delivery methods, such as “flipped” classrooms and continue to evolve, the University will need to
organizations space, event space, expanded active learning environments, are driving this trend. undertake a systematic regular review of the basic
advising space and other activities. instructional spaces across campus. These regular
Amplifying this trend, the University plans to
reviews will help ensure that these current trends
implement a revised General Education program.
inform consistent upgrades to furniture, furnishings
Students will choose degree programs (majors
SPACE NEEDS AND FACILITIES and minors) to fulfill four areas of knowledge and
and IT/AV delivery tools and methods, along with
PROJECTIONS complete general education (the REAL areas),
purposeful scheduling for maximum space usage.

Academic Spaces { Scientific and Quantitative REASONING Collaboration and Integration Spaces
{ Waldron College anticipates future growth Current modern campus building and space
{ Humanistic or Artistic EXPRESSION
to meet the needs of the region across design also includes purposeful identification of
multiple locations. { Cultural or Behavioral ANALYSIS collaboration spaces adjacent to more traditional
classroom/laboratory and academic spaces,
{ The CEHD has begun its Ed.D program, which { Applied LEARNING recognizing changing student expectations for the
will require additional faculty space estimated ability to study and work effectively in a variety of
at 1,700 square feet. The revised General Education REAL model builds settings and locations.
on the idea that students can pursue their goals and
{ ArtisCollege anticipates growth in the engage in exploration and learning in many ways Due to the large amount of new academic space
Information Technology Cyber Security and in all departments. The REAL model recognizes provided over the last decade or so wherein the
Computer Science programs for the Tech Talent that degree programs build competencies in the design incorporated these recent trends, there
Pipeline, estimated at 2,500 square feet for areas students need for lifelong learning and already exists a fair amount of collaborative study
additional faculty offices and support space. space across campus. There are also numerous

2020-2030
Master Plan
48

dining options across campus, which also include The University will also need to identify specific support and student orientation activities,
spaces to be used for informal study environments. on-campus and off-campus locations for veterans, among others.
Further, the recent residential hall renovations have students and married students and their families, as Students and their parents also desire expanded
included purposeful spaces designated for lounge/ these demographics are targeted for growth in the hotel, retail and dining opportunities during their
study activities. future. Potential Greek-life housing “communities” University experience. The on-campus food options
will also be identified for residential users, along
However, there are a few areas of campus where require regular “refreshes” to ensure the University
with potential extensions of on-campus living-
it is more difficult for students to find these stays abreast of changing taste trends. There is also
learning communities.
collaborative learning spaces. In particular, the currently a shortage of food and shopping options
academic areas in Peters, Waldron and Cook The University will also provide housing to near campus, and there is not a centrally recognized
Halls are lacking in these types of spaces. As support students attending New River Community grouping of establishments to act as the campus
new or repurposed footprints are brought online, College and living in on-campus housing in the “main street” as exists in most college towns.
these existing buildings should be explored for “Bridge to RU” program. This program is designed Further, it is desired to better connect students
the potential addition of collaborative spaces. to facilitate the retention of students early in their and others to the New River for both instructional
An additional enhancement of these types of academic careers and ultimately transferring to and public uses. To enhance this connection, it
campus spaces could include extended hours Radford University. is proposed to potentially move the RU Able
of operation, particularly for buildings with Temporary beds may be required during the times equipment and program to campus from its current
large concentrations of student study spaces, that residence halls are being renovated, depending off-campus leased space location. In conjunction
such as the CHBS Building, Kyle Hall, CFTS and on the timing and duration of the renovations. The with RU Outdoors and the Tourism and Special
McConnell Library. recently leased apartments will also be reviewed Events Resource Lab, these programs will enhance
Residential Spaces with respect to their condition and suitability for and facilitate greater connectivity to the overall
future occupancy, along with their use for alternate significant assets made available by the New River.
Based on the current available beds in on- University purposes.
campus residence halls and the recent leasing of Athletics Spaces
approximately 600 new beds in apartments located Student Support and Recreation Spaces The recent Athletics Master Plan identified the top
off-campus and adjacent to Central Campus bringing
Additional student collaborative and study spaces two priorities for facility upgrades: renovation/
the total to approximately 800 leased off-campus
were identified for various parts of campus. While repurposing of the Dedmon Center and a ticket/
beds, no additional new on-campus beds have been
recent construction projects and renovations concessions facility for the baseball/softball/
identified in the next 10 years. However, the University
typically incorporate these student-centered spaces, tennis outdoor complex. Other projects were also
seeks ways to better integrate academics in
older buildings are inadequate in this regard. identified as part of the Athletics Master Plan, with
residence halls, such as living-learning communities,
available funding.
advising space, faculty offices and classrooms. Students and their parents currently desire
sophisticated engagement, support staff and
The University will prepare a plan to renovate
facilities during their entire University experience.
the recently acquired off-campus units to be
While Heth Hall, Russell Hall and Whitt Hall
comparable to the on-campus housing. In some
currently provide many of these functions, there
instances, this will only require improvements to
are other related activities and departments
certain finishes, and in other instances, this will
that could benefit from being collected in a
require significant renovations to basic building
single location. This might include services for
systems and components. The completed
international students, transfer students, overall
renovations of all units will require multiple years.
academic advising, health and emotional wellness
49

Administrative and Support Spaces Electrical for potential replacements. Additional water
service lines will be required to provide domestic
Currently, there are several Administrative Services Based on analysis of the existing medium-
and fire suppression water for any proposed added
and Public Safety departments that are housed in voltage electrical campus loop supply system
building footprint.
separate buildings both on-campus and adjacent to and the Radford Electric Department substation
campus, which creates difficulty in communications performance, the current infrastructure appears Sanitary Sewer
and coordination of these functions. The existing capable of handling the identified potential added
buildings housing these functions are also not power loads. Additional electrical secondary service Based on the existing service provided by the City
entirely suited for their required purpose, and a fed from the loops will be required to provide of Radford’s sanitary sewer system, the current
number of staff departments are actually housed in power for potential added building footprint on infrastructure appears to be capable of handling the
leased space. Central Campus. Additional sources of emergency identified potential added sanitary drainage loads.
power are also desirable to provide power in certain Additional sanitary sewer drain lines will be required
There is also a shortage of available event space to provide capacity for any proposed added
buildings when necessary.
across campus to house various University functions building footprint.
and events. Kyle Hall and Muse Hall include spaces Steam
that can readily serve these purposes, but other Chilled Water
spaces in Cook and Peters Halls that currently serve Based on the capacity of the existing boiler plant
steam supply system, the current infrastructure Additional chilled water service, either as part
these purposes are less than optimal. of a loop or independently, will be required to
appears capable of handling the identified potential
added steam loads. Additional steam secondary provide cooling water for any proposed added
OVERALL INFRASTRUCTURE service will be required to provide hot water for any building footprint.
NEEDS proposed added building footprint. Information Technology
Sustainability Stormwater Fundamentally, today’s stakeholders rely
The Commonwealth of Virginia has promulgated a Based on analysis of the existing stormwater more heavily on the provision and support for
number of Executive Orders and other directives system and components, several areas for improved technology systems and components than in the
to promote sustainability at all state agencies. The drainage have been identified across campus. past. The ability to access and share electronic
University will need to continue to monitor the Additional stormwater management facilities will information and take advantage of evolving
impacts of these initiatives and adjust activities and also be required to offset the impervious surfaces technology in both academic and administrative
priorities accordingly. We will also need to continue that are created by any proposed added building areas are critical components of current campus
to explore the feasibility and cost-effectiveness of footprint. The University must also adhere to its own environments. To this end, additional data
potential alternative power sources and renewable Municipal Separate Storm Sewer Systems (MS4) services will be required to provide capacity for
energies and identify ways to reduce consumption General Permit. any proposed added building footprint. Existing
of power, water and other natural resources. buildings will also likely require additional
Water capacity to support new needs, as will the
overall campus wireless network to support
Based on the existing service provided by the
ever-expanding bandwidth requirements. In
City of Radford’s water supply system, the current
addition, the recently acquired off-campus
infrastructure appears capable of handling the
housing will require the addition of cable, phone
identified potential added water loads. However,
and wireless services.
the locations and conditions of many existing
components need to be documented and assessed

2020-2030
Master Plan
50

Pedestrian Ways
Pedestrian routes will need to be coordinated with
new building footprints, and existing routes need to
be enhanced where feasible. Pedestrian routes will
need to be coordinated with the newly-acquired,
off-campus housing where possible, in concert with
the City of Radford. An additional issue requiring
attention for pedestrian ways is shared usage
with Facilities maintenance vehicles, particularly
service carts.

Bikeways
New proposed bikeways need to be coordinated
with pedestrian and vehicular routes as necessary.

Greenways
The existing walking trails, along the New River,
need to be coordinated with the adjacent Greenway,
offering connectivity to Bisset Park and other
MULTIMODAL CAMPUS Transit System
amenities in these areas.
ACCESS NEEDS The Radford Transit system needs to be enhanced
to provide more efficient service to the most heavily Parking
Security and Emergency Systems and Access populated areas of campus, particularly around The existing parking locations and policies need
Additional security systems infrastructure and the campus perimeter. The current routes travel to be revised to accommodate new commuter
equipment will be required to provide capacity for through multiple areas of both Central Campus and patterns, new building footprints and allocation
any proposed added building footprint. Existing the Athletics/Recreation Campus, navigating many among various user groups. Lots have grown
buildings may also require additional capacity to separate locations, which tends to make the overall organically, leading to poor overall circulation
support new security and emergency system needs, circuit lengthy. The routes also do not provide patterns and misaligned user groups. The remote
such as door access control and exterior lighting, as adequate and timely coverage of the remote lots need to be better connected to campus by
will overall existing outdoor campus spaces. parking areas. transit and pedestrian ways.
The routes also include an on-campus “hub” in front
Accessibility Signage
of Preston Hall in Lot A. This hub provides drivers with
New building footprints will need to be provided a consistent location for time checks and restroom The existing major signage locations need to
with accessible routes as necessary, and existing facilities. Unfortunately, this location is a very heavily be expanded to include additional wayfinding
routes will need to be preserved and even enhanced populated and high traffic area and further is adjacent for visitors to campus, particularly to the most
where feasible. to the main administrative functions in Martin Hall. frequently visited buildings. This signage can also
While some of these hub functions have already serve to enhance and reinforce the branding of the
been relocated to the bus stop at Fairfax Street and University and the overall campus environment.
Hurlburt Student Center, it is desired to completely
remove transit bus traffic from Lot A.
51

Implementation Plan
The Master Plan is organized around multiple { Thelocations of existing Parking Lots AA and Athletics/Recreation Campus
overarching areas of emphasis. JJ between the Hurlburt Student Center and
There are several available sites for new buildings
Cook Hall: These two separate sites have been
{ Construct — New capital projects on Athletics/Recreation Campus, mostly located to
identified as a potential location for a future
{ Renovate — Multiple existing major campus support Athletics.
addition to the Hurlburt Student Center, but
buildings could also support other occupant uses. { Thelocation of existing Parking Lot BF
{ Repurpose— Numerous existing building between the baseball and softball fields: This
{ Thelocation of existing Parking Lot M between location has been identified in the Athletics
occupancies
Waldron and Kyle Halls: This location is mostly Master Plan as the location of the ticketing/
{ Evaluate and Upfit — Existing space usages near other academic buildings, but could concession/restroom facility.
{ Enhance — Campus infrastructure and support a number of University needs.
{ The location of existing Parking Lot DC
brand identity
{ The location of existing Buchanan House adjacent to the tennis courts: This location has
{ Create — New campuses and partnerships adjacent to Waldron and Peters Halls: The been identified in the Athletics Master Plan as
demolition of this existing building, a small and the location of the indoor tennis facility.
PROPOSED NEW inefficient building, which used to serve as the
BUILDING LOCATIONS President’s residence, would not negatively { The location of existing Parking Lot E
impact the overall campus, and the location adjacent to the Armstrong Complex: This
Central Campus occupies a campus footprint, which could be location could support a number of University
used much more effectively as it is near both administrative functions, given its proximity
The number of available sites for new buildings on
academic and student housing buildings. to the other administrative functions already
Central Campus is limited, particularly those sites
housed in the Armstrong Complex.
that do not negatively impact the current Central
Significant emphasis needs to be placed on
Campus view sheds and pedestrian and traffic { Thelocation of existing Parking Lot U and FF
ensuring that any new buildings on the Central
patterns. However, there are a number of potential near the Armstrong Complex: This location was
Campus adhere to the established aesthetic
future building footprint sites. identified in earlier master plans as a potential
campus brand, massing, materials and color palette,
{ The location of existing Parking Lot F between and that the buildings respond to current and location for a new Convocation Center.
Muse and Tyler Halls: This location has been future pedestrian patterns and historic and iconic
{ The area near the New River and beyond the
identified in a number of previous plans and viewsheds. Particular attention also needs to be
would provide an excellent completion of the Athletics facilities: This location might serve
given to the areas indicated in the historic resources
perimeter buildings surrounding the original well for the relocated RU Able program
survey as eligible for listing.
triangular-shaped campus. This location is near and equipment.
both academic and housing buildings, so a new
building here could support any number of
University needs.

2020-2030
Master Plan
52

Off-Campus
The University owns several parcels adjacent to
Central Campus.
{ The location of the existing building at 615
Fairfax Street: While this site is conveniently
located along Jefferson Street, it is not very big
and could only support a fairly small building. It
may be better utilized as a parking lot.

{ The locations of Parking Lots S and Y east of


Jefferson Street: Again, while these sites are
conveniently located along Jefferson Street,
neither site is very big and could only support
fairly small buildings. These may be better
maintained as parking lots.

{ The locations of Parking Lots K and L between


East Main Street and the railroad tracks: These
sites are reasonably conveniently located, but
are adjacent to privately held properties. These
may be better maintained as parking lots.

{ The existing building at 1101 Grove Avenue:


Printing Services is scheduled to be moved,
which would leave this building/site available
{ The location of the current Student Outdoor { The parcels at the corner of Jefferson and
for another use. Given its location several blocks
Recreation Center: This location would be well East Main Streets: While there are several
from campus, its potential uses, as it exists
suited for a new Convocation Center, given existing buildings on this site, it provides a
today, are somewhat limited. The most likely
its location and adjacent parking. This would potentially attractive location for a building or
use would be to renovate the building for an
require the relocation of the current outdoor parking given its access to both East Main and
administrative unit or other organization that is
recreation facilities. Jefferson Streets.
not required to be on campus; in the near term,
however, its use as swing space for offices or The Foundation owns parcels adjacent to campus, { The parcels at the corner of Tyler Avenue and
labs could be valuable. There would also be an including the recently-acquired apartments. Jefferson Street: This site provides a potentially
opportunity to demolish the existing structure attractive location for a welcome center or
{ Theparcel bounded by Calhoun Street,
and construct a new building in its place. This other building given its access to both Tyler
Lawrence Street and Tyler Avenue: This site is
would provide an opportunity for additional Avenue and Jefferson Street and its impressive
directly across Tyler Avenue from the Moffett
building footprint on currently owned property. view of campus. There are multiple existing
Quad and is large enough to potentially
buildings on this site with multiple current
support multiple buildings.
leases, which would impact the potential timing
of its use.
53

{ Numerous locations of the newly-acquired discussions between the Foundation and the City The RUC merger, in conjunction with the Clinical
housing units might offer alternate effective of Radford concerning this property. Simulation Center and other leased spaces in
uses for other building types or parking. the RHEC, uniquely positions the University
Given the current Central Campus footprint and the
within the developing Innovation Corridor and
The City of Radford owns property adjacent locations of newly-acquired, off-campus housing,
Academic Health Center, along the South Jefferson
to the Foundation-owned property at the Selu it is also advisable for the University to continue to
Street Corridor in downtown Roanoke. Future
Conservancy. The Selu land-use plan is currently review the opportunity for acquisition of adjacent
developments, along this corridor, offer several
being updated and generally indicates that properties, particularly including along Tyler Avenue,
opportunities for potential building footprints,
current University program activities at Selu are Jefferson Street and East Main Street. Private
which would need to be coordinated with multiple
being met by the existing facilities; however, owners have multiple commercial and residential
partners, including Carilion Clinic, Virginia Tech
there are plans to continue to increase the properties, along the Tyler Avenue and East Main
and the City of Roanoke. Examples would include
amount of academic and related activities at Street corridors, that might be developed as public-
academic, teaching and research space, but
Selu. There are no plans to expand the property private partnerships with the University. In particular,
might also include student services uses, such
boundaries at this time; however, given the City retail establishments for food, clothing and light
as recreation and wellness, dining, residential
of Radford has no plans to utilize this adjacent grocery could serve both the City of Radford and
and parking.
property, there may be value in continuing the University in these commercial-zoned districts.

2020-2030
Master Plan
54

PROPOSED ACADEMIC { Thecurrent Six-Year Capital Plan also includes


a proposed renovation and partial repurposing
FACILITIES ACTIONS AND of McConnell Library. This existing building
PHASING was built in three separate phases during the
In order to achieve the stated goals, several 1930s, 1960s and 1990s. A comprehensive
are proposed. renovation would transform McConnell
Library into a 21st century facility
{ The current Six-Year Capital Plan proposes a
supporting a wide variety of individual
new building for the departments of CVPA,
and group study spaces; state-of-the-art
along with additional clinic space for Waldron
CAIC on East Main Street Looking South learning technologies; compact storage
College. The Center for Adaptive Innovation
for print materials; flexible active learning
and Creativity (CAIC) will replace both the
spaces; and spaces to support the creation
existing Porterfield Hall and the existing
of new knowledge, creative scholarship, new
McGuffey Hall, which currently house several
media (audio and video studios, motion
CVPA departments. These buildings are
capture studio, 3D printing) and event
among the least energy-efficient on campus
and instructional spaces. The renovated
and are in dire need of replacement with many
building would also house offices for units,
of the associated existing building systems and
such as the Center for Innovative Teaching
components at their end-of-life and without
and Learning, Faculty Development and
up-to-date safety, security and accessibility
the Harvey Knowledge Center, that offer
capabilities. This building also provides an
coaching, peer tutoring and mentoring for
increased emphasis on the campus dynamic
both students and faculty/staff. The Library
for cross-disciplinary academic endeavors,
Learning Commons should evolve from a
particularly with respect to synergy between
combination of a library and computer lab
CAIC Hub the arts and health sciences. The building will
into a full-service learning, research and
house clinical spaces for community health
project space, designed for the future with
care, reinforcing ties to the surrounding
an open, flexible layout throughout the
area. The building will also include space for
building and including a video conference
the expanded Center for Interprofessional
room, digital media creation and editing
Education and Practice (CIPEP) suite. The
tools, writing center, equipment checkout,
new CAIC will be built on approximately
a large multipurpose meeting and event
the same footprint on-campus as these two
space and numerous group study rooms,
existing buildings. The Commonwealth of
which can be reserved online. The Library
Virginia has approved the Detailed Planning
Learning Commons should become an
design documents for the project, along with
active, comfortable space where students
all other required technical approvals from
can discover, create and collaborate with
the Department of Environmental Quality and
peers, a space that inspires them to be more
the Art and Architectural Review Board. The
productive and successful.
Capital Budget Request for the project
CAIC View of Courtyard has been submitted for approval by the
General Assembly.
55

Mcconnell Library Proposed Third Floor

Previous studies indicated the relocation The library is also among the least energy- Given its location facing the Main Quad
of the administrative offices; the addition efficient buildings on-campus and in dire and within the potential Historic District,
of compact storage units to replace Proposedneed
view at
of third
basicfloor
building systems replacement. the renovation of the 1930s facade will pay
conventional stacks; the conversion of It is likely that the state will be interested in particular attention to the original design
existing stack spaces to flexible study and 14 funding these types of systems renovations, and construction to preserve the building’s
workspaces; the capturing of the existing particularly those that improve sustainability historic integrity.
inaccessible courtyard as usable space; and security, as well as repurposing Libraries are changing rapidly, in both form
and the introduction of more public gallery spaces to optimize campus engagement and function, and the recent changes in
and cafe spaces. The renovation would also and usage. The renovation would replace usage in McConnell Library acknowledge the
contain a proposed consolidated Archives lighting throughout the building to meet need to revise library spaces to keep them
and Special Collections that protects library lighting standards, while also current. Library staff is currently preparing
the existing collections, as well as meets maximizing energy efficiency through the the Strategic Plan for 2020 and will be
the standards set forth in the ASHRAE use of LED fixtures and would also replace undertaking a visioning process to help
Handbook — HVAC Applications for all end-of-life controls and switches for inform future plans for the library. A pre-
Museums, Galleries, Archives and Libraries. efficient operations. planning study is underway to finalize the

2020-2030
Master Plan
56

programmatic elements of the renovation Computer Science programs for the Tech { Evaluate campus classrooms, class labs and
and repurposing of the Library. All of these Talent Pipeline. Certain building systems other basic instructional spaces with respect
elements — previous studies, strategic and components in Davis Hall will also be to continuing to upgrade technology, furniture
planning and the visioning process — will targeted for upgrades through Maintenance and furnishings. Evaluations should occur on an
be folded into the proposed capital project Reserve funding projects. annual basis within the duration of the Master
planning and execution to ensure the library y Walker Hall vacated swing spaces will be
Plan, and the evaluation teams will include
will remain a central part of the overall repurposed to consolidate most Information
members of Academic Affairs, Enrollment
student experience. Technology staff, along with up-fitting space
Management, Information Technology and
Facilities Management. Improvements could
{ The current Six-Year Capital Plan also includes a for several general classrooms/labs.
include movable desks and tables to facilitate
proposed renovation of Walker Hall. This existing y McConnell Library vacated swing spaces more interactive learning environments;
building was built in two separate phases and is will be repurposed as part of the McConnell additional white boards and smart boards;
in need of basic building systems replacement, Library’s capital renovation project. brighter and more resolute projection systems;
along with reprogramming of the existing space.
y Peters Hall spaces vacated by the CVPA simplified and updated control systems;
This renovation could possibly occur near the
Department of Dance will be repurposed appropriate interface technology for mobile
end of the ten-year Master Plan window.
for CEHD Department of Health and Human and other display devices to promote material
{ While not currently included in the Six- Performance spaces, including the relocated delivery; access to new and consistent 2-d
Year Capital Plan, Peters and Waldron Halls Nutrition and Dietetic Laboratory from and 3-d printing capabilities; and synchronous
are both approaching an age that requires McGuffey Hall. online delivery capabilities to allow concurrent
replacement of certain basic building systems on-site and off-site instruction.
y The Venture Lab has been accommodated
and components and updating and refreshing on the first floor of Kyle Hall. The location was { Evaluate campus classrooms, class labs and
of the spaces. specifically selected to allow direct controlled other basic instructional spaces with respect to
access with the ability to accommodate non- scheduling and cross-discipline collaboration,
{ There are preliminary plans to provide
regular-hours occupancy. efficiency regarding the use of spaces and in
programmatic expansion through the
selective repurposing of a number of existing { The creation of “ACCESS Radford” identified particular with respect to the “REAL” model
campus spaces upon completion of the in the Strategic Plan will require a small for General Education. Evaluations should
current Reed and Curie Halls renovation number of dedicated offices and can likely be occur on an annual basis within the duration
project and the future CAIC project, accommodated by re-assignment of several of the Master Plan, and the evaluation teams
existing offices and support spaces made will include members of Academic Affairs,
y Cook Hall spaces vacated by the Artis available after the Reed and Curie Halls and Enrollment Management, Conference Services
College will be repurposed to support a CAIC projects. and Facilities Management. The reviews
portion of the identified Waldron College and should facilitate working towards a culture of
CEHD needs. { TheSecurity Studies Initiative and the sharing space and maximizing utilization for
Geohazards and Unmanned Systems Research all instructional spaces, along with providing
y Davis Hall spaces vacated by the Artis
Center are being incorporated into the current increased student exposure to additional areas
College will be repurposed to provide
Reed and Curie Halls renovation project. of study.
additional faculty offices, classroom/labs
or other academic spaces, potentially
to serve the required expansion of the
Information Technology and Cyber Security
57

{ As spaces are repurposed across campus for { The Vinod Chachra IMPACT Lab is currently
various identified initiatives, continue to identify housed off-campus in the Corporate Park.
existing spaces that can be converted into Given the online nature of the program, the
collaborative study spaces, particularly in the various content delivery schedules and the
older academic buildings on campus. variable volume of coursework, it is appropriate
to maintain this program in off-campus leased
{ The University will also identify specific existing space. This allows the program to scale up or
buildings, or portions of existing buildings, down rather quickly as footprint needs adjust.
which might be candidates for extended hours The Corporate Park currently provides adequate
of operations. Opportunities might include the space for this unit, and the spaces have been
newer footprint buildings including the CHBS customized for IMPACT’s use. Although the
Building, Kyle Hall and the CFTS, along with building was not originally designed for this
the proposed CAIC. The identification and type of academic use, there are certain issues
implementation of additional hours of operation with the overall condition of the building and
will be reviewed and approved by the Divisions associated deferred maintenance. While the
of Academic Affairs and Finance current occupancy in the building will allow
and Administration. additional future maintenance investments,
alternate locations will be reviewed for this
{ The College of Graduate Studies and Research
program as the needs change and space
is currently located in the Buchanan House.
requirements expand.
This academic unit needs spaces that are { RHEC also supports a number of academic
more efficient and more central to campus { The RUC merger provides significant programs currently offered in the Roanoke
and portray more business-professional office opportunities to expand the offerings in the location. These include several programs for
environments. It will be necessary to undertake RUC CRCH location. Initially, the University the Waldron College, including the Clinical
a renovation of the Buchanan House, or possibly will continue to lease the same facility Simulation Center, along with MBA, Criminal
relocation of staff to another location, to footprint from Carilion Clinic previously leased Justice, Social Work and Education programs.
accommodate these needs. In the final analysis, by Jefferson College of Health Sciences, An overall facility review will be undertaken for
the Buchanan House has limited effectiveness as this space appears sufficient for the the RHEC to investigate potential synergies of
given its inefficient configuration with limited envisioned programs. As RUC develops, the current spaces and programs and anticipate
ability for flexible future organizational occupant current footprint will be evaluated for the future growth potential, particularly in support
use, and its footprint location could better appropriateness of the size, configuration of RUC.
serve other future needs given its location near and equipment and furnishings for the
academic and residential buildings. The available { SWVAHEC currently offers a number of
future. Further, the opportunity exists for
site footprint could easily support a building academic opportunities, including the
the University to engage more deeply in the
with 15,000 to 20,000 square feet, while the Appalachian Community Outreach Institute.
developing Academic Health Center and
Buchanan House only contains approximately It is currently envisioned that the size of
Innovation Corridor in Roanoke, along with
5,500 square feet. Its use as possible swing the space in SWVAHEC is sufficient for the
Carilion Clinic and Virginia Tech. This could
space is helpful, and after that need is met, foreseeable future, but a review should be
potentially lead to the development of a variety
it might be best to demolish the structure undertaken to confirm the effectiveness of
of new properties with these partners, through
to capture the site for more efficient use of the space.
a number of potential delivery methods.
valuable campus real estate as needs arise.

2020-2030
Master Plan
58

PROPOSED STUDENT Given their locations facing the Main Quad { Once these renovations are accomplished, a
and within the potential Historic District, the master schedule has been established for all 15
FACILITIES ACTIONS Norwood and Tyler Halls renovations will pay current existing residence halls to provide for
AND PHASING particular attention to their original design planned renovations on an approximate 30-
and construction to preserve their historic year frequency.
Proposed Housing Actions and Phasing
integrity. The Muse Hall renovation, however,
In order to achieve the stated goals, the following will offer an opportunity to update the building { Forall residence hall renovations, program
actions are proposed. elevation facing the Quad to incorporate space will be identified to strengthen the
elements, which more closely complement the current living-learning communities and
{ The current Six-Year Capital Plan includes
more historic buildings in this area of campus. academic support spaces, along with
proposed renovations of Norwood, Tyler and
The illustration shows one early concept for an providing informal student study and
Muse Halls over approximately the next eight
upgraded façade. collaborative spaces.
years. Norwood and Tyler Halls will include the
same level of renovation as the most recent { An overall schedule for the renovation of the
residence hall renovations, including air- { The renovation design of these existing
recently-acquired, off-campus housing units
conditioning and single bathrooms, while Muse buildings will also purposefully include program
will be prepared. In general, the schedule will
Hall will be renovated to a slightly lower level space for various living-learning elements as
be compiled to allow the most time-effective
of renovation to allow an option for residential part of the overall building. As an example,
methodology to complete all renovations, by
accommodations at lower student fees. the Honors College has been identified as a
concentrating on the most popular types of
These buildings are among the least energy- potential program component in the renovated
units and locations first.
efficient on campus and are in dire need of Tyler and Norwood Halls. A pre-planning study
replacement with many of the associated will be performed to identify the specific living-
existing building systems and components at learning community program elements for
their end-of-life and without up-to-date safety, these existing building renovations.
security and accessibility capabilities.

HOUSING RENOVATION MASTER PLAN CHART


COST
($MM)

14

12

10

2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2047 2049 Muse Hall Conceptual Elevation
59

Proposed Student Support and Recreation


Facilities Actions and Phasing
In order to achieve the stated goals, the following
actions are proposed.
{ The Master Plan indicates a potential location
for a University Welcome Center. This space
would provide an initial point of entry to Central
Campus, particularly for visitors and special
events, along with support for maps, parking
passes and other basic directional information.
This function currently exists in Heth Hall and
would require about 5,000 square feet.

{ The Master Plan indicates a potential location


for an addition to the Hurlburt Student Center,
which might also be appropriate during the ten-
year Master Plan duration. The program for this
potential addition has not been fully defined
at this point, but would probably include event
space, student organization space and student
study space. Hotel Conceptual Perspective

{ As spaces are repurposed across campus for


various identified initiatives, the University will
continue to identify existing spaces that can be
converted into community spaces to support
off-campus residents when on-campus,
including meeting and gathering spaces,
offices, outdoor spaces and other support
spaces.

{ Each on-campus food service option will


be reviewed for potential renovation and
updating at some point during the 10-year
Master Plan window. Changes in locations
for existing food service options, along with
additional new options, may also be identified
during this time frame, in coordination with
the food service vendor.
Hotel Conceptual Site Plan

2020-2030
Master Plan
60

{ The Master Plan includes the identification of the intersection of Tyler Avenue and Calhoun
walking and biking paths/trails both on-campus Street. Four existing structures would be
and in coordination with surrounding municipal demolished to make way for the hotel, which
facilities and locations. Discussions with the City will include 125 rooms, a conference center
of Radford indicate that there are opportunities to and on-site parking. The hotel is also planned
collaborate on the development of these assets. to feature a rooftop restaurant with a view
overlooking the campus. The hotel is planned to
{ The Master Plan also includes the proposed be completed by 2022/2023.
relocation of the RU Able facilities from its
off-campus Corporate Park location to the Proposed Athletics Facilities Actions
Athletics/Recreation Campus. and Phasing
{ The existing gymnasium in Peters Hall is also The 2014 Athletics Master Plan identifies a number Dedmon Center Conceptual Reconfiguration
identified to be reconfigured and refurbished of improvements and additions to the footprint of PHASE 1 - DEDMON MASTER PLANNING – SEATING RECONFIGURATION

to allow multiple usages for both academic athletics facilities. In order to achieve the stated improvements,
RADFORD UNIVERSITYmainly including
ATHLETICS safety
MASTERPLAN
purposes for CEHD and event space for various goals, initial actions, as illustrated in the Athletics NOVEMBER 13, 2014
and security systems and components
campus functions. Master Plan, are proposed. along with conventional utility systems.
{ Renovation and repurposing of the Dedmon Planning studies are underway to analyze
{ The Master Plan also includes locations for
Center to provide a more appropriate venue and prioritize the various utility systems and
potential public/private mixed-use residential
for the basketball and volleyball teams components improvements.
and retail properties, along the Tyler Avenue
by reconfiguring the main court area and
Corridor and the East Main Street Corridor. { Construction of an Administrative Services
seating bowl. At the same time, this allows
These properties could consist of dining and addition to the Armstrong Complex to collect
reconfiguring and increasing the amount of
shopping destinations desired by students and the remaining administrative departments
training, locker room and practice spaces within
parents and also faculty and staff, along with housed off-campus or in leased space, as
the building.
possibly the Bookstore or other University- included in the current Six-Year Capital Plan.
related enterprises. The development of these { The addition of a ticketing/concession/ The building would be approximately 15,000
facilities would need to be coordinated with restroom building to support the outdoor square feet and would consist of flexible office
the City of Radford and private development baseball/softball/tennis complex. and support spaces.
entities. The City of Radford has stated a clear
desire to facilitate success in this area of East { Otherimprovements in the Athletics Master { Construction of a new Public Safety Building to
Radford to match recent successes of similar Plan would be pursued in the future as collect all campus police, emergency services
developments in West Radford. demand is demonstrated and funding and safety personnel, as included in the later
becomes available. biennia of the current Six-Year Capital Plan,
{ The City of Radford and the Foundation are might also be appropriate during the 10-year
currently collaborating on a hotel and related Master Plan duration. The City of Radford is
Proposed Administrative and Support
conference/alumni/event center project currently studying the need for an EMS location
Facilities Actions and Phasing
adjacent to campus. The Foundation and the somewhere in East Radford. As the City of
City of Radford are working on the project with In order to achieve the stated goals, the following
Radford’s study develops, the University will
the help of Fortune 500 Company Jones Lang actions are proposed.
engage discussions on its location and program
LaSalle (JLL), a commercial real estate services { Thecurrent Six-Year Capital Plan includes and the potential for shared spaces.
firm. The multilevel hotel will be located at a project for various campus infrastructure
61

PROPOSED NEW BUILDING PLACEMENT

New Building Location


Full Building Renovation
Partial Building Renovation
Central Campus
Athletics/Recreation Campus
Public-Private Enterprise Districts/Strategic Growth Zones

2020-2030
Master Plan
62

INFRASTRUCTURE From a purchased power perspective, the University Electrical


currently purchases electric power from the
IMPROVEMENTS Radford Electrical Department. In order to provide
Based on recent studies, the overall medium-
voltage electrical system is currently adequate
Sustainability a redundant source for campus power, along with
for the total load demand of the Central Campus,
overall emergency electrical capacity, the University
There are a number of features and including both existing buildings and an estimated
continues to investigate the potential of repurposing
recommendations in the Master Plan that promote load for potential new buildings. Various specific
the Art Annex building adjacent to the existing
the University’s sustainable development. Proposed system and component upgrades will be required
steam plant into a co-generation combined heat and
new buildings are sited on campus to take for maintenance issues or routing situations, as
power (CHP) facility. The facility would consist of
advantage of existing utility infrastructure. New the study recommended replacement of identified
natural-gas-powered generators to provide campus
trees and plantings have been proposed for much switches, elbows and other basic gear.
medium-voltage power, while also providing heat for
of the campus to promote greater tree canopy As the campus expands to the east across
the steam plant operations. The existing occupants
cover. Stormwater and water quality management Jefferson Street, new medium-voltage electrical
of the Art Annex, consisting of the Ceramics
recommendations are identified, and the University distribution from the existing substation on East
program lab and equipment, would be relocated to
will investigate opportunities to incorporate other Main Street and specific building connections
a more suitable location given the inherent issues
stormwater quality practices on smaller scales would need to be added.
with students working in such an industrial area of
surrounding existing parking lots and buildings on
campus. This significant change in basic campus The overhead lines supporting the Athletics/
campus. These measures can include landscape
utility infrastructure would be pursued in association Recreation Campus appear to have capacity
planting areas and alternative infiltration areas in
with the City of Radford. for both the current facilities and potential
parking and adjacent pedestrian areas. Additionally,
The University will also aggressively seek other future buildings.
the University will continue to improve its on-
campus initiatives for materials recycling. opportunities to reduce electricity-related emissions. The University also desires the addition of
Examples of technologies and financial vehicles emergency generators to provide power to certain
The University’s greenhouse gas (GHG) inventory
for evaluation include battery storage systems, buildings during outages. While a number of
identifies areas for potential improvements in
photovoltaic solar panels, wind turbines and micro- buildings already have this capability, numerous
energy and utility savings and GHG reduction.
grids. Continued upgrading of controls monitoring other facilities would provide value to the
Currently, purchased power continues to be the
and commissioning activities can help identify University during emergency situations if power
University’s largest emissions source at about 60%
systems and components to provide potential was available.
of total emissions. The next largest emissions source
reductions in utility usage.
at about 22% of total emissions is on-campus Steam
stationary, which represents fuel sources consumed The University will also increase its efforts at student
directly on campus. and faculty/staff education for sustainability and The existing boiler plant capacity should
reduced energy usage. Studies have shown that accommodate the proposed new building
There are many methods for reducing net footprints, such that central steam capacity is not
even minimal efforts in this regard can be very
greenhouse gas emissions, including employing a concern for the short term. The existing steam
cost-effective and drive real savings, as evidenced
energy efficiency and conservation practices distribution piping will prove adequate for campus
by an award-winning Radford University research
and producing carbon-free energy. To pursue loads until the existing loop connected capacity
project published in the International Journal of
the emissions reduction goals identified in the exceeds 60,000 pounds per hour. Routine
Sustainability in Higher Education. The University
University’s Climate Action Plan, the University maintenance and replacement of piping, valves,
will also identify an opportunity to construct an
will have to implement a combination of actions supports and other components, along with the
educational display device for renewable energy to
and strategies. overall tunnel structure, will be needed over the
illustrate energy usage and reductions.
course of the Master Plan.
63

Stormwater { Purchase of off-site water quality credits. East Jefferson Street Systems
The City of Radford has indicated that, as drainage
{ Previous regulations allowed regional was directed towards Main Street over time, culverts
Central Campus Jefferson Street/
approaches to stormwater treatment, such that were piped to the south edge of the Norfolk
Adams Street Systems
BMPs could be established to cover several Southern Railway and discharged into a large gravel
New projects in this area of Central Campus
areas of campus in one combined BMP. In fact, drainage ditch on the railway property that parallels
will need to address quality as well as quantity
the University has had one of these BMPs in the commercial properties, along the north side
treatment requirements. The stormwater
place for quality treatment for a more than a of East Main Street. If it is determined that one of
management solutions are limited due to the
decade. While the University can continue to those culverts needs to be enlarged to qualify it as
presence of shallow rock formations and karst
maintain this BMP and take advantage of its an “adequate channel” for the purposes of meeting
geology. Infiltration is not permissible in karst
treatment capabilities, no new regional BMPs Virginia regulations for any new drainage system
areas, thereby eliminating the possibility of
are allowed. Therefore, BMPs will need to be proposed, the University would probably have to
bioretention without an underdrain system. These
included as part of any site project that reduces deal with the individual landowners/businesses to
issues also minimize the potential to utilize porous
previous drainage areas. acquire an easement.
pavements and previous pavers for proposed
impervious surfaces which would reduce the Given the issues in this area, a recommended
total impervious area, since these systems are Athletics/Recreation Campus Systems approach may be to over-manage or over-
most effective and cost efficient in areas where Future development of the Athletics/Recreation detain any new stormwater flows generated by
the subsurface soil conditions are conducive for Campus potentially includes a new concessions and new development on-site either by integrated
infiltration into the groundwater. bathroom facility and an indoor tennis facility. Site- stormwater management structures and
Based on current regulations, stormwater solutions specific BMPs are required to provide quality control underground storage or utilizing low-impact
to treat water quality and quantity issues and that as well as runoff reduction volumes (quantity control) development (LID) techniques and then discharging
do not rely on infiltration could include one or a to the regional system; however, the outlet from these storm flows at a rate lower than existing flows from
combination of the following best management facilities must be above the 100-year flood elevation this area to the existing systems.
practices (BMPs). of the New River. These site-specific practices may
Upon property acquisition of any areas east of
include one or a combination of the following.
{ Underground storage pipes and appropriate Jefferson Street, site-specific water quantity and
{ Underground storage pipes and appropriate water quality BMPs will be required, using similar
filter system.
filter system. techniques as described for on-campus situations.
{ Bio-retention
basins or rain gardens with
{ Bio-retention
basins or rain gardens with
underdrain systems, planted with native Stormwater Master Plan Documentation
vegetation adjacent to individual buildings/ underdrain systems, planted with native
In 2012, the University commissioned a Stormwater
impervious area. vegetation adjacent to individual buildings/
Master Plan in response to a request by the Virginia
impervious area.
DEQ. This Stormwater Master Plan, supplemented
{ Green roof system on a portion of roofs.
{ Cisternsto capture the stormwater runoff for by an extension to the Plan in 2016, documents
{ Cisternsto capture the stormwater runoff for use as gray water within the building. specific information relative to the watersheds in
use as gray water within the buildings. the areas on and adjacent to campus. This Plan
{ Manufactured
systems connected to building will help guide the future analysis and design for
{ Manufactured
systems connected to building downspouts and storm drainage system. the indicated potential new buildings and other
downspouts and storm drainage systems. campus development.
{ Purchase of off-site water quality credits.

2020-2030
Master Plan
64

Water Routine maintenance and replacement of piping,


supports and other components will be needed over
Given there are currently no issues with the overall
the course of this Master Plan.
supply availability or pressures for the potable and
fire supply systems at the Central Campus and Chilled Water
Athletics/Recreation Campus, the City of Radford
has indicated that they are well positioned to serve New chilled water supply will be required for
the projected growth of the campus. any new building footprints. Where feasible,
the University desires to expand the network
Routine maintenance and replacement of piping, of regional chilled water loops serving multiple
valves, supports and other components will be buildings; therefore, each building location will
needed over the course of this Master Plan. The be viewed in terms of its ability to complement
University has also engaged in an overall system field the required chilled water supply for adjacent
investigation and analysis to assist in the preparation existing buildings. In particular, new buildings near
of current water system and components location the Main Quad and the proposed CAIC will be
mapping and condition assessment. reviewed for this capability. A critical component of future content delivery
will be enhanced, more robust virtual connectivity
Sanitary Sewer Routine maintenance and replacement of piping,
between Central Campus and the University’s
valves, supports and other components will be
There is an issue with one of the main collector lines satellite campus locations, both current and future.
needed over the course of this Master Plan.
feeding out of the Central Campus, at the edge The provision for conferencing technology and
of the Preston Hall Parking Lot A along East Main Information Technology remote delivery will need to be accommodated,
Street. This older line has become blocked a number through both basic equipment and data pipelines
of times due to tree roots. The City of Radford Expansion of the fiber network should continue
expansions. One example would include
has treated the line with chemicals in an effort to forward with the recommendations of the Master
the expansion of the RUC connection to the
dissolve the roots multiple times. This blockage Plan. Where possible, fiber should enter new
nearby RHEC.
should be resolved prior to the addition of any buildings at two separate locations, and these
cables should use diverse paths back to Jefferson Ultimately, decommissioning of the McConnell
new infill projects in the Central Campus with the
Hall and Armstrong Complex for enhanced Library data center and transitioning to using the
removal and replacement of the existing line and
redundancy. As expansion of the Athletics/ Armstrong Complex data center as the primary
removal of culprit trees.
Recreation Campus continues, it will be beneficial on-campus data center should be considered.
If the expansion of the campus moves into the to provide redundant fiber paths from the Central Using shared systems housed at Virginia Tech or via
area east of Jefferson Street, the 8-inch diameter Campus to the Armstrong Complex data center. cloud services can provide the necessary system
sewer, along East Main Street, may become redundancy. The University will always need to
overloaded. If growth is anticipated in the area With the continued increase usage of wireless
maintain wiring and distribution for the network
east of Jefferson Street, an analysis may need to and cellular services by the University community
layer and at least a small number of servers on
be done to determine the existing flows in that and the expanded bandwidths offered by various
campus to maintain speed and performance of
8-inch sewer so that capacity projections can be providers, efforts should be made during planning
several services.
made based on a phased growth plan. This will and construction of new buildings to insure
adequate cellular coverage in both exterior spaces With respect to overall systems and applications,
determine at what point the University may need
and in the interior areas of buildings. Cellular new and enhanced technology solutions will need
to address the replacement of this line or if a new
service can also be enhanced by partnering with to be evaluated for implementation to promote
collector sewer connecting further downstream
cellular service providers to add access points at continual optimization of operational efficiencies,
needs to be considered.
various points across campus. productivity and data-driven decision making.
65

MULTIMODAL CAMPUS Accessibility congested area of campus. The additional pull-off


stops will provide locations for loading and unloading
ACCESS IMPROVEMENTS While parking around Central Campus may need to
of passengers.
be relocated to make way for construction of other
Security and Emergency Systems and Access facilities, pockets of parking that remain will need To provide an additional off-campus hub, it is
The Master Plan takes into account all of the various to be prioritized for handicapped, visitor and other recommended to relocate the current hub adjacent
security and emergency systems and components specific parking needs. to the bank at the intersection of Tyler Avenue and
to ensure they are not compromised by proposed East Main Street to the existing bus stop at Parking
On the Athletics/Recreation Campus, accessible
buildings locations or transportation access Lot BL at the Student Outdoor Recreation Center.
spaces will need to be maintained in the areas
routes. The Master Plan also identifies any required This location provides adequate space for “stacking”
closest to the Dedmon Center, Cupp Stadium and
expansions of these systems to accommodate areas of buses for required time-checks and is adjacent to
the baseball and softball fields.
of future planned growth. the Student Outdoor Recreation Center restrooms
In order to ensure various user groups understand for drivers. Further, this location greatly reduces
The University is in the process of converting accessible routes and building entry locations, the potential interferences of bus traffic with both
existing fire alarm systems and components it is recommended that an interactive campus pedestrians and vehicles.
to a consistent campus-wide installation and map mobile application be created. This will allow
desires to continue to make these upgrades. It is The University will need to coordinate these
real-time awareness for students, faculty, staff and
anticipated that all campus buildings and other proposed changes with Radford Transit; it is noted
visitors to more easily navigate campus.
selected off-campus buildings will be protected that conversations with the City of Radford and
by a fire detection and alarm system provided by Transit System Radford Transit were positive concerning these
a single manufacturer within the 10-year Master potential revised routes and improved amenities.
The proposed short-term building footprint
Plan window. additions and renovations will not dramatically Pedestrian Ways
The University also desires to expand the change the existing ridership patterns; however,
Improvements are proposed to numerous streets
deployment of building access control and future growth, along the Jefferson Street and East
connecting Central Campus to the City of Radford
security, including card reader access systems and Main Street corridors and Tyler Avenue, may require
to the east and west, including Downey, Clement,
components. Current policy requires new buildings adjustments to the routes and stop locations.
Fairfax and Calhoun Streets. These improvements will
to have electronic access control for all building Therefore, new “pull-off” stops are recommended
help to more positively connect the adjacent housing
exterior public entries. Specific interior doors for along Jefferson Street, East Main Street and Tyler
and commercial areas to Central Campus and will
new buildings are also provided with access control, Avenue, to support a perimeter route around
need to be coordinated with the City of Radford.
as proposed and approved by the Divisions of campus. This campus loop route should help
Various improvements are also recommended for
Academic Affairs and Finance and Administration. facilitate increased ridership instead of the current
the intersection of East Main Street and University
It is anticipated that all existing campus buildings longer routes. Off-site parking with more direct
Avenue, along with improvements to the pedestrian
and other selected off-campus buildings will be shuttle service will also be implemented.
sidewalks and the bridge itself.
protected by electronic door access control devices The existing on-campus hub at Preston Hall is
within the 10-year Master Plan window. This will Numerous existing pedestrian ways and sidewalks
proposed to be transitioned to the stop at Fairfax
include the installation of devices on existing doors on campus currently experience localized flooding
Street, such that Lot A will no longer be accessed
and possibly the addition of exterior backbone during heavy rain events, including near Muse Hall,
by transit buses. This will help to alleviate pedestrian
cabling routes. The University will develop specific along the sidewalk between Tyler/Norwood and
and vehicle traffic in the vicinity of Lot A, Preston,
schedules and prioritization of buildings during the Jefferson/Madison and near Preston Hall. Limited
Martin and Porterfield Halls. The stop in front of
10-year Master Plan window. grading and drainage projects are planned to
Waldron Hall is also recommended to be removed,
mitigate these events.
to alleviate pedestrian and traffic interactions in this

2020-2030
Master Plan
RADFORD UNIVERSITY
AUGUST 2016

66

coordinated this information with pedestrian ways,


transit routes and other factors.
In general, based on the outcomes of this study
work, the Master Plan reconfigures a number
of parking areas within the Central Campus;
relocates parking areas from Central Campus to
locations at the perimeter of campus and east of
Jefferson Street; adds parking along East Main
Street; and adds parking adjacent to the existing
parking at Athletics/Recreation Campus near the
Dedmon Center.
Overall landscaping improvements are also in order
Concept for West End Fairfax Street Improvements for a number of existing parking lots; in particular,
Lot A adjacent to Martin Hall is in serious need of
new trees, plantings and hardscape elements to
The Master Plan proposes to provide small parking Central Campus, though it appears their use enhance the beauty of the area and facilitate better
areas at various locations around campus for is not consistent; some are full, while others pedestrian access.
maintenance carts and other service vehicles, stand empty. Revised locations of bike racks or
which will help mitigate instances of potential potentially bike lockers and storage units near Signage
conflicts between these vehicles and pedestrians. busier corridors might well improve their use.
Additional campus entry signage is proposed
These specific marked areas will also be located to
New River Access and Greenways for a number of prominent locations around
minimize the visual impacts of these vehicles on
the perimeter of Central Campus and Athletics/
Existingmajor
Moffet Quadcampus open
Viewspace viewsheds. The City of PRadford has identified new greenway
from Fairfax Street
Looking into Moffet Quad
roposed Monumen t
Recreation Campus, including the east and west
connections to the proposed Pulaski Loop along ends of Fairfax Street, both ends of the University
Bikeways
CONCEPT FOR WEST END FAIRFthe AX NewST River
REand ET integrates
IMPROthe VEUniversity’s
MENTS Drive bridge and the entry to the Athletics area.
The City of Radford has identified a number existing portion of the greenway into this route. These signs are proposed to be consistent with the
of proposed new bikeways to expand and Improvements in the connectivity of the University current major signage and will help with wayfinding
complement the existing bikeways. The Master trails to the greenway are proposed and will be to a number of main visitor support buildings, such
Plan acknowledges these proposed routes in the coordinated with the City of Radford and other as Russell Hall. These signs will also continue to
proposed landscape/hardscape improvements and regional authorities as the route is finalized. reinforce the branding and visual identity of basic
traffic patterns. Existing bike paths run along Tyler, campus elements.
Jefferson and a portion of East Main Street, but Vehicle Access and Parking
could be improved through greater signage and The Master Plan team’s efforts in this area were
markings. Upgrades to these three main traffic ways supplemented by an outside independent
would need to be closely coordinated with the City consultant, to ensure the University incorporated the
of Radford. latest trends in this important part of the campus
The University is also reviewing the potential environment. The team and the consultant studied
of providing a bike-sharing program between the current parking operating and management
various campus locations and adjacent residential plan, including space locations, occupancy data,
areas. Bike racks are located throughout rates and fees and accessibility, and then closely
67

PROPOSED NEW TRANSIT ROUTES

Drop-Off Shelter
Perimeter Route
Perimeter Route/Remote Lot Route

2020-2030
Master Plan
68

PROPOSED GREENSPACE AND SIGNAGE IMPROVEMENTS

Existing Green Space


Green Space/Pathways Improvements
Existing Signs
New Signs
69

PROPOSED LANDSCAPE IMPROVEMENTS

Tree Canopy
Landscaping/Hardscaping

2020-2030
Master Plan
70

OUTDOOR SPACE { Locate new buildings in relation to pedestrian


routes, mature trees and adjacent buildings.
IMPROVEMENTS
{ Preserve
and extend established patterns of
Overall Campus
pathways and landscape/hardscape elements.
The Master Plan provides an opportunity to
improve and upgrade existing landscape and Proposed potential locations for new construction
hardscape elements and components, while for the Main Quad are inserted into the Quad’s
providing guidance on improving and expanding historic context to relate carefully to nearby
the overall current environment. Further, the ability buildings and to respect established built patterns.
to enhance the campus “sense of place” and The proposed potential new building site adjacent
create certain traditional student experiences and to Muse Hall will maintain the existing view and
alumni connections is an important element of pedestrian route from Muse Hall to the fountain at
outdoor spaces. An example of this is the recent the center of the Quad and to the residence halls
addition of the bronze statue of the Highlander along Tyler Avenue.
mascot and associated bronze bench in the area Understanding the value of the arboreal assets
between Russell and Heth Halls. The Student The sweeping pedestrian arc at the front of
adds to the aesthetic appeal of campus, reduces
Government Association has also committed to Heth Hall is preserved. A significantly reworked
temperatures and decreases water runoff. Tree
providing a University Seal in an outdoor space on landscaped and hardscaped area in front of Muse
cover can also potentially be utilized in runoff
Central Campus, such that events could be held Hall will replace the current large planter, seating,
amounts prescribed by the Municipal Separate
for students and alumni for specific occasions; plantings and sidewalks, which have become
Storm Sewer Systems (MS4) permit program.
for example, students could touch the seal upon outdated. A small hardscaped/landscaped area
Indigenous species will be used as appropriate to
admission or after commencement for good luck. at the front of McConnell Library emphasizes the
provide diversity and reduce the negative impacts
Additional identified potential outdoor experiential importance of this building along this route, offering
of monocultures. Decisions on the selection and
spaces are “plots” to accommodate various a pleasant outdoor space for reading and studying
maintenance of plantings will be made to minimize
National Pan-Hellenic Council functions alone or in a group.
the need for pesticide applications and extensive
and activities. maintenance efforts. Existing trees on the Main Quad should be
Several fundamental ideas and approaches preserved to the greatest extent practical, and new
Specific goals and strategies have been identified
are proposed as basic elements of the overall trees should be planted to emphasize views and
for each of the identified campus outdoor spaces to
improvements to the campus outdoor spaces. screen undesirable views. In particular, new trees
meet these goals.
Security will be considered with respect to any should be introduced into the reworked area in front
proposed new plantings and landscape elements to Main Quad, Moffett Quad and of Muse to shade the space and help transition the
ensure the safety of all areas of campus. Irrigation Governor’s Quad height of Muse Hall and the width of the open space
will only be used for areas requiring intensive to a more human scale. Trees and shrubs should also
The most important landscape goal for the Main be used to screen the quad from the parking areas
utilization, such as athletic fields. Hardscape Quad, Moffett Quad and the Governor’s Quad is
elements such as sidewalks will be installed to flanking Muse Hall on Tyler Avenue and Main Street.
to preserve and enhance the existing mature and
provide buffers where feasible when adjacent to historical character of these quads, particularly The existing Alumni Garden between McConnell
traffic and parking areas. as they relate to the potential Historic District. To Library and Reed and Curie Halls is a mature
The University will continue to invest and maintain achieve this goal, the following strategies outdoor space on the north of the Main Quad. While
existing trees, landscape plantings and lawn areas. are considered. it offers an excellent space for outdoor reflection
71

and collaboration, its plantings and hardscape are { Connect the plaza and garden at the Covington A specific addition to the corridor are “plots” for use
also outdated. Further, the accessibility of the space Center for Visual and Performing Arts with the by the National Pan-Hellenic Council organizations.
is not appropriate. This space could be enlivened adjacent proposed CAIC. This area might consist of outdoor furniture and
by reworking the hardscape elements and seating, display components to facilitate meeting space for
possibly including an amphitheater space at its { Plant
additional canopy trees at outer edge of various National Pan-Hellenic Council organizations
northern terminus. walks and adjacent areas. and activities.
Additional landscape and hardscape elements Much of the Adams Street Corridor has been Fairfax Street Corridor and Heth Plaza
will also be added to Moffett Quad at the Fairfax converted to a major pedestrian mall. The Master
Street end of the Quad, to provide seating and The most important landscape goal for the
Plan anticipates additional enhancement of this
enable potential photo opportunities for students Fairfax Street Corridor is to complete this
corridor with the two ends of the pedestrian mall as
and alumni. corridor as a primary east-west pedestrian route
areas of key importance.
on campus. To achieve this goal, the following
The Governor’s Quad is an established and mature Kyle Hall is located at the uppermost end of Adams strategies are considered.
recognized outdoor space and is proposed to be Street Corridor. The front of the building addresses
maintained in its current configuration with no { Reconfigure all existing parking areas, along
not just the Adams Street pedestrian corridor,
new buildings. However, there are opportunities Fairfax Street, to be more uniform and provide
but also the axis from Heth Hall passing at the
to enhance the current landscape/hardscape to better traffic movement.
front of the Peters Hall entry at Moffett Quad. The
provide additional seating and enliven the plantings. existing plaza below Kyle Hall includes paved areas { Plant
additional canopy trees at outer edge of
The existing handicapped ramp between Stuart and and grassed/planted areas, along with significant walks and adjacent areas.
Davis Halls adjacent to the Governor’s Quad needs stretches of brick steps to tie the pathways to the
significant improvement to its aesthetics and its building entries. The lower end of Adams Street { Provide new additional signage at the ends of
functionality. The adjacent terrace between Whitt Corridor, adjacent to the Covington Center for Fairfax Street to better identify this area.
and Young Halls provides an improved pedestrian Visual and Performing Arts and the proposed CAIC,
has been designed as a semicircular space hosting The Master Plan identifies a series of significant
connection and experience from this area to the
seating and landscape to screen the Fine Arts projects to improve traffic and pedestrian flow along
Main Quad; an improved ramp and landscape/
Center’s utility area below on East Main Street. this corridor, reconfigure the multiple parking areas
elements in this location would complete the overall
on both sides of Heth Plaza and create a much more
pedestrian experience in this location. The proposed CAIC will include a working courtyard
aesthetically pleasing viewshed along Fairfax from
One specific addition to the Main Quad is the and a significant building entry, along the Adams
Jefferson Street on one end to Tyler Avenue on the
opportunity for placing a University Seal in a Street Corridor. This new building will provide
other. The parking area between Russell Hall and the
hardscaped area. This could be used as a specific excellent opportunities to enliven the northern
Moffett Quad will be totally reworked to provide a
photographic opportunity for students and others, end of the corridor and will help attract and guide
smoother in-and-out traffic pattern and will include
along with potential ceremonial activities. pedestrians to the west and along East Main Street.
ample visitor, metered and handicapped parking
The Master Plan also proposes reworking the adjacent to the active public Admissions and
Adams Street Corridor intersection of the Adams Street Corridor with Advancement spaces in Russell Hall. The parking
The most important landscape goal for the Adams Fairfax Street, to provide a more visually appealing area between Peters Hall and Dalton Hall will also
Street Corridor is to continue to enhance this and safe environment for the interactions of be evaluated to provide a smoother in-and-out
corridor as a primary north-south pedestrian route pedestrians and vehicular traffic in this heavily traffic pattern or potentially the introduction of a
on campus. To achieve this goal, the following traveled area. pedestrian-only plaza.
strategies are considered.

2020-2030
Master Plan
72

New signage and other visual markings at each end Tyler Avenue Corridor shrubs. The parking area at Walker Hall could
of the Fairfax Street Corridor will also be provided potentially be removed completely, given the
The most important landscape goals, along Tyler
for a much stronger identification of this corridor as nominal number of spaces and its location directly
Avenue, are to improve the University’s appearance
a “main entry” to campus. across from Clement Street, a lively retail and food
in this busy thoroughfare and improve pedestrian
corridor. Note that, while screening parking and
Downey Street Corridor and bicycle safety. To achieve these goals, the
utility areas will improve the visual quality of the
following strategies are considered.
The most important landscape goal for the Tyler Avenue street front, the parking areas and the
Downey Street Corridor is to complete this { Improve shrub screening of parking and entries to adjacent buildings will require additional
corridor as a significant east-west pedestrian route service areas. lighting for nighttime safety.
on campus. To achieve this goal, the following Along most of the length of Tyler Avenue, bicycle
{ Plant
additional canopy trees at outer edge of
strategies are considered. lanes have already been installed on both sides of
walks and adjacent areas.
{ Complete the connection of Downey Street the street, but for a three-block stretch of the west
to the Adams Street Corridor, between the { Indicate
shared bicycle/vehicle lanes on the side of the road, parking is located at the side of
Covington Center for Visual and Performing west side of Tyler Avenue. the road with no dedicated bicycle lane. Bicycle
Arts and the Student Recreation and travel should be accommodated with a 14-foot-
{ Introduceenhancements to discourage mid-
Wellness Center with future connection to wide shared bicycle/car lane. The median in this
block crossings. particular areas should be planted with low, spiky
the CAIC courtyard.
shrubs and ground covers and might also have a
Existing improvements, along Tyler Avenue, have
A significant entry to campus from the east occurs decorative metal fence installed along its centerline
enhanced the street’s visual quality and pedestrian
along Downey Street. While the construction of the to discourage mid-block crossings by pedestrians.
safety by adding attractive and well-maintained
Covington Center for Visual and Performing Arts
landscaping to the medians in the center of the road University discussions with the City of Radford
and the Student Recreation and Wellness Center
and adding colored crosswalks at Tyler Avenue’s have reinforced the validity of these proposed
inhibited the use of Downey Street as a pedestrian
intersections with side roads. These efforts are improvements and offer opportunities for
way due to their requirements for parking and
strengthened in the Master Plan by introducing collaboration between the entities. A particular area
service entrances, the proposed new CAIC will
trees and plantings, along the edge of the sidewalk, for coordination is the intersection of Tyler Avenue
provide the opportunity to open this corridor. This
to unify the appearance of this street front and with Calhoun Street, which is the location of the
will serve to connect Downey Street from Jefferson
reinforce the image of a respected academic proposed hotel. Pedestrian connectivity between
Street into Parking Lot A on Central Campus and
institution. Existing trees, along Tyler Avenue, campus and the hotel should be enhanced as
ultimately to Muse Hall. This natural and pleasing
should be preserved with the rhythm of street trees appropriate in this area to encourage interaction
pedestrian connection will help to connect the
adjusted in areas to accommodate the existing along this corridor.
east side of both the City of Radford and Central
trees. In particular, the grove of existing trees at the
Campus to the west side. Further, the University East Main Street Corridor
rear of Moffett Hall and the historic oak grove at the
will work with the City of Radford to potentially
rear of Muse Hall should be preserved to enhance The most important landscape goals, along
upgrade the sidewalks, along Downey Street
the established facade of the University. East Main Street, are to improve the University’s
from Central Campus to the Student Outdoor
Recreation Center to the west. This will provide a The parking area at Tyler Hall would be screened appearance in this busy thoroughfare and improve
strong connection between the indoor and outdoor from the street with shrubs around three feet in pedestrian and bicycle safety. To achieve these
recreation facilities and will “bridge” the west side height, planted between the trees to mitigate the goals, the following strategies are considered.
housing areas to campus. visual impact of vehicles parked in these areas. { Introducemature trees in parking lots and
Large utility areas and pieces of mechanical along the street.
equipment would also be screened with dense
73

{ Extendshared bicycle/vehicle lanes along East


Main Street.

{ Improve crosswalks and pedestrian


accommodation at the intersection with
University Drive.

Currently, a number of relatively tall buildings with


paved parking lots in front dominate the campus’
western East Main Street facade (Tyler Avenue to
University Drive). Though some nice plantings have
been introduced within the parking lots, they have
not had the time to grow sufficiently to screen
buildings or shade the parking area. The Master Plan
recommends more canopy trees for the parking area,
of a sufficient size at installation to offer significant
shade to the lot within five years. These trees will keep
the parking lot’s surface from heating excessively
during the summer months and will reduce the visual
University Drive Bridge Update
bulk of the tall campus buildings when viewed from
the street. As along Tyler Avenue, large canopy trees
Drive, the University should consider design { Introduce canopy trees along the length of
are recommended on both sides of the roadway to
enhancements in the center of the intersection to the street.
enhance the visual quality of the street by unifying the
make the intersection more highly visible and to
street front and screening views of the large campus { Place
new building infill to screen parking areas
calm traffic. The University is also working with
parking lot and the railway to the north. and extend vistas from Central Campus.
the City of Radford to incorporate improvements
The campus’ eastern East Main Street face to the University Drive Bridge, including new
(University Drive to Jefferson Street) was not Currently, the Jefferson Street campus edge is
fencing, lighting and sidewalk widening.
impacted by the realignment of East Main Street visually disorganized, bearing little visual relation to
All of these enhancements would need to be the older, statelier parts of the academic campus
some years ago and thus lacks the attractive
coordinated with the City of Radford. University surrounding the Main Quad and Moffett Quad.
landscaped medians and bicycle lanes of the
discussions with the City of Radford to date The Master Plan proposes a similar treatment for
western portion of the street. Flanking canopy trees
have reinforced the validity of these proposed this area to offer greater visual cohesiveness and
should also be continued through this portion of
improvements and offer opportunities for improve pedestrian safety.
East Main Street to unify this northern campus edge.
collaboration between the entities.
At East Main Street’s intersection with Tyler As recommended for Tyler Avenue, Jefferson
Avenue, University Drive and Jefferson Street, Jefferson Street Corridor Street will include canopy trees on both sides of
highly visible painted crosswalks are proposed the road to unify the street front. The University
The most important landscape goal for the
to connect the corners of these intersections to should also coordinate with the City of Radford to
Jefferson Street Corridor is to improve the visual
guide pedestrian movement and make pedestrian potentially introduce turning lanes, traffic-calming
quality and organization on the campus street
crossings more highly visible to motorists. At devices and medians with landscaping along the
front. To achieve this goal, the following strategies
East Main Street’s intersection with University length of the road. These elements, along Jefferson
are considered.

2020-2030
Master Plan
74

Street, have the obvious aesthetic advantage of { Create


a River Campus complex to provide Recreation Campus. This pedestrian mall would pass
improving the appearance of one of the key faces connectivity to the New River and support between the Dedmon Center and the proposed
of campus, but they also function to alleviate numerous academic and student life activities. future Indoor Tennis Facility, and then between the
traffic coming down the hill from Tyler Avenue, baseball field and the softball field and outdoor
channel vehicles into defined turn lanes and greatly The only existing entry to the Athletics/Recreation tennis courts. This corridor would serve to connect
improve pedestrian safety at crossings. Campus is the bridge over the railroad on virtually all of the athletic facilities on Athletics/
University Drive. In its current condition, this Recreation Campus for pedestrians and could be
Potential new building infill, along Jefferson Street, bridge is an uninviting place for pedestrians with used for outdoor events and pre-game activities.
would be carefully located to relate to each other four wide lanes, narrow sidewalks on either side
on both the Central Campus side and eastern side for pedestrians and no safe accommodation for General vehicular circulation would be limited to
of Jefferson Street. Vistas and pedestrian axes bicyclists. The Master Plan indicates improved the area north of Cupp Stadium and the Dedmon
from the Main Quad and Moffett Quad would be accommodation of bicyclists and pedestrians Center, extending to the eastern periphery of the
preserved and extended across Jefferson Street, by narrowing the four vehicle travel lanes and baseball field and the intramural fields. A smaller
particularly below Kyle Hall to the current residential widening the sidewalk on each side of the bridge. drive connects from the east end of the main drive
areas to the east. Other elements that will help make the bridge of the railroad to the existing parking lot near the
more inviting to pedestrians and bicyclists include outdoor tennis courts and baseball field, and a
University discussions with the City of Radford
attractive light fixtures with banners and more service drive allows service access between the
have reinforced the validity of these proposed
attractive fencing on the sides of the bridge. Dedmon Center and the soccer field to the rear
improvements and offer opportunities for
Improvements at the intersection also could of the proposed Indoor Tennis Facility. Parking
collaboration between the entities.
include colored crosswalks for pedestrian safety, is accommodated throughout the area with new
Athletics/Recreation Campus enhancing the appeal of this key link between parking lots at the east and west sides of the
the academics and athletics areas of campus. Dedmon Center and a parking lot at the east end
The most important goals for the Athletics/
All of these proposed improvements offer great of the Athletics/Recreation Campus. The parking
Recreation Campus outdoor spaces are to improve
opportunities to enhance overall branding for the at the east of the Dedmon Center is configured to
connections from Athletics/Recreation Campus
University and would require close coordination preserve existing trees on the current roadway by
to Central Campus, among athletic facilities and
with the City of Radford for both technical and providing a wide parking island within the lot that
recreational options at the New River. To achieve
funding considerations. will allow the trees to continue to thrive and shade
this goal, the following strategies are considered.
the parking lot.
{ Enhance University Drive and the bridge The 2014 Athletics Master Plan identified a
to accommodate bicycles and encourage significant transformation of the Athletics/ River Campus
pedestrian use. Recreation Campus to accommodate a number The Master Plan indicates the significant
of additional and expanded athletic facilities. development of a River Campus to enhance the
{ Create a pedestrian corridor connecting With the addition of these new facilities near connectivity of the New River to the University.
through the center of the athletic facilities to be the Dedmon Center, the area will be reorganized Construction of a greenway, along the river, is
identified and branded as Champion’s Walk. to accommodate these facilities and allow for proposed, connecting on the west to the existing
separated vehicular and pedestrian circulation City of Radford New River Greenway coming
{ Revise
the traffic patterns in the area of the
through the space. from Bisset Park. Several gathering areas with
Dedmon Center.
Pedestrians are given priority on a tree-lined appropriate outdoor furniture and shelters are
Champion’s Walk extending from the eastern end proposed, along this greenway, to provide spaces
of Cupp Stadium to beyond the softball field and for relaxation and contemplation with potential
Hitting Facility to the east end of the Athletics/ academic research and student life activities.
75

Boat and canoe launch ramps would provide Standard Campus Elements
direct access to the river for floats and canoes.
Over time across campus, certain common building,
Festival event areas, along with an amphitheater,
landscape and hardscape elements have been
are proposed adjacent to the river. Recreational
constructed and installed in various styles, colors
elements, such as ziplines, ropes courses and
or other inconsistent visual appearances. The
climbing walls, would be located in the area,
Master Plan will identify standards for these
potentially for both student and public use. A
common elements.
restaurant adjacent to the river would provide
food service and event spaces. A rails-to-trails { Main entry signage
connection, along the existing trestle bridge, would
{ Seating and benches
provide connectivity to other greenways in the
New River Valley.
{ Exterior light fixtures
Development, along the New River, will be
executed in full compliance with all regulatory and { Emergency phones
administrative local, state and federal requirements.
{ Railings and handrails
Careful maintenance plans for existing riparian
barriers will be established and followed. Materials { Fences and guards
will be selected to minimize maintenance and
replacement given potential flood events. Activities { Building signage
and services would be coordinated between the
City of Radford and other jurisdictions, along { Pavers

with the University, to maximize participation in


{ Sidewalks
the development of the River Campus and in the
associated activities. { Cart paths and access drives

Consistency in the provision and installation of these


elements will help enhance the visual impact of the
campus and reinforce overall University branding.

2020-2030
Master Plan
76

PROPOSED RIVER CAMPUS DEVELOPMENT


77

2020-2030
Master Plan
78

SUMMARY REFERENCES
The preparation of the 2020-2030 Master Plan provided a singular and The following references were used in the preparation of the Master Plan.
significant opportunity for the entire University community to engage in the y 2018-2023 Strategic Plan — Radford University, 2017
future development of the campus and the surrounding community. Further,
the timing allowed the Master Plan to reinforce the 2018-2023 Strategic Plan by y Six-Year Plan and Six-Year Capital Outlay Plan — Radford University, 2017
ensuring the University’s physical resources accommodate the future needs of y Comprehensive Plan — City of Radford, 2017
the University. The Master Plan is organized around the following overarching
y City of Roanoke Downtown Plan 2017
areas of emphasis.
y Reconnaissance-Level Architectural Survey of Radford University,
prepared for the Virginia Department of Historic Resources — CJMW
Construct Evaluate and Upfit Architecture, December 9, 2016
y CAIC – Highest priority y Classrooms and labs – Scheduling, y Athletics Master Plan for Radford University — Moseley Architects/
efficiency, delivery methods and REAL
y Hurlburt Addition General Education Populous, November 2014

y Administrative Services Addition y Student study and collaboration spaces y Radford University Campus Accessibility Audit — Gay and Neel, Inc.,
December 12, 2011
y Welcome Center y Event and meeting spaces
y Radford University Stormwater Master Plan — Draper Aden Associates,
y Public Safety Building
June 2011
y Athletics Ticketing/Concessions Enhance
Building y Radford University Campus Master Plan — HEWV, 2008
y Sustainability
y Radford University Campus Master Plan — Boynton, Rothschild, Rowland
Renovate y Utilities
Architects, 2001
y Transit
y McConnell Library y Radford University Campus Master Plan — Sasaki Associates, Inc., 1993
y Campus perimeter
y Tyler/Norwood/Muse Halls y Radford University Academic Space Planning Services — Ayers Saint
y Greenspaces Gross, October 2018
y Dedmon Center Arena
y Brand identity y Radford University Parking Review — Walker Consultants, January 7, 2019

Repurpose y Radford University Institutional Research — Statistical information


Create
y Programmatic expansion through
selective repurposing of areas within y Greenway/Riverway – River Campus
Davis, Cook, Walker, Peters, Kyle and y Roanoke locations – RUC/RHEC
Young Halls
y Hotel
y Waldron College growth
y Public-private/retail spaces
y CEHD programs
y Other opportunities as identified
y Tech Talent Pipeline
y Venture Lab
y Tourism Lab
79

ACKNOWLEDGMENTS President’s Cabinet Master Planning Committee

Radford University included the engagement of Kenna M. Colley, Ed.D. — Interim Provost and Mike Biscotte — Chair
Vice President for Academic Affairs
many groups and individuals, both on-campus and Sandra Bond ’97, MBA ’00 — Administrative and
off-campus, in the preparation of the 2020-2030 Craig Cornell — Vice President for Professional Faculty Senate
Master Plan. The University acknowledges the Enrollment Management
Kenna M. Colley, Ed.D — Academic Affairs
contributions of many individuals, organizations Danny M. Kemp — Vice President for Information
and committees. John Cox — Radford University Foundation
Technology and Chief Information Officer
BRIAN O. HEMPHILL, PH.D. — PRESIDENT Nickola Dudley — University Relations
Wendy Lowery — Vice President for
Board of Visitors University Advancement Jake R. Fox, Ph.D. — Faculty Senate

Robert A. Archer, Rector Heather Miano — Executive Director Michael Gawrys, Jorge Coartney, James Perkins
of Administration and Scott Shaffer — Finance and Administration
James R. Kibler, Jr., J.D., Vice Rector
Chad A. Reed — Vice President for Finance and Mildred Johnson, M.S. ’81 —
Thomas Brewster, M.S. ’95, Ed.D. Administration and Chief Financial Officer Enrollment Management
Jay A. Brown, Ph.D. Ashley Schumaker — Chief of Staff and Danny M. Kemp — Information Technology
Gregory A. Burton Vice President for University Relations
Tom Lillard — University Advancement
Krisha Chachra Susan P. Trageser, Ed.D. — Vice President for
Robert G. Lineburg — Athletics
Student Affairs
Rachel D. Fowlkes, Ed.D.
Karen Montgomery — Staff Senate
Academic Deans and Athletic Director
Susan Whealler Johnston, Ph.D.
Joyendu “Joy” Bhadury, Ph.D. — Dean, Jamie Penven, Ph.D. — Student Affairs
Mark S. Lawrence Sandra C. Davis and William C. Davis Rick Roth, Ph.D. and David Sallee, Ph.D. —
Debra K. McMahon, Ph.D. College of Business and Economics At-Large
Karyn K. Moran ’88 Benjamin D. Caldwell, Ph.D. — Dean, College of Ashley Schumaker — Administrative Liaison
Graduate Studies and Research
Nancy A. Rice Julianna Stanley — Student
Kenneth M. Cox, Au.D.— Dean, Waldron College Government Association
David A. Smith ’85, M.S. ’87
of Health and Human Services
Georgia Anne Snyder-Falkinham
Margaret Devaney — Dean, College of Visual and
Lisa Throckmorton ’94 Performing Arts
Breon Case, Student Representative Steve Helm — Dean, McConnell Library
A special thanks is provided to the
Jake R. Fox, Ph.D., Faculty Representative Robert G. Lineburg — Director of Athletics
Facilities Management Support
J. Orion Rogers, Ph.D — Dean, Artis College of Team and the University Relations
Science and Technology Document Development Team.
Matthew J. Smith, Ph.D. — Interim Dean, College
of Humanities and Behavioral Sciences
Tamara Wallace, Ph.D. — Dean, College of
Education and Human Development

2020-2030
Master Plan
2020-2030 MASTER PLAN

New Building Location


Full Building Renovation
Partial Building Renovation
New/Improved Parking
River Campus Development
Drop-Off Shelter
Central Campus
Athletics/Recreation Campus
Public-Private Enterprise Strategic Growth Zones
Green Space/Pathways Improvements
Tree Canopy Improvements
Landscaping/Hardscaping Improvements
1/2020