PERHITUNGAN VOLUME (ACTUAL CHECK)

#NAME?
#NAME?

Volume
No. Nama Pekerjaan Formula
m1/m2/m3

### #NAME?

### #NAME? = 1.00


### #NAME? 2.00 x 5.00 x 2.00 = 20.00

### #NAME?
### #NAME? 2.00 x 6.38 x 1.00 x 0.80 = 10.21

### #NAME? 10.21 x 0.25 2.55


### #NAME? 2.00 x 6.38 x 0.80 x 0.20 2.04

### #NAME? (0.25+0.6) /2 x 0.6 = 0.26 3.25


2.00 x 6.38 x 0.26 = 3.25

### #NAME? 2.00 x 3.00 x 2.30 = 13.80


### #NAME? 13.80 x 2.00 = 27.60
### #NAME? = 27.60
### #NAME?
a. Pembesian 115.00 x 0.81 = 93.15
b. Cetakan 3.33 x 0.81 = 2.70
c. Beton K.175 2.00 x 13.50 x 0.15 x 0.20 = 0.81
### #NAME?
a. Pembesian 115.00 x 0.21 = 23.81
b. Cetakan 3.33 x 0.21 = 0.69
c. Beton K.175 2.00 x 2.00 x 2.30 x 0.02 = 0.21
10 #NAME?
a. Pembesian 115.00 x 0.15 = 17.25
b. Cetakan 3.33 x 0.15 = 0.50
c. Beton K.175 1.00 x 5.00 x 0.15 x 0.20 = 0.15
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? Berat Pipa /M1 = 4.52 Kg 416.56

Kolom 2.00 x 12.88 x 4.52 = 116.44


Balok 2.00 x 33.20 x 4.52 = 300.13
416.56

### #NAME? 2.00 x 4.75 x 4.74 = 45.03


### #NAME? = 45.03
### #NAME? = 4.60
### #NAME? 2.00 x 33.43 x 0.50 46.46
2.00 x 21.72 x 0.30
33.43 + 13.03 =
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 4.00 = 8.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 8.00 x 3.00 x 0.05 = 2.40
### #NAME? 2.00 x 8.00 x 3.00 x 0.10 = 4.80
### #NAME? 2.00 x 8.00 x 3.00 = 48.00
### #NAME? 2.00 x 2.00 x 8.00 = 32.00
### #NAME? 2.00 x 27.60 = 55.20
### #NAME? 2.00 x 8.00 = 16.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 8.00 = 16.00
### #NAME? 2.00 x 9.00 = 18.00
### #NAME? 2.00 x 6.00 = 12.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME?
1 Pembuatan Lemari Kunci 2.00 x 10.00 x 0.40 x 0.50 = 4.00
### #NAME? = 1.00
### #NAME?
#NAME? a. Pembesian 210.00 x 4.00 = 840.00
#NAME? b. Cetakan 3.33 x 4.00 = 13.32
#NAME? c. Beton K.175 2.00 x 10.00 x 0.40 x 0.50 = 4.00
### #NAME? 2.00 x 10.00 = 20.00
### #NAME? Berat Pipa /M1 = 4.52 Kg 406.80

Kolom 2.00 x 25.00 x 4.52 = 226.00


Balok 2.00 x 20.00 x 4.52 = 180.80
406.80
### #NAME? = 21.50
### #NAME? 2.00 x 8.00 x 3.00 x 0.05 = 2.40
### #NAME? 2.00 x 8.00 x 3.00 x 0.10 = 4.80
### #NAME? 2.00 x 8.00 x 3.00 = 48.00
### #NAME? 2.00 x 2.00 = 4.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 1.00 = 2.00
### #NAME? 2.00 x 2.00 = 4.00
=

### #NAME?
### #NAME? = 12.52
### #NAME? = 0.63
### #NAME? = 3.15
### #NAME? = 6.30
### #NAME? = 36.50
### #NAME? = 2.00
### #NAME? = 1.00
### #NAME? = 2.00
=

### #NAME?
###
### #NAME? 65.80
### #NAME? 16.45
### #NAME? 4.65
### #NAME? a. Pembesian 121.00 x 11.62 = 1405.81
b. Cetakan 3.33 x 11.62 = 38.69
c. Beton K.225 11.62
2.00 x 0.20 x 3.14 x 1.3² = 2.12
2.00 x 0.20 x 2.00 x 3.14 x 1.30 = 3.27
0.20 x 0.80 x 20.20 = 3.23
0.20 x 14.99 = 3.00
11.62
### #NAME? = 28.57
### #NAME? = 32.75
### #NAME? = 32.75
### #NAME? = 51.65
### #NAME? = 18.00
### #NAME? = 18.00
### #NAME? = 1.00
###
### #NAME? 2.00
### #NAME? 300.00
### #NAME? 300.00
### #NAME? 300.00
### #NAME? 20.00
### #NAME? 68.00
### #NAME? 201.72 + 168.20 369.92
### #NAME? 64.30 x 0.40 x 0.15 = 3.86
### #NAME? 64.30 x 0.40 = 25.72
### #NAME? 64.30 x 0.80 = 51.44
### #NAME? 0.10 x 219.00 = 21.90
### #NAME? 0.10 x 53.15 = 5.32
### #NAME? = 53.15
### #NAME? = 17.00
### #NAME? = 5.00
### #NAME? = 1.00
### #NAME? = 215.17
### #NAME? = 31.20
17 #NAME? 2.00 x 66.30 x 0.20 = 26.52
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN : ###
PEKERJAAN : PERLENGKAPAN RUANG FRONT OFFICE
LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG

No. Koofisien Satuan Upah / Bahan Harga Upah Harga Bahan Jumlah Harga Jumlah Harga

1 Membuat 1 M2 Backdrop Bahan Rangka Multiplek Finishing HPL & PVCSheet Dibulatkan Rp 1,216,900.00
Upah :
1.840 oh Pekerja Rp 89,000.00 Rp 163,760.00
2.800 oh Tukang Rp 120,000.00 Rp 336,000.00
0.620 oh Kepala Tukang Rp 140,000.00 Rp 86,800.00
0.300 oh Mandor Rp 140,000.00 Rp 42,000.00
Bahan :
0.080 Kg Paku 1 cm - 2,5 cm Rp 17,000.00 Rp 1,360.00
0.800 Kg Lem Kayu Rp 18,000.00 Rp 14,400.00
1.200 Lbr Multiplek 6mm Rp 85,000.00 Rp 102,000.00
0.610 Lbr Rangka Multiplek 12mm Rp 170,000.00 Rp 103,700.00
1.200 Lbr HPL Rp 245,000.00 Rp 294,000.00
1.000 Set List Stainless/Acc Rp 15,000.00 Rp 15,000.00
Rp 628,560.00 Rp 530,460.00 Rp 1,159,020.00
Overhead + Fee 10% Rp 57,951.00
Jumlah Rp 1,216,971.00

2 1 M2 PEMASANGAN KACA CERMIN TEBAL 5 mm RANGKA MULTIPLEK Dibulatkan Rp 574,000.00


Upah :
0.120 oh Pekerja Rp 89,000.00 Rp 10,680.00
0.510 oh Tukang kayu Rp 120,000.00 Rp 61,200.00
0.015 oh Kepala Tukang Rp 140,000.00 Rp 2,100.00
0.001 oh Mandor Rp 140,000.00 Rp 140.00
Bahan :
1.100 m2 Kaca Cermin t = 5 mm Rp 270,000.00 Rp 297,000.00
1.200 Lbr Multiplek 6mm Rp 85,000.00 Rp 102,000.00
0.433 Lbr Rangka Multiplek 12mm Rp 170,000.00 Rp 73,547.87
Rp 74,120.00 Rp 472,547.87 Rp 546,667.87
Overhead + Fee 10% Rp 27,333.39
Jumlah Rp 574,001.26

Hal.5 Dari 16 ANALISA SNI 2018


DAFTAR UPAH DAN BAHAN

KEGIATAN REVITALISASI DAN PENGEMBANGAN ASRAMA HAJI


PEKERJAAN INTERIOR RUANG ASRAMA
LOKASI ASRAMA HAJI EMBARKASI TABING - PADANG

No. URAIAN SATUAN HARGA SATUAN KET.

UPAH
1 Kepala Tukang OH Rp 140,000.00
2 Mandor OH Rp 140,000.00
3 Pekerja OH Rp 89,000.00
4 Tukang OH Rp 120,000.00

BAHAN
1 Paku 1 cm - 2,5 cm Kg Rp 17,000.00
2 Lem Kayu Kg Rp 18,000.00
3 Multiplek 6mm Lbr Rp 85,000.00
4 Multiplek 12 mm Lbr Rp 170,000.00
5 HPL Lbr Rp 245,000.00
6 List Stainless/Acc Set Rp 15,000.00
7 Kaca Cermin t = 5 mm m2 Rp 270,000.00
8 Wallpaper Type D m2 Rp 42,000.00
9 Lem Wallpaper kg Rp 15,000.00

Padang, 18 Februari 2021


Penawar,
#NAME?

MASHURI

Hal.6 Dari 16 Daftar Upah Bahan


TIME SCHEDULE
KEGIATAN #NAME?
PEKERJAAN PERLENGKAPAN RUANG FRONT OFFICE
LOKAS ASRAMA HAJI EMBARKASI TABING - PADANG
TAHUN #NAME?

MINGGU KE
BOBOT
No. URAIAN PEKERJAAN I II III IV V KET.
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
a b c d e f

### #NAME? #NAME? #NAME? #NAME?


### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

JUMLAH #NAME?
BOBOT PER MINGGU #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RENCANA
BOBOT KOMULATIF #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
BOBOT PER MINGGU
REALISASI BOBOT KOMULATIF
CEPAT ( + ) / LAMBAT( - )

Waktu pelaksanaan 120 (Seratus Dua Puluh ) hari kalender Padang, 18 Februari 2021
Penawar,
#NAME?

MASHURI
Kartu Asistensi
### #NAME?
### #NAME?
### #NAME?
### 2019

Nama dan Tanda


No. Uraian
Tangan

NAMA JABATAN TANDA TANGAN


Nomor : 02/PRALAKSANA/2020 Padang, 18 Februari 2021
Perihal : Surat Penawaran

Kepada Yth . : PEJABAT PENGADAAN BARANG/JASA


ASRAMA HAJI EMBARKASI TABING PADANG

Di -
Padang

Dengan Hormat,
Sehubungan dengan pelaksanaan Pekerjaan Interior Ruang Asrama Haji Embarkasi Padang
Sumatera Barat, dengan ini kami mengajukan penawaran dengan ketentuan sebagai berikut :

1. 1 Kami menerima dan mempelajari Dokumen Pengadaan Langsung


2. Kami sanggup melaksanakan pekerjaan tersebut dengan penawaran harga sebesar :
Rp 23,980,000.00
Dua Puluh Tiga Juta Sembilan Ratus Delapan Puluh Ribu Rupiah.
3. Pekerjaan dimaksud akan kami laksanakan dalam jangka waktu 30 (tiga puluh) hari
kalender sejak kontrak (SPK) ditanda tangani
4. Penawaran ini berlaku selama 30 (tiga puluh) hari kalender sejak tanggal pembukaan
penawaran.

Demikian Surat Penawaran ini kami sampaikan, dan kami menyatakan sanggup dan tunduk pada
semua ketentuan yang tercantum dalam Dokumen Pemilihan.

Penyedia Jasa
#NAME?

MASHURI
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERLENGKAPAN RUANG FRONT OFFICE
LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)
1 Pembuatan Lemari Kunci 1.00 Unit 8,350,000.00 8,350,000.00
- Rangka Multiplek Finish HPL /Kertasive
- Bilah Acrylic 5mm Laser Cutting
- Marking Nama Acrylic Laser Cutting & sesuai nama gedung
- Penggantung Kunci Besi lapis Chrome
2 Pembuatan Lemari Nakas FO 6.00 Unit 1,200,000.00 7,200,000.00
- Rangka Multiplek Finish HPL /Kertasive
- Kaki Roda/ Caster Wheel
- Rel laci Triple Plat
- Engsel Sendok Hydraulic
- 2 Laci sorong & 1 Cabinet
3 Pembuatan Partisi Acrylic Bubble Wall 1.00 Unit 6,250,000.00 6,250,000.00
- Bahan Acrylic Bening
- Lighting Sytem berubah warna
- Bubble 2 - 5mm
- Sistim Pintu Engsel Tanam dan Jepit
Jumlah Rp. 21,800,000.00
PPn 10% Rp. 2,180,000.00
Jumlah Total Rp. 23,980,000.00
Dibulatkan Rp. 23,980,000.00
Terbilang : Dua Puluh Tiga Juta Sembilan Ratus Delapan Puluh Ribu Rupiah.

Padang, 18 Februari 2021


Penawar,

MASHURI
GAMBAR KERJA
GAMBAR KERJA
RENCANA ANGGARAN BIAYA

PEKERJAAN : PARTISI RUANG ARSIP


LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)

1 Pembuatan Partisi Ruang Arsip 23.00 M2 620,000.00 14,260,000.00


- Rangka Alluminium
- Kaca Clear 5mm
- Termasuk Stiker Sand Blasting sejajar pinggang hingga kepala
- Jalusi Alluminium Atas dan Bawah
2 Pembuatan Pintu Sliding 2.00 Daun 3,200,000.00 6,400,000.00
- Rangka Alluminium
- Kaca Clear 5mm
- Termasuk Stiker Sand Blasting sejajar pinggang hingga kepala
- Termasuk Accecories ex. dekson/setara

Jumlah Rp. 14,260,000.00


PPn 10% Rp. 1,426,000.00
Jumlah Total Rp. 15,686,000.00
Dibulatkan Rp. 15,686,000.00
Terbilang : Lima Belas Juta Enam Ratus Delapan Puluh Enam Ribu Rupiah.

Padang, 18 Februari 2021


Penawar,

MASHURI
GAMBAR KERJA
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBUATAN TUGU SANJAI


LOKASI : ASRAMA HAJI EMBARKASI TABING - PADANG

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN
SATUAN (Rp) HARGA (Rp)

1 Pekerjaan Konstruksi Tugu 1.00 Paket 10,560,000.00 10,560,000.00


- Ukuran 4 x 1,2 Meter Tinggi Tapak Beton 2,5 Meter
- Tinggi Total termasuk Monumen = 4,5 Meter
- Rangka Portal Beton Praktis
- Finishing Cat Exterior, Batu Alam dan Granit
- Termasuk Stiker Sand Blasting sejajar pinggang hingga kepala
- Jalusi Alluminium Atas dan Bawah
2 Pembuatan Monumen Sanjai Bahan Beton Poles Rangka Besi 1.00 Paket 7,500,000.00 7,500,000.00
- Finish Cat Minyak + Top Coat Anti lumut
3 Pembuatan Tulisan dan Ornamen tambahan 1.00 Paket 6,830,000.00 6,830,000.00
- Marking Tulisan Acrylic Laser Cutting
- Lighting Sytem berubah warna
- Pot dan Bunga/Perdu berdaun hijau

Jumlah Rp. 24,890,000.00


PPn 10% Rp. 2,489,000.00
Jumlah Total Rp. 27,379,000.00
Dibulatkan Rp. 27,379,000.00
Terbilang : Dua Puluh Tujuh Juta Tiga Ratus Tujuh Puluh Sembilan Ribu Rupiah.

Padang, 18 Februari 2021


Penawar,

MASHURI
GAMBAR KERJA