Rak Kunci
Rak Kunci
#NAME?
#NAME?
Volume
No. Nama Pekerjaan Formula
m1/m2/m3
### #NAME?
### #NAME?
### #NAME? 2.00 x 6.38 x 1.00 x 0.80 = 10.21
### #NAME?
### #NAME? = 12.52
### #NAME? = 0.63
### #NAME? = 3.15
### #NAME? = 6.30
### #NAME? = 36.50
### #NAME? = 2.00
### #NAME? = 1.00
### #NAME? = 2.00
=
### #NAME?
###
### #NAME? 65.80
### #NAME? 16.45
### #NAME? 4.65
### #NAME? a. Pembesian 121.00 x 11.62 = 1405.81
b. Cetakan 3.33 x 11.62 = 38.69
c. Beton K.225 11.62
2.00 x 0.20 x 3.14 x 1.3² = 2.12
2.00 x 0.20 x 2.00 x 3.14 x 1.30 = 3.27
0.20 x 0.80 x 20.20 = 3.23
0.20 x 14.99 = 3.00
11.62
### #NAME? = 28.57
### #NAME? = 32.75
### #NAME? = 32.75
### #NAME? = 51.65
### #NAME? = 18.00
### #NAME? = 18.00
### #NAME? = 1.00
###
### #NAME? 2.00
### #NAME? 300.00
### #NAME? 300.00
### #NAME? 300.00
### #NAME? 20.00
### #NAME? 68.00
### #NAME? 201.72 + 168.20 369.92
### #NAME? 64.30 x 0.40 x 0.15 = 3.86
### #NAME? 64.30 x 0.40 = 25.72
### #NAME? 64.30 x 0.80 = 51.44
### #NAME? 0.10 x 219.00 = 21.90
### #NAME? 0.10 x 53.15 = 5.32
### #NAME? = 53.15
### #NAME? = 17.00
### #NAME? = 5.00
### #NAME? = 1.00
### #NAME? = 215.17
### #NAME? = 31.20
17 #NAME? 2.00 x 66.30 x 0.20 = 26.52
DAFTAR HARGA SATUAN PEKERJAAN
KEGIATAN : ###
PEKERJAAN : PERLENGKAPAN RUANG FRONT OFFICE
LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG
No. Koofisien Satuan Upah / Bahan Harga Upah Harga Bahan Jumlah Harga Jumlah Harga
1 Membuat 1 M2 Backdrop Bahan Rangka Multiplek Finishing HPL & PVCSheet Dibulatkan Rp 1,216,900.00
Upah :
1.840 oh Pekerja Rp 89,000.00 Rp 163,760.00
2.800 oh Tukang Rp 120,000.00 Rp 336,000.00
0.620 oh Kepala Tukang Rp 140,000.00 Rp 86,800.00
0.300 oh Mandor Rp 140,000.00 Rp 42,000.00
Bahan :
0.080 Kg Paku 1 cm - 2,5 cm Rp 17,000.00 Rp 1,360.00
0.800 Kg Lem Kayu Rp 18,000.00 Rp 14,400.00
1.200 Lbr Multiplek 6mm Rp 85,000.00 Rp 102,000.00
0.610 Lbr Rangka Multiplek 12mm Rp 170,000.00 Rp 103,700.00
1.200 Lbr HPL Rp 245,000.00 Rp 294,000.00
1.000 Set List Stainless/Acc Rp 15,000.00 Rp 15,000.00
Rp 628,560.00 Rp 530,460.00 Rp 1,159,020.00
Overhead + Fee 10% Rp 57,951.00
Jumlah Rp 1,216,971.00
UPAH
1 Kepala Tukang OH Rp 140,000.00
2 Mandor OH Rp 140,000.00
3 Pekerja OH Rp 89,000.00
4 Tukang OH Rp 120,000.00
BAHAN
1 Paku 1 cm - 2,5 cm Kg Rp 17,000.00
2 Lem Kayu Kg Rp 18,000.00
3 Multiplek 6mm Lbr Rp 85,000.00
4 Multiplek 12 mm Lbr Rp 170,000.00
5 HPL Lbr Rp 245,000.00
6 List Stainless/Acc Set Rp 15,000.00
7 Kaca Cermin t = 5 mm m2 Rp 270,000.00
8 Wallpaper Type D m2 Rp 42,000.00
9 Lem Wallpaper kg Rp 15,000.00
MASHURI
MINGGU KE
BOBOT
No. URAIAN PEKERJAAN I II III IV V KET.
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
a b c d e f
JUMLAH #NAME?
BOBOT PER MINGGU #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RENCANA
BOBOT KOMULATIF #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
BOBOT PER MINGGU
REALISASI BOBOT KOMULATIF
CEPAT ( + ) / LAMBAT( - )
Waktu pelaksanaan 120 (Seratus Dua Puluh ) hari kalender Padang, 18 Februari 2021
Penawar,
#NAME?
MASHURI
Kartu Asistensi
### #NAME?
### #NAME?
### #NAME?
### 2019
Di -
Padang
Dengan Hormat,
Sehubungan dengan pelaksanaan Pekerjaan Interior Ruang Asrama Haji Embarkasi Padang
Sumatera Barat, dengan ini kami mengajukan penawaran dengan ketentuan sebagai berikut :
Demikian Surat Penawaran ini kami sampaikan, dan kami menyatakan sanggup dan tunduk pada
semua ketentuan yang tercantum dalam Dokumen Pemilihan.
Penyedia Jasa
#NAME?
MASHURI
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERLENGKAPAN RUANG FRONT OFFICE
LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)
1 Pembuatan Lemari Kunci 1.00 Unit 8,350,000.00 8,350,000.00
- Rangka Multiplek Finish HPL /Kertasive
- Bilah Acrylic 5mm Laser Cutting
- Marking Nama Acrylic Laser Cutting & sesuai nama gedung
- Penggantung Kunci Besi lapis Chrome
2 Pembuatan Lemari Nakas FO 6.00 Unit 1,200,000.00 7,200,000.00
- Rangka Multiplek Finish HPL /Kertasive
- Kaki Roda/ Caster Wheel
- Rel laci Triple Plat
- Engsel Sendok Hydraulic
- 2 Laci sorong & 1 Cabinet
3 Pembuatan Partisi Acrylic Bubble Wall 1.00 Unit 6,250,000.00 6,250,000.00
- Bahan Acrylic Bening
- Lighting Sytem berubah warna
- Bubble 2 - 5mm
- Sistim Pintu Engsel Tanam dan Jepit
Jumlah Rp. 21,800,000.00
PPn 10% Rp. 2,180,000.00
Jumlah Total Rp. 23,980,000.00
Dibulatkan Rp. 23,980,000.00
Terbilang : Dua Puluh Tiga Juta Sembilan Ratus Delapan Puluh Ribu Rupiah.
MASHURI
GAMBAR KERJA
GAMBAR KERJA
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)
MASHURI
GAMBAR KERJA
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)
MASHURI
GAMBAR KERJA