You are on page 1of 2
Tel .: +971 4 340 6861 Fax : +971 4 340 6862 AL MAJAL MDC Dubai P.O.Box : 116936 Sharjah P.O.Box : 71838 DEWATERING LLC E-Mail : info@mdccont.com Website : www.mdecont.com Mis: ACTCO GENERAL CO. L.L.C Date — October. 04, 2015 P.O. Box: 4694 Dubai UAE Ref— Q 473 /2015 Tel: 04 - 282.0404 Fax: 04 - 286 9145 Attn: Eng. Mohamed Jansher. Project ID: Proposed Warehouse on plot no: W-38B at Dubai Airport Free Zone (DAFZ), Dubai-UAE. Subject: Dewatering Work Offer Dear Sir With reference to your above project we are pleased to quote our best price for the above project as below: Background: Based on the information you provided to us, The area required to be dry as per following: As per your information Dewatering required for Underground water tank area only, ‘The water tank area size ‘Approxi. (30 x 9:m), and the Excavation level — 3.70 m as per your information, ‘The Ground water table level ~ 2.10 m from E.G.L (0,00) as per the soil report. Discharge point: Not given Proposed Method: [As per the site condition and the depth required our proposal to use well point system, 6 inch Lay flat Hose with sedimentation tank with all necessary fitting will be used. Charges: Details of Our Dewatering Equipment Unit Hire Rate Full and complete well point dewatering system including installation, ‘A. mobilization, drilling, and Dewatering pump with all accessories L/S / Month 26,000.00 without diesel L/S rate for one month only. Booster Pump without diesel including 6” Discharge hose = B. “Gt required) PerPump/PerDay 220.00 Note: - 1. Minimum duration is one month and If exceed one month the rate will be pro rata. 2. Dewatering system should installed at the water table level. 3. Our price given based on the information provided by you, and any change will change our price. Tel .: 4971 4 340 6861 Fax : +971 4 340 6862 AL MAJAL MDC Dubai PO.Box : 116936 Sharjah P.O.Box : 71838 DEWATERING L.L.C E-Mail : info@mdecont.com Website : www.mdccont.com Payment terms: ‘To be agreed. Validity of this offer: ‘This offer will be valid for 30 days only from its date above. Delivery period: Installation and mobilization will be after 10 days after officially confirmation of the quotation, Our Responsibility (AL MAJAL MDC): 1+ Supply all the required Pumps, Accessories, Discharge system including Sediment tanks with all the fitting and the discharge hose to provide complete operational dewatering system. 2+ The technical support along with all dewatering work stages. 3+ Method statement, Drawings and calculations. Your Responsibilities (the main contractor): 1- Any security procedure or requirements should arranged by you 2- Any special requirements such as safety materials or environmental protective actions. 3+ You will provide Water & filter aggregates size (3/8) for our system installation. 4- Any Excavation for the Trenches if required your responsibility. 5+ Diesel for our pumps and drilling machine will be your responsibility 6- (3) Labors to be available from your side atthe installation period. 7- You will be responsible for all existing services: Etisalat, Electricity, Water, Drainage, etc. 8- Provide Day & Night Watchman for our system on & off at site 9- Payment for all authority’s charges & deposits etc. will be your responsibility (D.M, RTA, Nakhecl,Trakhees, Tecom, etc...) 10- Reimburse for the equipment damaged on site or the materials which cannot be recovered from site. I- All kind of Ramp and permission for Road crossing & Crain services if required shall be your responsibilty Please return signed and stamped copy of this quotation as a confirmation of your order, or send a confirmation letter signed by authorized person General Manager ACCEPTED. ‘Wahib Azzam, Signature 050-47

You might also like