SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
LIVING
E FURNITURE ₱ -
TELEVISION 1 SET ₱ -
WALL HANGING 3 SET ₱ -
INDOOR PLANT 3 SET ₱ -
RUG/CARPET 1 SET ₱ -
CURTAIN 1 SET ₱ -
₱ -
₱ -
₱ -
F STAIR REMODELLING ₱ -
1/2" HARDIFLEX 8 PCS ₱ -
METAL FURRING 10 PCS ₱ -
BLACK SCREW 1 BOX ₱ -
HUDSON POLYURETHANE FLOOR VARNISH SEALER 2 L ₱ -
HUDSON POLYURETHANE FLOOR VARNISH TOPCOAT 3 L ₱ -
HUDSON POLYURETHANE FLOOR VARNISH REDUCER 2 L ₱ -
₱ -
₱ -
₱ -
MATERIAL COST
LABOR COST
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
KITCHEN
A KITCHEN FIXTURE ₱ -
MARINE PLYWOOD 10 PCS ₱ -
WOOD GLUE 4 QUARTS ₱ -
FINISHING NAIL 1" 1 KG ₱ -
FINISHING NAIL 1 1/2" 1 KG ₱ -
HORIZONTAL BAR 1 SETS ₱ -
2 x 1/4 WOOD EDGING 20 PCS ₱ -
SPICES TRAY 1 PCS ₱ -
GOOSENECK FAUCET 1 SET ₱ -
NANO BLACK STAINLESS STEEL SINK 1 PCS ₱ -
VERTICAL BLINDS 1 SET ₱ -
RANGE HOOD/KITCHEN HOOD 1 SET ₱ -
COOKTOP STOVE GAS 1 SET ₱ -
₱ -
₱ -
₱ -
₱ -
₱ -
B REPAINT ₱ -
FLAT LATEX WHITE 1 DRUM ₱ -
BRUSH & SANDPAPER 1 SET ₱ -
SKIM COAT *MONDO* 2 BAG ₱ -
₱ -
₱ -
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
DINING
MATERIAL COST
LABOR COST
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
POWDER ROOM
A FLOOR TILES ₱ -
30 x 30 mm TILES 33 PCS ₱ -
EAGLE CEMENT BAGS 0.3 BAGS ₱ -
SAND 0.025 CU.M. ₱ -
TILE GROUT 0.75 KL ₱ -
₱ -
₱ -
₱ -
B WALL TILES ₱ -
20 x 20 mm TILES 151 PCS ₱ -
EAGLE CEMENT BAGS 0.652 BAGS ₱ -
SAND 0.054 CU.M. ₱ -
TILE GROUT 2.5 KL ₱ -
₱ -
₱ -
MATERIAL COST
LABOR COST
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
CEILING RENOVATIONS
D CEILING RENOVATION ₱ -
PLYWOOD 5 PCS ₱ -
GYPSUM BOARD 2 PCS ₱ -
FINISHING NAIL 1" 1 KG ₱ -
FINISHING NAIL 1 1/2" 1 KG ₱ -
STRIP LIGHT 2 ROLL ₱ -
SAND PAPER 10 PCS ₱ -
BOYSEN WOODPRIME B-180 7 L ₱ -
BOYSEN MASONRYPUTTY B-7311 14 L ₱ -
BOYSEN BUG OFF TOPCOAT 10 L ₱ -
BOYSEN PAINT THINNER B-0340 5 L ₱ -
BOYSEN SANDING SEALER 2 L ₱ -
CEILING LIGHT 23 SET ₱ -
LINEAR LIGHT 1 SET ₱ -
₱ -
MATERIAL COST
LABOR COST
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST
SERVICE AREA
A WALL ₱ -
CHB 165 PCS ₱ -
EAGLE CEMENT BAGS 13 BAGS (40kg) ₱ -
SAND 1.2 CU.M. ₱ -
#16 G.I. TIRE WIRE 1 ROLL ₱ -
12 MM Ø REBARS 2 PCS ₱ -
10 MM Ø REBARS 1 PCS ₱ -
WELDING ROD 3 KG ₱ -
1/2" PHENOLIC BOARD 4 PCS ₱ -
2x2x12 COCO LUMBER 4 PCS ₱ -
₱ -
₱ -
₱ -
B WOOD CLADDING ₱ -
2 x 2 x 12 PINEWOOD 5 PCS ₱ -
HUDSON TIMBERCOAT SEALER 3 L ₱ -
HUDSON TIMBERCOAT TOPCOAT 3 L ₱ -
FINISHING NAIL 1" 0.5 KG ₱ -
FINISHING NAIL 1 1/2" 0.5 KG ₱ -
₱ -
C CEILING ₱ -
12 mm Ø REBAR 2 PCS ₱ -
SAND 0.12 CU.M. ₱ -
GRAVEL 0.25 CU.M. ₱ -
EAGLE CEMENT BAGS 3 BAGS ₱ -
WELDING ROD 1 KL ₱ -
PHENOLIC BOARD 2 PCS ₱ -
2x2x12 COCO LUMBER 4 PCS ₱ -
#16 G.I. TIRE WIRE 1 ROLL ₱ -
MATERIAL COST
LABOR COST
SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST
GRAND TOTAL
GRAND TOTAL ₱ -