KETERANGAN :

Ruko = 7 Unit
L 64 m2 - 83 m2
L 84 m2 - 119 m2 = 26 Unit +
= 46 Unit
U
Total = 79 Unit
B T

Lahan = 11.932 m² (100,00%)


S
RTH (Fasos) = 786 m²
SITEPLAN PERUMAHAN

)
Jalan + Saluran = 4.586 m² +

1.5

OSO
9.4
14.6
5.5 NANGKAAN

11.2
D5 D3 D2 D1
= 5.372 m² (45,02%) Ruko 8 (OPSI II)

10
A1

11.7

11.5

11.3
12
8.1

11
1.3 8.5 8

DOW
5.
1 11 14 14

6
Luas Kavling Total = 6.560 m² (54,98%) 1.
5
12D6 .6 7 7 7 7 A2 Ruko 7 Skala 1:1000

6.5
.8 5.1

6
4.
D7

6
Ruko 6

6
A3

8
1 2

6.5

-BON
5.
.6 D8

6.5
2.
31 4.9 2.3 21.8
2.6
11 8
A5 Ruko 5

6.5
3.9 B7

7
11 B5

10.6
B3 B1

7.9

MBER
Ruko 3
8.5

A6

6.5
6.5 8

13
9.1 6.6 6.5
2.7 3.8 16.8 6.5
10.2

D19 D17 6.5 Ruko 2

8.5
A7

6.5
.3
D15 D11
29

8
7
D9 14

P (JE
6 7
6.5 Ruko 1

ar
12

6.5
6.5 14
B10 B8
8

6.5 7

Troto
6.5 8
13 B6

8
8

B4

STRI
9.6 C8 B2 14

13

8.5
6 C7 C6 A8
12

6
C5 C3
6 C2 C1

Jl. MA
D14
12

6 8

8
D12 D10 6 A9
6.3 6

12
8

6
E16 E15 6 6

6.5
6 6
E14 6 A10
12

6
8

8
12

7.6

6.5
6 C18 12 Ruko
C17 C16 A11
12

6
C15 C9 12 Eksisting
8

E12 E11 A16


6
6.5

12
C10 A12
6

7.1
12

8
6.4

7 C14
12

A17
6
3.4

6 A14
6.5

4 8
C11 12
6

E17 6
14
6.3

7.6 E18
9.1

A18 A15
8
12

C12
9.4

8 5.3
6.6

6.6
4.1

12.3 4.5
10.2
12
6.5

6.6
8

E1
8

6.4 6 12.9
6
7

6
6.6

6
6.7

6 6
3.

10 E2
8.8

12

.2 8.1
12

E10 E9 E8 E7 E6 E5 13.8
8.3
7.7

E3
8.4

15