S.N. Description of work Quantity units Rate Amount Remarks
1
Earthwork in Excavation for
landside clearance(Borangkhola-
Borang) 901.75 m3 54.82 49,433.94
2 Cutting at Gahira Chautara 23.00 m3 54.82 1,260.86
3 Filling at Gahira chautara 23.00 m3 54.82 1,260.86
Total 51,955.66

Prepared By: 09/22/2020


Lakshman Khanal
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung,Gandaki Province, Nepal
Measurement Book
Name of Project :- Ward no 1 Landslide Clearance
Location:- Rainas Municipality
S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Earthwork in Excavation for landside
clearance(Borangkhola-Borang) 901.75 m3
Mashar 1 22.00 2.50 0.70 38.50 m3
Gahira Chautara 1 16.00 2.50 0.70 28.00 m3
1 15.00 2.50 0.30 11.25 m3
Mashar Ghumti 1 10.00 2.00 0.80 16.00 m3
1 6.00 1.50 0.70 6.30 m3
Bhangeri 1 20.00 3.00 2.00 120.00 m3
1 20.00 2.50 2.20 110.00 m3
1 10.00 2.50 1.00 25.00 m3
1 5.00 1.50 2.00 15.00 m3
kaavrechaur 1 20.00 2.00 0.80 32.00 m3
1 5.00 2.00 0.70 7.00 m3
Jungepani 1 5.00 2.00 1.00 10.00 m3
1 9.00 2.00 3.00 54.00 m3
1 5.00 4.00 1.50 30.00 m3
Naala 1 20.00 1.00 0.50 10.00 m3
Dobhandhunga 1 10.00 2.00 1.00 20.00 m3
Mahendra bal bikas 1 12.00 2.50 1.00 30.00 m3
1 10.00 2.50 1.00 25.00 m3
Earthwork in Excavation for landside
clearance(Bhalayekharka)
Borangkhola 1 6.00 1.50 0.30 2.70 m3
Jhyanipani 1 37.00 2.50 0.50 46.25 m3
Ghimiregaun 1 24.00 2.50 1.30 78.00 m3
1 15.00 2.50 1.20 45.00 m3
Thado Bagaicha 1 8.00 2.50 0.50 10.00 m3
Ratamata(Dalit basti jane bato) 1 20.00 2.00 0.40 16.00 m3
Dhakal Gaun 1 35.00 2.00 0.50 35.00 m3
Gyanodaya jane bato 1 7.00 2.50 0.50 8.75 m3
Borangkhola tala 1 30.00 3.00 0.80 72.00 m3

2 Cutting at Gahira Chautara 1 20.00 2.30 0.50 23.00 m3


3 Filling at Gahira chautara 1 20.00 2.30 0.50 23.00 m3

Prepared By:
Lakshman Khanal
(3)Average excavating (Hard soil)
Specs. Clause (A) Labour Input (B) Material Input (C) Equipment Input
Activity No.
No. Category Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate

Hydraulic
Excavator (
Diesel Lit 0.188 105.00 19.74 11 to 150 Hr 0.019 1,800.00
HP, upto .
80m3)

Unskilled nos. 0
Skilled nos. 0
T & P 3% 0
0 14.31
Total of A+B+C 48.51
Rate per cu. M 48.51
54.8163

Earth work excavation by Excavator (Class I , Bucket factor ( Averaget excavating : 1.1 ,Job efficiency good :0.83 ,Standard Production for PC 150 : 86 m3per hour)
quipment Input
Amount

34.20

34.20
Analysis of Rates
Item No :-
Description :- Gabion ( 8 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (8 gauge) at bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion ( 10 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (10 gauge) at Bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion (12 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (12 gauge) at Bhotewodar 86.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13% VAT 11.18
97.68

b. Box Size-2x1x1 44-1-Bii/44-2-i/45


Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
Detailed Estimate
Name of Project :- Toilet and Masonary wall
Location: Rainas Municipality
S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Earthwork in Excavation 8.0 m3
Long wall 2 3.1 0.9 0.91 5.1 m3
Short wall 2 1.8 0.9 0.91 2.9 m3
2 Stone Soiling 3.1 m3
1 9.8 0.9 0.150 1.3 m3
Floor 1 2.5 4.7 0.15 1.8 m3
3 PCC(1:2:4) 1.6 m3
1 9.8 0.90 0.08 0.7
Floor 1 2.5 4.70 0.08 0.9
4 Stone Masonary(1:4) 4.8 m3
1 9.8 0.7 0.7 4.8
5 DPC Band
1 9.8 0.23 0.2 0.45 m3
6 Brick Masonary(1:4) 4.5 m3
1 9.8 0.23 2.29 5.2 m3
Deduction
Door 2 0.76 0.23 1.83 -0.64 m3
Ventilation 2 0.61 0.23 0.30 -0.08 m3
7 Chaukosh 0.11 m3
Door 2 0.76 0.09 1.83 0.08 m3
Ventilation 2 0.61 0.09 0.30 0.03 m3
8 Panal 3.15 m2
Door 2 0.76 1.83 2.78 m2
Ventilation 2 0.61 0.30 0.37 m2
9 PCC(1:2:4) 1.29 m3
Slab 1 3.35 2.13 0.13 0.93 m3
Sill 1 9.80 0.23 0.08 0.18 m3
Lintel 1 9.80 0.23 0.08 0.18 m3
10 Plaster (1:4) 24.67 m2
Big Room 1 5.64 2.29 12.92 m2
Small Room 1 5.13 2.29 11.75 m2
11 Reinforcement 224.00 Kg
Vertical Rod 16mm Rod 6 3.35 1.58 31.76 Kg
DPC Band 12mm dia 4 9.8 0.89 34.89 Kg
Sill 12 mm dia 2 9.8 0.89 17.44 Kg
Lintel 12mm dia 2 9.8 0.89 17.44 Kg
Stirrups 8mm dia 290 0.3 0.39 33.93 Kg
Slab
Main Bar 10 mm dia 34 2.1 0.62 44.27 Kg
Distribution Bar 10 mm dia 21 3.4 0.62 44.27 Kg
12 Pan 2 2.0 Nos
13 Fittings 1 1.0 Ls
14 Hill Tank 1 1.0 Nos
15 Tile(1:4) 9.76 m2
Floor 2 1.37 1.22 3.34 m2
Side 2 5.49 0.70 7.69 m2
Deduction
Door 2 0.91 0.70 -1.27 m2
Masonary wall
1 Earthwork in excavation 1 10 0.72 0.5 3.6 m3

2 Masonary wall(1:4) 14.99 m3


Straight 1 10 0.72 1.70 12.24 m3
Slpoe 1 4.5 0.72 1.70 2.75 m3

Prepared By Checked By Approved By


Manju Bhandari Atit Khanal Dev Bdr. Adhikari
Rainas Municipality
Office of Rainas Municipal Executive
Tinpiple,Lamjung, 4 No. Provience
2017

sfo{ ;DkGg k|lta]bg


of]hgfsf] gfd Toilet and Masonary wall ;Demf}tfsf] s"n c+s M #REF!
of]hgf :yn M Rainas Municipality vr{ ePsf] s"n c+s M #REF!
sfof{/De ldlt M ;Demf}tf eGbf 3l6 a9 #REF!
:fDkGg ePsf] ldlt M 36L a9Lsf] k|lt;t M #REF!

;Demf}tf adf]lhd v'b ePsf] sfd ;Demf}tf eGbf 3l6 ÷ a9L


s|=:f+Vof sfdsf] laj/0f OsfO{ s}lkmot
kl/0ffd OsfO{ b/ hDdf d"No kl/0ffd OsfO{ b/ hDdf d"No kl/df0f OsfO{ b/ hDdf dNo
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!
a9L ePsf] - _ 36L ePsf] - _
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
BoQ
#REF!
#REF!
S.N. Description of work Quantity units Rate Amount Remarks
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
12 #REF! #REF! #REF!
13 #REF! #REF! #REF!
14 #REF! #REF! #REF!
15 #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
Total
VAT (13%)
Grand Total
#REF!
#REF!
#REF!
Bill of Quantity (BoQ)
###
### F/Y :- 2074 /075
Rate (NRs.)
S.No. Descriptions Unit Quantity Amount (NRs.)
In Figure In Words
1.0 #REF! LS 1.000
2.0 #REF! m3 4.434
3.0 #REF! m3 1.794
4.0 #REF! m3 4.549
5.0 #REF! m3 1.572
6.0 #REF! Kg. 124.810
7.0 #REF! m2 19.878
8.0 #REF! m3 1.527
9.0 #REF! m3 8.126
10.0 #REF!
11.0 #REF! m3 0.179
12.0 #REF! m2 1.934
13.0 #REF! m2 2.275
14.0 #REF! m2 1.046
15.0 #REF! m2 3.100
Masonry wall
1.0 #REF! Kg. 195.450
2.0 #REF! m2 26.020
13% VAT
Total

Name and address of Firm :-