DETAIL ESTIMATE
Name of Project :- Ward no 1 new track
Location:- Rainas Municipality
S.N. Chainage Depth(m) Width Distance Area(m2) Avg.Area Quantity(m3) units Remarks
1 Earth work in excavation
0+000 0.5 4.40 2.00 2302.40 m3
0+050 1.5 4.35 50.00 6.00 4.00 200.00 m3
0+100 1.5 4.40 50.00 6.00 6.00 300.00 m3
0+150 1.5 4.50 50.00 6.00 6.00 300.00 m3
0+193 1.4 4.50 43.00 7.30 6.65 285.95 m3
0+200 1.25 4.00 7.00 5.00 6.15 43.05 m3
0+247 1 4.40 47.00 3.00 4.00 188.00 m3
0+297 2.25 4.50 50.00 6.00 4.50 225.00 m3
0+347 1.25 4.30 50.00 5.00 5.50 275.00 m3
0+397 1.25 4.15 50.00 4.38 4.69 234.50 m3
0+447 1.25 4.25 50.00 4.38 4.38 219.00 m3
0+457 0.5 4.25 10.00 2.00 3.19 31.90 m3
Prepared By:
Lakshman Khanal
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, Gandaki Province, Nepal
AOC
Name of Project :- Ward no 1 new track
Location:- Rainas Municipality
S.N. Description of work Quantity units Rate Amount Remarks
1 Earth work in excavation 2302.40 m3 54.82 126,217.57
Total 126,217.57
Earth work excavation by Excavator (Class I , Bucket factor ( Averaget excavating : 1.1 ,Job efficiency good :0.83 ,Standard Production for PC 150 : 86 m3per hour)
quipment Input
Amount
34.20
34.20
Analysis of Rates
Item No :-
Description :- Gabion ( 8 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (8 gauge) at bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55
Item No :-
Description :- Gabion ( 10 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (10 gauge) at Bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55
Item No :-
Description :- Gabion (12 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (12 gauge) at Bhotewodar 86.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13% VAT 11.18
97.68