PROJECT :LIVING AREA

SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

LIVING

A TELEVISION CABINET SET ₱ -


PLYWOOD 12 PCS ₱ -
WOOD GLUE 2 QUARTS ₱ -
FINISHING NAIL 1" 0.25 KG ₱ -
FINISHING NAIL 1 1/2" 0.25 KG ₱ -
CONCEALED HINGES 7 SETS ₱ -
2 x 1/4 WOOD EDGING 15 PCS ₱ -
₱ -
₱ -

B L SHAPE SOFA 1 SET ₱ -

C WOOD PARTITION DESIGN ₱ -


WOOD PLANK WOOD STAIN WALNUT 8 PCS ₱ -
WOOD GLUE 1 QUARTS ₱ -
FINISHING NAIL 1" 0.25 KG ₱ -
FINISHING NAIL 1 1/2" 0.25 KG ₱ -
BOYSEN XYLADECOR STAIN 1 L ₱ -
₱ -
₱ -
₱ -

D SHELVES & SHOE RACK ₱ -


HARDIFLEX 2 PCS ₱ -
WOOD GLUE 1 QUARTS ₱ -
FINISHING NAIL 1" 0.25 KG ₱ -
FINISHING NAIL 1 1/2" 0.25 KG ₱ -
HUDSON TIMBERCOAT SEALER 1 L ₱ -
HUDSON TIMBERCOAT TOPCOAT 1 L ₱ -
2 x 1/4 WOOD EDGING 8 PCS ₱ -
SANDPAPER 8 PCS ₱ -
WOOD FILLER 1 GAL ₱ -
STRIP LIGHT 1 ROLL ₱ -
₱ -
₱ -
₱ -
₱ -
₱ -

E FURNITURE ₱ -
TELEVISION 1 SET ₱ -
WALL HANGING 3 SET ₱ -
INDOOR PLANT 3 SET ₱ -
RUG/CARPET 1 SET ₱ -
CURTAIN 1 SET ₱ -
₱ -
₱ -
₱ -

F STAIR REMODELLING ₱ -
1/2" HARDIFLEX 8 PCS ₱ -
METAL FURRING 10 PCS ₱ -
BLACK SCREW 1 BOX ₱ -
HUDSON POLYURETHANE FLOOR VARNISH SEALER 2 L ₱ -
HUDSON POLYURETHANE FLOOR VARNISH TOPCOAT 3 L ₱ -
HUDSON POLYURETHANE FLOOR VARNISH REDUCER 2 L ₱ -
₱ -
₱ -
₱ -

G ELECTRICAL MATERIALS LUMP SUM ₱ -

H PLUMBING MATERIALS LUMP SUM ₱ -

I ASSEMBLING & INSTALLING LUMP SUM ₱ -

MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT :KITCHEN
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

KITCHEN

A KITCHEN FIXTURE ₱ -
MARINE PLYWOOD 10 PCS ₱ -
WOOD GLUE 4 QUARTS ₱ -
FINISHING NAIL 1" 1 KG ₱ -
FINISHING NAIL 1 1/2" 1 KG ₱ -
HORIZONTAL BAR 1 SETS ₱ -
2 x 1/4 WOOD EDGING 20 PCS ₱ -
SPICES TRAY 1 PCS ₱ -
GOOSENECK FAUCET 1 SET ₱ -
NANO BLACK STAINLESS STEEL SINK 1 PCS ₱ -
VERTICAL BLINDS 1 SET ₱ -
RANGE HOOD/KITCHEN HOOD 1 SET ₱ -
COOKTOP STOVE GAS 1 SET ₱ -
₱ -
₱ -
₱ -
₱ -
₱ -

B REPAINT ₱ -
FLAT LATEX WHITE 1 DRUM ₱ -
BRUSH & SANDPAPER 1 SET ₱ -
SKIM COAT *MONDO* 2 BAG ₱ -
₱ -
₱ -

C NEW DOOR FOR BATHROOM ₱ -


DESIGN CRAFT VENEER WOOD DOOR 1 SET ₱ -
DOOR JAMB 1 SET ₱ -
DOOR KNOB 1 SET ₱ -
#3 HINGES 3 SETS ₱ -
₱ -
₱ -
₱ -

D DEMOLISHING LABOR LUMP SUM ₱ -

E ASSEMBLING & INSTALLING LABOR LUMP SUM ₱ -


MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT :DINING AREA
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

DINING

A DINING SET 1 SET ₱ -

B PENDANT LIGHTING 1 SET ₱ -

C ASSEMBLING & INSTALLING LUMP SUM ₱ -

MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT :POWDER ROOM
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

POWDER ROOM

A FLOOR TILES ₱ -
30 x 30 mm TILES 33 PCS ₱ -
EAGLE CEMENT BAGS 0.3 BAGS ₱ -
SAND 0.025 CU.M. ₱ -
TILE GROUT 0.75 KL ₱ -
₱ -
₱ -
₱ -

B WALL TILES ₱ -
20 x 20 mm TILES 151 PCS ₱ -
EAGLE CEMENT BAGS 0.652 BAGS ₱ -
SAND 0.054 CU.M. ₱ -
TILE GROUT 2.5 KL ₱ -
₱ -
₱ -

C FIXTURE & FURNITURE ₱ -


WATER CLOSET 1 SET ₱ -
LAVATORY 1 SET ₱ -
MIRROR 1 PCS ₱ -
₱ -

D ASSEMBLING & INSTALLATION LUMP SUM ₱ -

MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT CEILING RENOVATIONS
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

CEILING RENOVATIONS

D CEILING RENOVATION ₱ -
PLYWOOD 5 PCS ₱ -
GYPSUM BOARD 2 PCS ₱ -
FINISHING NAIL 1" 1 KG ₱ -
FINISHING NAIL 1 1/2" 1 KG ₱ -
STRIP LIGHT 2 ROLL ₱ -
SAND PAPER 10 PCS ₱ -
BOYSEN WOODPRIME B-180 7 L ₱ -
BOYSEN MASONRYPUTTY B-7311 14 L ₱ -
BOYSEN BUG OFF TOPCOAT 10 L ₱ -
BOYSEN PAINT THINNER B-0340 5 L ₱ -
BOYSEN SANDING SEALER 2 L ₱ -
CEILING LIGHT 23 SET ₱ -
LINEAR LIGHT 1 SET ₱ -
₱ -

MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT :SERVICE AREA
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST LABOR COST

SERVICE AREA

A WALL ₱ -
CHB 165 PCS ₱ -
EAGLE CEMENT BAGS 13 BAGS (40kg) ₱ -
SAND 1.2 CU.M. ₱ -
#16 G.I. TIRE WIRE 1 ROLL ₱ -
12 MM Ø REBARS 2 PCS ₱ -
10 MM Ø REBARS 1 PCS ₱ -
WELDING ROD 3 KG ₱ -
1/2" PHENOLIC BOARD 4 PCS ₱ -
2x2x12 COCO LUMBER 4 PCS ₱ -
₱ -
₱ -
₱ -

B WOOD CLADDING ₱ -
2 x 2 x 12 PINEWOOD 5 PCS ₱ -
HUDSON TIMBERCOAT SEALER 3 L ₱ -
HUDSON TIMBERCOAT TOPCOAT 3 L ₱ -
FINISHING NAIL 1" 0.5 KG ₱ -
FINISHING NAIL 1 1/2" 0.5 KG ₱ -
₱ -

C CEILING ₱ -
12 mm Ø REBAR 2 PCS ₱ -
SAND 0.12 CU.M. ₱ -
GRAVEL 0.25 CU.M. ₱ -
EAGLE CEMENT BAGS 3 BAGS ₱ -
WELDING ROD 1 KL ₱ -
PHENOLIC BOARD 2 PCS ₱ -
2x2x12 COCO LUMBER 4 PCS ₱ -
#16 G.I. TIRE WIRE 1 ROLL ₱ -

D WOODEN CANTILEVER ROOF ₱ -


2" x 4"PINEWOOD 5 PCS ₱ -
BLACK BOLTS 2 BOX ₱ -
POLYSHADE POLYCARBONATE ROOF 2 PCS ₱ -
WIRE ROPE KIT STAINLESS STEEL CABLE 2 SET ₱ -
FINISHING NAIL 1 1/2" 0.5 KL ₱ -
MARINE EPOXCY 1 SET ₱ -

E FIXTURES & APPLIANCES ₱ -


STOVE 1 SET ₱ -
8.5 kg WASHING MACHINE 1 SET ₱ -
GOOSENECK FAUCET 1 SET ₱ -
DRYING RACK 1 SET ₱ -
SINK 1 SET ₱ -

F ASSEMBLING & INSTALLATION LUMPSUM ₱ -

MATERIAL COST
LABOR COST

TOTAL AMAOUNT COST


PROJECT GRAND TOTAL
SUBJECT : BILL OF QUANTITIES

SCOPE OF WORKS
ITEM PARTICULARS QTY UNIT PRICE MATERIAL COST

GRAND TOTAL

A LIVING AREA 1 LUMP SUM ₱ -

B KITCHEN 1 LUMP SUM ₱ -

C DINING AREA 1 LUMP SUM ₱ -

D POWDER ROOM 1 LUMP SUM ₱ -

E SERVICE AREA 1 LUMP SUM ₱ -

E CEILING RENOVATIONS 1 LUMP SUM ₱ -

GRAND TOTAL ₱ -