BACKUP QUANTITY

VOLUME PERHITUNGAN VOLUME


NO. URAIAN PEKERJAAN SAT. Ket Ket
KONTRAK MC0 P L T Unit B H t Jumlah Berat Dia.
Column MC Column52 Column8 Column9 Column10 Column11 Column12 Column13 Column14 Column15 Column16 Column17 Column18
Column2 Column3 Kontrak
1

PEKERJAAN PERSIAPAN
A
1 Papan Proyek unit 1.00 1.00
2 Pek. Laporan & Dokumentasi ls 1.00 1.00
Sub Total A
B PEKERJAAN FONDASI & TANAH -
1 Pek. Galian Tanah Fondasi m3 87.97 92.00 cek Volume cek Volume
Pondasi P1 1.10 1.10 1.25 16.00
Pondasi P2 93.30 0.90 0.80 1.00
Pondasi P3 0.50 0.50 1.25 2.00
2 Pek. Urug Tanah Kembali m3 29.32 30.67 cek Volume cek Volume
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) m3 19.55 19.76
Utama 14.00 10.00 0.10
Teras Keliling Bangunan 52.00 1.00 0.10
Teras 2.80 2.00 0.10
4 Pek. Pasir Urug -
- Bawah Fondasi m3 13.12 13.12
Bawah P1 1.10 1.10 0.10 16.00
Bawah P2 93.30 0.90 0.10 1.00
Bawah P3 0.50 0.50 0.10 2.00
- Bawah Lantai m3 15.06 15.06
Utama 14.00 10.00 0.10
Teras 2.80 2.00 0.10
5 Pek. Fondasi Tapak P1 (90x90x20) -
- Beton K-225 m3 2.59 2.59 0.90 0.90 0.20 16.00
- Pembesian kg 394.37 457.37 cek Volume cek Volume
tul pokok 2.30 7.00 16.00 0.89 12.00
begel 2.30 7.00 16.00 0.89 12.00
- Bekisting m2 1.23 11.52 cek Volume 3.60 0.20 16.00 cek Volume
6 Pek. Fondasi Batu Belah P2 m3 19.29 32.66 cek Volume 93.30 0.50 0.70 cek Volume
7 Pek. Fondasi Tapak P3 (50x50x20) -
- Beton K-225 m3 0.16 0.16 0.50 0.50 0.20 2.00
- Pembesian kg 24.65 26.63 cek Volume cek Volume
tul pokok 1.50 5.00 2.00 0.89 12.00
begel 1.50 5.00 2.00 0.89 12.00
- Bekisting m2 1.08 1.08 2.00 0.20 2.00
8 Pek. Sloof Beton (15/30) -
- Beton K-225 m3 3.94 4.20 cek Volume 93.30 0.15 0.30 - cek Volume
- Pembesian kg 584.85 693.30 cek Volume cek Volume
tul pokok 93.30 6.00 - 0.89 12.00
begel 0.80 622.00 - 0.39 8.00
- Bekisting m2 52.58 55.98 cek Volume 93.30 - 0.15 0.30 - cek Volume
Sub Total B -
PEKERJAAN STRUKTUR -
C
C.1 STRUKTUR BETON -
1 Pek. Kolom Beton K1 (25/25) T.1,35 m -
- Beton K-225 m3 0.17 0.17 1.35 0.25 0.25 2.00
- Pembesian kg 28.22 28.22
tul pokok 1.35 8.00 2.00 0.89 12.00
begel 1.10 10.00 2.00 0.39 8.00
- Bekisting m2 2.70 2.70 1.35 - 0.25 0.25 2.00
2 Pek. Kolom Beton K2 (25/25) T.4,93 m -
- Beton K-225 m3 1.85 1.85 4.93 0.25 0.25 6.00
- Pembesian kg 309.23 309.23
VOLUME PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN SAT. Ket Ket
KONTRAK MC0 P L T Unit B H t Jumlah Berat Dia.
tul pokok 4.93 8.00 6.00 0.89 12.00
begel 1.10 34.00 6.00 0.39 8.00
- Bekisting m2 29.59 29.59 4.93 - 0.25 0.25 6.00
3 Pek. Kolom Beton K3 (25/25) T.4,58 m -
- Beton K-225 m3 0.57 0.57 4.58 0.25 0.25 2.00
- Pembesian kg 95.74 95.74
tul pokok 4.58 8.00 2.00 0.89 12.00
begel 1.10 32.00 2.00 0.39 8.00
- Bekisting m2 9.16 9.16 4.58 - 0.25 0.25 2.00
4 Pek. Kolom Beton K4 (25/25) T.4,08m1 -
- Beton K-225 m3 0.51 0.51 4.08 0.25 0.25 2.00
- Pembesian kg 85.39 85.39
tul pokok 4.08 8.00 2.00 0.89 12.00
begel 1.10 29.00 2.00 0.39 8.00
- Bekisting m2 8.17 8.17 4.08 - 0.25 0.25 2.00
5 Pek. Kolom Beton K5 (25/25) T.3,5m1 -
- Beton K-225 m3 1.31 1.31 3.50 0.25 0.25 6.00
- Pembesian kg 219.49 219.49
tul pokok 3.50 8.00 6.00 0.89 12.00
begel 1.10 25.00 6.00 0.39 8.00
- Bekisting m2 21.00 21.00 3.50 - 0.25 0.25 6.00
6 Pek. Kolom pedestal fondasi Beton K1 (25/25) T.90cm -
- Beton K-225 m3 1.01 1.01 0.90 0.25 0.25 16.00
- Pembesian kg 169.32 169.32
tul pokok 0.90 8.00 16.00 0.89 12.00
begel 1.10 7.00 16.00 0.39 8.00
- Bekisting m2 16.20 16.20 0.90 - 0.25 0.25 16.00
7 Pek. Kolom Praktis KP (11/11) -
- Beton K-175 m3 0.30 0.47 cek Volume 3.50 0.11 0.11 11.00 cek Volume
- Pembesian kg 95.85 153.53 cek Volume cek Volume
tul pokok 3.50 4.00 11.00 0.62 10.00
begel 0.54 25.00 11.00 0.39 8.00
- Bekisting m2 10.78 16.94 cek Volume 3.50 - 0.11 0.11 11.00 cek Volume
8 Pek. Balok Beton B1,B2 (20/30) -
- Beton K-225 m3 3.69 3.69 61.50 0.20 0.30 1.00
- Pembesian kg 482.49 482.49
tul pokok 61.50 4.00 1.00 0.89 12.00
begel 1.10 411.00 1.00 0.39 8.00
- Bekisting m2 49.20 49.20 61.50 - 0.20 0.30 1.00
9 Pek. Beton Balok Lintel BL (12/15), RB (12/15) -
- Beton K-175 m3 1.81 1.81 100.56 0.12 0.15 1.00
- Pembesian kg 466.51 466.51
tul pokok 100.56 4.00 1.00 0.62 10.00
begel 0.44 672.00 1.00 0.39 8.00
- Bekisting m2 41.08 42.23 cek Volume 100.56 - 0.12 0.15 1.00 cek Volume
10 Pek. Ramp Beton T = 10 cm -
- Beton K-175 m3 0.35 0.35 2.00 0.88 0.10 2.00
- Pembesian kg 42.24 42.24
2.00 0.88 2.00 5.45 10.00

- Bekisting m2 0.69 1.15 cek Volume 2.00 0.88 0.10 2.00 cek Volume
11 Pek. Balok B3 dan Balok Sopi Sopi (15/20) -
- Beton K-175 m3 1.32 1.32 44.00 0.15 0.20 1.00
- Pembesian kg 197.90 226.08 cek Volume cek Volume
tul pokok 44.00 4.00 1.00 0.89 12.00
begel 0.60 295.00 1.00 0.39 8.00
- Bekisting m2 17.56 24.20 cek Volume 44.00 - 0.15 0.20 1.00 cek Volume
12 Pek. Plat Beton Topi Topi (10/55) -
- Beton K-225 m3 0.65 0.65 5.60 0.10 0.55 2.00
VOLUME PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN SAT. Ket Ket
KONTRAK MC0 P L T Unit B H t Jumlah Berat Dia.
- Pembesian kg 162.34 162.34
tul pokok 5.60 4.00 2.00 0.39 8.00
begel 0.65 39.00 2.00 0.89 12.00
- Bekisting m2 7.67 7.67 5.60 - 0.10 0.55 2.00
13 Pek. Kolom pipa besi 3" -
- Pipa besi m1 18.80 18.80
- Angkur Ø12mm bh 16.00 16.00
- Baut 12mm bh 16.00 16.00
- Base plate 6mm uk.25x25cm kg 5.89 5.89
- Plate 6mm uk.7,5x7,5cm dudukan rangka atap kg 0.53 0.53
C.2 PEKERJAAN ATAP -
Rangka Atap -
1 L 40.40.4 kg 366.65 488.22 cek Volume cek Volume
y 6.58 2.00 6.00 2.42
r 10.26 2.00 6.00 2.42
2 2 X L 50,50,5 kg 946.30 997.92 cek Volume cek Volume
R 12.00 2.00 6.00 3.78
X 10.00 2.00 6.00 3.78
3 Kuda Kuda 2 x C 100.50.20.2,3 kg 32.50 65.57 cek Volume 4.03 2.00 2.00 4.07 cek Volume
4 Gording C 100.50.20.2,3 kg 875.00 875.00
16.00 11.00 4.07
4.80 1.00 4.07
4.80 4.00 4.07
5 L 50,50,5 dudukan gording kg 49.80 49.80 0.10 78.00 3.78
6 Trekstang Ø12 kg 49.65 54.69 cek Volume 1.10 56.00 0.89 12.00 cek Volume
7 Ikatan angin Ø16 kg 166.60 172.82 cek Volume 10.95 10.00 1.58 16.00 cek Volume
8 Pelat sambung T 10mm kg 377.10 377.10
9 Angkur Ø16 x 300 mm bh 64.00 64.00
10 Bout M12 x 30 mm bh 608.00 608.00
11 Cat Sincromat Rangka baja m2 150.00 150.00
Penutup -
1 Atap Spandek t = 0.35 mm m2 285.12 285.12 16.00 12.00 4.80 4.00
2 Pasang Aluminium Foil, Glaswool, Roofmesh m2 140.00 140.00 14.00 10.00
3 Listplank GRC m' 116.40 116.40 73.60
4 Nok samping flasing plat m1 95.60 95.60
Sub Total C -
D PEKERJAAN PLAFOND -
1 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 m2 137.03 137.03 14.00 10.00
2 Plafond Calsiboard 4,5 mm + Rangka m2 70.00 70.00
Toilet 2.97 1.65 1.80
Teras 19.20 4.80 4.00
Keliling 47.20 47.20 1.00
3 Lis Gipsum 5 cm m' 243.60 243.60 243.00
Sub Total D -
E PEKERJAAN PASANGAN -
1 Pasangan Dinding Bata m2 237.24 264.67 cek Volume cek Volume
x 45.45 3.50
y 40.00 3.50
sopi2 10.00 1.40
depan 14.00 1.40
bukaan
p1 1.60 2.58 1.00
p2 0.80 2.58 4.00
p3 0.80 2.58 1.00
p4 0.70 2.58 1.00
j1 2.26 2.15 9.00
j2
j3 1.08 1.78 4.00
j4 0.68 0.48 1.00
VOLUME PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN SAT. Ket Ket
KONTRAK MC0 P L T Unit B H t Jumlah Berat Dia.
bv
2 Plester + Acian m3 498.20 563.75 cek Volume cek Volume
el 3,5-
el 3,5+
3 Pasangan Rolaag Bata m' 19.80 27.00 cek Volume 60.00 0.45 cek Volume
4 Pekerjaan Lapis cor Beton t = 5 cm bawah lantai keramik m3 7.53 7.53 14.00 10.00 0.05 2.28 2.00 0.05
5 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 100 cm m3 2.43 2.66 cek Volume 53.20 1.00 0.05 cek Volume
6 Pekerjaan Meja Beton Wastafel t = 8 cm m3 0.12 0.12 1.70 0.60 0.08
7 Pasangan Keramik Lantai 40/40 Polished m2 136.40 137.03 14.00 10.00
8 Pasangan Keramik Lantai 30/30 UnPolished (rabat) m2 52.00 54.80 cek Volume 49.20 1.00 2.80 2.00 cek Volume
9 Pasangan Keramik Lantai 20/20 Unpolished m2 3.04 3.04 1.65 1.80
10 Pasangan Plint Keramik Lantai 40/10 polished m' 97.40 97.40 122.00
Pasangan Keramik meja & dinding Wastafel 20/20 3.16 cek Volume 1.60 0.60 1.00 cek Volume
11 m2 1.77
Polished
12 Pasangan Keramik Dinding 20/40 Polished m2 5.29 12.40 cek Volume 1.65 1.80 2.00 cek Volume
13 Plestran & Acian Kaprot halus Kolom Entrace m2 5.12 5.12
14 Pek. Logo & tulisan plat dinding fin. Cat duco ls 1.00 1.00
15 Tali Air m1 25.00 25.00
16 List Profil Dinding m1 27.90 27.90
17 Pasang Prasasti granit 40/60 ls 1.00 1.00
18 Pasang Papan Nama (terpasang) ls 1.00 1.00
Sub Total E -
PEKERJAAN KUSEN PINTU & JENDELA -
F
1 Kusen/Pintu type P1 unt 1.00 1.00
2 Kusen/Pintu type P2 unt 4.00 4.00
3 Kusen/Pintu type P3 unt 1.00 1.00
4 Kusen/Pintu type P4 (Spandrel) unt 1.00 1.00
5 Kusen/Jendela type J1 unt 9.00 9.00
6 Kusen/Jendela type J3 unt 4.00 4.00
7 Kusen/Jendela type BV unt 1.00 1.00
8 Tralis Jendela (Besi begel) m2 40.01 43.73 cek Volume cek Volume
Sub Total F -
PEKERJAAN PENGECATAN -
G
1 Pek. Pengecatan Dinding Interior m2 249.10 264.67 cek Volume cek Volume
2 Pek. Pengecatan Dinding Exterior m2 249.10 249.10
3 Pek. Pengecatan Plafond m2 207.03 207.03
4 Pek. Pengecatan Listplank m2 34.92 34.92 0.35
Sub Total G -
H PEKERJAAN PLUMBING & SANITAIR -
1 Instalasi Pipa PVC AW 4" m' 17.00 17.00
2 Instalasi Pipa PVC AW 3" m' 12.00 12.00
3 Instalasi Pipa PVC AW 2" m' 2.00 2.00
4 Instalasi Pipa PVC AW 3/4" m' 20.00 20.00
5 Instalasi Pipa PVC AW 1/2" m' 10.00 10.00
6 Septic Tank dan Rembesan unt 1.00 1.00
7 Pemasangan Closed Jongkok bh 1.00 1.00
8 Pemasangan Kran Air bh 2.00 2.00
9 Pemasangan Wastafel + Kran bh 2.00 2.00
10 Floor Drain bh 1.00 1.00
11 Pemasangan Cermin Wastafel 100x160 unt 1.00 1.00
Sub Total H -
PEKERJAAN LISTRIK
I -
1 Penyambungan Daya Listrik (BP) dan UJL VA 5,500.00 5,500.00
2 Perijinan Sertifikat Layak Operasi (SLO) VA 5,500.00 5,500.00
3 Panel Listrik Indoor (30x40x17) unt 1.00 1.00
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 m' 2.00 2.00
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 +conduit ttk 26.00 26.00
6 Pek. Instalasi Power AC 2 PK (18000 BTU) ttk 2.00 2.00
VOLUME PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN SAT. Ket Ket
KONTRAK MC0 P L T Unit B H t Jumlah Berat Dia.
7 Pemasangan Lampu TKI TL 2x36W (Tanpa Grid) bh 13.00 13.00
8 Pemasangan Lampu Baret Kotak 36W bh 7.00 7.00
9 Pemasangan Lampu Sorot Outdoor 20W bh 2.00 2.00
10 Pemasangan Lampu Downlight 4'' 18W bh 4.00 4.00
11 Pemasangan Saklar Tunggal bh 4.00 4.00
12 Pemasangan Saklar Ganda bh 5.00 5.00
13 Pemasangan Stop Kontak Single bh 8.00 8.00
14 Pemasangan Stop Kontak Ganda bh 16.00 16.00
15 Pemasangan Stop Kontak AC bh 2.00 2.00
16 Pemasangan AC split wall 2 PK (18.000 BTU) unit 2.00 2.00
17 Grounding (max 2 Ohm) lot 1.00 1.00
Sub Total I
TOTAL -
Column1 Column12 Column2 Column3 Column4
PEKERJAAN PERSIAPAN
A 1
1 2 Papan Proyek unit 1
2 3 Pek. Laporan & Dokumentasi ls 1
4 Sub Total A
B 5 PEKERJAAN FONDASI & TANAH
1 6 Pek. Galian Tanah Fondasi m3 87.97
7 Pondasi P1
8 Pondasi P2
9 Pondasi P3
2 10 Pek. Urug Tanah Kembali m3 29.32
3 11 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) m3 19.55
12 Utama
13 Teras Keliling Bangunan
14 Teras
4 15 Pek. Pasir Urug
16 - Bawah Fondasi m3 13.12
17 Bawah P1
18 Bawah P2
19 Bawah P3
20 - Bawah Lantai m3 15.06
21 Utama
22 Teras
5 23 Pek. Fondasi Tapak P1 (90x90x20)
24 - Beton K-225 m3 2.59
25 - Pembesian kg 394.37
26
Column5 Column6