塔博卡真空炉车间配套要求 TABOCA‘s VDU Workshop Requirement


Total power distribution of the whole
480KVA (Three-phase 440V; 60Hz, single-phase 254V, five-wire system).
VDU 总配电负荷
Around 9m*5m. As the attached drawing (VDU Platform Base Loading Position
Footprint/Foundation 地基
Foundation Layout).
The total working weight of the VDU on the platform is about 22 tons, and all the
VDU operation platform
weight falls on 6 columns of the platform. DIBOO and IAT already provided the
设备操作平台
design drawings for TABOCA to manufact the platform.
At least leave the same size of open space as the footprint in front of the platform
Operating area 炉前操作空间
for products discharging operation.
The lifting height can’t be less than 6.5m, the carrying capacity is not less than 5 tons, and
the crane travel covers the entire VDU operating space. DIBOO and IAT will design and
Crane 行车
manufacture the TABOCA‘s VDU Workshop Requirement VDU based on the confirmed crane
height which provided by TABOCA(6.59m).

The supporting power supply capacity of the VDU is 480KVA, the standard is
Power distribution requirement three-phase five-wire system. It is required to set the power switch cabinet in VDU
配电系统要求 workshop. Then TABOCA and IAT needs to connect the cable from the switch cabinet
to the inlet wire terminal of VDU control panel.

1) Flow and pressure: The circulating cooling water flow of the VDU is 20-30m3/h,
the water pressure is not less than 0.2-0.3MPa, and inlet water temperature is
lower than 35-40°C.

2) Water quality requirements: The water quality is clean, the total solid content of
the dissolvability should not exceed 1000mg/L, the acidity (pH value) is 6-9, and the
total hardness (calculated as calcium carbonate) should be less than 450mg/L. It is
recommended to configure a soft water system.

3) Water Pipe: inlet pipe DN80, outlet pipe DN150. The backwater is open type and
Cooling water 冷却水系统 not under pressure. TABOCA and IAT needs to connect the inlet water pipe and
outlet water pipe from the cooling pool/tower to the VDU water distributor. The
pipes can be connected in the ground or buried in the ground.

4) Water pump: When the VDU is working, it is not allowed to stop the cooling water
supply. The water pumps need to be working at all times. TABOCA needs to prepare
a 20-30KW standby generator for pump working for around 5 hours if the entire
power grid is off, or configure a 30-50m3 spare high-seated pool for cooling
around 5 hours.

5) Cooling tower: The cooling method can be cooled by configurating a cooling


tower on the cooling pool or by using a counter current closed cooling tower.

Connect the nitrogen pipe (DN 20) to vacuum pump position or use the bottle
Nitrogen 氮气
nitrogen at site (at least 2 bottles all the time)