March 2021 Electrical Report

Task
Maintain the power of lighting and door interlock at filling/blending/labeling/ washing area 1st F B1
Fixed humidity problem in EMKA incubator b2
Install timer for 100 L tank in SPF area
Fixed the inactivated autoclave door problem in B2
Change circulation pump for 300 L SPF tank in B2
Fixed the problem occurred in heater for AHU 24 B2
Fixed the problem in inactivated blending pumps in B2
Maintain the water treatment station
Change flow switch at firefighting piping in warehouse
Fixed the problem in water pump in warehouse
Install a new stand for water tank in warehouse
Fixed the alarm in battery charge for forklift in warehouse
fixed the pressure switch at compressor for – 20 freezer room in warehouse
Maintain the shower tank electrical panel in B2
Supply power for fume hood in new setting B1
Change check valve at diesel pump in firefighting room
Installed a new alarm for 300 litter SPF tank (stop motor)
Installing new power plugs for heaters in lap Animals
Change phase sequence in cold room in warehouse
Repaired the circulation pump in WFI tanks
Maintain the elevator in B2
Maintain the two generators
Routine work