You are on page 1of 4

PHASE 5C

P L T Qty Total Sat


Tie Beam
Beton 1.00 0.20 0.25 1.00 0.05 m3
Beton m2 1.00 0.20 0.25 1.00 0.90 m2
Beton m' 62.65 1.00 62.65 m'

Bekisting m2 1.00 0.20 0.25 1.00 0.70 m2


Bekisting m' 62.65 1.00 62.65 m'

Besi
4D10 1.12 0.01 - 4.00 2.76 kg
D10-200 1.02 0.01 0.20 6.00 3.77 kg
6.53 kg

Concrete Pedestal
Beton 1 1.55 0.35 0.35 1.00 0.19 m3
Beton 2 0.25 0.60 1.00 1.00 0.15 m3

Beton m2 1.55 0.35 0.35 1.00 2.17 m2


Beton m2 0.25 0.60 1.00 0.80 m2
2.97
Besi 1
4D10 2.50 0.01 - 4.00 6.17 kg
D10-200 1.52 0.01 0.20 9.00 8.43 kg

Besi 2
4D10 1.00 0.01 - 4.00 2.47 kg
D10-150 1.95 0.01 0.20 6.00 7.21 kg
24.28 kg
Bored Pile
Beton 4.00 0.15 - 1.00 0.28 m3

Beton & Bekisting m2 4.00 0.15 - 1.00 0.28 m2

Besi
6-D16 4.69 0.02 - 6.00 44.43 kg
D10-100 1.06 0.01 0.10 41.00 26.84 kg
71.27 kg
95.55 kg gabungan bored pile+p
gabungan bored pile+pedestal
PHASE 5B
P L T Qty Total Sat
Tie Beam
Beton 1.00 0.20 0.25 1.00 0.05 m3
Beton m' 29.65 1.00 29.65 m'

Bekisting 1.00 0.20 0.25 1.00 0.90 m2


Bekisting m' 29.65 1.00 29.65 m'

Besi
4D10 1.12 0.01 - 4.00 2.76 kg
D10-200 1.02 0.01 0.20 6.00 3.77 kg
6.53 kg

Concrete Pedestal
Beton 1 1.55 0.35 0.35 1.00 0.19 m3
Beton 2 0.25 0.60 1.00 1.00 0.15 m3

Beton m2 0.95 0.35 0.35 1.00 1.33 m2


Beton m2 0.25 0.60 1.00 1.00 0.80 m2
2.13 m2

Besi 1
4D10 2.50 0.01 - 4.00 6.17 kg
D10-200 1.52 0.01 0.20 9.00 8.43 kg

Besi 2
4D10 1.00 0.01 - 4.00 2.47 kg
D10-150 1.95 0.01 0.20 6.00 7.21 kg
24.28 kg
Bored Pile
Beton 4.00 0.15 - 1.00 0.28 m3

Besi
6-D16 4.69 0.02 - 6.00 44.43 kg
D10-100 1.06 0.01 0.10 41.00 26.84 kg
71.27 kg
95.55 kg gabungan bored pile+p
gabungan bored pile+pedestal