Professional Documents
Culture Documents
FOR
TWO WHEEL AND THREE WHEEL MOTOR CYCLE
ASSEMBLY AND PARTS MANUFACTURING PLANT
PROJECT TO BE IMPLEMENTED IN OROMIA REGIONAL STATE JIMMA
TOWN
September, 2022
Jimma, Ethiopia
TABLE OF CONTENT
TABLE OF CONTENT.................................................................................................................................2
EXECUTIVE SUMMARY........................................................................................................................... 4
1. INTRODUCTION................................................................................................................................. 5
1.1. Background of the Promoter..........................................................................................................5
1.2. Reason for Project Change.............................................................................................................5
1.3. Project Justification........................................................................................................................6
1.4. Objective of the project..................................................................................................................7
1.5. The Socio Economic Significance of the Project.......................................................................... 7
1.6. Location and Premises Required................................................................................................... 9
1.7. Location Map of the Area............................................................................................................ 11
2. MARKET STUDY AND PLANT CAPACITY..................................................................................12
2.1. Market Study................................................................................................................................12
2.1.1. Market Demand................................................................................................................... 12
2.1.1. Past and Present Demand for Two Wheel Motor Cycle in Ethiopia................................... 14
2.1.2. Projected Demand for Two Wheel Motor Cycle................................................................. 15
2.1.3. Marketing Strategy and Promotion......................................................................................16
2.1.4. Market Share........................................................................................................................17
2.2. Plant Capacity and Production Program...................................................................................... 17
2.3. Pricing.......................................................................................................................................... 18
3. TECHNICAL STUDY OF THE PROJECT........................................................................................19
3.1. Product Nature and Description...................................................................................................19
3.2. Raw materials and Input.............................................................................................................. 22
3.3. Production Process and Technology............................................................................................22
3.4. Assembly Process Flow............................................................................................................... 23
3.5. Source of Technology.................................................................................................................. 24
3.6. Machinery and Equipments/Assembly facility............................................................................24
3.7. Project Design and Work............................................................................................................. 37
3.8. Construction and Civil Works..................................................................................................... 37
3.9. Utilities.........................................................................................................................................40
3.10. Project Implementation Plan/ Action Plan...............................................................................41
4. MANPOWER AND ORANIZATIONAL MANAGEMENT.............................................................42
I
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
II
EXECUTIVE SUMMARY
1. Project name Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing
Plant
3. Nationality Ethiopian
5. Project Composition To assemble two wheel motor cycle with model with annual capacity of 30,000 per
year at full capacity in phase 1 In Phase 2 - Three Wheel Motor Cycle Assembly
and Phase 3- Parts manufacturing Plant
6. Premises Required The promoter already owned a total of 0.2 hectare, which is equivalent to 2,000M2
7. Total Initial Investment Br. 60,840,010 of which 30% equivalent to Br. 18,252,003 financed by the
Capital owners equity and the rest 70% equivalent to Br. 42,588,007 financed through
bank loan
8. Employment The total manpower required for the plant will be 204 employees at full capacity.
Opportunity
Permanent workers 181
Skilled 161
Unskilled 20
Temporary workers 23
Skilled 3
Unskilled 20
9. Market Share The project will supply 60% of products for Domestic market and 40% for
export (International market) mainly for neighboring countries like South
Sudan, Sudan and Kenya.
10. Benefits of the factory Assembled and supply quality motor cycle, add value to the economy, Source of
For The Region/ Revenue, Employment opportunity, Import substitution and export promotion,
Country Benefit for the Local Community, Stimulate the Local Economy and technology
transfer
1
1. INTRODUCTION
In dynamic economic environment, like the one currently exist in Ethiopia, the development of
higher metal industry and supportive manufacturing sector has a great role to make the overall
economic growth to be persistent. In this regard, motor cycle assembly has a great role to make
the economic growth to be persistent.
The government of Ethiopia has a conducive investment polices and guidelines that promote the
private sectors involvement in the economic development through the various investment and
business endeavors.
In this regard, the owner of the envisioned motor cycle assembly plant planned, Wozan &
Ahimed General trading PLC to invest in Jimma Town, carried out this pre-project study to
check the market, technical and financial feasibility of this project. The result of the study is very
sound and promising for the owner to start the project in this area.
The promoter has a good business reputation in two and three wheel motor cycle importing
business. He is very determined to commence the project. Hence, he expects to get the required
support from the Federal and town governments to make the project operational.
The promoter of the proposed project, has ample business experience in importing and trade
mainly distribution of spare parts for two and three wheel motor cycle. Currently, he needs to
extend his rich business and capital to two wheel and three wheel motor cycle assembly and parts
manufacturing project.
Import substitution and export to east Africa via that the project will generate
2
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Current location of the project is more suitable for the proposed project
Ethiopia has a great economic potential in Africa. The current double digit and dynamic
economic growth in all sectors supports the idea to become a great nation. As components of the
economy, agricultural and construction sectors are growing in the fastest rate. Therefore, there is
a need for parallel growth in other manufacturing industries that have a value chain and pair
(backward and forward) relationship with these sectors to make the growth long-lasting.
In this regard, Motor Cycle Assembling plant would have two basic advantages for the
development of an economy. First it facilitates transport of people and goods cheaply. Second, it
facilitates the process of industrial development through the creation of backward linkages for
the manufacture of parts and components.
Besides, the establishment of a low cost vehicle assembly plant in Ethiopia increases the supply
of and motorized vehicles for personnel as well as for good transport in the urban and possibly in
the rural areas. Such facilities will not only care the transportation current transport problem but
are also expected to bring about some qualitative change in the lives of the population at large.
Since Ethiopia is one of the nation with the least number of vehicles per individuals, the
expansion of vehicle assembly and manufacturing factory has a great impact to alleviate this
problem. Therefore, establishment of motor cycle assembling plant will have a good market in
the country.
In addition to the above facts, the following points further explain the rationales for
establishment for the envisioned plant by the owners.
3
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The government of Ethiopia promising five year growth and transformation development
plan II (2015/16-2019/20), the will bring prosperity to its citizens with collaboration with
private sector investment actions through industrialization.
Availability of skilled labor force at reasonable price
The envisaged project deemed to contribute to the economic development of the nation and
region in the following ways:
The project under discussion will provide quality and fair priced assembled Bajaj Motor Cycle
work service for the country market. This will benefits the users to get better product with better
price and durability.
B. Value Add
The establishment of this factory will add a value to the manufacturing sector in specific and in
the economy in general.
C. Source of Revenue
As public policy of any nation, the government collects different forms of taxes from different
business organizations and individuals. Among the different forms of taxes, business income
taxes, VAT and payroll taxes are collected from undertaking business activities. Therefore, the
factory will serve as sources of revenue for both the region and nation in general.
D. Employment Opportunity
4
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
One of the problems that our country faced is unemployment. Therefore, the current objective of
the government is working on tackling the problem of unemployment and fostering the
development process either through creating self employment or employment in other
organization. Hence, this factory will hire around 204 persons.
By minimizing the market gab for Motor Cycle demand and supply, the factory will help to
reduce the nation’s foreign exchange cost to import these materials. This will save the foreign
exchange resource of the nation.
As a corporate responsibility the company will engage in different development activities on the
surrounding areas (Jimma Town). This will better worth the community and contribute for the
development of the region.
This factory has positive externality in the zone that will encourage the economic movement of
local economy. Hence, there will be economic relationship and transactions among different
actors.
H. Technology Transfer
By assembled Motor Cycle, the project will train and develops the capacity of the technical staffs.
By doing this, the company will add value in technology transfer for the nation.
By assembly two wheel motor cycle, the project will contribute in solving transport problem of
the nation.
i. Location
5
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The envisioned project will be located in Jimma town, , which is 355 kms from Addis Ababa.
The main justifications behind the selection of this location are:
Strategically located to the central and largest market of the nation (Addis Ababa)
Relatively advanced development in infrastructure (Power, Water, Telephone internet,
road etc.
All asphalt road to the nearest market outlets
Availability of huge skilled labor force
Conducive investment policy and governance
Environmentally fit for manufacturing industry
The total area of land owned by the promoter for the envisioned project is estimated to be 0.2
hectare, which is equivalent to 2,000 m2. This land planned to use as indicated in table below.
6
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
7
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
As sectors of the economy, the agriculture and construction sector also grows with double digit
with the average annual growth 10.31% and 12% respectively in the past 8 years. As shown in
the table below the growth of the sectors directly related with the economy as parts of the
economy.
Table Major Economic Indicators
Trends in Performance of the Economy: Growth Rates (%)
This fast growth of these sectors resulted from different bodies like government, non government
and private activities in Ethiopia is growing in the fastest rate. Moreover, the current five years
Ethiopian Growth and transformation plan will expand the economic growth paramount level by
harnessing the resource and expanding industrialization.
When there exist fast economic growth, the economy demands parallel fast growth to the
transport sector. Hence, as one auxiliary components of the transport sector, the demand for two
wheel motor cycle products will increase.
3. Demography
In addition to the economy growth, population is one factor. The rate of growth of the urban
population is increasing from year to year. The latest report of the United Fund for Population
Agency revealed that Ethiopia’s population has reached 73 million in July 2005, which puts
Ethiopia as the second most populous country in Africa. According to the Central Statistics
Authority (CSA), current population growth is estimated to be 2.8% per annum, and the growth
rate is expected to remain above 2% for the next 20 years. Rural population is growing at about
3.0% while the urban population is growing at about 4.3%. Total population is projected to reach
129 million by 2030. In Ethiopia, of the total population, about 16.0% is estimated to reside in
8
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
the urban areas. The trend suggests that the size of urban population is likely to continue to grow
at a high speed in the future. The share of urban population will rise from 16.0% in 2005 to about
23% by 2030. Nearly 30 million of the total 129 million will live in cities and towns by 2030.
In general having a huge population is a potential for any business including two wheel motor
cycle products.
2.1.1. Past and Present Demand for Two Wheel Motor Cycle in
Ethiopia
Bicycles are widely used in developing countries particularly in well-developed cities,
moderately developed urban centers as well as in semi-urban areas for personal transport as well
as movement of light goods. In Ethiopia bicycles are used in most of the urban areas where the
topography is suitable for riding a bicycle.
As there is no a plant which manufactures or assemble bicycles in the country the entire demand
for the product is met through import. According to the data obtained from Ethiopian Revenues
& Customs Authority the bulk of import originated from China and India. Import of bicycles
during the period 2002 – 2011 is shown in the table below
Table Import of Bicycles (Units)
9
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
As can be seen from the table above, import of bicycles is characterized by fluctuations from
year to year with out a clear trend. During the period 2002--2011 the maximum import registered
was 76,521 units in 2007 while the minimum (19,840 units) was imported in year 2002.
However, during the period under consideration, the average annual import of bicycles was
about 47,937 units.
In the absence of a clear trend in the import or apparent consumption of bicycles, the average of
the recent five years (2007--2011) is assumed to approximate the current effective demand.
Accordingly, the present (2012) demand is estimated at 48,950 bicycles per annum.
Hence, to project the future demand for bicycles a 7% annual growth rate (the average of
expected GDP growth rate and urban population growth rate) is considered. Accordingly, the
projected demand for bicycles using the estimated present demand as a base and applying a
growth rate of 7% is depicted in the table below.
10
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Electronic Medias
Public Relations
The marketing strategy mainly focus on the satisfying the needs, orders and the requirement of
the customers.
The project will supply 60% of products for Domestic market and 40% for export (International
market) mainly for neighboring countries like South Sudan, Sudan and Kenya.
Considering the gradual growth of demand and the time required to develop the required skill the
rate of capacity utilization during the first, second, third year and fourth year of production will
be 60%, 80%, 90% and 100% respectively, which is 15% of growth annually. Full capacity
utilization will be reached during the fourth year of operation. The plant will operate 300 days
11
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
per year and one shift system(8 hours) and will assemble 30,000 units of two wheel boxer Bajaj
motor cycles per year at full capacity.
Description Year
1 2 3 4_10
Capacity utilization (%) 60 80 90 100
Assembled 2 wheel motor cycle in Unit 18,000.00 24,000.00 27,000 30,000.00
2.3. Pricing
It would be important to examine the possible level of price based on the competitor’s action. In
this connection, the existing average prices of other brand imported motor cycle in Addis Ababa
were assessed for the benefit of comparison. Based on the existing price in the market the project
stetted the motor cycle price for domestic and export market as follows;
12
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Bicycles are very useful and popular simple machines that serve as personal means of transport.
Designed mainly for one man ride (and non sportive use) in this project, the bicycles can also be
made for two people ride and also to carry goods. A carrier is added to the assembly for goods and
people In case of options, the bicycle being free from any fuel input it is cheap to use and preferred
by many people of all ages and income. Bicycles are very popular in many cities of our country
where the landscape of the city is level and free from steep roads.
This envisaged project will assemble two wheel motor cycle with Bajaj brand model for Boxer-s
and BM 150 in phase I.
Boxer-S BM150
The Boxer BM 150 was the highest displacement "Bajaj Boxer" ever made. The bike had 144.8cc
4-stroke air cooled engine, 130mm drum brakes at both the ends and robust large front telescopic
fork. Bajaj discontinued this bike quite early.
13
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
GENERAL:
Price Discontinued
Launched 2011
ENGINE:
Engine Displacement 144.82 and 150 CC
Engine Type Air cooled, 4 stroke
Number Of Cylinders 1
Valves Per Cylinder 2
Max Power 12.0 PS @7500 rpm
Max Torque 12.3 Nm @5500 rpm
Bore x Stroke N/A
Fuel Type Petrol
Starter Electric-Kick
TRANSMISSION:
Transmission Type Manual
Number Of Speed Gears 4
Final Drive (Rear Wheel) Chain
WHEELS & TYRES:
Front Tyre (Full Spec) 3.00 X 17
Rear Tyre (Full Spec) 100 / 90 x 17
BRAKES:
Front Brake Type 130 mm Drum
Rear Brake Type 130 mm Drum
SUSPENSION:
Suspension Front Telescopic, 125mm Fork travel
Suspension Rear 100 mm rear wheel travel, SNS shock absorber
DIMENSIONS:
Overall Length 2016 mm
Overall Width 760 mm
Overall Height 1028 mm
Wheelbase 1285 mm
Ground Clearance 190 mm
Kerb Weight 123 kg
Fuel Capacity 11.0 Litres
14
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The total cost of the inputs and raw materials required for motor cycle assembly at full capacity
is estimated to be Birr 712,800,000.00 as shown in the table below;
Table 6- Total cost of machineries and equipments listed in the table below;
15
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Motorized Conveyor
Work station
16
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Pin Lines
Overhead structures
Adopters
Air hoses
Spring balancers
Electric lines
Conveyor Ramp
FRL units
17
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Width: 660 mm
Height: 600 mm
Pitch: 2.4 m
Overhead Structure
Lightening facilities.
Electrical fans.
VCS boards.
18
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Structure – MS
Structure length – 26 m
Tightening tools
Special tools
19
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
20
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Fork lift
Frame Trolley
Engine Trolley
Wheel Trolley
Muffler Trolley
Seat Trolley
Tank trolley
Kitting Trolley
Storage rack
Unpacked material Storage: Unpacked material should be stored in crates & Bins.
Material Supply to Line: Material should be supplied to line in dedicated trolleys to avoid handling
damages
21
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
5. Inspection facilities
Torque wrenches
Co Analyzer
Chassis dynamometer
To check the mileage and speed of the vehicle after assembly as per the test standard.
Over all dimensions - Length = ~2300 mm, Width = ~1250mm Installation - In Trench
or on floor
Top sheet - M.S steel structure isolated with 3-4 mm Aluminum checked plate
22
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Weight – 200-300 Kg. (Approx) Power - 220 volt 5 Amp electric supply, 50 Hz. Vehicle
Cooling - With moveable, high speed Fan.
6. Utilities
i. Compressor
No of Phases – 3 & 1
Frequency – 50 Hz
23
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Fuel – Diesel
Operation standard
Torque standard
8. Signage boards
Table 7- total cost of machineries and equipments listed in the table below;
SN Description UOM Quantity Unit Price Total Price
in Br in Br.
1 Assembly Facility and Overhead Structure Set 2 1,306,000.00 2,612,000.00
2 Tools and Fixture Set 3 408,581.00 1,225,743.00
3 Machine Hydraulic (MH) Facilities Set 2 1,034,210.00 2,068,420.00
4 Unpacking & Line supply Set 3 185,470.00 556,410.00
5 Inspection facilities Set 2 365,025.00 730,050.00
6 Compressor Set 1 148,210.00 148,210.00
7 Diesel Generator 400kVA Set 1 760,210.00 760,210.00
8 Standards and Procedures Set 5 15,200.00 76,000.00
9 Signage boards Set 20 6,500.00 130,000.00
Total 8,307,043.00
Fright, Insurance, bank charge, transport, installation etc (13%) 1,079,915.59
Grand Total 9,386,958.59
24
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
9. Vehicles
Truck
Service Bus
Pick Up 4 WD
25
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
26
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The proposed project comprises stock of different components to be executed at different phases
of the project life. These activities include: Design and Construction of various buildings
(workshops), importing of machineries, inputs and other raw materials, import of vehicles and
other tasks.
As indicated in part 1 the total land holding of the project is estimated to be 2,000M2.The
buildings are planned to accommodate assembly houses, office, warehouse (input and finished )
and other utility requirements as well as offices and a social rooms/constructions.
In general the buildings must be capable of being kept clean and provision should be made for
keeping the sewerages drained out properly and room temperature is attained to keep healthy
environment. In most environments, equipment should be totally enclosed in a light structure:
where the climate is suitable. A concrete floor, which can be swept, is usual. Besides, the loading
and offloading areas together with incoming and outgoing roads are proposed to be paved to
ensure a clean environment around the project site. The site will be encircled by a chain linked
fence fastened to concrete posts. The project construction is designed by professional engineers
and construction will be done under close supervision and collaboration of the engineers. The
following are the features of the building;
27
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
28
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The total cost of Building and construction works listed in the table below;
29
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
3.9. Utilities
A number of utilities would be put in place in order to ensure smooth functioning of the factory.
These utilities include:
Water Supply,
Telephone line
Fuel
Drainage Facility
30
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
equipments and start rendering services. The time schedule for the above mentioned major
activities is presented below:
Table 12-Project-Implementation-Schedule
The organizational structure should be in a way that the company able to achieve its objectives as
well as the satisfaction of standard requirement.
The total manpower required for the plant will be 204 employees at full capacity.
At initial stage of the project operation technical expatriate staff will be hired from India.
The total number of manpower, Manpower list, qualification, salary and sex composition are
listed in the table 13.
31
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
32
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The organizational structure of the project is designed by including all the necessary personnel
under the right division. At the top of the organizational structure, there will be manager with the
responsibility of supervising the overall activity of the plant. Depending up on the nature of the
center and the amount of work to be performs; there exist auxiliary units under the general
manager.
Employees under each unit will be supervised by the department head that is accountable for the
general manager. General Manager is appointed by board of director.
33
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Owner
Owner
Audit Inspection
Legal Service
service
Production
Admin & Finance Commercial
Department
Department Department
Planning HR & Personnel Public relation Finance & General Service &
Procurement Logistics
Fig-Organizational-Structure
34
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Hence the following section deals with the duties and responsibilities of some departments.
1. General Manager
Duties and responsibilities
She/he will plan, organize, direct and control the overall activities of the factory
She/he will devise policies and strategies that will enable the factory to be profitable.
She/he will incorporate modern technological innovation that will facilitate the service
delivery of the project center and increase customer’s satisfaction.
He/he will plan, organize, direct and control the human and non-human resources of the
plant so as to achieve the short and long run objectives of the organization.
2. The Production Department
Duties and responsibilities:-
It is the core department of the project center and has the following responsibilities.
Design and prepared prototype for motor cycles based on the plant standard and
customer preferences
Use modern manufacture, processing and technologies that will enhance the quality of
the motor cycles.
Produce quality product that will enable the plant competent both in the domestic and
international market.
Use appropriate technology to manage its products.
Control on the quality of raw materials, inputs, quality of the product and also the overall
production process.
Produce products in least cost so that the profitability of the center is guaranteed.
Moreover control over the quality of the final products .
3. Administration and Finance Department
Duties and responsibilities:-
Will plan, organize direct and control the financial transaction of the plant by using the
entire necessary document.
35
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Will develop sound financial control system by developing modern financial control
systems.
Will prepare the annual financial statements and prepare condensed reports for the
general manager, owner and other concerned government body.
Will control the human and non human resources of the plant, which include: effective
handling of the different inventories of the machineries, equipments, raw materials,
finished products, and devise strategies of controlling against fraud and damage.
Manage and execute the company national and international procurement procedure
Administer and control the company logistic resource
Effectively administer the company Procurement process domestically as well as
internationally.
Manage the public relation of the company/factory with external parties/stakeholders
Provide and manage general supportive service to the plant.
4. Commercial Department
Duties and responsibilities:-
Will handle the overall marketing activities of the organization which include planning,
organizing, directing, and controlling.
Provide cost estimates in preparation for securing ...
Gather information on new product design, profile
Approval of new products profile & brand plan analyzes market research.
Plan and execute sales.
Will develop effective customer handling strategies
Will design and implement effective advertisement and promotion schemes
Will develop the marketing strategies for future project center’s development.
Conduct both foreign and domestic market research for expanding the sales of the
company
a. Training Requirement
The manufacturing employees of the plant expected to take basic metal and automotive
technology manufacturing skill training for 10 days. In addition training could be given to the
36
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
mechanic and to the supervisor will also take skill training from one of TVET Colleges or similar
undertaking factories in Addis Ababa.
37
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
The financial analysis of the envisioned plant is based on the data provided in the preceding
sections and the following assumptions.
B. Depreciation
Building 5%
Vehicles 20%
Software 25%
38
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
C. Working Capital
39
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
40
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
Based on the price and the capacity program of the factory indicated in previous chapter (chapter 2), the revenue of the plant projected
at full capacity1 is shown in the table below;
1
At third year of Operation
41
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
42
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
43
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
44
Project Proposal for Two Wheel and Three Wheel Motor Cycle Assembly and Parts manufacturing Plant
5.2.9. Profitability
According to the projected income statement, the project will start generating profit inthe 1st year
of operation. Important ratios such as profit to total sales, net profit to equity (Return on equity)
and net profit plus interest on total investment (return on total investment) show an increasing
trend during the lifetime of the project.
The income statement and the other indicators of profitability show that the project is viable.
6. FUTURE DEVELOPMENT
Every business undertakings be it large or small should have future development plan. It is a
plain fact that business activities are undertook in a dynamic business nature and different
environment. Therefore, the plant will have an expansion phase depending on the condition of
the industry character particularly the following areas;
45