3. Simulation current to test sectionalize function by Test JIG. Insert only one phase but the screen displayed
two phases and neutral.
=> You have to check the connection of current input.
We think that A Phase and Current Com may be changed each other.
So, you need to check it
We have a question about No.3 and No.4. Is the above screen events field data or testing data?
Question :
Q1. Current and Voltage input equipment : Testing Jig ? or Relay testing equipment?
Q2. If you carried out by relay testing equipment, What is the relay setting value
[input current and phase] ?
Q3. Operating Mode : If you operated RT-200P as a Sectionalizer, we need operating mode value
and operating count value?
Q4. What is the firmware version of RT-200P when you carried out RT-200P?,
Pls inform us firmware version number?
문의 :
테스트 할 때 조건
전류 전압 입력 장비 : 시험용 JIG 인지 계전기 시험기 인지
계전기 시험기로 입력 하였다면 계정기 설정 값(입력 전류 및 위상)
동작 모드 : 섹션이라면 동작 Mode, 동작 Count
펌웨어 버전 :