Professional Documents
Culture Documents
10.5 Supply sanitary equipment preparations & BR feeding pipes for kitchen and Kitchenette wash basins as per as per drawings and count 3 3000 9000
market price.
Install sanitary equipment preparations & BR feeding pipes for kitchen and Kitchenette wash basins as per drawings. count 3 1000 3000
10.6 Supply sanitary equipment preparations & BR feeding pipes for outdoor faucet as per as per drawings and market price. count 1 3000 3000
Install sanitary equipment preparations & BR feeding pipes for outdoor faucet as per drawings. count 1 1000 1000
10.7 Supply sanitary equipment preparations for outdoor floor drains as per as per drawings and market price. count 6 1500 9000
Install sanitary equipment preparations for outdoor floor drains as per drawings. count 6 500 3000
10.8 Supply sanitary equipment preparations for bathrooms floor drains as per as per drawings and market price. count 10 1500 15000
Install sanitary equipment preparations for bathrooms floor drains as per drawings. count 10 500 5000
10.9 Supply sanitary equipment preparations for bathrooms shower drains as per as per drawings and market price. count 5 1500 7500
Install sanitary equipment preparations for bathrooms shower drains as per drawings. count 5 500 2500
10.10. Supply sanitary equipment preparations for showers as per as per drawings and market price. count 6 3000 18000
Install sanitary equipment preparations for showers as per drawings. count 6 1000 6000
10.11 Supply sanitary equipment preparations for rain showers as per as per drawings and market price. count 5 3000 15000
Install sanitary equipment preparations for rain showers as per drawings. count 5 1000 5000
10.12 Supply sanitary equipment preparations for washing machine as per as per drawings and market price. count 1 3000 3000
Install sanitary equipment preparations for washing machines as per drawings. count 1 1000 1000
10.13 Supply sanitary equipment preparations for drier as per as per drawings and market price. count 1 3000 3000
Install sanitary equipment preparations for drier as per drawings. count 1 1000 1000
10.14 Supply sanitary equipment preparations for central water filters as per as per market price. count 1 3000 3000
Install sanitary equipment preparations for central water filters in kitchens. count 1 1000 1000
10.15 Supply 1 inch Kessel Drainage pipes for air conditioning as per specs, engineers instructions and market price. mL 50 100 5000
Install 1 inch Kessel Drainage pipes for air conditioning as per specs and engineers instructions. mL 50 80 4000
10.16 Install Kessel Drainage pipes for outdoor drainages per specs and engineers instructions. mL 30 100 3000
Supply Kessel Drainage pipes for outdoor drainage as per specs, engineers instructions and market price. mL 30 80 2400
10.17 Supply 1 inch Poly BR feeding pipes (German manufacture) for cold water & insulated for heaters mL 325 100 32500
network as per specs, engineers instructions and market price.
Install 1 inch Poly BR feeding pipes (German manufacture) for cold water & insulated for heaters network per specs and engineers mL 325 80 26000
instructions.
10.18 Supply feeding pipes for public feeding network as per specs, engineers instructions and market price. mL 250 100 25000
Install feeding pipes for public feeding network per specs and engineers instructions. mL 250 80 20000
10.19 Supply floor drain for the outdoor as per drawings, specifications and market price. count 6 220 1320
Install floor drain for outdoor as per drawings and specifications. count 6 80 480
10.20. Supply floor drain for the bathrooms as per drawings, specifications and market price. count 10 220 2200
Install floor drain for the bathrooms as per drawings and specifications. count 10 80 800
10.21 Supply Kessel rectangular floor drain for the showers (65 cm length) as per drawings, specifications and market price. count 5 2500 12500
Install Kessel rectangular floor drain for the showers (65 cm length) as per drawings, specifications and market price. count 5 1000 5000
10.22 Install 3 inch Kessel drainge pipes for risers as per specs and engineers sections mL 127 100 12700
Supply 3 inch Kessel drainge pipes for risers as per specs and engineers sections mL 127 80 10160
10.23 Install 4 inch Kessel drainge pipes for risers as per specs and engineers sections mL 127 110 13970
Supply 4 inch Kessel drainge pipes for risers as per specs and engineers sections mL 127 80 10160
10.24 Install sanitary equipment preparations & kessel drainage pipes for flower box mL 8 80 640
Supply sanitary equipment preparations & kessel drainage pipes for flower box mL 8 80 640
10.25 Install 1 inch Poly BR feeding pipes (German manufacture) for risers per specs and engineers instructions. mL 167 100 16700
Supply 1 inch Poly BR feeding pipes (German manufacture) for risers as per specs, engineers instructions and market price. mL 167 80 13360
Plumbing Work Total 451030
A2G2_Mr. MOHSEN SELIM_Katameya VILLA _ BOQ
Supply exposed ceiling 2 frame spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials
required for the complete installation back to panel boards as per drawings and price market. count 66 250 16500
Install exposed ceiling 2 frame spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the
complete installation back to panel boards as per drawings. count 66 80 5280
Supply ceiling spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials required for the
9.12 complete installation back to panel boards as per drawings and price market. count 72 250 18000
Install ceiling spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the complete
installation back to panel boards as per drawings. count 72 80 5760
9.13
Supply waterproof ceiling spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials required
for the complete installation back to panel boards as per drawings and price market. count 89 250 22250
Install waterproof ceiling spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the
complete installation back to panel boards as per drawings. count 89 80 7120
9.14
Supply outdoor waterproof floor spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials
required for the complete installation back to panel boards as per drawings and price market. count 11 250 2750
Install outdoor waterproof floor spot light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the
complete installation back to panel boards as per drawings. count 11 80 880
9.15
Supply indirect floor light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials required for the
complete installation back to panel boards as per drawings and price market. ml 53.6 50 2680
Install indirect floor light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the complete
installation back to panel boards as per drawings. ml 53.6 30 1608
9.16
Supply indirect Ceiling light outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials required for the
complete installation back to panel boards as per drawings and price market. ml 91.5 50 4575
Install indirect Ceiling light outlets including Sweedy cables (3x1x3 mm2) and all necessary work required for the complete
installation back to panel boards as per drawings. ml 91.5 30
250 2745
0
Supply lighting switch outlets including switch device, wires (2x3mm2) and all necessary work and materials required for the
9.17 complete installation as per drawings and price market. count 67 250 16750
Install lighting switch outlets including switch device, wires (2x3mm2) and all necessary work and materials required for the
complete installation as per drawings. count 67 80 5360
Supply electrical deviator switch outlets including switch devices as per approved sample, wires (3x2 mm2) and all necessary
9.18 work and materials required for the complete installation as per drawings and market price. count 30 360 10800
Install electrical deviator switch outlets including switch devices as per approved sample, wires (3x2 mm2) and all necessary work
required for the complete installation as per drawings. count 30 150 4500
Supply wall electrical sockets outlets @25 cm height from finish floor including Sweedy cables and socket devices as per
9.19 drawings and approaved sample.and price market. count 74 250 18500
Install wall electrical sockets outlets @25 cm height from finish floor including Sweedy cables and socket devices as per drawings
and approaved sample. count 74 80 5920
Supply waterproof wall electrical outlets @25 cm height from finish floor for bathrooms including Sweedy cables and socket
9.20. devices as per drawings and approaved sample.and price market. count 9 250 2250
Install waterproof wall electrical outlets @25 cm height from finish floor for bathrooms including Sweedy cables and socket
devices as per drawings and approaved sample. count 9 80 720
Supply wall electrical sockets outlets @130 cm height from finish floor including Sweedy cables and socket devices as per
9.21 drawings and approaved sample.and price market. count 17 250 4250
Install wall electrical sockets outlets @130 cm height from finish floor including Sweedy cables and socket devices as per
drawings and approaved sample. count 17 80 1360
Supply water proof wall electrical sockets outlets @130 cm height from finish floor including Sweedy cables and socket devices
9.22 as per drawings and approaved sample.and price market. count 12 250 3000
Install water proof wall electrical sockets outlets @130 cm height from finish floor including Sweedy cables and socket devices as
per drawings and approaved sample. count 12 80 960
Supply floor electrical outlets including including Sweedy cables and socket devices as per drawings and approaved sample.and
9.23 price market. count 14 250 3500
Install floor electrical outlets including Sweedy cables and socket devices as per drawings and approaved sample. count 14 80 1120
Supply In Furniture electrical outlets including Sweedy 4 mm cables and socket devices as per drawings and approaved
9.24 sample.and price market. count 14 250 3500
Install In Furniture electrical outlets including Sweedy 4 mm cables and socket devices as per drawings and approaved sample. count 14 80 1120
Supply telephone outlets including Sweedy double 6mm cables, telephone plugs and all required accessories boxes, fitting and
9.25 materials to complete the work as per drawings and price market. count 7 220 1540
Install telephone outlets including Sweedy double 6mm cables, telephone plugs and all required accessories boxes, fitting and
materials to complete the work as per drawings. count 7 80 560
Supply television outlets including Sweedy cables and TV plugs with TV coaxial cable and all required accessories boxes, fittings
9.26 and materials to complete the work as per drawings. price market. count 11 360 3960
Install television outlets including Sweedy cables and TV plugs with TV coaxial cable and all required accessories boxes, fittings
and materials to complete the work as per drawings. count 11 80 880
Supply television (data) outlets including Sweedy cables and TV plugs with TV coaxial cable and all required accessories boxes,
9.27 fittings and materials to complete the work as per drawings. price market. count 11 360 3960
Install television (data) outlets including Sweedy cables and TV plugs with TV coaxial cable and all required accessories boxes,
fittings and materials to complete the work as per drawings. count 11 80 880
Supply & install HDMI outlets including Sweedy double 6mm cables, HDMI plugs and all required accessories boxes, fitting and
9.28 materials to complete the work as per drawings and price market. count 13 360 4680
Supply & install USB outlets including Sweedy double 6mm cables, USB plugs and all required accessories boxes, fitting and
9.29 materials to complete the work as per drawings and price market. count 5 80 400
9.30. Supply 15x15 cm exhaust fan preparations and Sweedy cables for bathrooms/nanny's as per specs, drawings and market price. count 2 200 400
Install 15x15 cm exhaust fan preparations and Sweedy cables for bathrooms/nanny's as per specs, drawings and market price. count 2 80 160
9.31 Supply Air conditioning (5 hp) concealed outlets and 6mm Sweedy cables as per drawings and price market. count 5 675 3375
Install Air conditioning (5 hp) concealed outlets and 6mm Sweedy cables as per drawings. count 5 80 400
9.32 Supply Air conditioning (4 hp) concealed outlets and 6mm Sweedy cables as per drawings and price market. count 4 675 2700
Install Air conditioning (4 hp) concealed outlets and 6mm Sweedy cables as per drawings. count 4 80 320
9.33 Supply Air conditioning (3hp) concealed outlets and 6mm Sweedy cables as per drawings and price market. count 2 675 1350
Install Air conditioning (3 hp) concealed outlets and 6mm Sweedy cables as per drawings. count 2 80 160
9.34 Supply electrical bell outlets as per drawings and price market. count 1 180 180
Install electrical bell outlets as per drawings. count 1 80 80
9.35 Install electrical riser (4 Cables 25 mm each - cables from the source of electricity from the outside villa panel board). mL 35 80 2800
Supply electrical riser (4 Cables 25 mm each - cables from the source of electricity from the outside villa panel board) as price
market. mL 35 430 15050
9.36 Install satellite system. mL 20 80 1600
Supply satellite system as price market. mL 20 180 3600
9.37 Install telephone riser. mL 15 80 1200
Supply telephone riser as price market. mL 15 180 2700
Supply ABB electrical distribution panelboard with all the necessary accessories and materials required for completing the
9.38 installation as price market. count 3 6300 18900
Install ABB electrical distribution panelboard with all the necessary accessories required for completing the installation . count 3 1800 5400
9.39
Supply & install door bell box outlets including devices as per approved sample, wires (3x2 mm2) and all necessary work and
materials required for the complete installation as per drawings and market price. count 1 300 300
9.40.
Supply & install internet panel 30x40 with all the necessary accessories and materials required for completing the installation as
price market. count 1 2800 2800
9.41
Supply & install shutter switches outlets including Sweedy cables (3x1x3 mm2) and all necessary work and materials required for
the complete installation back to panel boards as per drawings and price market. count 4 350 1400
9.42 Supply & install High Voltage Electrical Outlets count 4 350 1400
Supply wall electrical sockets outlets @30 cm height from finish floor including Sweedy cables and socket devices as per
9.43 drawings and approaved sample.and price market. count 36 250 9000
Install wall electrical sockets outlets @30 cm height from finish floor including Sweedy cables and socket devices as per drawings
and approaved sample. count 36 80 2880
Supply wall electrical sockets outlets @60 cm height from finish floor including Sweedy cables and socket devices as per
9.44 drawings and approaved sample.and price market. count 10 250 2500
Install wall electrical sockets outlets @60 cm height from finish floor including Sweedy cables and socket devices as per drawings
and approaved sample. count 10 80 800
9.45 Electrical outlet for tv set @ floor count 1 2000 2000
Electrical Work Total 300473
Sample _ BOQ
Supply C /BKHAM/ 1 ceramics 50*50 cm flooring from el Sallab for spaces. 00-08 &00-09 (Nanny's Room),00-10 & 00-11(Driver's Room ) as per approved
sample. and market price. m2 42.5 110 4675 9775
For HPL & Engineered wood floors
2.3.4 Install second grade ''Phara'ana'' ceramic tiles flooring from AlGawhara for all HPL floorings as per approved sample. m2 285 120 34200
Supply second grade ''Phara'ana'' ceramic tiles flooring from AlGawhara for all HPL floorings as per approved sample and market price. m2 285 70 19950 54150
2.4. Porcelain work
For skirting
2.4.1 Install Wood textured porcelain - Madera - Color: Nogal skirting from Tiles for spaces no. 01-08 (Ahmeds Bedroom ) as per approved sample mL 22 80 1760
SupplyWood textured porcelain - Madera - Color: Nogal skirting from Tiles for spaces no. 01-08 (Ahmeds Bedroom ) as per approved sample and market
price. mL 22 200 4400 6160
For floors
Install Wood textured porcelain - Madera - Color: Nogal tiles from Tiles for spaces no. 01-08 (Ahmeds Bedroom ), no 01_09(Ahmeds Bathroom),no
2.4.2 01_05(Master Bathroom) as per approved sample. m2 36 120 4320
Supply Wood textured porcelain - Madera - Color: Nogal tiles from Tiles for spaces no. 01-08 (Ahmeds Bedroom ),no 01_09(Ahmeds Bathroom),no
01_05(Master Bathroom) as per approved sample and market price. m2 36 900 32400
2.4.3 Install Grey Matte14x115 cmCode: 1010006881Flooring for spaces no. 01-06 (Abd el Rahmans Bathroom ) as per approved sample m2 5 120 600
Supply Grey Matte14x115 cmCode: 1010006881Flooring for spaces no. 01-06 (Abd el Rahmans Bathroom ) as per approved sample and market price m2 5 320 1600
2.4.4 Install Esna Tiles- Nile Co (CODE: HM-GEO-512 _ SIZE: 20x20CM for space no 01_13(Terrace) as per approved sample m2 11 120 1320
Supply Esna Tiles- Nile Co (CODE: HM-GEO-512 _ SIZE: 20x20CM for space no 01_13(Terrace) as per approved sample and market price. m2 11 720 7920
2.4.5 Install GRS Patagonia 19.5 x 120 cm fres Code: 1020000212 flooring for space no. 02-05 (Roof Terrace ) as per approved sample. m2 100 120 12000
2.4.5
Supply GRS Patagonia 19.5 x 120 cm fres Code: 1020000212 flooring for space no. 02-05 (Roof Terrace ) as per approved sample and market price. m2 100 800 80000
2.4.6 Install Hekla grey 60X120 from terra for spaces no. 02-05, 02-03 (Roof Terrace-Utility room ) as per approved sample. m2 26 120 3120
SupplyHekla grey 60X120 from terra for spaces no. 02-05, 02-03 (Roof Terrace-utility room ) as per approved sample and market price. m2 26 1495 38870
Install ENIS METROPOLIT NATURE59.6 X 59.6 CM ANTRACCODE: 1020004193 from Mahgoub for space no. 02-04 (Roof Toilet ) as per approved
2.4.7 sample. m2 6 120 720
Supplyl ENIS METROPOLIT NATURE59.6 X 59.6 CM ANTRACCODE: 1020004193 from Mahgoub for space no. 02-04 (Roof Toilet ) as per approved
sample and market price m2 6 995 5970 188840
For walls
2.4.8 Install RAK A99GZ CTW-NOK.W289R 19.8 X 120 Cm walls from Mahgoub for space no. 00-07(Guest Bathroom) as per approved sample. m2 4.5 130 585
Install RAK A99GZ CTW-NOK.W289R 19.8 X 120 Cm walls from Mahgoub for space no. 00-07(Guest Bathroom) as per approved sample and market m2 4.5 585 2632.5
2.4.9 Install Mirage-Glocal GC 01 30*60 tiles walls for space no. 01-11(Monyas Bathroom) as per approved sample. m2 44 130 5720
Supply Mirage-Glocal GC 01 30*60 tiles walls for space no. 01-11(Monyas Bathroom) as per approved sample and market price. m2 44 1130 49720
2.4.10 Install Grey Matte14x115 cmCode: 1010006881Walls for spaces no. 01-06 (Abd el Rahmans Bathroom ) as per approved sample m2 6 130 780
Supply Grey Matte14x115 cmCode: 1010006881Walls for spaces no. 01-06 (Abd el Rahmans Bathroom ) as per approved sample and market price m2 6 320 1920
2.4.11 Install ENIS METROPOLIT Code 1020004189 from Mahgoub for spaces no. 02-04 (Roof Toilet ) as per approved sample m2 6 130 780
Supply ENIS METROPOLIT Code 1020004189 from Mahgoub for spaces no. 02-04 (Roof Toilet ) as per approved sample and market price m2 6 935 5610
Install ENIS DUBAI METROPOLIT 33.3 X 100 CM SILVER CODE: 1020004192 from Mahgoub for spaces no. 02-04 (Roof Toilet ) as per approved
2.4.12 sample m2 5 130 650
Supply ENIS DUBAI METROPOLIT 33.3 X 100 CM SILVER CODE: 1020004192 from Mahgoub for spaces no. 02-04 (Roof Toilet ) as per approved
sample and market price m2 5 970 4850
2.4.13 Install Hekla grey 60X120 from terra for space no. 02-03 (Utility Room ) as per approved sample. m2 7 130 910
SupplyHekla grey 60X120 from terra for space no. 02-03 (Utility Room ) as per approved sample and market price. m2 7 1495 10465 84622.5
2.5. Cement Tiles Work
For floors
2.5.1 Install Cement tiles- Code: 995129 for space no 01-11(Monyas Bathroom) as per approved sample m2 6 120 720
Install Cement tiles- Code: 995129 for space no 01-11(Monyas Bathroom) as per approved sample and market priced m2 6 720 4320 5040
3 Wood work
3.1. Wooden doors and architraves
Rates include lacquer paint but not the accessories.
Door Model DR01/GF sheet DR-01 - Double leaf sliding glass and lacquered massive wood door with all the required accessories as per detailed drawings and
3.1.1 Door Model
approved DR02/GF sheet DR-02 - Single leaf Sliding glass and lacquered massive wood door with all the required accessories as per detailed drawings and
sample. count 1 18000 18000
approved sample.
3.1.2 Door Model DR03/GF sheet DR-03 - Single leaf hinged Stained massive wood Door with all the required accessories as per detailed drawings and approved count 1 23000 23000
sample.
3.1.3 Door Model DR04/GF sheet DR-04 - Single leaf hinged Stained Massive Wood frame with glass panel with all the required accessories as per detailed count 1 12000 12000
drawings and approved sample.
3.1.4 Door Model DR05/GF sheet DR-05- Single leaf hinged Stained massive wood Door with all the required accessories as per detailed drawings and approved count 1 10000 10000
sample.
3.1.5 Door Model DR06/GF sheet DR-06 - Single leaf hinged flush stained(Outside)& Lacquered (Inside) Massive wood door with all the required accessories as count 1 12000 12000
per detailed drawings and approved sample.
3.1.6 Door Model DR07/GF sheet DR-07 - Single leaf hinged flush stained(Outside)& Lacquered (Inside) Massive wood door with all the required accessories as count 1 10000 10000
per detailed drawings and approved sample.
3.1.7 Door Model DR8/FF sheet DR-08 - Double leaf hinged flush stained Massive wood door with grooves within flush wood cladding from both sides with all the count 1 10000 10000
required accessories as per detailed drawings and approved sample.
3.1.8 Door Model DR9/FF sheet DR-09 - Single leaf hinged flush stained Massive wood door with grooves within flush wood cladding from one sides with all the count 1 22000 22000
required accessories as per detailed drawings and approved sample.
3.1.9 Door Model DR10/FF sheet DR-10 - Single leaf hinged flush stained Massive wood door within flush wood cladding from one side with all the required count 1 20000 20000
accessories as per detailed drawings and approved sample.
3.1.10 Door Model DR11/FF sheet DR-11 - Single leaf hinged flush stained Massive wood door within flush wood cladding from one side with all the required count 1 14000 14000
accessories as per detailed drawings and approved sample.
3.1.11 Door Model DR12/FF sheet DR-12 - Single leaf hinged flush stained Massive wood door with all the required accessories as per detailed drawings and count 1 14000 14000
approved sample.
3.1.12 Door Model DR13/FF sheet DR-13 - Single leaf sliding flush stained Massive wood frame with glass panel with copper rods with all the required accessories count 1 12000 12000
as per detailed drawings and approved sample.
3.1.13 Door Model DR14/RF sheet DR-14 - Single leaf hinged flush stained Massive wood door with all the required accessories as per detailed drawings and count 1 15000 15000
approved sample.
3.1.14 Door Model DR15/RF sheet DR-15 - Single leaf hinged flush stained Massive wood door with all the required accessories as per detailed drawings and count 2 12000 24000
approved sample.
3.1.15 count 2 12000 24000
3.2. Wooden claddings and panels
For walls
Install & Supply stained oak veneer cladding and MDF sheets for walls for space no. 00-02 & 0-03 (Reception and lobby ground floor), colors and details
3.2.1 according to drawings Sheet (MD-06) as per approved sample and market price. m2 16 1800 28800
Install & Supply stained Mahogany wood veneer cladding and MDF sheets for walls for space no. 00-12 (guest bedroom ground floor), colors and details
3.2.2 according to drawings Sheet (MD-07) & (GF-IE-0.12.01) as per approved sample and market price. m2 13 2400 31200
Install & Supply stained oak massive veneer cladding and MDF sheets for walls for space no. 01-08 (Ahmed's Bedroom first floor), colors and details
3.2.3 according to drawings Sheet (MD-08) & (FF-IE-0.08.01)as per approved sample and market price. m2 7 1800 12600
Install & Supply stained oak massive veneer planks 15cm width cladding and MDF sheets for walls for space no. 01-03 (Master Bedroom first floor), colors
3.2.4 and details according to drawings Sheet (MD-09) as per approved sample and market price. m2 5 1800 9000
Install & Supply Lacquered pine wood cladding dark grey color with gilded color on grooves on MDF sheets for walls for space no. 01-03 (Master Bedroom
3.2.5 first floor), colors and details according to drawings Sheet (MD-09) as per approved sample and market price. m2 5 1600 8000
3.3. Wooden floors
Install & Supply Stained oak wood section skirting for spaces 00-03 (Reception & Dining) , 00-04 (Ground Floor Living space) , 00-05 (Kitchen) , 01-02 , 01-
For skirtings
03 (Master bedroom and dressing) & 01-04 (Master bedroom living) ,00-12 (Guest bedroom) & 01-08 (Ahmed's Bedroom) , (Abd elRahman's bedroom) 01-
3.3.1 10 & 01-12 (Monaya's bedroom and dressing room) , 01-01 (First floor common living room ) as per approved sample and market price. mL 210 500 105000
3.4. Install &
HPL & Engineered
Supply HPL flooring Chocolate Oak (Original Laminate - 4 way bevel plank - 205x20.5cm) from PERGO or similar for spaces 00-03 (Reception &
wood Floors
Dining) , 00-04 (Ground Floor Living space) , 00-05 (Kitchen) , 01-02 , 01-03 (Master bedroom and dressing) & 01-04 (Master bedroom living) as per
3.4.1 approved sample and market price. m2 165 845 139425
Install & Supply HPL flooring Vintage Oak (Original Laminate - 4 way bevel plank - 205x20.5cm) from PERGO or similar for spaces 00-12 (Guest bedroom)
3.4.2 & 01-08 (Ahmed's Bedroom) as per approved sample and market price. m2 50 845 42250
Install & Supply HPL flooring Natural Sawcut Oak (Original Laminate -Classic Plank-120x19cm) from PERGO or similar for spaces 01-07 (Abd elRahman's
3.4.3 bedroom) as per approved sample and market price. m2 20 715 14300
Install & Supply HPL flooring European Oak (Original Laminate - 4 way bevel plank - 205x20.5cm) from PERGO or similar for spaces 01-10 & 01-12
3.4.4 (Monaya's bedroom and dressing room) as per approved sample and market price. m2 30 845 25350
Install & Supply HPL flooring Morning Oak (Original Laminate -Classic Plank-120x19cm) from PERGO or similar for spaces 01-01 (First floor common
3.4.5 living room) as per approved sample and market price. m2 20 715 14300
3.5. Others
Install & Supply wooden TV unit, drawers and Wooden Screen for space no. 01-02 (Master Living room), as per drawing (OD-04) , approved sample and
3.5.1 market price. LS 1 55000 55000
3.5.2 Install & Supply wood pergola for space no. 01-01 (Master Living Terrace), as per drawings sheet MD-10 , approved sample and market price. LS 1 48000 48000
3.5.3 Install & Supply wood pergola and screen for (Outdoor Roof Terrace), as per drawings sheet MD-05 , approved sample and market price. LS 1 48000 48000
3.5.4 Install & Supply wood Frame around bay window for space no. 01-10 (Monaya's bedroom), as per drawings (OD-05) & approved sample and market price. mL 10 300 3000
3.5.5 Install & Supply wooden sill at bay window for space no. 01-10 (Monaya's bedroom), as per drawings (OD-05) &approved sample and market price. mL 2.5 300 750
3.5.6 Install & Supply wooden sill at bay window for space no. 01-08 (Ahmed's bedroom), as per drawings (FF-01-08.01) &, approved sample and market price. mL 2.5 300 750
3.5.7 Install & Supply Stained wood counter (2.4x0.5x0.5)m for space no. 00-13 (guest bathroom), as per drawings &approved sample and market price. Count 1 7300 7300
Install & Supply washed Laquered contar wood Vanity unit (0.7x1.5x0.5) for space no. 01-11 (Monaya's bathroom), as per drawings &approved sample and
3.5.8 market price. LS 1 7000 7000
3.5.9 Install & Supply Stained Azizi wood Shelves (0.3x0.3x0.05)m for space no. 01-09 (Ahmed bathroom), as per drawings &approved sample and market price. Count 2 600 1200
3.5.10 Install & Supply Stained Azizi wood Shelf (1x0.3x0.05)m for space no. 01-09 (Ahmed bathroom), as per drawings &approved sample and market price. Count 1 1000 1000
3.5.11 Install & Supply Stained Azizi wood Counter (1.25x0.5x0.15)m for space no. 01-09 (Ahmed's bathroom), as per drawings &approved sample and market price. Count 1 4000 4000
Install & Supply Stained Azizi wood Shelf (1.3x0.5x0.05)m for space no. 01-06 (AbdelRahman's bathroom), as per drawings &approved sample and market
3.5.12 price. Count 1 1500 1500
3.5.13 Install & Supply Stained Azizi wood counter (1.3x0.1x0.6)m for space no. 01-05 (Master bathroom), as per drawings &approved sample and market price. Count 2 3000 6000
3.5.14 Install & Supply Pitch Pine wood shelf (1.3x0.1x0.6)m for space no. 02-04 (Roof's toilet), as per drawings &approved sample and market price. Count 2 3000 6000
3.5.15 Install & Supply Oak Massive Wood stairs coping for main stairs, as per detail (FD-06), drawings &approved sample and market price. ml 13 2500 32500
4 Gypsum boards
All boards are water proof and are choosen according to drawings and approved samples.
4.1 Install & Supply Flat gypsum boards according to drawings as per approved sample and market price. m2 310 250 77500
4.2 Install & Supply curtain pockets according to drawings as per approved sample and market price. mL 31 150 4650
4.3 Install & Supply shadow gap according to drawings as per approved sample. mL 288 130 37440
4.4 Install & Supply light pocket according to drawings as per approved sample. mL 69 160 11040
4.5 Install & Supply curtain pockets with indirect light according to drawings as per approved sample. mL 17 180 3060 1025915
5 Painting work
5.1. Walls and ceilings
5.1.1 Supply plastic paint for walls for all spaces as per approved sample and market price, with the exclusion of bathrooms and kitchen. m2 365 40 14600
Apply plastic paint for walls for all spaces as per approved sample, with the exclusion of bathrooms and kitchen. m2 365 90 32850
5.1.2 Supply plain Lacquered paint for walls for all bathrooms & kitchen as per approved sample and market price. m2 60 100 6000
Apply plain Lacquered paint for walls for all bathrooms & kitchen as per approved sample. m2 60 100 6000
5.1.3 Supply plain plastic paint for ceilings for all spaces as per approved sample and market price,with the exclusion of bathrooms and kitchen. m2 297 40 11880
Apply plain plastic paint for ceilings for all spaces as per approved sample ,with the exclusion of bathrooms and kitchen. m2 297 90 26730
5.1.4 Supply Textured terraco paint for railing of space no.02-05 ( roof terrace) as per approved sample and market price. m2 24 60 1440
Apply Textured terraco paint for railing of space no.02-05 ( roof terrace) as per approved sample and market price. m2 24 90 2160
5.1.5 Supply plain Lacquered paint for ceilings for all bathrooms & kitchen as per approved sample and market price. m2 80 100 8000
Apply plain Lacquered paint for ceilings for all bathrooms & kitchen as per approved sample. m2 80 100 8000 117660
7 Aluminum/steel/copper work
Supply & install a library of 2x2 cm Steel Sections (1.2x0.3x2.95m) and 6mm Glass shelves for space no. 01-01 (Common Living first floor), according to
7.1 drawings, specs, approvd samples and market price. count 1 35000 35000
Supply & install Anti-Burglery Aluminum for items no. W01, W02, W03, W04, W05, W06, W08, W10, DR29, DR30, DR31 & DR32 according to drawings,
7.2 specs, approvd samples and market price. count 13 30000 390000
7.3 Supply & install wrought iron for items W07 & W09 according to supplier's drawings, specs, approvd samples and market price. count 3 1500 4500
7.4 Supply & Install Steel Handrail rods 2x2 cm for main stairs as per detail (FD-06),drawings, specs, approvd samples and market price. count 140 200 28000 457500
Supply & Install Heating System for spaces no. 00-03 (Reception), 00-04 (Living Room), 00-12 (Guest Bedroom), 00-13 (Guest
Bathroom), 01-01 (Living Room), 01-02 (Master Living), 01-03 (Master Bedroom), 01-05 (Master Bathroom), 01-06
(Abdelrahman's Bathroom), 01-07 (Abdelrahman's Bedroom), 01-08 (Ahmed's Bedroom), 01-09 (Ahmed's Bathroom), 01-11
(Monaya's Bathroom), 01-12 (Monaya's Bedroom) & 02-02 (Roof Living) Count 16 **
11.3 Supply & install boiler for radiater and water feed. Count 1 **
11.4
Supply & install Italian Calpeda motor of 1 hp for the water tank. Count 1 **
11.5
Supply & install Italian Calpeda motor of 1 hp for the general piping network . Count 1 **
11.6
According to
Supply & install 50 Kilo Watt- diesel powered ''Perkins'' electrical generator or ony equivilantly similar brand. Count client's decision **
11.10. Supply and install Motion sensors system as per drawings LS **
11.11 Supply and install Fire fighting system for kitchen as per drawings. LS **
11.12 Supply and install surveillance automation module as per drawings. LS **
11.13 Supply and install intercom module, that controls the villa door lock from a touch monitor and views the caller. LS **
11.14 Supply and install central devices for internal communication between the landline handsets as per drawings. LS **
11.15
Supply and install mechanical Shutters units for spaces no. 01-01 (Living Room), 01-02 (Master Living), 01-03 (Master
Bedroom), 01-07 (Abdelrahman's Bedroom), 01-08 (Ahmed's Bedroom) & 01-12 (Monaya's Bedroom) as per drawings, specs and
**
market price Count 8
11.16 Supply and install mechanical Shutters units for roof structure as per drawings, specs and market price Count 5 **
على المقاول زيارة الموقع و دراسة كافة البنود طبقا للواقع على ان تكون تلك المعاينة نافية تماما للجهالة:مالحظة