Besi
4D10 1.12 0.01 - 4.00 2.76 kg
D10-200 1.02 0.01 0.20 6.00 3.77 kg
6.53 kg
Concrete Pedestal
Beton 1 1.55 0.35 0.35 1.00 0.19 m3
Beton 2 0.25 0.60 1.00 1.00 0.15 m3
Besi 2
4D10 1.00 0.01 - 4.00 2.47 kg
D10-150 1.95 0.01 0.20 6.00 7.21 kg
24.28 kg
Bored Pile
Beton 4.00 0.15 - 1.00 0.28 m3
Besi
6-D16 4.69 0.02 - 6.00 44.43 kg
D10-100 1.06 0.01 0.10 41.00 26.84 kg
71.27 kg
95.55 kg gabungan bored pile+p
gabungan bored pile+pedestal
PHASE 5B
P L T Qty Total Sat
Tie Beam
Beton 1.00 0.20 0.25 1.00 0.05 m3
Beton m' 29.65 1.00 29.65 m'
Besi
4D10 1.12 0.01 - 4.00 2.76 kg
D10-200 1.02 0.01 0.20 6.00 3.77 kg
6.53 kg
Concrete Pedestal
Beton 1 1.55 0.35 0.35 1.00 0.19 m3
Beton 2 0.25 0.60 1.00 1.00 0.15 m3
Besi 1
4D10 2.50 0.01 - 4.00 6.17 kg
D10-200 1.52 0.01 0.20 9.00 8.43 kg
Besi 2
4D10 1.00 0.01 - 4.00 2.47 kg
D10-150 1.95 0.01 0.20 6.00 7.21 kg
24.28 kg
Bored Pile
Beton 4.00 0.15 - 1.00 0.28 m3
Besi
6-D16 4.69 0.02 - 6.00 44.43 kg
D10-100 1.06 0.01 0.10 41.00 26.84 kg
71.27 kg
95.55 kg gabungan bored pile+p
gabungan bored pile+pedestal