Maun West Wastewater Treatment Plant

Inlet Works Preliminary Layout


The proposed layout is as illustrated below.

MAUN WEST WASTEWATER TREATMENT PLANT

INLET WORKS ARRANGEMENT

Vortex DeGritter
Manual Medium Manual Fine
Screen Screen
Connection FOG Chamber
Flume
from Contract 1

Mechanical Mechanical
Medium Screen Fine Screen Vortex DeGritter

Course Screen
To Anaerobic
Ponds

Tanker
Discharge Bay

Brief Outline of Proposed Process


1. 500mm dia pipeline picks up sewage from incoming rising main from the village. Rising
main is from a pump and it is assumed partial screening will have happened at the
Pumpstation before the treatment works.
2. Before reaching screen chamber the sewer line collects sewage from the tanker
discharge bay
3. Two screen channels are provided, I for mechanical screens, another for manual
screens
4. For each channel a medium screen (25mm) and a fine screen 10mm) is provided
5. Screen collection and compaction system will be provided for each set of mechanical
screens
6. After fine screens the channel merge before feeding 2 vortex degritters with grit
extraction systems
7. Vortex degritters can be used independently, 1 duty, 1 standby arrangement.
8. Flow Measurement is done by an ultrasonic meter by the flume just after the vortex
degritter.

9. Skimming tank is the last unit after the flume, with a scraper to remove scum into a
collection box.
Drawing with the proposed layout is attached for more clarity.