Professional Documents
Culture Documents
KEGIATAN : -
LOKASI KEGIATAN : -
TAHUN ANGGARAN : 2021
P L T/D K BJ n JUMLAH
NO URAIAN PEKERJAAN VOLUME
(m) (m) (m) (m)
A PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1.00 ls
- Mob Demob 1.00 1.00
2 Pengukuran dan Pemasangan BouwPlank 27.25 m1
- Pengukuran dan BouwPlank 36.00 18.50 4.00 27.25
KEGIATAN : -
LOKASI KEGIATAN : -
TAHUN ANGGARAN : 2021
P L T/D K BJ n JUMLAH
NO URAIAN PEKERJAAN VOLUME
(m) (m) (m) (m)
19 ### 174.72 kg
Rangka Atap Hollow 4/4 10.00 2.41 2.00 48.17 Depan
0.20 2.41 10.00 4.82
0.40 2.41 6.00 5.78
2.95 2.41 6.00 42.63 Samping
0.20 2.41 15.00 7.23
0.40 2.41 12.00 11.56
Kolom Hollow 2/4 3.00 1.78 3.00 16.02
Gording Hollow 4/4 4.00 2.41 4.00 38.53
KEGIATAN : -
LOKASI KEGIATAN : -
TAHUN ANGGARAN : 2021
P L T/D K BJ n JUMLAH
NO URAIAN PEKERJAAN VOLUME
(m) (m) (m) (m)
KEGIATAN : -
LOKASI KEGIATAN : -
TAHUN ANGGARAN : 2021
P L T/D K BJ n JUMLAH
NO URAIAN PEKERJAAN VOLUME
(m) (m) (m) (m)
WAHYUDDIREKAPITULASI
TADJUDDIN, ST
H. JAMALUDDIN, SE DIREKTUR
PEKERJAAN : NIP.
LANJUTAN PEMB. GEDUNG SERBA GUNA PENGADILAN
LOKASI : JL. SULTAN HASANUDDIN NO.38 PANGKAJENE
TAHUN ANGGARAN : 2021
1 2 3
STRUKTUR & ARSITEKTUR LAPANGAN TENNIS
A. PEKERJAAN PERSIAPAN 21,408,208.50
B. PEKERJAAN TANAH, PONDASI & BETON 168,343,283.83
C. PEKERJAAN STRUKTUR BAJA & ATAP 444,622,738.63
D. PEKERJAAN DINDING 202,657,966.26
E. PEKERJAAN LANTAI & PLAFOND 47,183,465.47
F. PEKERJAAN PINTU DAN JENDELA 39,885,246.94
G. PEKERJAAN PENGECATAN 40,157,385.27
H. PEKERJAAN INSTALASI LISTRIK 24,537,158.77
I. PEKERJAAN SANITASI 14,572,218.75
KONSTRUKSI LANTAI LAPANGAN TENNIS
A. PEKERJAAN LANTAI KONSTRUKSI BETON 130,403,110.81
B. PEKERJAAN FINISHING LANTAI 15,004,741.88
C. PEKERJAAN LAIN-LAIN 2,000,000.00
Satu Milyar Dua Ratus Enam Puluh Lima Juta Delapan Ratus Lima Puluh Ribu Rupiah
Harga Satuan
No. Uraian Pekerjaan Volume Sat. Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6=3X5
STRUKTUR & ARSITEKTUR LAPANGAN TENNIS
A PEKERJAAN PERSIAPAN 21,408,208.50
1 Mobilisasi dan Demobilisasi 1.00 ls 2,500,000.00 2,500,000.00
2 Pengukuran dan Pemasangan BouwPlank 27.25 m1 70,026.00 1,908,208.50
3 Pembongkaran & Perapihan Bangunan Eksisting 1.00 ls 15,000,000.00 15,000,000.00
4 Revitalisasi Pohon 1.00 ls 2,000,000.00 2,000,000.00
PEMBULATAN 1,265,800,000.00
KONSULTAN PERENCANA
CV. KAMPOENG GAMBAR
WAHYUDDI TADJUDDIN, ST
DIREKTUR
BACKUP DATA VOLUME
PERHITUNGAN
NO. URAIAN PEKERJAAN DAN SKETSA VOL SAT
1 2 3 4
A. PEKERJAAN PENDAHULUAN
1 Mobilisasi & Mobilisasi 1.00 Ls
2 Pengukuran dan Pemasangan Bouwkplank 27.25 m' Ukuran : P L N Jumlah
36.00 18.50 4.00 27.25
Volume = (P x L) 27.25 m'
B. PEKERJAAN PONDASI
1 Galian Tanah Pondasi (Poer & Batu Kali) 77.52 m3 Ukuran : P L D Jumlah
Galian Tanah Pondasi Poer 1.00 1.00 1.50 1.50 m3
Titik : 14
Volume Galian Poer = Jumlah x Titik 21.00 m3
Galian Tanah Pondasi Batu Kali Ukuran : P L D N Jumlah
H Dinding Pembata 6.00 0.60 0.60 12.00 25.92
V Dinding Pembata 18.50 0.60 0.60 2.00 13.32
H Podium 1 2.00 0.60 0.60 2.00 1.44
H Podium 2 4.65 0.60 0.60 2.00 3.35
H Podium 3 1.40 0.60 0.60 2.00 1.01
H Podium 4 1.72 0.60 0.60 2.00 1.24
V Podium 1 5.83 0.60 0.60 2.00 4.19
V Podium 2 7.35 0.60 0.60 1.00 2.65
V Podium 3 9.45 0.60 0.60 1.00 3.40
Volume Galian Batu Kali = 56.52 m3
Volume Galian Poer + Batu Kali = 77.52 m3
Pjg Pondasi Batu Kali : 156.99
2 Aanstamping Pondasi 16.23 m3
Aanstamping Pondasi Poer Ukuran : P L T Jumlah
1.00 1.00 0.15 0.15 m3
Titik : 14
Volume Aanstamping Poer = Jumlah x Titik 2.10 m3
1 2 3 4
C. Titik Poer Pondasi = 14 Titik
Volume =
Total Panjang Besi = (Model A + Model B) x C 490.00 m'
Kebutuhan Besi = P Besi/12 40.83 Btg
Berat Besi D13, 12,5 kg = Btg/m 1.04 kg/m
Kebutuhan Besi Tulangan 510.42 kg
Kawat Ikat = 1% dari Kebut Besi Tlg 5.10 kg
515.52 kg
Cor Beton K-175 3.50 m3 Ukuran : P = Panjang L = Lebar T = Tinggi Jml Titik
1.00 1.00 0.25 14
Volume = (P x L x T) x Jml Titik 3.50 m3
6 Kolom Pedestal : 40x40cm - K.225 (Besi 105,50 kg/m3)
Bekesting 46.67 m2 A. Panjang = Keliling Dinding Kolom = 1.60 m'
B. Tinggi Dinding Kolom = 2.50 m
C. Titik Kolom Poer = 14 Titik
Volume = ( (A x B) x c) = 46.67 m2
Besi Polos D13" 590.82 kg Ukuran : P=Panjang L=Lebar T=Tinggi Jml Titik J=Jarak Beugel
0.40 0.40 2.50 14 0.15 cm
Besi Beugel Ø8" :
Keliling (P x 2) + (L x 2) 1.60 m'
Jml Batang = T / J 16.67 Btg
Jml Beugel / Titik 26.67 m' 2.22 Btg
Berat Besi 4.74 kg/12 0.40 kg/m
Kebutuhan Besi 10.53 kg/Titik
Kawat Ikat 1% 0.11 kg/Titik
Jml Kebut Besi 10.64 kg/Titik 31 Btg
Volume = Jml Kebut Besi x Jml Titik 148.94 kg
Besi Tulangan D13" :
Jml Batang = 12 Btg
Kebut Besi m/Titik 30.00 m' 2.50
Berat Besi 14.5 kg/12 1.04 kg/m
Kebutuhan Besi 31.25 kg/Titik
Kawat Ikat 1% 0.31 kg/Titik
Jml Kebut Besi 31.56 kg/Titik 35 Btg
Volume = Jml Kebut Besi x Jml Titik 441.88 kg
Volume = V Beugel + V Tulangan 590.82 kg
Cor Beton K-175 5.60 m3 Ukuran : P = Panjang L = Lebar T = Tinggi Jml Titik
0.40 0.40 2.50 14
Volume = (P x L x T) x Jml Titik 5.60 m3
1 2 3 4
9 Urugan Tanah Kembali Bekas Galian 33.54 m3 Ukuran : P L T Jumlah
Urugan Kembali Pondasi Poer 0.40 0.40 1.25 (0.20) m3 Penguran Kolom
1.00 1.00 1.25 1.25 m3
Titik : 14
Volume = Jumlah x Titik 14.70 m3
Urugan Kembali Pondasi Jalur m3 Ukuran : 1/3 Galian Pondasi
0.33 56.52
Volume = (1/3 x Vgalian Pondasi) 18.84 m3
1 2 3 4
C. PEKERJAAN STRUKTUR BAJA & ATAP
1 Kolom WF 250x125x6x9 (Berat 29,60 kg/m1) 2,486.40 kg Ukuran : P BJ N Jumlah
6.00 29.60 14.00 2,486.40 kg
Volume = 2,486.40 kg
2 Rafter WF 250x125x6x9 (Berat 29,60 kg/m1) 4,204.20 kg Ukuran : P BJ N Jumlah
Rafter 9.43 29.60 14.00 3,905.72 kg
Overstek 1.00 21.32 14.00 298.48 kg
Volume Rafter + Overstek= 4,204.20 kg
3 Balok WF 150x75x5x7 (Berat 14 kg/m1) 1,008.00 kg Ukuran : P BJ N Jumlah
6.00 14.00 12.00 1,008.00 kg
Volume = 1,008.00 kg
4 Gording C 100x50x20x2,3 (Berat 4.07 kg/m1) 586.08 kg Ukuran : P BJ N Jumlah
6.00 4.07 24.00 586.08 kg
Volume = 586.08 kg
5 Base Plate Tb. 10 mm (Berat 81,01 kg/m2) 99.23 kg Ukuran : P L BJ N Jumlah
0.35 0.25 81.01 14.00 99.23 kg
Volume = 99.23 kg
6 End Plate Tb. 8 mm (Berat 64,93 kg/m2) 167.03 kg Ukuran : P L BJ N Jumlah
Rafter Tepi 0.53 0.13 64.93 14.00 60.22 kg
Rafter Tengah 0.47 0.13 64.93 14.00 52.84 kg
Overstek 0.48 0.13 64.93 14.00 53.97 kg
Volume = 167.03 kg
7 Stiffener Plate Tb. 6 mm 150.27 kg Ukuran : T L BJ N Jumlah
Rafter 0.23 0.06 48.61 224.00 150.27 kg
Volume = 150.27 kg
8 Angkur Baut D. 19 mm - Panjang 70 Cm 56.00 bh Ukuran : Jmlh Baut Jmlh Kolom Jumlah
4.00 14.00 56.00 bh
Volume = 56.00 bh
9 Grouting Non-Shrinkage 0.12 m3 Ukuran : P L T N Jumlah
0.35 0.25
0.10 14.00 0.12
Volume = 0.12 m3
10 Baut HTB M16 210.00 bh Ukuran : Jmlh Baut Jmlh Kolom Jumlah
Rafter Tepi 8.00 14.00 112.00 bh
Rafter Tengah 8.00 7.00 56.00 bh
Overstek 6.00 7.00 42.00 bh
Volume = 210.00 bh
11 Trekstang Ø 12 mm 207.58 kg Ukuran : P BJ T N Jumlah
9.70 0.89 - 24.00 207.58
Volume = 207.58 kg
12 Ikatan Angin D. 16 mm 418.00 kg Ukuran : P BJ T N Jumlah
11.00 1.58 - 24.00 418.00
Volume = 418.00 kg
13 Turn Buckle M16 24.00 bh Ukuran : N Jumlah
24.00 24.00
Volume = 24.00 bh
14 Penutup Atap Spandek ZincAlume, Tb. 0.40 mm 821.10 m2 Ukuran : P L N Jumlah
39.10 10.50 2.00 821.10
Volume = 821.10 m2
15 Bubungan Atap Spandek ZincAlume 39.10 m Ukuran : P L N Jumlah
39.10 - 1.00 39.10
Volume = 39.10 m2
16 Pasang Turbin Ventilator 24" Alumunium 4.00 bh Ukuran : N Jumlah
4.00 4.00
Volume = 4.00 bh
PERHITUNGAN
NO. URAIAN PEKERJAAN DAN SKETSA VOL SAT
1 2 3 4
D. PEKERJAAN DINDING
1 Pasangan Dinding 1/2 Bata - Ad. 1Pc:4Psr 283.83 m2 Ukuran : Pengurangan :
P T L T
Bidang H1 24.00 1.00 24.00
Bidang H2 2.70 1.00 2.70
Dinding Pembatas
Bidang H3 30.00 1.00 30.00
Bidang H4 2.70 1.00 2.70
Bidang V1 14.30 1.00 14.30
1 2 3 4
1 2 3 4
F. PEKERJAAN PINTU DAN JENDELA
1 Pintu Geser Besi Type 1 : Rangka Hollow 100x50x2, Uk. 3 - m3 Ukuran : P T N Jumlah
6.00 3.00 1.00 18.00
Volume 18.00 m2
2 Pintu P1 Aluminium (2 Unit)
Profil Kusen Aluminium 4" 13.60 m Ukuran : P T N Jumlah
Kusen 1 2.50 - 4.00 10.00
Kusen 1 0.90 - 4.00 3.60
Volume 13.60 m
Profil Daun Pintu Aluminium 0.55 m2 Ukuran : P T N Jumlah
Daun 0.80 2.05 2.00 3.28
Pengurangan :
Kaca Mati 0.70 1.95 2.00 (2.73)
Volume 0.55 m2
Profil Daun Ventilasi Aluminium 0.21 m2 Ukuran : P T N Jumlah
Daun 0.80 0.35 2.00 0.56
Pengurangan :
Kaca Mati 0.70 0.25 2.00 (0.35)
Volume 0.21 m2
Kaca Polos 5 mm 2.38 m2 Ukuran : P T N Jumlah
Kaca Pintu 0.70 1.95 2.00 2.73
Kaca Pintu 0.70 0.25 2.00 (0.35)
Volume 2.38 m2
Engsel Pintu 6.00 bh Ukuran : Per Unit N Jumlah
Pintu 3.00 2.00 6.00
Volume 6.00 bh
Engsel Ventilasi 4.00 bh Ukuran : Per Unit N Jumlah
Vent 2.00 2.00 4.00
Volume 4.00 bh
Handle Pintu + Kunci Tanam 2.00 bh Ukuran : Per Unit N Jumlah
Pintu 1.00 2.00 2.00
Volume 2.00 bh
Slot Handle Ventilasi 2.00 bh Ukuran : Per Unit N Jumlah
Vent 1.00 2.00 2.00
Volume 2.00 bh
G PEKERJAAN PENGECATAN
1 Cat Dinding Tembok 3 Lapis Ex. Mowilex 567.65 m2
2 Cat Plafond Ex. Dulux 63.81 m2
3 Cat Besi 3 Lapis Ex. Emco Lux 126.82 m2 Ukuran : P Luas Jumlah
Kolom WF 250x125x6x9 (Berat 29,60 kg/m1) 84.00 0.38 31.58 m2
Rafter WF 250x125x6x9 (Berat 29,60 kg/m1) 145.95 0.38 54.88 m2
Balok WF 150x75x5x7 (Berat 14 kg/m1) 72.00 0.18 12.85 m2
Gording C 100x50x20x2,3 (Berat 4.07 kg/m1) 144.00 0.05 7.44 m2
Base Plate Tb. 10 mm (Berat 81,01 kg/m2) 1.23 1.23 m2
End Plate Tb. 8 mm (Berat 64,93 kg/m2) 2.57 2.57 m2
Stiffener Plate Tb. 6 mm 3.09 3.09 m2
Rangka C 75x45x15x2,3 (Berat 3,25 kg/m1) 254.80 0.05 13.17 m2
Siku 40x40x3 mm (Berat 1.83 kg/m1) - Ventilasi - m2
Volume 126.82 m2
PERHITUNGAN
NO. URAIAN PEKERJAAN DAN SKETSA VOL SAT
1 2 3 4
H. PEKERJAAN SANITAIR
1 Kloset Jongkok Ex. TOTO 2.00 Bh
2 Kran Air 3/4" Ex. Wasser 2.00 Bh
3 Pipa PVC Ø3" 15.00 m'
4 Pipa PVC Ø3/4" 10.00 m'
5 Floor Drain Stainless 2.00 m'
6 Septicktank 1.00 unit
7 Mesin Pompa Air 1.00 unit
8 Profil Tank Fiber 1100 L 1.00 unit
9 Pembuatan Sumur Dangkal + Gorong2 1.00 ls
B. PEKERJAAN FINISHING
KONSULTAN PERENCANA
CV. KAMPOENG GAMBAR
WAHYUDDI TADJUDDIN, ST
DIREKTUR
A. DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 4.1.1.4 Pemasangan 1 m3 Lantai Kerja Beton Mutu fc= 7,4 MPa (K100), Slump (3-6), w/c = 0,87
A. 4.1.1.7 Pemasangan 1 m3 Beton Mutu fc= 19,3 MPa (K225), Slump (12 ± 2), w/c = 0,58
A. 4.1.1.8 Pemasangan 1 m3 Beton Mutu fc= 21,7 MPa (K250), Slump (12 ± 2), w/c = 0,56
A. 4.1.1.10 Pemasangan 1 m3 Beton Mutu fc= 26,4 MPa (K300), Slump (12 ± 2), w/c = 0,53
A. 4.1.1.11 Pemasangan 1 m3 Beton Mutu fc= 28,8 MPa (K325), Slump (12 ± 2), w/c = 0,49
A. 4.1.1.12 Pemasangan 1 m3 Beton Mutu fc= 31,2 MPa (K350), Slump (12 ± 2), w/c = 0,48
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 130,000.00 3,640.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 190,690.00
B BAHAN
Semen Portland kg 448.000 1,180.00 528,640.00
Pasir Beton (kg) kg 667.000 128.57 85,757.14
Batu Pecah 2-3 cm (kg) kg 1000.000 231.48 231,481.48
Air Bersih ltr 215.000 25.00 5,375.00
JUMLAH HARGA BAHAN 851,253.62
C PERALATAN
-
JUMLAH HARGA ALAT -
A. 4.4.1.9 Pemasangan 1 m2 Dinding Batu Merah (5x11x22) cm tebal 1/2 Batu Camp. 1SP:4PP
A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela (Kayu Kelas I)
A.4.6.1.2 Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Kusen Jendela (Kayu Kelas II)
A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Kaca, Kayu Kelas I
A.4.6.1.7 Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Jalusi Kayu, Kelas I
A.4.6.1.7A Pembuatan dan Pemasangan 1 m2 Pintu dan Jendela Jalusi Kayu, Kelas II
A.4.6.1.9 Pembuatan 1 m2 Daun Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I
A.4.6.1.12 Pembuatan 1 m2 Daun Pintu Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Kelas II
A. 4.6.2.12 Pemasangan 1 Buah Door Holder / Pull Handel Pintu Stainless (Tipe C)
A. 4.7.1.10 Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Setara Mowilex
A. 4.7.1.20 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual Sistem 2 Lapis Setara Emco Lux
SPL Pemasangan 1 Titik Pengerangan (Kabel NYM 3,25 mm, Pipa Listrik, Klem Kabel, Inbow & T-Doas 5/8")
SPL Pemasangan 1 Titik Instalasi Stop Kontak (Kabel NYM 3,25 mm, Pipa PVC Konduit dia. 20 cm
BAHAN PASANGAN
1 Batu Kali
Batu Pecah 5-7 cm M3 Rp 242,000.00
Batu Pecah 3-5 cm M3 Rp 265,000.00
Batu Pecah 2-3 cm M3 Rp 312,500.00
Batu Pecah 2-3 cm (kg) Kg Rp 231.48
Batu Pecah 1-2 cm M3 Rp 300,000.00
Batu Pecah 0,5-1 cm M3 Rp 400,000.00
2 Batu Belah M3 Rp 150,000.00
3 Tanah Timbunan M3 Rp 65,000.00
Tanah Timbunan Pilihan M3 Rp 90,000.00
4 Pasir
Pasir Urug M3 Rp 130,000.00
Pasir Pasang M3 Rp 150,000.00
Pasir Pasang pilihan M3 Rp 200,000.00
Pasir Beton M3 Rp 180,000.00
Pasir Beton (kg) kg Rp 128.57
5 Kerikil
Kerikil Kasar M3 Rp 350,000.00
6 Sirtu M3 Rp 100,000.00
7 Kapur Pasang M3 Rp 115,500.00
8 Semen Portland kg Rp 1,180.00
Semen Portland 50 kg Zak Rp 59,000.00
Semen Portland 40 kg Zak Rp -
9 Semen Mortar Untuk Bata Ringan
Semen MU 380 kg Rp 2,360.00
10 Semen Warna kg Rp 10,000.00
11 Batu Merah Bj Rp 500.00
12 Bata Ringan M3 Rp 840,000.00
Bata Ringan Per Bh Bh Rp 12,600.00
13 Paving Blok
Paving Blok Mutu (K225) Uk, 10 x 20 cm, Tebal 6 cm m2 Rp 55,000.00
Paving Blok Mutu (K225) Uk, 10 x 20 cm, Tebal 8 cm m2 Rp 75,000.00
Paving Blok Mutu (K300) Uk, 10 x 20 cm, Tebal 6 cm m2 Rp 65,000.00
Paving Blok Mutu (K300) Uk, 10 x 20 cm, Tebal 8 cm m2 Rp 85,000.00
14 Roster Terawang Bh Rp 58,800.00
15 Ijuk kg Rp 15,000.00
NO BAHAN / MATERIAL SATUAN 2021 KETERANGAN
BAHAN KAYU
1 Kayu Kls I
Balok Kayu Kelas I - Ulin M3 Rp 13,000,000.00
Papan Kayu Kelas I - Ulin M3 Rp 17,000,000.00
2 Kayu Kls I (Bayam)
Balok Kayu Kelas I - Bayam M3 Rp 10,000,000.00
Papan Kayu Kelas I - Bayam M3 Rp 17,000,000.00
3 Kayu Kls I (Kumea)
Balok Kayu Kelas I - Kumea M3 Rp 6,500,000.00
Papan Kayu Kelas I - Kumea M3 Rp 7,500,000.00
4 Kayu Kls II
Balok Kayu Kelas II M3 Rp 3,700,000.00
Papan Kayu Kelas II M3 Rp 3,700,000.00
5 Kayu Kls III
Balok Kayu Kelas III M3 Rp 2,000,000.00
Papan Kayu Kelas III M3 Rp 2,500,000.00
6 HPL Uk. 120 x 240 Lbr Rp 250,000.00
7 Lisplank Kayu GRC 20 cm Lbr Rp 50,500.00
8 Dolken kayu Ø8-10/400 cm Btg Rp 20,000.00
BAHAN LANTAI
1 Lantai Keramik
Keramik 10 x 20 cm bh Rp 1,100.00
Keramik 20 x 20 cm bh Rp 2,760.00
Keramik 30 x 30 cm bh Rp 6,700.00
Keramik 40 x 40 cm bh Rp 12,000.00
Keramik 10 x 40 cm bh Rp 3,000.00
Keramik 30 x 60 cm bh Rp 16,875.00
Keramik 60 x 60 cm bh Rp 33,750.00
Keramik 10 x 60 cm bh Rp 5,625.00
Keramik 20 x 25 cm bh Rp 4,000.00
Keramik 25 x 40 cm bh Rp 8,200.00
2 Lantai Granit
Granit Lantai (Eurogres Cream Marble 60 x 60 Polished) Bh Rp 37,500.00
Granit Lantai (Indogress Uni-color Topaz 60 x 60 Polished) Bh Rp 64,000.00
Granit Lantai (Granito Salsa Pearl White Polished 60 x 60 Polished Bh Rp 102,850.00
Granit Lantai (Granito Salsa Pearl White 60 x 60 cm Unpolished) Bh Rp 89,100.00
Plint Granit Lantai (Eurogres Cream Marble 20 x 60 Polished) Bh Rp 12,500.00
Plint Granit Lantai (Indogress Uni-color Topaz 20 x 60 Polished) Bh Rp 21,333.33
Keramik Marmer 100 x 100 cm M2 Rp 638,000.00
Batu Alam Andesit M2 Rp 180,000.00
NO BAHAN / MATERIAL SATUAN 2021 KETERANGAN
BAHAN KACA
1 Kaca Bening 8 mm M2 Rp 380,000.00
2 Kaca Bening 5 mm M2 Rp 140,000.00
3 Kaca Bening 3 mm M2 Rp 120,000.00
4 Kaca Tempered 8 mm M2 Rp 386,000.00
5 Kaca Tempered 5 mm M2 Rp 213,000.00
6 Karet List Kaca M' Rp 2,500.00
BAHAN ALUMINIUM
1 Pintu Aluminium M2 Rp 350,000.00
2 List Aluminium strip M Rp 10,000.00
3 Aluminium Composite Panel
ACP Type PVDF, Tbl. 0,3 mm Standard Ex. Seven Dove Alloy M2 Rp 281,500.00
ACP Type PVDF, Tbl. 0,3 mm Standard Ex. Seven Glossy Alloy M2 Rp 281,500.00
4 Kusen Alumunium 4" Ex. Alexindo (Powder Coating) M' Rp 92,000.00
5 Kusen Alumunium 3" Ex. Alexindo (Powder Coating) M' Rp 82,000.00
6 Kusen Jendela Frame Alumunium Ex. Alexindo (Powder Coating) M' Rp 62,000.00
7 Kusen Pintu Frame Alumunium Ex. Alexindo (Powder Coating) M' Rp 82,000.00
8 Jendela Nako (rangka + kaca 5 mm) M2 Rp 625,000.00
BAHAN PIPA
1 Pipa PVC
Pipa PVC Maspion Tipe AW Ø 1/2" M' Rp 8,750.00
Pipa PVC Maspion Tipe AW Ø 3/4" M' Rp 10,250.00
Pipa PVC Maspion Tipe AW Ø 1" M' Rp 14,000.00
Pipa PVC Maspion Tipe AW Ø 1 1/2" M' Rp 20,000.00
Pipa PVC Maspion Tipe AW Ø 2" M' Rp 23,750.00
Pipa PVC Maspion Tipe AW Ø 2 1/2" M' Rp 25,000.00
Pipa PVC Maspion Tipe AW Ø 3" M' Rp 48,750.00
Pipa PVC Maspion Tipe AW Ø 4" M' Rp 73,750.00
BAHAN MEKANIKAL
1 Mesin Pompa Air Sumur Dangkal Shimizu PS 128 - Otomatis Unit Rp 380,000.00
2 Mesin Pompa Air Sumur Dangkal Shimizu PS 135 E - Otomatis Unit Rp 535,000.00
BAHAN LANGIT-LANGIT
1 Eternit 100 x 100 Lbr Rp 22,000.00
2 Tripleks
Tripleks 122 x 224 x 0.2 cm Lbr Rp 47,000.00
Tripleks 122 x 224 x 0.3 cm Lbr Rp 50,000.00
Tripleks 122 x 224 x 0.6 cm Lbr Rp 70,000.00
Tripleks 122 x 224 x 0.9 cm Lbr Rp 95,000.00
Tripleks 122 x 224 x 1.2 cm Lbr Rp 165,000.00
Tripleks 122 x 224 x 1.8 cm Lbr Rp 230,000.00
3 Multipleks
Multipleks 122 x 224 x 0.4 cm Lbr Rp 60,000.00
Test :
Satu Milyar Dua Ratus Enam Puluh Lima Juta Delapan Ratus Lima Puluh Ribu Rupiah
Se 1 Satu
Dua 2 Dua
Tiga 3 Tiga
Empat 4 Empat
Lima 5 Lima Milyar
Enam 6 Enam Juta
Tujuh 7 Tujuh Ribu
Delapan 8 Delapan
Sembilan 9 Sembilan
1265850000 0 1
1265850000 0 2
1265850000 0 3
1265850000 0 4
1265850000 0 5
1265850000 0 6
1265850000 0 7
1265850000 0 8 Satu Milyar
1265850000 1 9 Satu
265850000 2 10 Dua Ratus
65850000 6 11 Enam Puluh Lima Juta
5850000 5 12 Lima
850000 8 13 Delapan Ratus
50000 5 14 Lima Puluh Ribu
0 0 15
0 0 16
0 0 17
0 0 18
0 0 19
0 0 20
Test :
Sepuluh Milyar Dua Ratus Empat Belas Juta Dua Ratus Tiga Puluh Sembilan Ribu Seratus Rupiah
Se 1 Satu
Dua 2 Dua
Tiga 3 Tiga
Empat 4 Empat
Lima 5 Lima Milyar
Enam 6 Enam Juta
Tujuh 7 Tujuh Ribu
Delapan 8 Delapan
Sembilan 9 Sembilan
10214239100 0 1
10214239100 0 2
10214239100 0 3
10214239100 0 4
10214239100 0 5
10214239100 0 6
10214239100 0 7
10214239100 1 8 SePuluh Milyar
214239100 0 9
214239100 2 10 Dua Ratus
14239100 1 11 Empat Belas Juta
4239100 4 12 Empat
239100 2 13 Dua Ratus
39100 3 14 Tiga Puluh Sembilan Ribu
9100 9 15 Sembilan
100 1 16 Seratus
0 0 17
0 0 18
0 0 19
0 0 20
Test :
Tujuh Belas Milyar Empat Ratus Lima Puluh Tujuh Juta Dua Ratus Empat Puluh Empat Ribu Delapan Ratus Rupiah
Se 1 Satu
Dua 2 Dua
Tiga 3 Tiga
Empat 4 Empat
Lima 5 Lima Milyar
Enam 6 Enam Juta
Tujuh 7 Tujuh Ribu
Delapan 8 Delapan
Sembilan 9 Sembilan
17457244800 0 1
17457244800 0 2
17457244800 0 3
17457244800 0 4
17457244800 0 5
17457244800 0 6
17457244800 0 7
17457244800 1 8 Tujuh Belas Milyar
7457244800 7 9 Tujuh
457244800 4 10 Empat Ratus
57244800 5 11 Lima Puluh Tujuh Juta
7244800 7 12 Tujuh
244800 2 13 Dua Ratus
44800 4 14 Empat Puluh Empat Ribu
4800 4 15 Empat
800 8 16 Delapan Ratus
0 0 17
0 0 18
0 0 19
0 0 20
Rp. 10,214,239,100.00
59874165
Satu Milyar Dua Ratus Enam Puluh Lima Juta Delapan Ratus Lima Puluh Ribu Rupiah
Rp. 10,214,239,100.00
50
50
Ratus Lima Puluh Ribu Rupiah
50
50